Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “lifecycle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

An Overview of Regional Experiments on Biomass Burning Aerosols and Related Pollutants in Southeast Asia: From BASE-ASIA and the Dongsha Experiment to 7-SEAS

By modulating the Earth-atmosphere energy, hydrological and biogeochemical cycles, and affecting regional-to-global weather and climate, biomass burning is recognized as one of the major factors affecting the global carbon cycle. However, few comprehensive and wide-ranging experiments have been conducted to characterize biomass-burning pollutants in Southeast Asia (SEA) or assess their regional impact on meteorology, the hydrological cycle, the radiative budget, or climate change. Recently, BASEASIA (Biomass-burning Aerosols in South-East Asia: Smoke Impact Assessment) and the 7-SEAS (7- South-East Asian Studies) Dongsha Experiment were conducted during the spring seasons of 2006 and 2010 in northern SEA, respectively, to characterize the chemical, physical, and radiative properties of biomass-burning emissions near the source regions, and assess their effects. This paper provides an overview of results from these two campaigns and related studies collected in this special issue, entitled Observation, modeling and impact studies of biomass burning and pollution in the SE Asian Environment. This volume includes 28 papers, which provide a synopsis of the experiments, regional weatherclimate, chemical characterization of biomass-burning aerosols and related pollutants in source and sink regions, the spatial distribution of air toxics (atmospheric mercury and dioxins) in source and remote areas, a characterization of aerosol physical, optical, and radiative properties, as well as modeling and impact studies. These studies, taken together, provide the first relatively complete dataset of aerosol chemistry and physical observations conducted in the sourcesink region in the northern SEA, with particular emphasis on the marine boundary layer and lower free troposphere (LFT). The data, analysis and modeling included in these papers advance our present knowledge of source characterization of biomass-burning pollutants near the source regions as well as the physical and chemical processes along transport pathways. In addition, we raise key questions to be addressed by a coming deployment during springtime 2013 in northern SEA, named 7-SEASBASELInE (Biomass-burning Aerosols Stratocumulus Environment: Lifecycles and Interactions Experiment). This campaign will include a synergistic approach for further exploring many key atmospheric processes (e.g., complex aerosol-cloud interactions) and impacts of biomass burning on the surface-atmosphere energy budgets during the lifecycles of biomass burning emissions.

aerosol/biomass burning↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASA's Space Launch System

The development of the Space Launch System (SLS) launch vehicle requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The characteristics of these systems must be matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large complex systems engineering challenge being addressed in part by focusing on the specific subsystems handling of off-nominal mission and fault tolerance. Using traditional model based system and software engineering design principles from the Unified Modeling Language (UML), the Mission and Fault Management (M&FM) algorithms are crafted and vetted in specialized Integrated Development Teams composed of multiple development disciplines. NASA also has formed an M&FM team for addressing fault management early in the development lifecycle. This team has developed a dedicated Vehicle Management End-to-End Testbed (VMET) that integrates specific M&FM algorithms, specialized nominal and off-nominal test cases, and vendor-supplied physics-based launch vehicle subsystem models. The flexibility of VMET enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the algorithms utilizing actual subsystem models. The intent is to validate the algorithms and substantiate them with performance baselines for each of the vehicle subsystems in an independent platform exterior to flight software test processes. In any software development process there is inherent risk in the interpretation and implementation of concepts into software through requirements and test processes. Risk reduction is addressed by working with other organizations such as S&MA, Structures and Environments, GNC, Orion, the Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission and Loss of Crew probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and detection and responses that can be tested in VMET and confirm that responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - ARINC 653 partitioned OS, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM. The plan for VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by Flight Software. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure the effectiveness of M&FM algorithms performance in the FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.

