Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “open subsystem”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

244 records · Page 14

New Developments and Capabilities Within WEC-Sim

WEC-Sim is an open-source software for simulating wave energy converters and has been actively developed and applied since its initial release in 2014 to simulate a wide variety of device archetypes. WEC-Sim is developed jointly by the National Renewable Energy Laboratory and Sandia National Laboratories within the MATLAB/SIMULINK environment. A general wave-to-wire model begins with a deployment site resource characterization, which is used to complete the hydrodynamic simulation of wave energy converters (WEC), with the power generation profile imported to a grid simulator to understand the influence on the local electrical network. While modeling the entire wave-to-wire is difficult and encompasses multiple time scales and physics, WEC-Sim is focused on the hydrodynamics simulation to predict, analyze, and optimize WEC dynamics and power performance. WEC-Sim simulations are performed in the time domain based on the radiation and diffraction method using hydrodynamics coefficients derived from boundary element method (BEM)-based frequency-domain potential flow solvers (e.g., WAMIT, NEMOH, Capytaine, or ANSYS-AQWA). With this level of modeling fidelity, WEC-Sim can handle floating body hydrodynamics, mechanical and electrical power generation methods, advanced control implementation, mooring systems, and other unique applications such as desalination. Additional WEC-Sim functionalities include pre-built Simulink blocks and MATLAB scripts that can simulate a wide range of floating systems and the corresponding auxiliary subsystems. The developers of WEC-Sim continue to release new versions of the software, at least annually, with the latest release in September 2022. These releases include bug fixes, updates to software documentation, as well as new features to expand WEC-Sim's capabilities to model a wide range of WEC concepts. This publication will highlight the new features added to WEC-Sim between versions 4.1.0 to 5.0.1, which spans a 2-year period from June 2020 to September 2022. New features described here include topics such as continuous integration checks, revised Morison Element and nonlinear hydro implementations, run directly from Simulink (required for hardware-in-the-loop execution), BEMIO updates to import Capytaine BEM hydrodynamics, addition of cable blocks, and new wave visualization features.

TIDAL AND WAVE POWER↗

New Developments and Capabilities Within WEC-Sim: Preprint

WEC-Sim is an open-source software for simulating wave energy converters, which has been actively developed and applied since its initial release in 2014 to simulate a wide variety of device archetypes. WEC-Sim is developed jointly by the National Renewable Energy Laboratory (NREL) and Sandia National Laboratories (Sandia) within the MATLAB/SIMULINK environment. A general wave-to-wire model begins with a deployment site resource characterization, which is used to complete the hydrodynamic simulation of wave energy converters (WEC), with the power generation profile imported to a grid simulator to understand the influence on the local electrical network. While modeling the entire wave-to-wire is difficult and encompasses multiple time scales and physics, WEC-Sim is focused on the hydrodynamics simulation to predict, analyze, and optimize WEC dynamics and power performance. WEC-Sim simulations are performed in the time domain based on the radiation and diffraction method using hydrodynamics coefficients derived from boundary element method (BEM)-based frequency-domain potential flow solvers (e.g., WAMIT, NEMOH, Capytaine, or ANSYS-AQWA). With this level of modeling fidelity, WEC-Sim can handle floating body hydrodynamics, mechanical and electrical power generation methods, advanced control implementation, mooring systems, and other unique applications such as desalination. Additional WEC-Sim functionalities include pre-built Simulink blocks and MATLAB scripts that can simulate a wide range of floating systems and the corresponding auxiliary subsystems. The developers of WEC-Sim continue to release new versions of the software, at least annually, with our latest release in September 2022. These releases include bug fixes, updates to software documentation, as well as new features to expand WEC-Sim's capabilities to model a wide range of WEC concepts. This publication will highlight the new features added to WEC-Sim between versions 4.1.0 to 5.0.1 which spans over a two year period from June 2020 to September 2022. New features to be described will include topics such as continuous integration checks, revised Morison Element and nonlinear hydro implementations, run directly from Simulink (required for hardware-in-the-loop execution), BEMIO updates to import Capytaine BEM hydrodynamics, addition of cable blocks, and new wave visualization features.

