Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “integrated planning and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Bonneville, Power Administration Timing System

Time is an integral part of the Bonneville Power Administration's (BPA) operational systems. Generation and power transfers are planned in advance. Utilities coordinate with each other by making these adjustments on a timed schedule. Price varies with demand, so billing is based on time. Outages for maintenance are scheduled to assure they do not interrupt reliable power delivery. Disturbance records are aligned with recorded timetags for analysis and comparison with related information. Advanced applications like traveling wave fault location and real-time phase measurement require continuous timing with high precision. Most of BPA is served by a Central Time System (CTS) at the Dittmer Control Center near Portland, OR. This system keeps time locally and supplies time to both the control center systems and field locations via a microwave signal. It is kept synchronized to national standard time and coordinated with interconnected utilities. It is the official BPA time. Powwer system control and operation is described, followed by a description of BPA timing systems including CTS, the Fault Location Acquisition Reporter, time dissemination, and phasor measurements. References are provided for further reading.

Martin, Kenneth E.↗

Landsat 9: Mission Status and Prelaunch Instrument Performance Characterization and Calibration

Landsat 9 is currently under development as a joint effort between NASA and the United States Geological Survey (USGS). Landsat 9 is essentially a rebuild of Landsat 8 and has the same two sensors, the Operational Land Imager (OLI) and the Thermal Imaging Sensor (TIRS). The OLI-2 on Landsat 9, is being built by Ball Aerospace and has completed its pre-launch characterization and calibration and is scheduled to be delivered in the summer of 2019. The TIRS-2, being built by Goddard Space Flight Center, is currently undergoing testing through Spring 2019 and also scheduled for summer 2019 delivery. Several improvements to the characterization of both instruments have been incorporated into the testing plan, including improved spectral and radiometric characterization. The instruments will then be integrated onto the spacecraft being built by Northrop Grumman Innovation Systems (NGIS). The mission is targeted to launch as early as December 2020 on an Atlas-5.

Markham, Brian↗

Landsat 9: Mission Status and Prelaunch Instrument Performance Characterization and Calibration

Landsat 9 is currently under development as a joint effort between NASA and the United States Geological Survey (USGS). Landsat 9 is essentially a rebuild of Landsat 8 and has the same two sensors, the Operational Land Imager (OLI) and the Thermal Imaging Sensor (TIRS). The OLI-2 on Landsat 9, is being built by Ball Aerospace and has completed its pre-launch characterization and calibration and is scheduled to be delivered in the summer of 2019. The TIRS-2, being built by Goddard Space Flight Center, is currently undergoing testing through Spring 2019 and also scheduled for summer 2019 delivery. Several improvements to the characterization of both instruments have been incorporated into the testing plan, including improved spectral and radiometric characterization. The instruments will then be integrated onto the spacecraft being built by Northrop Grumman Innovation Systems (NGIS). The mission is targeted to launch as early as December 2020 on an Atlas-5.

Markham, Brian↗

Integrated payload and mission planning, phase 3. Volume 4: Optimum utilization of Spacelab racks and pallets

The methodology to optimize the utilization of Spacelab racks and pallets and to apply this methodology to the early STS Spacelab missions was developed. A review was made of Spacelab Program requirements and flow plans, generic flow plans for racks and pallets were examined, and the principal optimization criteria and methodology were established. Interactions between schedule, inventory, and key optimization factors; schedule and cost sensitivity to optional approaches; and the development of tradeoff methodology were addressed. This methodology was then applied to early spacelab missions (1980-1982). Rack and pallet requirements and duty cycles were defined, a utilization assessment was made, and several trade studies performed involving varying degrees of Level IV integration, inventory level, and shared versus dedicated Spacelab racks and pallets.