Trevino, Luis↗

Systems Engineering and Management Applications of ISO 9001:2015 for Government

The manufacturing segment of the business world is busy assessing the impact of ISO 9001:2015, and updating their management systems to meet the required compliance date. What does the new revision mean for government agencies that deliver large engineering projects rather than mass production? In fact, the standard, especially the new revision, can be used quite readily for government agencies, or applied to specific projects, once it is understood in terms of the similarities with systems engineering and project management. From there it can be extrapolated to "mission realization" systems, and a Quality Management System (QMS) is a logical result that can bring order to processes and systems that likely already exist in some fashion. ISO 9001:2015 is less product-oriented than previous versions. It can be more broadly applied to public organizations as well as private; and to services (missions) as well as products. The emphasis on risk management in the revised standard provides the needed balance for weighing decisions with respect to cost, schedule, technical, safety, and regulatory compliance; so if this is not part of agency governance already, this is a good place to start, especially for large engineering projects. The Systems Engineering standard used for this analysis is from NASA's NPR 7123.1 NASA Systems Engineering Processes and Requirements; however, those who are more familiar with ISO/IEC 26702 Systems Engineering-application and management of the systems engineering process, or SAE/EIA 632 Processes for Engineering a System will also recognize the similarities. In reality, the QMS outlined by ISO 9001 reinforces the systems engineering processes, and serves to ensure that they are adequately implemented, although most of the ISO 9001 literature emphasizes the production and process aspects of the standard. Rather than beginning with ISO 9001and getting lost in the vocabulary, it is useful to begin with the systems engineering lifecycle. Identification of stakeholder expectations, identifying solutions, creating specific product or service designs, production of the product or service, delivery to the public, and the associated management, planning, and control processes, are a familiar place to begin thinking of the overall system of identifying, designing, and competing a project or mission. Lining up this lifecycle with the ISO requirements (see Figure 1) illustrates how a quality management system is concerned with the same processes, and provides a governance and assurance function. If implemented properly, there are cost savings resulting from less rework, repair, reprocessing, failures, misplaced documents, and similar types of deficiencies1. Starting with an organization's systems engineering processes allows the organization to use their own terminology for a QMS plan, and tailor the plan to their own project or organization, so that it is more easily developed, understood, and implemented.

Shepherd, Christena C.↗

Promoting a Culture of Tailoring for Systems Engineering Policy Expectations

NASA's Marshall Space Flight Center (MSFC) has developed an integrated systems engineering approach to promote a culture of tailoring for program and project policy requirements. MSFC's culture encourages and supports tailoring, with an emphasis on risk-based decision making, for enhanced affordability and efficiency. MSFC's policy structure integrates the various Agency requirements into a single, streamlined implementation approach which serves as a "one-stop-shop" for our programs and projects to follow. The engineers gain an enhanced understanding of policy and technical expectations, as well as lesson's learned from MSFC's history of spaceflight and science missions, to enable them to make appropriate, risk-based tailoring recommendations. The tailoring approach utilizes a standard methodology to classify projects into predefined levels using selected mission and programmatic scaling factors related to risk tolerance. Policy requirements are then selectively applied and tailored, with appropriate rationale, and approved by the governing authorities, to support risk-informed decisions to achieve the desired cost and schedule efficiencies. The policy is further augmented by implementation tools and lifecycle planning aids which help promote and support the cultural shift toward more tailoring. The MSFC Customization Tool is an integrated spreadsheet that ties together everything that projects need to understand, navigate, and tailor the policy. It helps them classify their project, understand the intent of the requirements, determine their tailoring approach, and document the necessary governance approvals. It also helps them plan for and conduct technical reviews throughout the lifecycle. Policy tailoring is thus established as a normal part of project execution, with the tools provided to facilitate and enable the tailoring process. MSFC's approach to changing the culture emphasizes risk-based tailoring of policy to achieve increased flexibility, efficiency, and effectiveness in project execution, while maintaining appropriate rigor to ensure mission success.