TIDAL AND WAVE POWER↗

Chapter 12 - Flight Envelope

The term "flight envelope" is used to refer to the boundaries of aircraft loading and flight conditions within which operation of the aircraft is satisfactory, and beyond which some aspect becomes unacceptable. This flight envelope represents, in fact, the limiting conditions arising from a matrix of inter-related flight envelopes covering the appropriate variables. Thus, for each loading (i.e., external stores configuration and its associated range of weight and center of gravity (c.g.) position) and aircraft configuration (i.e., position of undercarriage (u/c), flaps, slats, etc.), the envelopes of airspeed versus altitude, airspeed versus load factor, angle of attack versus angle of sideslip, etc., must be investigated to establish the limits within which all aspects such as handling qualities, engine behavior, structural loads, etc., remain acceptable. Flight testing of new or derivative aircraft models is carried out with the initial purpose of defining a flight envelope which is, first and foremost, safe and secondarily, which enables the effective use of the vehicle for its intended purpose. Flight testing occurs only after numerous reviews of the design and review of results from ground tests and predictions of flight characteristics in such areas as structures, aerodynamics, stability and control, flight controls (particularly fly-by-wire control systems, propulsion, etc.). Accordingly, opening and expanding the envelope is a task that must be approached cautiously, systematically, and with coordination and cooperation of the many disciplines involved in the design and test of an airplane. (Sections 8 and 10 cover test planning and safety of flight considerations, respectively). The fundamental tenet in establishing a flight envelope via flight test is risk reduction. This is reflected in the typical sequence of events leading to initial flight test - design reviews (both hardware and software), then ground test involving singular disciplines (windtunnel tests for aerodynamics, structurally loading the wing/fuselage/nacelle on a ground test article with loads anticipated to occur in flight, flight control system control law checkout, propulsion test cell runs and/or flying test bed tests, etc.), and then ground tests involving multi-disciplines (See Section 9). Only after these have been accomplished will an initial, limited, low-risk, flight envelope be established. The limited envelope will typically be in the middle of the projected final flight envelope. Subsequent flight tests will then be devoted to expanding the initial envelope by operating the airplane at increasing ranges - representing increasing risk - of engine operation, airspeeds both fast and slow, altitude, load factor both above and below 1g, centers of gravity (fore and aft), and with system/subsystem failures. Whether flight tests are to define a flight envelope on a new model airplane with the attendant new airframe, new engine(s), and new subsystems (hydraulics, pressurization, etc.), or on an airplane involving only a few of these areas such as new engines in an old airframe, the fundamental approach to establishing an envelope is the same.

H Walgemoed↗

Recent Developments in the WEC-Sim Open-Source Design Tool: Preprint

WEC-Sim (Wave Energy Converter SIMulator) is an open-source code for simulating wave energy converters, which has been actively developed and applied to simulate a wide variety of device archetypes and has become a popular tool since its initial release in 2014. WEC-Sim is developed jointly by the National Renewable Energy Laboratory (NREL) and Sandia National Laboratories (SNL) within the MATLAB/SIMULINK environment. Figure 1 illustrates a general wave-to-wire model which begins with a deployment site resource characterization, which is used to complete the hydrodynamic simulation of a single WEC (or array), with the power generation profile imported to a grid simulator to understand the influence on the local electrical network. While modelling the entire wave-to-wire is difficult and encompass multiple time scales and physics, WEC-Sim is focused on the hydrodynamics simulation to predict, analyze and optimize WEC dynamics and power performance. WEC-Sim simulations are performed in the time domain based on the radiation and diffraction method using hydrodynamics coefficients derived from boundary element method (BEM) based-frequency-domain potential flow solvers (e.g., WAMIT, NEMOH, Capytaine, or ANSYS-AQWA). Within this level of modeling fidelity, WEC-Sim can handle floating body hydrodynamics, mechanical and electrical power generation methods, advanced control implementation, mooring systems, and other unique applications such as desalination. Table 1 lists additional WEC-Sim functionalities, which are created using prebuilt Simulink blocks and MATLAB scripts that can simulate a wide range of floating systems and the corresponding auxiliary subsystems.