Logston, R. G.↗

Evaluation of an Arrival Coordinator Position in a Terminal Metering Enviornment

NASA has developed an integrated arrival-management solution for terminal area precision scheduling (TAPSS). Ahuman-in-the-loop simulation investigated the performance of the components of the TAPSS system. The focus ofthis paper is set on the terminal radar approach control (TRACON) traffic management controller (TMC) and ArrivalRadar Coordinator (ARC) combined position, which played an integral part in coordinating, adjusting, and instantiatingthe arrival schedule computed by the TAPSS system. Analysis of the simulation data highlights the roleof the ARC within the described terminal metering environment, describes his planning strategies, the interactionswith his tools and coordination with controllers, and lends insights to the impact of the ARCs actions to the arrivalproblem. High levels of comfort and confidence were reported when working with the TAPSS system. Challengesposed the sequencing of unscheduled satellite arrival flights during periods of peak demand. To accommodate thoseflights into the arrival stream, the ARC had to identify sequence slots, while minimizing disruptions to the schedule.

terminal metering↗

Guest Editorial: Planning and operation of resilient distribution system for integrated multi-energy

Resilience is the ability of power systems to prepare for and adapt to low-probability, high-impact incidents and withstand and recover rapidly from disruptions. With the ageing of electricity distribution infrastructure and increasing threats of weather-related incidents and natural disasters, the need to effectively enhance the resilience of the electricity distribution system has become urgent and has attracted worldwide attention. Although there are an increasing number of publications related to enhancing resilience strategies, resilience is an emerging concept in power systems. Existing practices are mostly focused on deploying distributed energy resources (DERs) and microgrids, hardening the existing infrastructures and building redundant capacities. However, from a broader perspective, resilience enhancement of power distribution system is a systematic engineering, involving long-term system planning and upgrading (e.g., deployment of smart grid technologies and intelligent switches), short-term proactive scheduling, real-time robust and resilient control of DERs, and post-event restoration and recovery strategies. Based on this point, this Special Issue in IET Energy System Integration focuses on soliciting the most recent and original technologies, scheduling and control strategies for improving the resilience of power distribution system. Eight papers are presented in this Special Issue, covering various aspects related to resilience enhancement of power distribution system, including fault-tolerant frequency measurement, robust scheduling of integrated electricity and district heating systems, robust control of DERs, efficient methods for safety verification as well as novel graph theory-based approach to restore the distribution systems after multiple simultaneous faults. A brief introduction of these 8 papers is provided below.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Shared automated vehicle fleet operations for first-mile last-mile transit connections with dynamic pooling

Shared automated vehicles (SAVs) have the potential to promote transit ridership by providing efficient first-mile last-mile (FMLM) connections through reduced operational costs to fleet providers and lower out-of-pocket costs to riders. To help plan for a future of integrated mobility, this paper investigates the impacts of SAVs serving FMLM connections, as a mode that provides flexibility in access/egress decisions and is well coordinated with train station schedules. To achieve this objective, a novel dynamic pooling algorithm was introduced to match SAVs with riders while coordinating the riders' arrival times at the light-rail station to a known train schedule. Microsimulations of SAVs and travelers throughout two central Austin neighborhoods show how larger service areas, higher levels of SAV demand, and longer arrival times between successive trains require larger SAV fleet sizes and higher SAV utilization rates to deliver close traveler wait times. Four-person SAVs appear to perform similar to 6-seat SAVs but will cost less to provide. Using a dynamic pooling algorithm tightly coordinated with train arrivals (every 15 min) delivers 87% of travelers to their stations in time to catch the next train, whereas uncoordinated assignments deliver just 58% of travelers in time.

33 ADVANCED PROPULSION SYSTEMS↗

Case study: Lockheed-Georgia Company integrated design process

A case study of the development of an Integrated Design Process is presented. The approach taken in preparing for the development of an integrated design process includes some of the IPAD approaches such as developing a Design Process Model, cataloging Technical Program Elements (TPE's), and examining data characteristics and interfaces between contiguous TPE's. The implementation plan is based on an incremental development of capabilities over a period of time with each step directed toward, and consistent with, the final architecture of a total integrated system. Because of time schedules and different computer hardware, this system will not be the same as the final IPAD release; however, many IPAD concepts will no doubt prove applicable as the best approach. Full advantage will be taken of the IPAD development experience. A scenario that could be typical for many companies, even outside the aerospace industry, in developing an integrated design process for an IPAD-type environment is represented.

