Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “onshore”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Southeast Regional Carbon Sequestration Partnership (SECARB) Collect Repeat 3-D Survey

The baseline 3-D survey of Cranfield was collected by Denbury Onshore LLC. in 2007 and data provided to the SECARB Early team at the BEG as a major cost share contribution for Phase II. The baseline 3-D survey covered the entire Cranfield Field as well into the surrounding brine-saturated water leg. This data remains extremely valuable in characterization for Phase III, and has been analyzed extensively. Bureau researchers Hongliu Zeng and Tip Meckel have analyzed the baseline 3-D to develop reservoir models. For example, Zeng enhanced seismic data to extract textures suggestive of high sinuosity aggradational point bar from the lower Tuscaloosa interval. Meckel assessed the logs and seismically imaged structure to better define the oil-water contact to assure that the DAS experiment was set in the water leg, and mapped the graben-edge fault that separates the Phase II and the Phase III areas. Additional characterization work continues by a number of students under funding from SECARB (Kordi dissertation) as well as additional efforts under BES funding though the CFSES project.

01 COAL, LIGNITE, AND PEAT↗

SECARB Semi-Annual Field Review Reports - Early Test

The Southern States Energy Board (SSEB) managed the overall Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III project and The Bureau of Economic Geology (BEG), at the University of Texas at Austin, managed all activities associated with the Early Test field site near Cranfield, Mississippi (the Early Test or Cranfield Project). BEG was assisted in the management of site activities by Sandia Technologies (Sandia). BEG and Sandia implemented reporting procedures that included monthly and quarterly technical progress reports, as well as periodic reporting on key field activities. Subsequent sections of this report catalog the field activities and are organized in a semiannual chronology. The Cranfield Project was located approximately 12 miles east of Natchez, Mississippi. Denbury Onshore, LLC, began operating a commercial CO 2 flood of the field (using the subsurface injection of CO 2 for EOR) in June 2008. Carbon dioxide from the Jackson Dome, a natural source near Jackson, Mississippi, was delivered to the Cranfield oilfield via pipeline. Beginning in October 2008, the SECARB Early Test team characterized the surface and subsurface of the Cranfield site. During the field test CO 2 was injected into the lower Tuscaloosa Formation, a regionally extensive saline formation with the potential to hold millions of tons of CO 2 emissions. By January 2015, the team injected more than 11 million metric tons of CO 2 and monitored a total stored CO 2 mass of 5,326,975 metric tons. SECARB’s study operations occurred in four integrated research program areas within Cranfield field: (1) the High Volume Injection Test area (HiVIT); (2) the Detailed Area of Study (DAS); (3) the Geomechanical area; and (4) the near-surface observatory, also called the “P-site.” Carbon dioxide injection activities were conducted at the HiVIT and the DAS. Figure 1.1-1 provides a depiction of the DAS.

01 COAL, LIGNITE, AND PEAT↗

SECARB Regional Project Assessment

The SECARB Cranfield Early Test Project was designed to safely demonstrate large-scale, long-term CO 2 injection and storage in a CO 2 -enhanced oil recovery (EOR) operation and associated saline reservoir. Storage during EOR operations has the potential to offset commercial costs, holding a significant promise for future large-scale deployment in the southeastern United States. Denbury Onshore LLC began CO 2 -EOR operations in July 2008 at the Cranfield oilfield located east of Natchez, Mississippi (Figure 1). The location offered an ideal setting to investigate storage monitoring at a commercial CO 2 -EOR operation. The field team, led by the Gulf Coast Carbon Center of the Bureau of Economic Geology at the University of Texas at Austin, deployed the largest suite of monitoring, verification, accounting (MVA) technologies to collect data to assess long-term CO 2 utilization and storage. The CO 2 injection interval is within the 3,000-meter-deep fluvial lower Tuscaloosa Formation, a large and regionally extensive saline reservoir, at a broad four-way structural closure that defines the Cranfield oilfield. Tests were conducted in the oil-producing area as well as in the non-oil-producing brine aquifer. The CO 2 used during EOR operation was transported via pipeline from the Jackson Dome, a natural source of CO 2 . The study focused on four integrated research areas: (1) the High-Volume Injection Test area (HiVIT); (2) the Detailed Area of Study (DAS); (3) the Geomechanical area; and (4) the near-surface observatory, also called the “P-site.” CO 2 injection occurred at the HiVIT and the DAS (Figure 2 and Figure 3). The DAS was located down-dip of the oil-water interface of the Cranfield oilfield. The well layout included one injection well and two down-dip observation wells. The team was the first of the regional partnerships to monitor more than 1 million metric tons of CO 2 . At the end of the project, the team monitored more than 11 million metric tons of CO 2 injected and 5 million metric tons of CO 2 stored. The Cranfield Project was the fifth project worldwide, and the first such project in the United States, to reach this CO 2 injection volume while being monitored to demonstrate storage effectiveness.

