Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “modern grid”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

A comprehensive framework for validating simulation models of power system equipment using terminal measurements

Accurate simulation of power-plants is essential to the planning and operation of modern power grids. The current methods used to periodically check power-plant simulation models have many open questions about their limitations and accuracy. The research in this project explored using Monte-Carlo Experimentation (MCE) as a means for answering these important questions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Defining Power Efficient Residential Electric Appliances and Equipment

While the long-established concept of "energy efficiency" has successfully reduced energy consumption and bills in homes, it is no longer sufficient to address the modern challenges of electrical load growth, infrastructure upgrades and associated affordability challenges. We introduce the concept of “power efficiency” for household appliances and equipment, providing a framework to support affordable home modernization and grid management. Energy efficiency is the measure of energy used (kWh) to provide comfort/conveniences, power efficiency is the measure of power used (kW) to provide those same comforts/conveniences. Energy efficiency was needed because energy is a limited resource and expensive. Now power efficiency is needed because power delivery into a building is a limited resource and expensive. We propose a new set of metrics for defining and measuring power efficiency by investigating how current appliance nameplate ratings are established, and assessing the availability and use of existing data.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Supercharge NY

The Energy Program for Innovation Clusters (EPIC) Supercharge NY enabled The Clean Fight to execute an inaugural accelerator program focused on enabling world-class, growth-stage energy storage companies to successfully scale deployments and establish domestic manufacturing pathways in New York State. The Clean Fight has developed and tested a successful accelerator model designed to reduce the barriers growth-stage climate tech companies face by collapsing the sales cycle to scaling solutions at speed. The Clean Fight’s Supercharge NY project allowed for the exploration into the understanding of New York-focused energy storage opportunities, challenges, and methods for enabling successful projects. The Clean Fight’s Supercharge NY project enabled high-touch matchmaking with industry leading customer and capital partners, technical assistance to facilitate scaling supply chain and manufacturing capacity, and access to non-dilutive funding for first-of-a-kind or demonstration projects in New York State. The results of the program provide a public benefit by accelerating deployments of energy storage to provide value-added energy services and sustainability benefits to communities while boosting economic opportunity and job creation for all.

25 ENERGY STORAGE↗

Data-Centric Communication Framework for Multicast IEC 61850 Routable GOOSE Messages over the WAN in Modern Power Systems

In this paper, a data-centric communication framework is proposed for multicast routable generic object-oriented substation event (GOOSE) messages (MRGM) over the wide area network (WAN) for effective substation-to-substation (SS2SS) and substation to control center (SS2CC) communications. In this structure, the IEC 61850 GOOSE message is transmitted over the WAN using the data distribution service (DDS) as a fast, reliable, and secure data-centric communication middleware. The main feature of this framework is its multicast capability, where several authorized subscribers can receive a published message simultaneously. This can significantly improve the system monitoring and control of the protection systems in modern smart grids, where intelligent schemes can be applied. The effectiveness of the proposed platform, in terms of total end-to-end delay between participants, is evaluated through experimental results obtained from the actual hardware-based test setup developed at the Florida International University (FIU) smart grid testbed. The results demonstrate that the latency between sending and receiving a GOOSE message among participants is within its maximum time span defined by the IEC 61850-90-5 working group for communications over the WAN.

42 ENGINEERING↗

Detection of DoS Attacks Using ARFIMA Modeling of GOOSE Communication in IEC 61850 Substations

Integration of Information and Communication Technology (ICT) in modern smart grids (SGs) offers many advantages including the use of renewables and an effective way to protect, control and monitor the energy transmission and distribution. To reach an optimal operation of future energy systems, availability, integrity and confidentiality of data should be guaranteed. Research on the cyber-physical security of electrical substations based on IEC 61850 is still at an early stage. In the present work, we first model the network traffic data in electrical substations, then, we present a statistical Anomaly Detection (AD) method to detect Denial of Service (DoS) attacks against the Generic Object Oriented Substation Event (GOOSE) network communication. According to interpretations on the self-similarity and the Long-Range Dependency (LRD) of the data, an Auto-Regressive Fractionally Integrated Moving Average (ARFIMA) model was shown to describe well the GOOSE communication in the substation process network. Based on this ARFIMA-model and in view of cyber-physical security, an effective model-based AD method is developed and analyzed. Two variants of the statistical AD considering statistical hypothesis testing based on the Generalized Likelihood Ratio Test (GLRT) and the cumulative sum (CUSUM) are presented to detect flooding attacks that might affect the availability of the data. Our work presents a novel AD method, with two different variants, tailored to the specific features of the GOOSE traffic in IEC 61850 substations. The statistical AD is capable of detecting anomalies at unknown change times under the realistic assumption of unknown model parameters. The performance of both variants of the AD method is validated and assessed using data collected from a simulation case study. We perform several Monte-Carlo simulations under different noise variances. The detection delay is provided for each detector and it represents the number of discrete time samples after which an anomaly is detected. In fact, our statistical AD method with both variants (CUSUM and GLRT) has around half the false positive rate and a smaller detection delay when compared with two of the closest works found in the literature. Our AD approach based on the GLRT detector has the smallest false positive rate among all considered approaches. Whereas, our AD approach based on the CUSUM test has the lowest false negative rate thus the best detection rate. Depending on the requirements as well as the costs of false alarms or missed anomalies, both variants of our statistical detection method can be used and are further analyzed using composite detection metrics.