Waldrop, C. T.↗

The road plan model: Information model for planning road building activities

The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

Azinhal, Rafaela K.↗

DIP: Digital Information Platform

The third DIP workshop’s topic is DIP for Flight Operators and Consumers. Participants will receive insight the consumer onboarding process and steps to take to consume from the platform. Showcase demos will be provided covering data integration services, data analytics using ML/AI technologies, and Collaborative Digital Decision Reroute (CDDR) capabilities. More details on service performance metrics will be discussed as well as updates on the technical development plan and schedule. Participants interested in consuming DIP services are highly encouraged to attend this workshop and provide feedback.

ATM-X↗

Ring Buffered Network Bus

This report describes the research effort to demonstrate the integration of a data sharing technology, Ring Buffered Network Bus, in development by Dryden Flight Research Center, with an engine simulation application, the Java Gas Turbine Simulator, in development at the University of Toledo under a grant from the Glenn Research Center. The objective of this task was to examine the application of the RBNB technologies as a key component in the data sharing, health monitoring and system wide modeling elements of the NASA Aviation Safety Program (AVSP) [Golding, 1997]. System-wide monitoring and modeling of aircraft and air safety systems will require access to all data sources which are relative factors when monitoring or modeling the national airspace such as radar, weather, aircraft performance, engine performance, schedule and planning, airport configuration, flight operations, etc. The data sharing portion of the overall AVSP program is responsible for providing the hardware and software architecture to access and distribute data, including real-time flight operations data, among all of the AVSP elements. The integration of an engine code capable of numerically "flying" through recorded flight paths and weather data using a software tool that allows for distributed access of data to this engine code demonstrates initial steps toward building a system capable of monitoring and modeling the National Airspace.

Source record↗

Logistics planning for phased programs.

It is pointed out that the proper and early integration of logistics planning into the phased program planning process will drastically reduce these logistics costs. Phased project planning is a phased approach to the planning, approval, and conduct of major research and development activity. A progressive build-up of knowledge of all aspects of the program is provided. Elements of logistics are discussed together with aspects of integrated logistics support, logistics program planning, and logistics activities for phased programs. Continuing logistics support can only be assured if there is a comprehensive sequential listing of all logistics activities tied to the program schedule and a real-time inventory of assets.

Cook, W. H.↗

Planning for Space Station utilization

User requirements for the planned Space Station, and utilization planning to meet those needs, are discussed. The continual involvement of the customer in all aspects of the Space Station Program is to be achieved by identifying customers and by defining, refining, and integrating their requirements so as to stimulate the best possible design, development, and operations. Planning guidelines to be used in the Space Station definition process are shown and discussed, as is the Space Station Planning Schedule.

Raney, W.↗

Modular, Crushed-Rock Thermal Energy Storage Pilot Design (Final Report)

The goal of this project was to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The completed effort included a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. For the feasibility study, the Brenmiller technology was designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) NGCC plant in Astoria, New York. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. The study also included a techno-economic evaluation of a 200 MWh commercial-scale demonstration. Prior to this project, EPRI had reviewed Brenmiller’s technology, which is being built to demonstrate bGen™ at 1.7 MWe on a solar plant (Rotem) and has been designed for an NGCC facility in Italy, assessing it at technology readiness level (TRL) 5. Brenmiller is also conducting a separate 1-MWth pilot with NYPA that pairs a bGen™ module with a microturbine for a combined-heat-and-power (CHP) application to improve efficiency and provide flexibility. The next-step pilot being designed as part of this project would represent a 5-fold increase in scale, versus Rotem, and would show the technology’s ability to provide effective and economical energy storage, bringing the technology to TRL 6. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. The main objective of the work completed by the Electric Power Research Institute, Inc. (EPRI), Brenmiller Energy (Brenmiller), New York Power Authority (NYPA), and United E&C (formerly AECOM) was to perform a Phase I feasibility study on the integration of a crushed-rock thermal energy storage (TES) with a fossil plant. Under this project, the EPRI-led team successfully completed a feasibility study to prepare for the potential future Phase II pre-front end engineering design (pre-FEED) to implement a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. Specific deliverables under this project included the Technology Maturation Plan, Conceptual Study, Techno-Economic Assessment, Technology Gap Assessment, Project Plan for Phase II (submitted as Phase II Renewal Application), Commercialization Plan, and the Final Report (this document). This Final Report includes a compilation of the various summary reports that were prepared during the 12-month schedule of the Phase I project execution under award DE-FE0032017.