01 COAL, LIGNITE, AND PEAT↗

Southeast Regional Carbon Sequestration (SECARB) Anthropogenic Test Annual Partner Information

The Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III Anthropogenic Test is a full integrated carbon dioxide (CO 2 ) capture, transportation, and geologic storage project located in southern Alabama. The CO 2 for the Anthropogenic Test will be obtained from a demonstration-scale, post-combustion CO 2 captures facility at Southern Company's subsidiary Alabama Power's existing 2,657 Megawatt (MW) Barry Electric Generating Plant in Mobile County, Alabama. A small amount of flue gas from Plant Barry (equivalent to the amount produced when generating 25 MW of electricity) will be diverted from the plant's #5 coal burning unit and captured using a process developed by Mitsubishi Heavy Industries to produce high purity CO 2 . The captured CO 2 is compressed at Plant Barry and transported to the plant gate where Denbury Onshore, LLC takes ownership of the CO 2 . Denbury then transports CO 2 approximately 19 kilometers (12 miles) by dedicated pipeline to the injection location at Citronelle Field. The CO 2 will be injected by Denbury into the saline Paluxy Formation, which stratigraphically overlies the Rodessa Formation oil resevoir. The SECARB team will apply proven and experimental MVA technologies to monitor CO 2 movement in the subsurface during and post-injection. This activity is aligned with U.S. Department of Energy program goals. Coordination among the CO 2 supplier (the power plant), the field operators, industrial partner companies, and cost share providers is essential in conducting a successful project. Goals are to develop and maintain strong industrial partner support for the field test and the overall CO 2 capture and storage effort. The following report documents annual partner information outreach, education, and team meetings/workshops conducted to taste.

01 COAL, LIGNITE, AND PEAT↗

Efficient and low-cost hydrogen production by wind power driven water electrolysis

The document describes and discusses the results of a techno-economic analysis for wind driven electrolysis systems. The costs obtained for different plants, including onshore and offshore locations and different plant sizes, are discussed. Large scale wind electrolysis plants show high potential to achieve the target of 2 $/kg. Initial results of experimental tests for a single cell electrolyzer, to be coupled directly with a wind turbine, are also presented and discussed.

08 HYDROGEN↗

Computed Tomography Scanning and Geophysical Measurements of the Fayetteville Shale Formation from the Nixon B #1-7 Well

The computed tomography (CT) facilities and the Multi-Sensor Core Logger (MSCL) at the National Energy Technology Laboratory (NETL) in Morgantown, West Virginia were used to characterize core from the Fayetteville and Pitkin formations. This core came from a vertical well drilled by Southwestern Energy (Nixon B #1-7 well) and characterized as part of the U.S. Department of Energy’s (DOE) Fossil Energy and Carbon Management Onshore portfolio’s focus on unconventional shale plays. The primary impetus of this work is to characterize Fayetteville Shale core, from an unconventional shale play in Northwestern Arkansas, that is relatively under-reported on when compared to larger unconventional resources in the continental U.S.

58 GEOSCIENCES↗

Bell Creek Test Site: 3-D Seismic and Characterization Report

The Plains CO 2 Reduction (PCOR) Partnership, led by the Energy & Environmental Research Center (EERC), is working with Denbury Onshore (Denbury) to evaluate the effectiveness of large-scale injection of carbon dioxide (CO 2 ) into the Bell Creek oil field for CO 2 enhanced oil recovery (EOR) and to study long-term incidental CO 2 storage. A technical team that includes Denbury, the EERC, and others are conducting activities to determine the baseline reservoir characteristics for development of a geologic model for predictive simulations and to serve as a comparison to time-lapse data as they are acquired. One of the activities was the acquisition and interpretation of a baseline three-dimensional (3-D) surface seismic survey acquired over a major portion of the field which is the subject of this report. The interpretation will be used to advance the field characterization effort. The geophysical data will be integrated with the EERC’s geologic model to improve its accuracy. In the future, when paired with at least one subsequent 3-D surface seismic survey, the data difference will provide a direct indication of where the CO 2 has migrated within the reservoir and aid in monitoring, verification, and accounting goals.

