Load Control System Reliability

This report summarizes the results of the Load Control System Reliability project (DOE Award DE-FC26-06NT42750). The original grant was awarded to Montana Tech April 2006. Follow-on DOE awards and expansions to the project scope occurred August 2007, January 2009, April 2011, and April 2013. In addition to the DOE monies, the project also consisted of matching funds from the states of Montana and Wyoming. Project participants included Montana Tech; the University of Wyoming; Montana State University; NorthWestern Energy, Inc., and MSE. Research focused on two areas: real-time power-system load control methodologies; and, power-system measurement-based stability-assessment operation and control tools. The majority of effort was focused on area 2. Results from the research includes: development of fundamental power-system dynamic concepts, control schemes, and signal-processing algorithms; many papers (including two prize papers) in leading journals and conferences and leadership of IEEE activities; one patent; participation in major actual-system testing in the western North American power system; prototype power-system operation and control software installed and tested at three major North American control centers; and, the incubation of a new commercial-grade operation and control software tool. Work under this grant certainly supported the DOE-OE goals in the area of “Real Time Grid Reliability Management.”

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Texas A&M Radioisotope Production and Radiochemistry Program

The main motivation of the project at Texas A&M University was to carry out the production of critically needed radioisotopes used in medicine for diagnostic and therapy, and to establish an academic program in radionuclide production and separation methods. After a lengthy battle with the Texas A&M University Radiation Safety Office, the Texas Department of State Health Services granted us a license for the production of radionuclides in July 2015, allowing us to work in earnest in our project objectives. Experiments began immediately after licensing, and we started the assembly and testing of our target systems. There were four analytical/theoretical projects and two experimental target systems. These were for At-211 production and for Zn- 62/Cu-62 production. The theoretical projects were related to the production of Mo-99/Tc-99m using (a) a subcritical aqueous target system and (b) production of Tc-99m from accelerator-generated Mo-99 utilizing a photon-neutron interaction with enriched Mo-100 targets. The two experimental projects were the development of targetry systems and production of At-211 and Zn-62/Cu-62 generator. The targetry system for At-211 has been tested and production of At-211 is chronic depending of availability of beam time at the cyclotron. The installation and testing of the targetry system for the production of Zn-62/Cu-62 has not been finalized. A description of the systems is described. The academic program in radionuclide production and separation methods was initiated in the fall of 2011; due to the lack of a radiochemistry laboratory, it was suspended. We expect to re-start the academic program at the Texas A&M Institute for Preclinical Studies under the Molecular Imaging Program.

43 PARTICLE ACCELERATORS↗

Establishment, test and evaluation of a prototype volcano surveillance system

A volcano-surveillance system utilizing 23 multilevel earthquake counters and 6 biaxial borehole tiltmeters is being installed and tested on 15 volcanoes in 4 States and 4 foreign countries. The purpose of this system is to give early warning when apparently dormant volcanoes are becoming active. The data are relayed through the ERTS-Data Collection System to Menlo Park for analysis. Installation was completed in 1972 on the volcanoes St. Augustine and Iliamna in Alaska, Kilauea in Hawaii, Baker, Rainier and St. Helens in Washington, Lassen in California, and at a site near Reykjavik, Iceland. Installation continues and should be completed in April 1973 on the volcanoes Santiaguito, Fuego, Agua and Pacaya in Guatemala, Izalco in El Salvador and San Cristobal, Telica and Cerro Negro in Nicaragua.

Ward, P. L.↗

Evaluation of the Computing Systems for Yucca Mountain Repository TSPA-LA Model Operational Readiness

Sandia National Laboratories (SNL) was tasked to conduct an evaluation of the legacy computing systems of the now-closed Yucca Mountain Project (YMP) to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, in the event that the License Application (LA) review by the U.S. Nuclear Regulatory Commission (NRC) is re-started and involves additional requests for information (RAIs). Six problem areas or components of the computing system were identified and subsequently resolved or improved to ensure the operational readiness of the TSPA-LA model capability on the server cluster. As part of this readiness review, the legacy TSPA computational cluster that was relocated from the SNL YMP Lead Lab Project Office in Las Vegas, Nevada to the SNL offices in Albuquerque, New Mexico was replaced with new hardware. Three floating licenses of Goldsim Version 9.60.300 were installed on the new cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software was tested and installed to support the TSPA- type analysis on the server cluster. TSPA-LA modeling cases were tested and verified for the model reproducibility on the current server cluster. All test runs were executed on multiple processors on the server cluster utilizing the Goldsim distributed processing capability, and all runs were completed successfully. The model reproducibility verification was evaluated by two approaches: numerical value comparison and graphical comparison, and the analysis demonstrated an excellent reproducibility of the TSPA-LA model runs on the server cluster. The current server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

97 MATHEMATICS AND COMPUTING↗

Reproduction of the Yucca Mountain Project TSPA-LA Model Runs using TSPA Computing Systems