Blankenship, Van A.↗

Achieving Improved Reliability with Failure Analysis

Reliability is the ability of a product to properly function, within specified performance limits, for a specified period of time, under the life cycle application conditions. Failure analysis is a vital tool in the effort to ensure reliability of electronic products and systems throughout their product lifecycle. Today, organizations involved in activities within the electronics supply chain are facing new challenges, not just from complex assembly styles, harsher lifecycle environments, and sophisticated supply chains, but also from customers who are demanding a quicker turn-around. Unfortunately, root cause failure analysis is often performed incompletely, leading to a poor understanding of failure mechanisms and causes and, customer dissatisfaction due to recurring failures. The PDC starts with an introduction to reliability concepts, physics of failure and an overview of failure mechanisms that affect PCBs, PCBAs and components. The PDC then dives into root cause hypothesizing techniques (Pareto, FMEA, fishbone, FTA), non-destructive and destructive analysis and, materials characterization will be discussed. Numerous failure analysis case studies will be used to illustrate the techniques and analysis principles to arrive at the root cause(s) of field failures on printed circuit boards, active components, and assemblies. What Will You Learn: Topics include: Overview of Reliability Concepts Failure mechanisms of electronic products Root cause analysis Failure analysis techniques -Non-destructive techniques (optical, CSAM etc.) -Destructive analysis (DPA, Decap, FIB etc.) -Materials characterization (XRF, EDS, TMA/DSC etc.) Who Will Benefit: Reliability engineers, failure analysis engineers, engineering managers, design engineers, component engineers, quality assurance functions and, personnel involved with reliability activities within their company.

non-destructive techniques↗

In Space Assembled Telescope (ISAT) Study Preliminary Findings

“When is it advantageous to assemble telescopes in space rather than deploying them from launch vehicle fairings”? This question forms the crux of the objectives of a NASA study we have been conducting in collaboration with colleagues from different NASA centers, industry and academia. In this study, we have engaged a broad cross section of experts from the various fields of optics engineering, that is, telescope design and instrument design, structure and thermal engineering, robotics, launch system engineering, orbital mechanics, integration and testing, astrophysics, and NASA programmatics among others. Initial efforts began with a quick review of the current state of art of the component technologies that contribute towards an in-space assembled telescope. Then, leveraging the collective expertise of the diverse group of experts, we formulated a reference telescope design and attempted to develop a baseline approach to modularize the telescope into components amenable for robotic assembly. The group identified different trades associated with modularization and also developed a set of criteria to discern between the different options as revealed by the trades. Based on the modularization of the telescope, we will assess the impact of various launch vehicles, orbits for assembly and operation, robotic systems and operational approaches, and other related variables. From this, a concept to assemble the reference telescope in space from modular components will be developed. Based on this concept, and definition of the modules, we will develop a mission lifecycle plan for an assembled telescope over different phases of preliminary design, detailed design, assembly-test-and-integration, and in space operations. The mission lifecycle plan will be used to evaluate cost and risk implications of in-space assembly toward answering our fundamental question of the advantages, if any, of assembling a telescope in space as compared to self-deployment. In this paper, we summarize the objectives of the study, a review of the status of the underlying component technologies, a description of the methodology, including three different multi-day technical interchange meetings (TIMs), summary of findings from the TIMs and other related activities. In addition, a detailed description of the various factors that impact in-space assembly, their interplay and criteria for discerning among them, a preliminary description of the life cycle plan, including the test and integration plan, and initial observations on cost and risk implications will be included in the paper.