02 PETROLEUM↗

Bell Creek Test Site - Development of a Cost-Effective, Long-Term Monitoring Strategy

The Bell Creek oil field is operated by Denbury Onshore LLC (Denbury) as a commercial enhanced oil recovery (EOR) project which provides an opportunity to improve the understanding of associated carbon dioxide (CO 2 ) storage that occurs as a natural part of the EOR process as well as provides a large-scale CO 2 injection site that can be used to inform carbon storage in deep saline formations (DSFs). The Plains CO 2 Reduction (PCOR) Partnership Bell Creek project, which is conducted in collaboration with the commercial project, provides a substantive opportunity for the validation of viable monitoring, verification, and accounting (MVA) strategies with applicability to both large-scale carbon storage in DSFs and associated carbon storage through EOR. In collaboration with Denbury, a 5-year research MVA program was conducted to demonstrate 16 MVA techniques with applications to geologic CO 2 storage scenarios. The program represents 1.5 years of preinjection and over 3 years of operational MVA activities coinciding with the first 3.2 million tons of associated CO 2 storage. Insights provided through the Bell Creek project and investigation into a long-term monitoring plan have resulted in an ongoing field demonstration of two emerging geophysical techniques, the Krauklis seismic wave (K-wave) and scalable, automated, semipermanent seismic array (SASSA), through complementary projects. These techniques show promise for providing more cost-efficient, lower-impact, near-real-time solutions for long-term monitoring. If proven successful, these techniques will provide additional techniques compatible with long-term monitoring strategies. While the development of a long-term monitoring plan for the Bell Creek project will take into consideration specific operations and benefits to the project, the case study will provide recommendations that are expected to be broadly applicable for commercial carbon storage projects throughout the PCOR Partnership region and the wider deployment of carbon capture and storage.

02 PETROLEUM↗

Initial Risk Inventory for Commercial Scale Storage Sites

The “Southeast Regional CO 2 Utilization and Storage Acceleration Partnership” (SECARB-USA) project supports the U.S. Department of Energy (DOE) Office of Fossil Energy's (FE) mission to help the United States meet its need for secure, affordable, and environmentally sound fossil energy supplies by utilizing the advancements made since 2003 by the Regional Carbon Sequestration Partnership (RCSP) Initiative to continue to identify and address knowledge gaps. The SECARB-USA regional initiative encompasses the states of Alabama, Arkansas, Florida, Georgia, Louisiana, Mississippi, North Carolina, South Carolina, Tennessee, Virginia, and portions of Kentucky, Missouri, Oklahoma, Texas, and West Virginia. The primary objective of the project is to identify and address regional onshore storage and transport challenges facing commercial deployment of carbon dioxide (CO 2 ) capture, utilization, and storage (CCUS) technologies. This document provides an overview of risks relevant to commercial CCUS projects.

01 COAL, LIGNITE, AND PEAT↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Active Aerodynamic Load Control for Wind Turbines

The goal of this project was to develop and demonstrate an advanced dielectric barrier discharge (DBD) plasma actuator technology. We set out to demonstrate the efficacy and impact of the new actuator technology as a key component of an active load control system for wind turbines. A DBD plasma actuator consists of a thin layer of dielectric material separating a pair of offset electrodes. One of those electrodes is embedded between the dielectric layer and a non-conductive substrate, while the other is exposed to air. When driven by an appropriate high voltage waveform, the device ionizes the air near the surface of the dielectric and adjacent to the exposed electrode. Collisions between the ions in the plasma and neutral air molecules result in a wall-jet – a region of induced air velocity that can be used to modify the flow around a lifting body. Use of the device near the trailing edge of a wind turbine blade, designed in such a way as to amplify the effects of the flow-modifying device, can result in large changes to the global forces experienced by the blade. Because of the fast response time of the device, it can allow the turbine to react in real time to changes in the wind associated with turbulence, wind shear, gusts, and the like, when paired with appropriate sensors and control algorithms. The goal of this project was to increase the capacity of the device to induce velocity on its surface at the levels required by large, utility-scale wind turbines. The first technical goal was to increase the induced velocity from the current industry-best of about 4 m/s to 10 m/s by modifying the electrical waveform used to drive the device and by introducing a semi-conductive surface coating to control electrostatic charge build-up on the surface. The second goal was to use the device to modify the lift on a representative airfoil in a wind tunnel, demonstrating a reduction in lift coefficient of 0.2 or better. The third goal was to produce an actuator-induced velocity of 20 m/s. Alongside our partners at the University of Texas at Dallas, we also applied modern, advanced design methods to optimize the impact of the technology on the design of wind turbines. We also had planned to install a segmented, active load control system on a test turbine to demonstrate the ability to reduce unsteady aerodynamic forces on the turbine associated with changes in the wind. The highest induced velocity achieved during this research was 11 m/s. However, practical design constraints limited the change in lift coefficient to about 0.12 for a representative airfoil in the wind tunnel at a Reynolds number of 400,000. The primary conclusion is that the plasma actuator control authority remains insufficient for practical purposes when extrapolated to Reynolds numbers over 1 million. The potential impact of the active lift control concept was evaluated through detailed simulations for three wind turbine sizes: a 3.4MW onshore turbine, a 10MW offshore turbine, and a 15MW offshore turbine. A feedback control system was designed for each turbine within two scenarios: one where the active lift control is used as a retrofit capability on the baseline design, and the other where the designers were permitted to “upscale” the turbines in order increase annual energy production. The levelized cost of energy was then evaluated for the range of turbine sizes and design configuration. It was found that the LCOE reduction associated with active lift control fell in the range of 0.7% to 7.2%, with the highest reduction associated with upscaling the 3.4MW turbine.

