Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Fabrication and installation of the Mu2e cryogenic distribution system

The muon-to-electron conversion (Mu2e) experiment at Fermilab will be used to search for the charged lepton flavor-violating conversion of muons to electrons in the field of an atomic nucleus. The Mu2e experiment is currently in the construction stage. The scope of this paper is the cryogenic distribution system and superconducting power leads for four superconducting solenoid magnets: Production Solenoid (PS), an Upstream and Downstream Transport Solenoids (TSu and TSd) and Detector Solenoid (DS). The design of the cryogenic distribution system and the fabrication of several sub-systems was reported previously. This paper reports on additional fabrication and installation progress that has been performed over the past two years. Lessons learned during fabrication and testing of the cryogenic distribution system components are described. In particular, the challenges and solutions implemented for aluminum welding are reported. A description of the process used to qualify the welding procedure and welders for welding the aluminium stabilized NbTi superconducting power leads is provided. Additionally, the progress made with regards to installing the power leads into the cryogenic Feedboxes is covered.

White, Michael J.↗

2021 Prototype Manufacture and Installation Awardee: Pecos Wind Power, Inc.

Through the 2021 Competitiveness Improvement Project (CIP), Pecos Wind Power will manufacture a prototype of its 85-kilowatt (kW) horizontal-axis distributed wind turbine, the PW85, a new wind turbine that began development in 2017 when the company was founded. The PW85 wind turbine includes an industry-leading rotor diameter (30 meters) and full-span variable pitch blades to target a levelized cost of energy (LCOE) of $0.103/kilowatt-hour in low annual wind speeds (6 meters per second). This is 55% lower than the average small wind turbine project installed in 2018. The goal of this project is to spur the development of increasingly lower-cost, high-capacity-factor distributed wind turbines. As a result, Pecos Wind Power will manufacture and install wind turbines that increase the geographic area in which distributed wind power is cost competitive with retail-priced electricity and other distributed energy resources - primarily solar energy.

CIP↗

Automated solar collector installation design including version management

Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of predefined “features” with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives. Some embodiments may provide viewing, creating, and manipulating of multiple versions of a solar collector layout design for a particular installation worksite. The use of versions may allow analysis of alternative layouts, alternative feature classifications, and cost and performance data corresponding to alternative design choices. Version summary information providing a representative comparison between versions across a number of dimensions may be provided.

14 SOLAR ENERGY↗

Exploring the Potential of Factory Installed Solar + Storage for Homebuilding

In recent years, an increasing number of grid disruptions due to intense weather events, natural disasters, and high peak loads resulted in increased interest in energy-resilient homes. Solar + storage (S+S) as an energy resiliency solution can provide continuity, onsite generation, and backup power during critical events. This project explored factory-installed solar plus storage (FISS) to overcome first cost and installation barriers and bring this resiliency solution to scale for single-family affordable and market-rate homebuyers. Guided by the principles of Lean manufacturing, the team explored how factories building high-performance zero energy modular homes can incorporate S+S into their existing construction system while improving quality and productivity and reducing the costs of the resilient energy system.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION,↗

IOTA Proton Injector Beamline Installation

The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility, is a beamline capable of delivering 20-mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. First beam in the IPI beamline is anticipated in 2023, when it will operate alongside the existing electron injector beamline to facilitate further fundamental physics research and continued development of novel accelerator technologies in the IOTA ring. This report details the expected operational profile, known challenges, and the current state of installation.

43 PARTICLE ACCELERATORS↗

Quantifying Error in Photovoltaic Installation Metadata: Preprint

In this research, we quantify the level of metadata error for a fleet of 2860 photovoltaic (PV) systems, using metadata values provided by fleet owners. Using satellite imagery and time series analysis techniques available in open-source Python packages Panel-Segmentation and PVAnalytics, respectively, we evaluate the accuracy of PV system metadata such as location, azimuth, tilt, and mounting configuration (fixed tilt vs. tracking). We find that approximately 75% of provided latitude-longitude coordinates are within 190 meters of the actual solar installation. We were unable to link 7.8% of latitude-longitude coordinates to any solar installation via satellite imagery analysis. We evaluate the level of error in owner-provided mounting configuration (fixed tilt vs. single-axis tracking), finding only 8 systems with an incorrect mounting configuration. When evaluating azimuth and tilt parameters, we find that approximately 64% of the data is correct, with data for 860 systems (approximately 30%) not provided by system owners. To illustrate the importance of having correct solar metadata, we evaluate how incorrect metadata affects solar performance estimates by modeling system AC energy output at ground-truth vs. incorrect latitude-longitude coordinates, mounting configurations, and azimuth-tilt configurations. Energy output estimates can vary significantly if incorrect metadata parameters are used, with incorrect mounting configuration leading to the largest discrepancy with over 20% variation in expected energy output.

azimuth↗

Method of installing a hybrid foundation for offshore wind turbines

A method of installing a hybrid foundation for an offshore wind turbine, the method includes providing a monopile, friction wheel, and suction bucket; installing the friction wheel and suction bucket in the sea floor; and inserting the monopile through the opening into the sea floor.