IEC 61850 electrical substations↗

IDAES-PSE Software Tools for Optimizing Energy Systems and Market Interactions

Modern power grids coordinate electricity production and consumption via multi-scale wholesale energy markets. Historically, levelized cost metrics were the de facto standard for techno-eco-nomic analyses of energy systems and comparison of technology options. However, these metrics neglect the complexity of energy infrastructure including the time-varying value of electricity. An emerging alternative is multi-period optimization, which considers the locational marginal price of electricity as input data (parameters). In this work, we present a general interface for multi-period optimization with time-varying energy prices to facilitate rapid analysis and comparison of potential energy systems models. The PriceTakerModel class is written in the IDAES-PSE platform and allows users to generate a multi-period, price-taker model instance, as well as automatically generate common operational constraints for their model, such as start-up and shutdown. We show this interface successfully generates multi-period price-taker models, facilitates model discrimination, and aids in analyzing various technologies for deployment in unique energy markets.

Laky, Daniel↗

Front End Engineering Design Report

Energy storage is becoming an increasingly important component on modern power grids to ensure sufficient balancing capability for intermittent renewable power generations is available to maintain system reliability. Although energy storage has traditionally been provided by pumped storage hydroelectric systems, it is not possible to install these at every location and they can be expensive to construct. Lithium Ion batteries are increasingly being used to carry out energy storage grid services, however these can be expensive when specified over a few hours of capacity. An alternative way to store substantial energy is to use thermal energy storage (TES). This has been deployed on concentrated solar units using molten nitrate salts as a storage media. Again, the cost of the material can be prohibitive, thus lower cost alternative materials are being actively sought, such as sand, rocks and concrete. This project investigates the potential for Concrete Thermal Energy Storage (CTES) when used to directly store thermal energy from a thermal plant source. This report represents the initial Front-End Engineering Design (FEED) deliverables that are submitted for the Hazard and Operability (HAZOP) safety review for process validation.

25 ENERGY STORAGE↗

CTES Pilot Plant Detailed Design Report

Energy storage is becoming an increasingly important component on modern power grids to ensure sufficient balancing capability for intermittent renewable power generations is available to maintain system reliability. Although energy storage has traditionally been provided by pumped storage hydroelectric systems, it is not possible to install these at every location and they can be expensive to construct. Lithium Ion batteries are increasingly being used to carry out energy storage grid services, however these can be expensive when specified over a few hours of capacity. An alternative way to store substantial energy is to use thermal energy storage (TES). This has been deployed on concentrated solar units using molten nitrate salts as a storage media. Again, the cost of the material can be prohibitive, thus lower cost alternative materials are being actively sought, such as sand, rocks and concrete. This project investigates the potential for Concrete Thermal Energy Storage (CTES) when used to directly store thermal energy from a thermal plant source. This report represents the Detailed Design phase deliverables comprising of the process, mechanical, electrical, piping along with control and instrumentation documents. Civil and structural deliverables are included on a preliminary basis due to outstanding site investigation activities. CTES block transportation testing results and the pilot plant testing plan is also included in this report.