Mukherjee, Rudranarayan↗

Achieving Improved Reliability with Failure Analysis

Reliability is the ability of a product to properly function, within specified performance limits, for a specified period of time, under the life cycle application conditions. Failure analysis is a vital tool in the effort to ensure reliability of electronic products and systems throughout their product lifecycle. Today, organizations involved in activities within the electronics supply chain are facing new challenges, not just from complex assembly styles, harsher lifecycle environments, and sophisticated supply chains, but also from customers who are demanding a quicker turn-around. Unfortunately, root cause failure analysis is often performed incompletely, leading to a poor understanding of failure mechanisms and causes and, customer dissatisfaction due to recurring failures. The PDC (Professional Development Course) starts with an introduction to reliability concepts, physics of failure and an overview of failure mechanisms that affect PCBs (Printed Circuit Boards), PCBAs (Printed Circuit Board Assembly) and components. The PDC then dives into root cause hypothesizing techniques (Pareto, FMEA (Failure Modes and Effects Analysis), fishbone (Cause-And-Effect Diagram), FTA (Fault Tree Analysis)), non-destructive and destructive analysis and, materials characterization will be discussed. Numerous failure analysis case studies will be used to illustrate the techniques and analysis principles to arrive at the root cause(s) of field failures on printed circuit boards, active components, and assemblies. What Attendees will Learn: Topics include: Overview of Reliability Concepts Failure mechanisms of electronic products Root cause analysis Failure analysis techniques -Non-destructive techniques (optical, CSAM (Confocal Scanning Electron Microscopy) etc.) -Destructive analysis (DPA (Destructive Physical Analysis), Decap (Decapsulation), FIB (Focused Ion Beam) etc.) -Materials characterization (XRF (X-Ray Fluorescence) , EDS (Error Detection Sequential), TMA/DSC (Thermal Mechanical Analysis/Differential Scanning Calorimetry) etc.)

PCB quality↗

Understanding Community Needs and Desires

This panel exchange is focused on the Integration Test phase within the development lifecycle with special emphasis and dedicated discussion on integration and testing of complex systems. Layout and scheduling of integration tasks come from the verification of interface and performance requirements. However, planning for integration activities of complex systems is inherently different from traditional systems engineering integration planning activities. Decisions about the systems under development have to consider not only the technical and programmatic viewpoints but also the political, societal, operational, and economic viewpoints. Definition of performance measures, found intrinsic in the plan, with trans-disciplinary implications will be discussed. A scenario of integration of UAS in the NAS will be used as a benchmark of current views and lifecycle challenges.

Murphy, James R.↗

Implementation of Human System Integration Workshop at NASA for Human Spaceflight

The human is a key element in the complex system of systems underlying space exploration missions. As a critical system, its operating bands and requirements need to be characterized and integrated with other systems. Optimal integration of the human system with hardware and software elements has an impact on multiple aspects of mission execution, including human health and performance, risk mitigation, effective design and functionality, enhanced safety, and reduced lifecycle costs. The field of Human Systems Integration (HSI) represents an interdisciplinary and comprehensive cross-cutting approach encompassing technical and management processes for integrating human as a system consideration and objective within and across all other system components and multiple domains. In addition to human activities, HSI covers training, operations and support dimensions. Moreover, HSI is an essential enabler to systems engineering practice, emphasizing human system aspects toward optimizing fully integrated system of systems performance while systematically infusing the needs of all users during the earliest stages of development. Consistent with the National Space Exploration Campaign, NASA is developing the Gateway, a lunar orbiting platform that will serve as astronaut habitat, support transit to deep space, validate new technologies and systems, and function as a science laboratory and communications hub, among other uses. It is an essential element of a phase that will extend human exploration into deep space through evolvable infrastructure and advanced technology, supporting assembly and logistics of other exploration architecture elements. In an effort to explore the current status and forward plan of HSI implementation in the mission (system of systems) lifecycle, the HSI Employee Resource Group conducted an HSI workshop using the Gateway Program as a case study. It revealed how different organizations at the Johnson Space Center incorporate HSI in their processes in preparation for the development and operation of the Gateway. The workshop focused on HSI methodology for implementation of the six NASA HSI domains: Human Factors Engineering, Operations Resources, Habitability and Environment, Maintainability and Supportability, Safety, and Training. Results from the workshop are reported on this paper, as well as some historical background of HSI at NASA, and the success in using an Employee Resource Group to promote technical knowledge. The authors hope that this information can be used to disseminate best practices for translational applications to other space exploration systems.