Zeng, Xiangwu↗

Evaluating the Long-Term Ecological Responses to Riparian Ecosystem Restoration at the Fort Benning, Georgia Military Installation

Riparian and instream restorations are commonly implemented to improve ecosystem condition. However, very few restoration activities are monitored for multiple years to assess long-term effectiveness. At the Department of Defense’s Fort Benning Military Installation (FBMI) in west-central Georgia, two experimental restoration projects (ephemeral drainage revitalization and instream habitat augmentation [i.e., coarse woody debris (CWD) additions]) were implemented ~14 years ago with the goal of reducing environmental impacts of military training activities. A SERDP project found that instream restoration improved some aspects of ecosystem function and community structure but not others. The objective of the current study was to re-evaluate the effect of these restoration practices on stream ecosystem processes ~14 years after implementation.

54 ENVIRONMENTAL SCIENCES↗

Breakdown of Electric Vehicle Supply Equipment Installation Costs

The plug-in electric vehicles (PEVs) market is receiving help from the current political climate, incentives at the federal and state levels, excessive cost of petroleum fuel, growing focus on climate solutions, increasing investment and direction by automobile manufacturers and increased awareness through media reports and advertising. Increasingly, the transportation industry, in both the United States and many other countries, is aimed at electric motive energy where practical. Increased investment in research and development have led to increasing vehicle range and lower battery costs; both of which have been deterrents in the past. The increasing demand for PEVs (consisting of the battery electric vehicle [BEV] and plug-in hybrid electric vehicle [PHEV], is challenged by the need for charging infrastructure to support these vehicles. The BEV relies totally on the on-board battery to supply the motive energy while the PHEV utilizes its battery and an installed internal combustion engine (ICE). The maximum benefit is achieved by using the battery power as much as possible. This arrangement requires the use of battery charging equipment, known as electric vehicle supply equipment (EVSE).

33 ADVANCED PROPULSION SYSTEMS↗

Long-Duration Energy Storage: Resiliency for Military Installations

This report provides a quantitative techno-economic analysis of a long-duration energy storage (LDES) technology, when coupled to on-base solar photovoltaics (PV), to meet the U.S. Department of Defense's (DoD's) 14-day requirement to sustain critical electric loads during a power outage and significantly reduce an installation's carbon footprint. The LDES modeled is Antora Energy's battery energy storage system (BESS). It is currently at a technology readiness level (TRL) of 7 and not ready for full-scale deployment. To support decisions on the value of near-term demonstrations, this analysis looked at the potential value of Antora Energy's BESS if deployed in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Nasa research on the aerodynamics of jet vtol engine installations

This paper summarizes some of the more pertinent results of NASA investigations related to the aerodynamics of jet VTOL engine installations. It shows that there is a base loss in hovering due to suction forces creased on the underside of the fuselage by the entrainment of ambient air in the slipstream, and that the magnitude of this effect is related to the turbulence in the jet stream and its consequent rate of mixing with ambient air. It also shows that there are large lift losses and pitching moments due to jet-free-stream interference and that these characteristics can be significantly altered by proximity to the ground. And, finally, it shows that simple bellmouth inlets give good pressure recovery and low distortion for vertically mounted lift engines if the inlet lip radius is sufficiently large, but that such inlets are not suitable for windmill starting of the engines.

VTOL AIRCRAFT↗

Installation and Assembly, Electrical Ground Support Equipment (GSE), Specification for

This specification covers the general workmanship requirements and procedures for the complete installation and assembly of electrical ground support equipment (EGSE) such as terminal distributors, junction boxes, conduit and fittings, cable trays and accessories, interconnecting cables (including routing requirements), motor-control equipment, and necessary hardware as specified by the applicable contract and drawings.

Electrical and Electronics↗

NASA Engineering and Safety Center Technical Bulletin No. 15-01: Preventing Incorrect Installation of Polarized Capacitors

Even though NASA’s Lessons Learned Information System has an entry on the reverse installation of polarized capacitors, this error keeps reoccurring and is a “lesson not learned.” The purpose of this bulletin is to discuss some of the reasons this keeps happening as well as offer best practices to prevent this error in the future.

Preventing Incorrect Installation of Polarized Cap↗

Installer Badges Toolkit

As the focus on home energy efficiency grows, the National Renewable Energy Lab (NREL) and the U.S. Department of Energy (DOE) Weatherization Assistance Program (WAP) are collaborating with the home energy retrofit industry to support the development of skilled workers. The Installer Badges Toolkit provides a flexible, customizable, and voluntary approach to training and skills recognition for WAP implementers, utility programs, private sector workers, and contractors.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Foundations of Off-Grid Solar in Haiti: 6. Installation, Operations, and Maintenance of Off-Grid Solar Systems

This training lends insight into key information and concepts for off-grid solar in Haiti, building foundational knowledge and an ability to catalyze interest in off-grid solar for rural electrification in Haiti. This self-paced course is offered in both English and French and covers a variety of topics related to energy access in Haiti including off-grid solar products, market potential in Haiti, supply and demand side considerations, system design, installation and maintenance, off-grid solar business models, financial modeling, gender and energy access, productive use of energy, and climate adaptation. The training is intended for university students, government partners, NGOs, funders, development partners, professionals, and more. No prior knowledge of off-grid solar or Haiti is required to benefit from this training. See NREL/PR-7A40-89260 for the French translation of this document.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