Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “negotiation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Analysis and design of a capsule landing system and surface vehicle control system for Mars exporation

The problems related to the design and control of a mobile planetary vehicle to implement a systematic plan for the exploration of Mars were investigated. Problem areas receiving attention include: vehicle configuration, control, dynamics, systems and propulsion; systems analysis; navigation, terrain modeling and path selection; and chemical analysis of specimens. The following specific tasks were studied: vehicle model design, mathematical modeling of dynamic vehicle, experimental vehicle dynamics, obstacle negotiation, electromechanical controls, collapsibility and deployment, construction of a wheel tester, wheel analysis, payload design, system design optimization, effect of design assumptions, accessory optimal design, on-board computer subsystem, laser range measurement, discrete obstacle detection, obstacle detection systems, terrain modeling, path selection system simulation and evaluation, gas chromatograph/mass spectrometer system concepts, chromatograph model evaluation and improvement and transport parameter evaluation.

Frederick, D. K.↗

Articulated elastic-loop roving vehicles

Prototype vehicle features exceptional obstacle-negotiating and slope-climbing capabilities plus high propulsive efficiency. Concept should interest designers of polar or ocean-bottom research vehicles. Also, its large footprint and low ground pressure will minimize ecological damage on terrain with low bearing strength, as in off-the-road application.

Chang, C. J.↗

Analysis and design of a capsule landing system and surface vehicle control system for Mars exploration

Investigation of problems related to the design and control of a mobile planetary vehicle to implement a systematic plan for the exploration of Mars has been undertaken. Problem areas receiving attention include: vehicle configuration, control, dynamics, systems and propulsion; systems analysis; terrain modeling and path selection; and chemical analysis of specimens. The following specific tasks have been under study: vehicle model design, mathematical modeling of a dynamic vehicle, experimental vehicle dynamics, obstacle negotiation, electromechanical controls, collapsibility and deployment, construction of a wheel tester, wheel analysis, payload design, system design optimization, effect of design assumptions, accessory optimal design, on-board computer sybsystem, laser range measurement, discrete obstacle detection, obstacle detection systems, terrain modeling, path selection system simulation and evaluation, gas chromatograph/mass spectrometer system concepts, chromatograph model evaluation and improvement.

Frederick, D. K.↗

A pilot demonstration project of technology application from the aerospace industry to city management (four cities program)

The Four Cities Program has completed the first year of the planned two-year program. At the beginning of the first year, a variety of program initiation activities were accomplished. Contracts were negotiated; science and technology advisors were interviewed, selected and assigned; general indoctrination and integration of the advisors into city affairs occurred; technical needs were identified and related projects pursued; pilot projects for the second year were identified; inter-city coordination on technical problems began to emerge; and the general soundness of the four cities program seems to have been established. Above all, the inter-personal relationships between the advisors and their interfaces in city government appear to be functioning smoothly. The establishment of such mutual respect, trusts, and confidences are believed essential to the success of the program.

Ervin, G. F.↗

Interface definition for the Far Ultraviolet Spectrometer Experiment S169

A final contract for development, fabrication, test and flight of the ultraviolet spectrometer experiment on an Apollo space mission is reported. Two interface control documents were completed and signed off and three more were essentially completed. Supporting preliminary concepts formulation, design study and component investigation, specification and subcontract negotiation were accomplished.

Fastie, W. G.↗

A study of remote guidance and control for planetary surface vehicles.

Description of tests that were originally conducted with the aim of extending the operational lifetime of the lunar roving vehicle beyond the period of the astronauts stay on the moon. The results obtained include the findings that a vehicle with six independently driven wheels appears to be practical, and that with proper drive motor sizing this configuration could provide redundancy as well as the ability to negotiate some crevasses and rocks.