25 ENERGY STORAGE↗

Innovative Utility Offerings

As electricity became a critical commodity in modern economies, most countries organized the electric power industry along a similar paradigm, establishing vertically-integrated and regulated utility monopolies with that received regulated returns on capital invested in centralized electrical infrastructure. In today’s rapidly evolving power sector, this business model is being actively redefined as innovative utilities all over the world begin offering more customer-centric products and services at the edge of the distribution system.

case studies↗

ESIF 2020

This annual report highlights research done at the Energy Systems Integration Facility (ESIF) in Fiscal Year 2020.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Use of Systems Engineering in Repurposing Coal-Fired Power Plants with Malta Pumped Thermal Energy Storage System

he electric sector across North America is facing a transition. Both economics and policy decisions have pointed towards a broad retirement of fossil assets across markets. Owners are facing the problem of how to evolve the base of the electric sector from fossil asset to greener alternative. Coal-fired power plants built the modern electricity grid. Their rotating machinery are the beating heart of the grid, providing essential resiliency and reliability services. Power plant retirements are disruptive to plant workforces and cause outsized impacts on surrounding communities. The transition from thermal power plants that use rotating machinery to generate electricity (e.g., coal- and gas-fired plants) to variable, inverter-based generation (e.g., solar and wind) is affecting the reliability of the electric grid. Grid operators and national regulators have issued warnings about known and anticipated risk. In 2021, Malta Inc. was awarded a Department of Energy (DOE) grant to study how to integrate a Malta 100MW Pumped Heat Energy Storage (PHES) system with a retiring coal-fired power plant to meet emissions requirements, retain plant workforces, preserve communities, and maintain grid reliability. This presentation provides a summary of this study, focusing on how systems engineering approach was used to arrive at a proposed design concept that met multiple objectives and requirements. There will be three main parts for this presentation. The first part of the presentation will focus on how different systems engineering was applied for this work. In particular, the following areas: stakeholder engagement, site selection process, developing requirements and use cases for the integrated system, defining the system and its boundary, coming up with different system architecture/option, performing a techno-economic analysis to compare the different options and down selection of the preferred option, will be discusses. For these areas, discussion on the decisions on how much breadth and depth to go into each area will be provided. These discussions provide good insights into how to apply systems engineering. The second part of the presentation will provide a deeper dive into the two recommended integration options that repurpose coal-fired power plants with Malta PHES system. The comparison of the two options and general guidance of how to choose an option will be provided. This is particularly useful for utilities who are facing coal-plant retirements. The two options will be compared based on its performance (such as power output, efficiency), complexity, and cost. The social impact on local communities of the two options will also be discussed. The final part of the presentation will discuss the impact that this work has had, including Malta Inc. being invited to the White House to discuss progress and outcomes of this work with the Interagency Working Group on Coal and Power Plant Communities and Economic Revitalization. In summary, this presentation aims to provide a showcase of how sy

25 ENERGY STORAGE↗

Emulation and Adversarial Analysis of EV Charging Networks

In the effort of decarbonization and evolution of the modern electrical grid, electric vehicles (EVs) play a key part to transform the grid. However, due to the rapid adoption of EVs and the demand of the charging infrastructure required to power said EVs, risk of a cyber-attack may impose serious consequences. There is a need to analyze and protect the charging ecosystem infrastructure from cyber threats before it reaches wide-scale deployment. In an effort to secure vehicle to grid (V2G) communications, standardization is necessary for continued reliable system operation. The protocol ISO 15118 outlines controls and practices that should be implemented for secure vehicle to grid (V2G) communications. The standard is gaining momentum for American markets as the demand for EV infrastructure grows. The adoption of ISO 15118 in American markets poses several challenges: the deployment of a public key infrastructure (PKI) as outlined within the standard, interoperability of charging different EVs with chargers from different manufactures using the PKI, and scaling the ecosystem to meet the demand while managing risks. This project was created to understand potential cyber and scaling challenges of PKI for EV infrastructure through utilizing a series of emulated components mapping to what exists in the EV ecosystem today, and the components of the PKI that are under development. The key nodes within the emulation that are under development are: electric vehicle (EV), electric vehicle supply equipment (EVSE), charge network operator (CNO), certificate authority (CA), and online certificate status protocol (OCSP) that must all interact using secure and trusted communications. With these emulated components and utilizing orchestration methods to rapidly deploy and scale the components, the ability to analyze risks of the ecosystem and address gaps before the PKI ecosystem is fully deployed to production should yield a more robust and mature production charging infrastructure. Our approach will use a modular architecture of virtual machines within an orchestration platform and will target scales of 100s, 1000s, and 10,000s of entities interacting. The core research questions trying to be answered with this scope of work are: what are the impacts of a rogue CA, what are the risks of certificate revocation list (CRL) management, what is the value of OCSP stapling, what components are vulnerable to DOS attacks, and what test effective payloads may impact the components.