03 NATURAL GAS↗

The MSFC Systems Engineering Guide: An Overview and Plan

As systems and subsystems requirements become more complex in the pursuit of the exploration of space, advanced technology will demand and require an integrated approach to the design and development of safe and successful space vehicles and there products. System engineers play a vital and key role in transforming mission needs into vehicle requirements that can be verified and validated. This will result in a safe and cost effective design that will satisfy the mission schedule. A key to successful vehicle design within systems engineering is communication. Communication, through a systems engineering infrastructure, will not only ensure that customers and stakeholders are satisfied but will also assist in identifying vehicle requirements; i.e. identification, integration and management. This vehicle design will produce a system that is verifiable, traceable, and effectively satisfies cost, schedule, performance, and risk throughout the life-cycle of the product. A communication infrastructure will bring about the integration of different engineering disciplines within vehicle design. A system utilizing these aspects will enhance system engineering performance and improve upon required activities such as Development of Requirements, Requirements Management, Functional Analysis, Test, Synthesis, Trade Studies, Documentation, and Lessons Learned to produce a successful final product. This paper will describe the guiding vision, progress to date and the plan forward for development of the Marshall Space Flight Center (MSFC) Systems Engineering Guide (SEG), a virtual systems engineering handbook and archive that will describe the system engineering processes that are used by MSFC in the development of complex systems such as the Ares launch vehicle. It is the intent of this website to be a "One Stop Shop" for our systems engineers that will provide tutorial information, an overview of processes and procedures and links to assist system engineering with guidance and references, and provide an archive of systems engineering artifacts produced by the many NASA projects developed and managed by MSFC over the years.

Shelby, Jerry A.↗

Plankton, Aerosol, Cloud, Ocean Ecosystem (PACE) Mission Integration and Testing

This paper describes the plans, flows, key facilities, components and equipment necessary to fully integrate, functionally test and qualify the Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Observatory. PACE is currently in the design phase of mission implementation. It is scheduled to launch in 2022, extending and improving NASA's twenty-year record of satellite observations of global ocean biology, aerosols and clouds. PACE will advance the assessment of ocean health by measuring the distribution of phytoplankton, which are small plants and algae that sustain the marine food web. It will also continue systematic records of key atmospheric variables associated with air quality and the Earth's climate. The PACE observatory is comprised of the spacecraft and three instruments, an Ocean Color Instrument (OCI) and two polarimeters, the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone). The spacecraft and the OCI, which is the primary instrument, are developed and integrated at the NASA Goddard Space Flight Center (GSFC). The OCI is a hyper-spectral scanning (HSS) radiometer designed to measure spectral radiances from the ultraviolet to shortwave infrared (SWIR) to enable advanced ocean color and heritage cloud and aerosol particle science. The HARP2 and SPEXone are secondary instruments on the PACE observatory, acquired outside of GSFC. The Hyper-Angular Rainbow Polarimeter instrument (HARP2) is a wide swath imaging polarimeter that is capable of characterizing atmospheric aerosols for purposes of sensor atmospheric correction as well as atmospheric science. The SPEXone provides atmospheric aerosol and cloud data at high temporal and spatial resolution. This paper will focus on the Integration and Test (I&T) activities for the PACE mission at NASA GSFC. This I&T phase consists of mechanical, electrical and thermal integration and test of all the spacecraft subsystems and the integration of the instruments with the spacecraft. The PACE observatory environmental tests include electromagnetic interference (EMI)/electromagnetic compatibility (EMC), vibration, acoustics, shock, thermal balance, thermal vacuum, mass properties and center of gravity. This paper will also discuss the observatory shipment to the launch site as well as the launch site processing.