Silva-Martinez, Jackelynne↗

Implementation of Human System Integration Workshop at NASA for Human Spaceflight

The human is a key element in the complex system of systems underlying space exploration missions. As a critical system, its operating bands and requirements need to be characterized and integrated with other systems. Optimal integration of the human system with hardware and software elements has an impact on multiple aspects of mission execution, including human health and performance, risk mitigation, effective design and functionality, enhanced safety, and reduced lifecycle costs. The field of Human Systems Integration (HSI) represents an interdisciplinary and comprehensive cross-cutting approach encompassing technical and management processes for integrating human as a system consideration and objective within and across all other system components and multiple domains. In addition to human activities, HSI covers training, operations and support dimensions. Moreover, HSI is an essential enabler to systems engineering practice, emphasizing human system aspects toward optimizing fully integrated system of systems performance while systematically infusing the needs of all users during the earliest stages of development. Consistent with the National Space Exploration Campaign, NASA is developing the Gateway, a lunar orbiting platform that will serve as astronaut habitat, support transit to deep space, validate new technologies and systems, and function as a science laboratory and communications hub, among other uses. It is an essential element of a phase that will extend human exploration into deep space through evolvable infrastructure and advanced technology, supporting assembly and logistics of other exploration architecture elements. In an effort to explore the current status and forward plan of HSI implementation in the mission (system of systems) lifecycle, the HSI Employee Resource Group conducted an HSI workshop using the Gateway Program as a case study. It revealed how different organizations at the Johnson Space Center incorporate HSI in their processes in preparation for the development and operation of the Gateway. The workshop focused on HSI methodology for implementation of the six NASA HSI domains: Human Factors Engineering, Operations Resources, Habitability and Environment, Maintainability and Supportability, Safety, and Training. Results from the workshop are reported on this paper, as well as some historical background of HSI at NASA, and the success in using an Employee Resource Group to promote technical knowledge. The authors hope that this information can be used to disseminate best practices for translational applications to other space exploration systems.

Silva-Martinez, Jackelynne↗

Impact of Convectively Detrained Ice Crystals on the Tropical Upper Troposphere and Lower Stratosphere

The role of convectively detrained ice crystals on the humidity of the tropical upper troposphere and lower stratosphere (UTLS) is investigated in simulations of cirrus clouds along trajectories launched from the 378K potential temperature level in the tropics. The one-dimensional (vertical) cloud model tracks individual ice crystals through their lifecycle beginning with detrainment from convection, followed by deposition growth, sedimentation and sublimation. Convective influence of the parcels is diagnosed by tracing the trajectories through time-dependent fields of convective cloud-top height adjusted to match the CloudSAT and CALIPSO statistics. Model simulations of UTLS water vapor and cloud fields are evaluated and constrained by comparison with Aura MLS and CALIPSO measurements. Preliminary results indicate sensitivity of the detrained ice crystal lifecycle to atmospheric conditions downstream of convection. Specifically, cooling (high relative humidity and supersaturation) downstream of convection leads to deposition growth and sedimentation of detrained ice crystals, resulting in net dehydration of the UTLS. In contrast, warming (low relative humidity and subsaturation) downstream of convection leads to sublimation of detrained ice crystals and subsequent hydration. As such, the impact of detrained ice crystals on the humidity of the UTLS exhibits distinct spatial variability. Detrained ice crystals predominantly dehydrate the UTLS in the tropical mean. Sensitivities to the convectively detrained ice crystal size and concentration are also examined using measurements from the StatoClim aircraft campaign. The importance of convectively detrained ice crystals will be discussed within the context of the overall contribution of convection to the lower stratospheric humidity.

Ueyama, Rei↗

Non-Turbulent Liquid-Bearing Polar Clouds: Observed Frequency of Occurrence and Simulated Sensitivity to Gravity Waves

A common feature of polar liquid-bearing clouds (LBCs) is radiatively-driven turbulence, which may variously alter cloud lifecycle via vertical mixing, droplet activation, and subsequent feedbacks. However, polar LBCs are commonly initiated under stable, non-turbulent conditions. Using long-term data from the North Slope of Alaska and McMurdo, Antarctica, we show that non-turbulent conditions prevail in ~25% of detected LBCs, surmised to be preferentially early in their lifecycle. We conclude that non-turbulent LBCs are likely common over the polar regions owing primarily to atmospheric temperature and stability. Such stable environments are known to support gravity wave activity. Using large-eddy simulations we find that short to intermediate period gravity waves may catalyze turbulence formation when aerosol particles available for activation are sufficiently small. We posit that the frequent occurrence of non-turbulent LBCs over the polar regions has implications for polar aerosol-cloud interactions and their parameterization in large-scale models.