hydrodynamics modeling↗

Integrated Simulation Design Challenges to Support TPS Repair Operations

During the Orbiter Repair Maneuver (ORM) operations planned for Return to Flight (RTF), the Shuttle Remote Manipulator System (SRMS) must grapple the International Space Station (ISS), undock the Orbiter, maneuver it through a long duration trajectory, and orient it to an EVA crewman poised at the end of the Space Station Remote Manipulator System (SSRMS) to facilitate the repair of the Thermal Protection System (TPS). Once repair has been completed and confirmed, then the SRMS proceeds back through the trajectory to dock the Orbiter to the Orbiter Docking System. In order to support analysis of the complex dynamic interactions of the integrated system formed by the Orbiter, ISS, SRMS, and SSMS during the ORM, simulation tools used for previous ‘nominal’ mission support required substantial enhancements. These upgrades were necessary to provide analysts with the capabilities needed to study integrated system performance. Prevalent throughout this ORM operation is a dynamically varying topology. In other words, the ORM starts with the SRMS grappled to the mated Shuttle/ISS stack (closed loop topology), moves to an open loop chain topology consisting of the Shuttle, SRMS, and ISS, and then, at the repair configuration, extends the chain topology to one consisting of the Shuttle, SMS, ISS, and SSRMS/EVA crewman. The resulting long dynamic chain of vehicles and manipulators may exhibit significant motion between the Shuttle worksite and the EVA crewman due to the system flexibility throughout the topology (particularly within the SRMS/SSRMS joints and links). Since the attachment points of both manipulators span the flexible structure of the ISS, simulation analysis may also need to take that into consideration. Moreover, due to the lengthy time duration associated with the maneuver and repair, orbital effects become a factor and require the ISS vehicle control system to maintain active attitude control. Several facets of the ORM operation make the associated analytical efforts different from previous mission support, including: (1) the magnitude of the SRMS handled payload (Le., Orbiter class), (2) the orbital effects induced on the integrated system consisting of the large Shuttle and ISS masses connected by a light flexible SRMS, (3) long duration environmental consequences due to the lengthy operational times associated with the maneuver and repair of the TPS, (4) active attitude control (as opposed to free drift) interacting with the SRMS and SSRMS manipulators (also due to the length of the maneuver and repair), (5) relative dynamics between the EVA crewman and thc worksite influenced by the extended flexible topology. In order to meet these analysis challenges, an ORM simulation architecture was developed leveraging upon numerous pre-existing simulation elements to analyze the various subsystems individually. For example, core manipulator subsystem simulations for both the SRMS and SSRMS were originally combined to provide the dual-arm dynamics topology simulation (in the absence of orbital dynamics and vehicle control). This capability was later merged with the simulation used to analyze SRMS loading with a heavy payload in the orbital environment with an active payload control system (in this case, the ISS Attitude Control System (ACS)), configured for the ORM. The resulting worksite dynamics simulation, based off of the modified ORM simulation, provided the extended topological chain of vehicles and manipulators, while taking into account the orbital effects of both the Shuttle and ISS (as well as its ACS). Verification and validation (V&V) of these integrated simulations became a challenge in itself. A systematic approach needed to be developed such that integration simulation results could be tested against previous constituent simulations upon which these simulations were built. General V&V categories included: (1) core orbital state propagation, (2), stand-alone SRMS, (3) stand-alone SSRMS, (4) stand-alone ISS ACS, (5) integrated Shuttle, SRMS, ISS (with active ACS) in the orbital environment, and (5) dual-arm SRMS/SSRMS dynamics topology. Integrated simulation V&V run suites were created and correlated to verification runs from subsystem simulations, in order to establish the validity of the results. This paper discusses the simulation design challenges encountered while developing simulation capabilities to mirror the ORM operations. The paper also describes the incremental build approach that was utilized, starting with the subsystem simulation elements and integration into increasing more complex simulations until the resulting ORM worksite dynamics simulation had been assembled. Furthermore, the paper presents an overall integrated simulation V&V methodology based upon a subsystem level testing, integrated comparisons, and phased checkout.