Sandia National Laboratories (SNL) conducted an evaluation of total system performance assessment (TSPA) related computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014). The current work examined main components of the computing system identified in the previous work (Lee and Hadgu, 2014) to ensure the operational readiness of the TSPA-LA model capability on the server cluster. The TSPA computing hardware and storage system were replaced in late 2014 to maintain core capability and improve computation efficiency. One floating license of GoldSim Version 9.60.300 was installed on the upgraded cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software was tested and installed to support the TSPA-type analysis on the server cluster. All the TSPA-LA modeling cases were tested and verified for the model reproducibility on the upgraded 2014 server cluster (CL2014). All test runs were executed on multiple processors on the server cluster utilizing the GoldSim distributed processing capability, and all runs completed successfully. The model reproducibility verification was evaluated by two approaches: numerical value comparison and graphical comparison. The analysis demonstrated an excellent reproducibility of the TSPA-LA model runs on the upgraded server cluster. The 2014 server cluster and supporting software systems are fully operational to support TSPA- LA type analysis.

97 MATHEMATICS AND COMPUTING↗

Reproduction of the Yucca Mountain Project TSPA-LA Model Runs using TSPA Computing Systems

Sandia National Laboratories (SNL) conducted an evaluation of total system performance assessment (TSPA) related computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014). The current work examined main components of the computing system identified in the previous work (Lee and Hadgu, 2014) to ensure the operational readiness of the TSPA-LA model capability on the server cluster. The TSPA computing hardware and storage system were replaced in late 2014 to maintain core capability and improve computation efficiency. One floating license of GoldSim Version 9.60.300 was installed on the upgraded cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software was tested and installed to support the TSPA-type analysis on the server cluster. All the TSPA-LA modeling cases were tested and verified for the model reproducibility on the upgraded 2014 server cluster (CL2014). All test runs were executed on multiple processors on the server cluster utilizing the GoldSim distributed processing capability, and all runs completed successfully. The model reproducibility verification was evaluated by two approaches: numerical value comparison and graphical comparison. The analysis demonstrated an excellent reproducibility of the TSPA-LA model runs on the upgraded server cluster. The 2014 server cluster and supporting software systems are fully operational to support TSPA- LA type analysis.

97 MATHEMATICS AND COMPUTING↗

Testing, analysis, and code verification of aerodynamics and heat transfer related to turbomachinery

Discussed here are the writing of a data acquisition code and the installation and testing of new pressure and temperature instrumentation to be used in the testing and evaluation of miniature heat flux sensors. A brief summary of the problem which led to the need for these tests is presented as well as a proposed data acquisition program and the results of investigations of two measurement systems, the Omega OM-900 temperature sensing system and the Scani-Valve Hyscan pressure measurement system.

King, Paul I.↗

The Texas A&M Radioisotope Production and Radiochemistry Program

The main motivation of the project at Texas A&M University was to carry out the production of critically needed radioisotopes used in medicine for diagnostics and therapy, and to establish an academic program in radionuclide production and separation methods. After a lengthy battle with the Texas A&M University Radiation Safety Office, the Texas Department of State Health Services granted us a license for the production of radionuclides in July 2015, allowing us to work in earnest in our project objectives. Experiments began immediately after licensing, and we started the assembly and testing of our target systems. There were four analytical/theoretical projects and two experimental target systems. These were for At-211 production and for Zn-62/Cu-62 production. The theoretical projects were related to the production of Mo-99/Tc-99m using a) a subcritical aqueous target system and b) production of Tc-99m from accelerator-generated Mo-99 utilizing a photon-neutron interaction with enriched Mo-100 targets. The two experimental projects were the development of targetry systems and production of At-211 and Zn-62/Cu-62 generator. The targetry system for At-211 has been tested and production of At-211 is chronic depending of availability of beam time at the cyclotron. The installation and testing of the targetry system for the production of Zn-62/Cu-62 has not been finalized. A description of the systems is described. The academic program in radionuclide production and separation methods was initiated in the fall of 2011 and, due to the lack of a radiochemistry laboratory, it was suspended. We expect to re-start the academic program at the Texas A&M Institute for Preclinical Studies under the Molecular Imaging Program.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

ATS-5 ranging receiver and L-band experiment, volume 1

The ATS-5 Ranging Receiver and L-band Experiment Final Report contains information describing the L-band ranging receiver and preliminary results of test data obtained in the Mojave station. Also covered is a brief program history and description of the installation and testing phase of the program at Mojave Ground Station. The ranging receiver was designed to utilize tone ranging techniques, with the tones being supplied from the station ATS ranging system. The receiver is used in conjunction with the station L-band transmit/receive system.