Clouds↗

Development of a Human Systems Integration Plan

NASA defines Human Systems Integration (HSI) as part of the overall systems engineering and acquisition strategy for space systems. The HSI Plan defines how HSI activities will be implemented across the lifecycle of the mission, as required by NPR 7123.1C, NASA Systems Engineering Processes and Requirements, and NPR 8705.2C Human-Rating Requirements for Space Systems. The goal of this presentation is to share with government and industry how an HSI Plan can be implemented. The presentation will cover HSI implementation for flight systems, vehicle processing, and interfaces. These are divided into six NASA HSI Domains: human factors engineering, operations resources, safety, training, maintainability and supportability, habitability and environment. HSI activities go across the mission’s lifecycle from pre-formulation and acquisition through design, development, operations, maintenance, and decommissioning. The HSI Plan includes a description of the HSI activities and products that are essential for human rating, operability, maintainability, supportability, and affordability of the mission systems. It also describes the role of the HSI Team required as part of the Human Rating process. The HSI Plan utilizes the operational expertise within NASA to ensure designs and testing are successful, leading to acceptable human spaceflight vehicles.

Jackelynne Silva-Martinez↗

Adding a Verification View for Autonomous Real-Time Architecture

Spacecraft software systems continue to increase in complexity and must frequently operate autonomously for extended periods. Thus, the consequences of software flaws are increasing and it is necessary to improve development methods to minimize the risk of latent flaws in the operational software. Traditional software architectures place verification as one element in the development architectural view and treat verification as a later lifecycle activity that is considered complete when the system is certified for flight. The Gateway Vehicle System Manager team, recognizing the importance of verification throughout the system lifecycle, is treating verification as an additional architectural view that receives continuous attention from the requirements analysis phase and continuing for the life of the operational system. The verification view consists of two viewpoints: development and operational. We present background on the verification view and discuss the approaches the Vehicle System Manager team is taking.

James B Dabney↗

Formal Methods Demonstration Project for Space Applications

Requirements and design specifications are a high priority candidate for better software engineering techniques. Most hazardous software safety errors found during system integration and test of two NASA spacecraft were the result of requirements discrepancies or interface specifications. The highest density of major defects found through the use of software inspections was during the requirements phase. This was seven times higher than the density of major defects found in code inspections. Requirements errors are between 10 and 100 times more costly to fix at later phases of the software lifecycle than at the requirements phase itself. One study found that early lifecycle errors are the most likely to lead to catastrophic failures.

critical↗

Ground Software Technologies – Embracing Change: Mission Drivers and Technology Opportunities to Enable Long Lived Missions

Mission lifecycles have proven to extend well beyond their original design. The benefits to this are countless but introduce challenges in today’s rapidly changing ground infrastructure and software technologies used to enable mission success. What remains constant is the risk posture missions maintain when accepting change and the use of new technologies. Larger missions are ready for change in early lifecycle development but near launch and especially in operations, few continue to evolve beyond what is set in place in phase C. This paper will discuss how the Advance Multi-Mission Operations System (AMMOS) intends to address, three driving missions concerns: Maintaining functionality (hardware/software) for decades, rapidly responding to security vulnerabilities in software, and finally the ability to quickly evolve infrastructure and software changes. These driving concerns are briefly described below: 1. Maintaining functionality (hardware/software) for decades. Hardware updates considerably faster than 10 years ago. Expectations that a system can remain in place for more than 10 years is no longer valid. Expecting to find hardware replacements for a system older than 5 years will increasingly become more and more challenging. How than do missions plan for hardware changes for long lived missions? Principle Objective: Provide abstraction by virtualizing and containerizing software abstract away any hardware dependencies and package up the application lightweight units. 2. Rapidly responding to security vulnerabilities in software. Cost is often the main impediment and largely driven by the revalidation and testing of system that undergo change. In todays, environment security updates are a major diver demanding systems remain up to date. How then do missions accept these changes and avoid large testing efforts? Principle Objective: Help reduce the cost of re-testing by automation of testing, deployment, and compartmentalizing change. 3. Ability to quickly evolve infrastructure and software changes. Responding quickly to change is similar to the second concern in this paper regarding security vulnerabilities. In this case, it address broader concerns of updating software and infrastructure on a more realistic timeline. How do missions stay up to date with the most recent versions of software and allowing for improved functionality? Principle Objective: Use continuous integration techniques at the system level to ensure rapid turnaround. This paper explores each of these concerns in more detail. It focuses the AMMOS’s current plans, challenges and current roadmap.