Thermal Protection System↗

Tidal Control of Jet Eruptions Observed by Cassini ISS

Observations by Cassini's Imaging Science Subsystem (ISS) of Enceladus' south polar region at high phase angles has revealed jets of material venting into space. Observations by Cassini's Composite Infrared Spectrometer (CIRS) have also shown that the south polar region is anomalously warm with hotspots associated with geological features called the Tiger Stripes. The Tiger Stripes are large rifts near the south pole of Enceladus, which are typically about 130 km in length, 2 km wide, with a trough 500 m deep, and are l1anked on each side by 100m tall ridges. Preliminary triangulation of jets as viewed at different times and with different viewing geometries in Cassini ISS images taken between 2005 and 2007 have constrained the locations of eight major eruptions of material and found all of them associated with the south polar fractures unofficially the 'Tiger Stripes', and found four of them coincident with the hotspots reported in 2006 by CIRS. While published ISS observations of jet activity suggest that individual eruption sites stay active on the timescale of years, any shorter temporal variability (on timescales of an orbital period, or 1.3 Earth days, for example) is more difficult to establish because of the spotty temporal coverage and the difficulty of visually isolating one jet from the forest of many seen in a typical image. Consequently, it is not known whether individual jets are continuously active, randomly active, or if they erupt on a predictable, periodic schedule. One mechanism that may control the timing of eruptions is diurnal tidal stress, which oscillates between compression/tension as well as right and left lateral shear at any given location throughout Enceladus' orbit and may allow the cracks to open and close regularly. We examine the stresses on the Tiger Stripe regions to see how well diurnal tidal stress caused by Enceladus' orbital eccentricity may possibly correlate with and thus control the observed eruptions. We then identify possible mechanisms by which tidal stress can provide access to the surface for volatile material and implications for observed jet activity.

Hurford, T. A.↗

Investigations on the multiple-sector hard-copper X-band accelerating structures

The development of advanced, high gradient accelerating structures is one of the leading activity of the particle accelerator community. In the technological research of new construction methods for these devices, high-power testing is a critical step for the verification of their viability. Recent experiments showed that accelerating cavities made out of hard copper, fabricated without high-temperature processes, can achieve better performance as compared with soft copper ones. Recently, we have built cavities using Tungsten Inert Gas welding and the high-power experiments confirmed that this joining process is a robust and low-cost alternative to brazing or diffusion bonding. This is a good solution for high-gradient operation, with a gradient of about 150 MV/m in X-band, at a breakdown rate of 10 -3 /pulse/meter using a shaped RF pulse with a 150 ns flat part. We continue the design, construction and high power tests of three-cells standing-wave X-band accelerating cavities fabricated with a split-open geometry, made of hard copper and vacuum-sealed by welding. Our aim is the fabrication of accelerating structures made out of hard copper alloys by using innovative cost-effective technologies. Moreover, our method of multiple-sector structures opens the way to new technological approaches and design methods, for example providing the possibility of placing dampers of the parasitic higher-order modes. Such structures with dampers allow for acceleration of multi-bunch beams, both in standing and in travelling-wave accelerating modality. Here, this paper describes the design of two cavities made of multiple sectors that were fabricated at the Italian Institute for Nuclear Physics in Frascati, Italy (INFN-LNF), assembled by means of clamping and then joined with the Tungsten Inert Gas welding in order to preserve the hardness of the metal. These are three-cell standing-wave X-band accelerating cavities, to be operated in the π-mode. We report the low-power RF tests of the first one, made of two halves, and the RF design of the second one, made of four quadrants. Both structures were built for high-gradient tests at SLAC National Accelerator Laboratory.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Aerospace Safety Advisory Panel Annual Report for 1999