Mastin, W. C.↗

Analysis and design of a capsule landing system and surface vehicle control system for Mars exploration

Problems related to the design and control of a mobile planetary vehicle to implement a systematic plan for the exploration of Mars are reported. Problem areas include: vehicle configuration, control, dynamics, systems and propulsion; systems analysis, terrain modeling and path selection; and chemical analysis of specimens. These tasks are summarized: vehicle model design, mathematical model of vehicle dynamics, experimental vehicle dynamics, obstacle negotiation, electrochemical controls, remote control, collapsibility and deployment, construction of a wheel tester, wheel analysis, payload design, system design optimization, effect of design assumptions, accessory optimal design, on-board computer subsystem, laser range measurement, discrete obstacle detection, obstacle detection systems, terrain modeling, path selection system simulation and evaluation, gas chromatograph/mass spectrometer system concepts, and chromatograph model evaluation and improvement.

Frederick, D. K.↗

Reliability inputs to Mariner 9 data explosion

This paper describes the prelaunch and post-launch reliability functions which contributed to the success of the Mariner 9 spacecraft. Examples are included to illustrate how each reliability activity was a vital part of each phase of the project. Prelaunch reliability functions included: (1) establishing, negotiating, and monitoring system and subsystem requirements, (2) participating in spacecraft system and subsystem design/hardware reviews, (3) monitoring preparation of failure mode effects and criticality analyses (FMECA), (4) establishing and managing a problem failure reporting (PFR) system for the spacecraft and its support equipment, (5) monitoring electronic parts activities, and (6) participating in spacecraft reviews. Particular emphasis is placed on mission operations reliability assurance activities, which included: (1) spacecraft problem/failure reporting, (2) managing an integrating failure reporting system which covered all mission operations activities, (3) real-time analysis of spacecraft anomalies, and (4) risk assessment.

Macgregor, D. S.↗

Control strategies for planetary rover motion and manipulator control

An unusual insect-like vehicle designed for planetary surface exploration is made the occasion for a discussion of control concepts in path selection, hazard detection, obstacle negotiation, and soil sampling. A control scheme which actively articulates the pitching motion between a single-loop front module and a dual loop rear module leads to near optimal behavior in soft soil; at the same time the vehicle's front module acts as a reliable tactile forward probe with a detection range much longer than the stopping distance. Some optimal control strategies are discussed, and the photos of a working scale model are displayed.

Trautwein, W.↗

The economic value of remote sensing of earth resources from space: An ERTS overview and the value of continuity of service. Volume 3: Intensive use of living resources: Agriculture. Part 1: Overview

Potential economic benefits obtainable from a state-of-the-art ERS system in the resource area of intensive use of living resources, agriculture, are studied. A spectrum of equal capability (cost saving), increased capability, and new capability benefits are quantified. These benefits are estimated via ECON developed models of the agricultural marketplace and include benefits of improved production and distribution of agricultural crops. It is shown that increased capability benefits and new capability benefits result from a reduction of losses due to disease and insect infestation given ERS's capability to distinguish crop vigor and from the improvement in world trade negotiations given ERS's worldwide surveying capability.

Kornhauser, A. L.↗

Computer graphics for management: An abstract of capabilities and applications of the EIS system

The Executive Information Services (EIS) system, developed as a computer-based, time-sharing tool for making and implementing management decisions, and including computer graphics capabilities, was described. The following resources are available through the EIS languages: centralized corporate/gov't data base, customized and working data bases, report writing, general computational capability, specialized routines, modeling/programming capability, and graphics. Nearly all EIS graphs can be created by a single, on-line instruction. A large number of options are available, such as selection of graphic form, line control, shading, placement on the page, multiple images on a page, control of scaling and labeling, plotting of cum data sets, optical grid lines, and stack charts. The following are examples of areas in which the EIS system may be used: research, estimating services, planning, budgeting, and performance measurement, national computer hook-up negotiations.

Solem, B. J.↗

Crawler Transporter Steering and Jel Systems

The transporter weighing 2.8 million kilograms (6.3 million pounds) was used to lift a 5.7-million-kilogram (12.6-million-pound) combination of mobile launcher and space vehicle, transfer this load approximately 5.6 kilometers (3.5 miles) from its point of assembly, negotiate curves of 152-meter (500-foot) mean radius, climb a 5-percent grade while maintaining the 122-meter (400-foot) structure in a vertical position within 10 minutes of arc, and smoothly position this huge structure to within plus or minus 5.1 centimeters (plus or minus 2 inches) on support pedestals at the launch pad. The crawler-transporter is described in detail.