17 WIND ENERGY↗

CCS Opportunity Along the Gulf Coast Corridor

The Gulf Coast corridor, onshore and offshore, from Corpus Christ to the Mississippi River presents a high concentration of CO2 from industrial sources and excellent storage reservoirs in the underlying Cretaceous and Tertiary sands. Analysis of the technical, geologic, economic and social aspects of this CCS opportunity is necessary for successful deployment of CCS technology and eventual attainment of NetZero goals. Presentation at the Offshore Technology Conference (OTC) held in Houston, Texas, May 6-9, 2024.

Grant, Timothy↗

Evaluation of Use Cases and Types of Databases for Hosting Wind Power Data

The goal of the National Wind Power Production Data Dashboard project is to develop a publicly available platform to model, process, and share wind power with uncertainty quantification for the current and future onshore and offshore wind plants across the continental United States. As of 2021, more than 70,000 utility-scale wind turbines have been installed across the United States and this number is expected to grow in the next few years. A large-scale wind power production database is needed for stakeholders (policy makers, operators, and researchers) to access easily for their decision-making. Currently, meeting that need is a challenge. Most wind power operators and system operators focus on regions of their own interest, and the data are usually inaccessible to the public.

17 WIND ENERGY↗

A Strategic Condition Framework for Energy Innovation

Building upon previous work in innovation, technology, and economic fields, we propose a conceptual framework to address the interplay dynamics of public policy and the value chains of clean energy technology innovation systems, by focusing on market structural and strategic conditions in relation to the rate and direction of knowledge diffusion within activity-based value chains. Our framework extends beyond socio-technical transition models by considering such nuances as: 1) the implications of geography, 2) the locus of knowledge types, 3) the dynamics of financial and knowledge flow, and 4) emphasizing the importance of both market structure and institutional conditions. At the firm level, we consider dynamics of interactions between suppliers and customers, innovation activities, the competitive environment, and the firm’s broader strategic relationship to governance activities and structures; we allow for the fact that each of these aspects of a firm’s identity may have a strategically relevant geographic dimension (e.g., service territories, locational concentration of input resources, etc.). We provide a proof-of-concept application of the U.S. utility-scale solar photovoltaic (PV) and onshore wind sectors, including their interactions with the U.S. power market, which we in present in a web-based information platform (Energy I-SPARK, ei-spark.lbl.gov).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning↗

Average and Marginal Capacity Credit Values of Renewable Energy and Battery Storage in the United States Power System

As deployment of renewable resources and storage continue to significantly grow in the coming decades, these technologies will play increasingly important roles in maintaining power systems' resource adequacy. Few analyses so far offer comprehensive comparisons of forward-looking average and marginal capacity credits of variable renewable energy and storage in the U.S. interconnections across a wide range of possible futures. To fill this research gap, we quantify the average and marginal capacity credits of solar PV, onshore and offshore wind, and batteries between 2026 and 2050 across the U.S power systems to examine the temporal trends, spatial patterns, and trade-offs between these two capacity accreditation approaches. Across technologies, capacity credits of solar PV most clearly follow downward trends over time, reflecting the significant rise in solar PV generation share as the grid decarbonizes. While battery storages' generation shares also rise significantly over time, their capacity credits always remain stably high due to their capabilities to be dispatched strategically during critical periods to maintain reliability. On the other hand, capacity credits of wind technologies in general follow slight upward trends as their generation shares level off. There are strong spatial variabilities of both average and marginal capacity credits across technologies, but capacity credits of solar PV displaying the most obvious spatial patterns with high capacity credits concentrating in wind-rich, solar-poor regions in SPP, PJM, and MISO, suggesting potential reliability benefits of interconnection-wide planning for renewable energy deployments. Additionally, except for offshore wind, average capacity credits of all other renewable technologies tend to be higher than their marginal capacity credits, indicating that existing renewable resources tend to be accredited higher than new resources at almost any time.