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for the calendar year 1999.This was a year of notable achievements and significant frustrations. Both the Space Shuttle and International Space Station (ISS) programs were delayed.The Space Shuttle prudently postponed launches after the occurrence of a wiring short during ascent of the STS-93 mission. The ISS construction schedule slipped as a result of the Space Shuttle delays and problems the Russians experienced in readying the Service Module and its launch vehicle. Each of these setbacks was dealt with in a constructive way. The STS-93 short circuit led to detailed wiring inspections and repairs on all four orbiters as well as analysis of other key subsystems for similar types of hidden damage. The ISS launch delays afforded time for further testing, training, development, and contingency planning. The safety consciousness of the NASA and contractor workforces, from hands-on labor to top management, continues high. Nevertheless, workforce issues remain among the most serious safety concerns of the Panel. Cutbacks and reorganizations over the past several years have resulted in problems related to workforce size, critical skills, and the extent of on-the-job experience. These problems have the potential to impact safety as the Space Shuttle launch rate increases to meet the demands of the ISS and its other customers. As with last year's report, these work- force-related issues were considered of sufficient import to place them first in the material that follows. Some of the same issues of concern for the Space Shuttle and ISS arose in a review of the launch vehicle for the Terra mission that the Panel was asked by NASA to undertake. Other areas the Panel was requested to assess included the readiness of the Inertial Upper Stage for the deployment of the Chandra X-ray Observatory and the possible safety impact of electromagnetic effects on the Space Shuttle. The findings and recommendations in this report do not highlight any major, immediate issues that might compromise the safe pursuit of the various NASA programs. They do, however, cover concerns that the Panel believes should be addressed in the interest of maintaining NASA's excellent safety record.The Panel is pleased to note that remedial efforts for some of the findings raised are underway. Given appropriate funding and cooperative efforts among the Administration, the Congress and the various contractors, the Panel is convinced that safety problems can be avoided or solved resulting in lower risk for NASA's human space and aeronautics programs. Section II of this report contains specific findings and recommendations generated by Panel activities during the calendar year 1999. Section III presents more detailed information in support of these findings and recommendations. A current roster of Panel members, consultants, and staff is included as Appendix A. Appendix B contains NASA's response to the findings and recommendations from the 1998 annual report. It has been augmented this year to include brief explanations of why the Panel classified the NASA response as " open,""continuing," or "closed." Appendix C lists the fact-finding activities of the Panel in 1999.

Blomberg, Richard D.↗

Analyses Made to Order: Using Transformation to Rapidly Configure a Multidisciplinary Environment

Aerospace problems are highly multidisciplinary. Four or more major disciplines are involved in analyzing any particular vehicle. Moreover, the choice of implementation technology of various subsystems can lead to a change of leading domain or reformation of the driving equations. An excellent example is the change of expertise required to consider aircraft built from composite or metallic structures, or those propelled by chemical or electrical thrusters. Another example is in the major reconfiguration of handling and stability equations with different control surface configuration (e.g., canards, t-tail v four-post tail). Combinatorial problems are also commonplace anytime that a major system is to be designed. If there are only 5 attributes of a design to consider with 4 different options, this is already 1024 options. Adding just 5 more dimensions to the study explodes the space to over one million. Even generous assumptions like the idea that only 10% of the combinations are physically feasible can only contain the problem for so long. To make matters worse, the simple number of combinations is only the beginning. Combining the issue of trade space size with the need to reformulate the design problem for many of the possibilities makes life exponentially more difficult. Advances in software modeling approaches have led to the development of model-driven architecture. This approach uses the transformation of models into inferred models (e.g. inferred execution traces from state machines) or the skeletons for code generation. When the emphasis on transformation is applied to aerospace, it becomes possible to exploit redundancy in the information specified in multiple domain models into a unified system model. F1urther, it becomes possible to overcome the combinatorial nature of specifying integrated system behavior by manually combining the equations governing a given component technology. Transformations from a system specification combined with a system-analysis mapping specification enable one-click combination of domain analyses. This is a flexibility that has been missing from many engineering codes, which often entangle design specification and physical examination much more than is required to conduct the analysis. This capability has been investigated and cultivated within the DARPA F6 program by a team of JPL and Phoenix Integration engineers building the Adapatable Systems Design and Analysis (ASDA) framework. By embracing system modeling with SysML and the Query-View-Transformation (QVT) language, the ASDA team has been able to build a flexible, easily reconfigurable framework for building up and solving large tradespaces. Examples of application and lessons learned in building the framework will be described in this paper. In addition, the motivation will be laid for various tool vendors to develop open model description standards while being able to maintain competitive advantage through proprietary algorithms and approaches. These standards will also be compared to the underpinnings of model-driven architecture and the OMG standards of the Meta-Object Facility (MOF), SysML, and QVT.

Cole, Bjorn↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