Petro, Susanna↗

The Fluids Integrated Rack and Light Microscopy Module Integrated Capabilities

The Fluids Integrated Rack (FIR), a facility class payload, and the Light Microscopy Module (LMM), a subrack payload, are scheduled to be launched in 2005. The LMM integrated into the FIR will provide a unique platform for conducting fluids and biological experiments on ISS. The FIR is a modular, multi-user scientific research facility that will fly in the U.S. laboratory module, Destiny, of the International Space Station (ISS). The first payload in the FIR will be the Light Microscopy Module (LMM). The LMM is planned as a remotely controllable, automated, on-orbit microscope subrack facility, allowing flexible scheduling and control of fluids and biology experiments within the FIR. Key diagnostic capabilities for meeting science requirements include video microscopy to observe microscopic phenomena and dynamic interactions, interferometry to make thin film measurements with nanometer resolution, laser tweezers for particle manipulation, confocal microscopy to provide enhanced three-dimensional visualization of structures, and spectrophotometry to measure photonic properties of materials. The LMM also provides experiment sample containment for frangibles and fluids. This paper will provide a description of the current FIR and LMM designs, planned capabilities and key features. In addition a brief description of the initial five experiments planned for LMM/FIR will be provided.

Motil, Susan M.↗

Waste Management Project Success - Regulatory Assurance Systems - 20118

Waste management (WM) and remediation projects are essential within a restorative environmental culture. Despite years of experience, challenges and obstacles associated with efficient and effective WM project execution remain. Although some obstacles are project specific, a common challenge is navigating the regulatory landscape from planning through execution, particularly with first of a kind (FOAK) and first in a while (FIAW) projects. The absence of a comprehensive regulatory assurance strategy places significant hurdles in the path of project success. To clear a path for the successful execution of increasingly complex WM projects, this paper focuses on development of a comprehensive regulatory assurance strategy and implementation plan that effectively engages stakeholders, agencies, and performers to produce project plans that fully and cost effectively integrate applicable regulatory requirements. The most reliable way to align regulatory processes and decisions needed for mission success is through a regulatory assurance system. This system establishes a healthy interface with regulatory decision makers, to work in a collaborative manner, to create a common vision for regulatory decisions on an agreed upon schedule. A regulatory assurance system consists of several elements. Although the mission may vary from cleanup to site closure to nuclear component production, the elements of a regulatory assurance system remain essentially constant and must include: 1) identifying a common vision or end state, 2) developing a long-term, integrated strategy and schedule, 3) establishing a regulatory partnering team consisting of key decision-makers, 4) regular and frequent communication with decision-makers, 5) ensuring consistent surveillance for early identification of issues and changes that may impact the project, 6) quick resolution of emerging issues to prevent schedule impact, 7) identifying core compliance functions, 8) periodically assessing progress of the project as it relates to regulatory assurance and, 9) providing constructive feedback to improve the process. A regulatory assurance system provides a living, multi-faceted approach to planning, visioning, communicating and tracking to avoid surprises and ensure smooth and timely progress to the project. The overall success measures will be whether the system produces common sense regulatory decisions supporting the vision on time without appeal. Effective regulatory frameworks rarely happen on their own. Balanced, common-sense regulatory decisions stem from teams that are trained to work together to achieve shared goals. In this paper, particular attention is placed on the importance of starting with a shared vision for a regulatory assurance and execution strategy that leverages experience to establish optimal approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