charging ecosystem↗

Architecture for Web-Based Visualization of Large-Scale Energy Domains: Preprint

With the growing penetration of inverter-based distributed energy resources and increased loads through electrification, power systems analyses are becoming more important and more complex. Moreover, these analyses increasingly involve the combination of interconnected energy domains with data that are spatially and temporally increasing in scale by orders of magnitude, surpassing the capabilities of many existing analysis and decision-support systems. We present the architectural design, development, and application of a high-resolution web-based visualization environment capable of cross-domain analysis of tens of millions of energy assets, focusing on scalability and performance. Our system supports the exploration, navigation, and analysis of large data from diverse domains such as electrical transmission and distribution systems, mobility and electric vehicle charging networks, communications networks, cyber assets, and other supporting infrastructure. We evaluate this system across multiple use cases, describing the capabilities and limitations of a web-based approach for high-resolution energy system visualizations.

grid modernization↗

Status of Power System Transformation: Leading Topics of 2024

This presentation provides an overview of key power sector transformation topics that are relevant for global power system decarbonization and net zero goals. It includes examples of strategies to achieve rapid power system decarbonization and enable clean energy deployment.

21st Century Power Partnership↗

A Generic FSC Wind Park EMT Model with IEEE Std 2800-Compliant Fault Ride-Through Capability

The modern power grid is seeing more and more electricity come from renewable sources like wind farms, which use sophisticated power electronics instead of traditional spinning generators. To keep everything running smoothly and meet industry standards such as IEEE 2800, these systems need smart control strategies. In our work, we built a flexible computer model of a full-scale wind farm converter that can handle grid disturbances without shutting down. When a fault or storm hits, the model’s built-in logic automatically adjusts the currents it sends to the grid and protects its internal energy storage, ensuring the wind farm stays connected and doesn’t damage its own equipment. Once the disturbance clears, the model restores normal operation seamlessly, so there’s no long interruption in power delivery. At the same time, it carefully regulates the voltage where the wind farm ties into the larger grid, helping to maintain safe voltage levels across the network. Our simulations show that this control setup not only meets all the requirements of IEEE Standard 2800 but also allows the wind farm to recover quickly and predictably, keeping the lights on no matter what happens on the grid.

17 WIND ENERGY↗

Building Energy Codes and Grid-Interactive Efficient Buildings: How building energy codes can enable a more dynamic and energy-efficient built environment

This report considers the role of national model codes to promote grid-interactive efficient buildings (GEBs) as part of the modernization of the U.S. electricity grid. It introduces GEBs, describes their ability to support a clean, resilient grid, and considers challenges and approaches for incorporating GEB measures into national model energy codes and standards. Desirable traits of GEB include being low energy, low peaking, and responsive to grid needs, and minimizing the curtailment of renewable energy resources. In addition, the future grid incurs a time and locational value on these types of building services. Accounting for these considerations in future code development requires a continuation and expansion of code-minimum energy efficiency requirements and inclusion of demand responsive and load flexibility measures while ensuring annual use and cost reductions. Also, efforts to include GEB measures in codes will be limited until they are fully developed into an American National Standards Institute (ANSI)-approved standard. Then it would be straightforward to address GEB measures through points or packages and/or scoring requirements. Otherwise, the building code would have to describe each specific grid responsive strategy. This document reviews topics pertinent to considering codes in this context. Specifically, the study presents the status and direction of current building energy codes, the future smart grid, low-energy buildings, and grid-integrated buildings. The report concludes with recommendations for future code development activities to support low-energy, grid-interactive buildings in order to provide added value to building owners, the grid, and society.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effects of diffraction in multiple-grid telescopes for X-ray astronomy

Diffraction effects in modern designs for grid collimator telescopes (assumed to have roughly a 100-micron grid period) are apparent at wavelengths longer than 1 A and are dominant at wavelengths longer than 10 A. In collimators with many grids spaced far apart the effects of diffracation are to reduce strongly the peak transmission of the collimator at longer wavelengths and to broaden it by about the amount expected from Fraunhofer diffraction through a slit the size of the grid openings. Comparisons between two-collimator measurements and the present calculations show reasonable agreement; it is therefore concluded that the present single-collimator calculation gives a good representation of their diffraction-limited angular response.

Lindsey, C. A.↗