Giovannoni, Brian J.↗

Additive Manufacturing for Rocket Propulsion Applications

Metal Additive manufacturing (AM) is changing how components are being fabricated for current and next generation spaceflights. AM provides many advantages including cost and schedule reduction, enhanced complexity for light-weighting, consolidation of parts, and improved performance using novel alloys and improved designs. This presentation will highlight some of the use cases of AM in rocket propulsion applications, the various processes and attributes for proper selection, and the integrated lifecycle for proper AM use. As AM evolves, there is a need to better understand these lifecycle design constraints such as geometry, microstructure and resulting properties, and surface texture for proper implementation. Ongoing research is being conducted on integral channel heat exchangers, such as combustion chambers and nozzles, using some of the AM processes. The presentation will conclude with a focus on this AM heat exchanger research and how it may be applied for future spaceflight.

Additive Manufacturing↗

Autonomous In-space Construction, Maintenance, and Reconfiguration Using Programmable Meta-Material

NASA ARC's Coded Structures Laboratory (CSL) is developing autonomous construction, maintenance, and reconfiguration technologies to meet long-duration and deep space infrastructure needs, in accordance with long-term NASA goals of "in-space reliance" and "mass-less exploration." We seek to achieve these capabilities by utilizing a "programmable meta-material" approach that integrates emerging advances in materials (mechanical meta-materials), manufacturing (cooperative mobile robotics), and autonomy (multi-agent planning algorithms). Through the ARMADAS project, we have shown assembly of high-performance engineered cellular materials using multiple cooperating mobile robotic assemblers. In this paper, we describe how such a programmable meta-material architecture may shift the paradigm of how we design, build, manufacture, and operate future space infrastructure and assets. The core of a programmable meta-material architecture consists of 3 main technology sub-areas: the structure, the assembly agents, and the assembly algorithms. We co-design these systems to ensure an adaptable system that can create and reconfigure structures from a base set of building block components. From this core technology, we can branch out and expand the capability of the system through additional secondary component types and robotic agents to perform activities such as inspections, maintenance, repair, payload installation, or perform power and communications interconnect. As these technologies mature, future designers will be able to utilize the system to rapidly integrate and operate assets in space or on planetary surfaces from a set of well-tested part library, or create their own modules to integrate into the system. A core trait to the development of this system is the automation approach. Because of the modular and functional discrete (pixel-like) nature of the structural system, a diverse set of powerful algorithms for analysis, planning, and simulation can be adapted and leveraged to optimize construction, maintenance, and dynamic reorganization (as hardware with programmable form and function). With an ability to free the design space from launch vehicle constraints and fundamentally shift how a mission is designed and conducted, we discuss the influence of a programmable meta-material architecture on mission design, build, and operations. For the "design phase", we discuss project lifecycle effects, costs, time, and performance. For the "build phase", we discuss reusability, ISRU, manufacturing, material logistics, and scalability. And for "operations", we discuss autonomy, maintenance and upgrades, reliability, and reconfiguration. Autonomy and modularity are the primary enabling traits of this system. Engineering systems that utilize a modular and reconfiguration building block approach such as digital communication and computation systems, currently lead all other areas of technology in size and complexity scalability. NASA is extending the benefits and flexibility of digital systems to hardware systems, to optimize materials lifecycle management and expand our space exploration mission capabilities.

in space assembly↗