25 ENERGY STORAGE↗

A Clean Energy Deployment Baseline for the Energy Community and Low-Income Tax Credit Bonuses [Slides]

The Inflation Reduction Act of 2022 introduced, for the first time, place-based federal tax incentives for projects sited in “Energy Communities,” potentially changing the economic calculus of where projects are best sited. Storage projects can qualify for a 10-percentage-point bonus to the Investment Tax Credit (e.g., from 30% to 40%), while wind and solar projects may qualify for either the ITC bonus or a 10% bonus to the Production Tax Credit (e.g., from $\$27.5$ to $\$30.25$/MWh). Energy Communities are areas with historical ties to fossil fuel industries and above average unemployment levels (FFEU), with closed coal mines or power plants, or contaminated properties. They seek to identify locations across the US that could especially benefit from economic revitalization. This report explores how the new federal tax credit incentives are impacting clean energy deployment patterns and establishes historical baselines against which future changes can be compared. We include a few case studies of clean energy projects going specifically to areas that were recently impacted by coal power plant closures to provide concrete examples of investments in Energy Communities. However, this publication does not assess how much of the incentive benefits pass from clean energy developers to hosting communities, nor does it offer a comprehensive view of the economic effects of clean energy deployment on Energy Communities. Key highlights include: - As clean energy projects take multiple years to conceptualize and develop, it is likely too early to see shifts towards Energy Community locations either among newly built projects or those that entered interconnection queues in 2023. - Approximately 35% of onshore wind, 50% of solar, and 60% of storage capacity built in 2023 and the first half of 2024 are located in Energy Communities, making them likely eligible for bonus incentives. While these bonus incentives were not available to projects coming online before 2023, we used 2023 Energy Community definitions to classify whether past projects were built in what is now considered an Energy Community. The deployment levels for 2023-2024 are similar to recent years (2020-2022) for solar and storage but slightly lower for wind. - Clean energy capacity has surged in the interconnection queues over the last few years, with about 45-50% of both recently proposed and total queued capacity being located in Energy Communities. While the amount of capacity in Energy Communities has also grown, its relative share is either stable (solar and storage) or slightly lower (wind) among projects that entered the queue in 2023. - Clean energy projects can be built at lower costs in Energy Communities. The levelized cost of energy after incentives was on average $\$9$/MWh (24%) lower for solar projects and $\$2$/MWh (6%) lower for wind projects built in 2023, relative to projects not located in Energy Communities. Wholesale electricity values at Energy Community locations relative to the rest of the market vary by region. The average value was often higher for wind projects (-$\$3$ to $\$11$/MWh) but lower for solar projects (-$\$6$ to 0/MWh). - Distributed solar that is owned by commercial entities is eligible for the Energy Community bonus and also, potentially, a Low-Income Community bonus. Residential solar installations in qualifying Energy Communities that are third-party owned represent about 10% of the total residential market. Larger commercial and industrial solar installations in Energy Communities make up 17% of the total market in 2023. Nearly 2 GW of distributed solar was built in areas qualifying as Low-Income Communities in 2023, exceeding the available annual program cap of 700 MW. Continued tracking of these trends will be important for system planners, investors, and local communities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Carbon storage cost modeling for the offshore Gulf of America

At the 2025 Annual University of Houston ROICE Workshop, Dr. Chung Shih delivered an invited talk titled "Carbon Storage Cost Modeling for the Offshore Gulf of America." This presentation highlighted the capabilities of NETL's offshore saline carbon storage cost model (CO2_S_COM_Offshore) in evaluating the economics of both new and reused storage infrastructure. While primarily intended for screening-level analysis, the model comprehensively considers critical components such as onshore facilities, pipelines connecting shore to offshore platforms, main platforms, and satellite platforms. Additionally, its integrated cashflow model encompasses the entire project lifecycle, from initial site screening to post-injection site care, providing users with a thorough understanding of how various operational or financial parameters impact project economics.

cost modeling↗