Davis, V. L.↗

Control elements for an unmanned Martian roving vehicle

The roving vehicle simulator was operated autonomously under control of the simulated on-board computer. With the microwave radar obstacle sensor mounted and operating, it was able to avoid a student placed in its path and to return to the originally assigned direction when that path was clear. The tactile obstacle sensor was able to detect impassable obstacles while allowing the vehicle to negotiate passable obstacles.

Wehe, R. L.↗

Stirling engine project status

The status of the Stirling project is summarized. Contract negotiations were completed with Ford Motor Company to carry out a major, cost-shared development program for an improved engine. A parallel, but independent, development activity by a second team is also planned.

Ragsdale, R. G.↗

Radio science requirements and the end-to-end ranging system

Radio science ranging requirements negotiated between past and present flight projects and the DSN have generally focused on just the DSS and spacecraft hardware. All elements in the end-to-end system are analyzed and considered in terms of the error hierarchy. The end-to-end system is defined and examined as it applies to the generation of radio science ranging requirements. The variability of the performance levels of the system elements is emphasized with respect to the radio science experiment being performed and the DSN-spacecraft frequency band configuration.

Berman, A. L.↗

Applicability of the Remote Mobile Emplacement Package (RMEP) design as a mobility aid for proposed post-84 Mars missions, phase O

The results of study to determine the applicability of the Remote Mobile Emplacement Package (RMEP) design concept as a mobility aid for the proposed post-'84 Mars missions are presented. The RMEP wheel and mobility subsystem parameters: wheel tire size, weight, stowed volume, and environmental effects; obstacle negotiation; reliability and wear; motor and drive train; and electrical power demand were reviewed. Results indicated that: (1) the basic RMEP wheel design would be satisfactory, with additional attention to heating, side loading, tread wear and ultraviolet radiation protection; (2) motor and drive train power requirements on Mars would be less than on Earth; and (3) the mobility electrical power requirements would be small enough to offer the option of operating the Mars mini rover untethered. Payload power required for certain sampling functions would preclude the use of battery power for these missions. Hazard avoidance and reverse direction maneuvers are discussed. Limited examination of vehicle payload integration and thermal design was made, pending establishment of a baseline vehicle/payload design.

Source record↗

Simulation study to evaluate a constant-groundspeed approach method in moderate and severe wind shears

The use of a constant-groundspeed procedure for flying final approaches in moderate and severe wind shear environments was investigated. Performance was compared to results of simulated constant-airspeed approaches in identical wind profiles. The simulation model was a medium twin-jet transport equipped with an autothrottle for maintaining constant groundspeed or constant airspeed. For both moderate and severe wind shears, the constant-groundspeed approach method was shown to provide a way to more safely negotiate the shears while also providing predictable and acceptable touchdown performance. Results showed airspeeds on final approach to be considerably higher using the constant-groundspeed method, which supplied the additional stall margin needed when tail-wind shears were encountered. Throttle movements were noticeably reduced in all wind profiles when constant-groundspeed approaches were flown. Touchdown conditions were practically identical for both approach methods in moderate wind shear.

Kelley, W. W.↗

SCATS: SRB Cost Accounting and Tracking System handbook

The Solid Rocket Booster Cost Accounting and Tracking System (SCATS) which is an automatic data processing system designed to keep a running account of the number, description, and estimated cost of Level 2, 3, and 4 changes is described. Although designed specifically for the Space Shuttle Solid Rocket Booster Program, the ADP system can be used for any other program that has a similar structure for recording, reporting, and summing numbers and costs of changes. The program stores the alpha-numeric designators for changes, government estimated costs, proposed costs, and negotiated value in a MIRADS (Marshall Information Retrieval and Display System) format which permits rapid access, manipulation, and reporting of current change status. Output reports listing all changes, totals of each level, and totals of all levels, can be derived for any calendar interval period.

Zorv, R. B.↗