Source record↗

Summary of Testing Results for the Structural Heat Intercept, Insulation, and Vibration Evaluation Rig (SHIIVER)

Testing was completed on the Structural Heat Intercept, Insulation, and Vibration Evaluation Rig (SHIIVER) between August 2019 and January 2020. SHIIVER was designed to be a test bed for the scaling of cryogenic fluid management technologies as applied to large upper stages and long duration in-space stages. The baseline SHIIVER design consists of uninsulated structural skirts attached to a propellant tank insulated with polyurethane Spray-On Foam Insulation (SOFI). The initial testing of the SHIIVER hardware was with liquid hydrogen and sought to demonstrate the use of boil-off vapor to intercept heat on a structural skirt, multilayer insulation (MLI) on the tank domes, and the radio frequency mass gauge (RFMG). Testing was completed in four stages: a baseline thermal vacuum test prior to installation of the MLI on the tank domes, a thermal vacuum test after the MLI installation, a reverberant acoustic test, and a subsequent thermal vacuum test to verify that no damage occurred during the reverberant acoustic testing. Each thermal vacuum test with chamber wall at ambient temperature and vacuum level in the 10-6 torr range was conducted continuously between approximately 90% full and 25% full. Test results showed that the vapor cooling reduced the heat load to the tank by approximately 10%, but the boil-off by less than 3% at 50% full, with and without MLI installed on the domes. The MLI installed on the domes reduced the heat load to the tank by approximately 40% at all fill levels, but the boil-off by approximately 25% at 90% full and 45% below 65% full. The RFMG performed well over all fill ranges, and several RF tank modes were used to gauge the mass of fluid in the tank. SHIIVER was then exposed to an acoustic environment of 147 dB OASPL (overall sound pressure level) in a reverberant chamber. The acoustic environment envelopes the upper stage internal acoustic level of several different modern launch vehicles. No structural or thermal performance changes were observed after exposure to the acoustic environment. Final thermal vacuum testing after the acoustic testing showed no degradation to the MLI due to the acoustic environment as measured via system heat loads

SHIIVER↗

DOUBLE QUARTER WAVE DEFLECTOR CAVITY DESIGN & SIMULATION

A Double Quarter Wave (DQW) Cavity has been designed, tested and installed for use in longitudinal measurements as part of a diagnostic beamline. This report will describe the design and testing used to characterize this cavity before its use in the study of a magnetized electron beam.

Stefani, M.↗

Overview of the Turbine Based Combined Cycle Discipline

The NASA Fundamental Aeronautics Hypersonics project is focused on technologies for combined cycle, airbreathing propulsions systems to enable reusable launch systems for access to space. Turbine Based Combined Cycle (TBCC) propulsion systems offer specific impulse (Isp) improvements over rocket-based propulsion systems in the subsonic takeoff and return mission segments and offer improved safety. The potential to realize more aircraft-like operations with expanded launch site capability and reduced system maintenance are additional benefits. The most critical TBCC enabling technologies as identified in the National Aeronautics Institute (NAI) study were: 1) mode transition from the low speed propulsion system to the high speed propulsion system, 2) high Mach turbine engine development, 3) transonic aero-propulsion performance, 4) low-Mach-number dual-mode scramjet operation, 5) innovative 3-D flowpath concepts and 6) innovative turbine based combined cycle integration. To address several of these key TBCC challenges, NASA s Hypersonics project (TBCC Discipline) initiated an experimental mode transition task that includes an analytic research endeavor to assess the state-of-the-art of propulsion system performance and design codes. This initiative includes inlet fluid and turbine performance codes and engineering-level algorithms. This effort has been focused on the Combined Cycle Engine Large-Scale Inlet Mode Transition Experiment (CCE LIMX) which is a fully integrated TBCC propulsion system with flow path sizing consistent with previous NASA and DoD proposed Hypersonic experimental flight test plans. This experiment is being tested in the NASA-GRC 10 x 10 Supersonic Wind Tunnel (SWT) Facility. The goal of this activity is to address key hypersonic combined-cycle-engine issues: (1) dual integrated inlet operability and performance issues unstart constraints, distortion constraints, bleed requirements, controls, and operability margins, (2) mode-transition constraints imposed by the turbine and the ramjet/scramjet flow paths (imposed variable geometry requirements), (3) turbine engine transients (and associated time scales) during transition, (4) high-altitude turbine engine re-light, and (5) the operating constraints of a Mach 3-7 combustor (specific to the TBCC). The model will be tested in several test phases to develop a unique TBCC database to assess and validate design and analysis tools and address operability, integration, and interaction issues for this class of advanced propulsion systems. The test article and all support equipment is complete and available at the facility. The test article installation and facility build-up in preparation for the inlet performance and operability characterization is near completion and testing is planned to commence in FY11.

Thomas, Scott R.↗

Reproduction of the Yucca Mountain Project TSPA-LA Uncertainty and Sensitivity Analyses and Preliminary Upgrade of Models

Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014) and Hadgu et al. (2015). The TSPA computing hardware (CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of GoldSim with Versions 9.60.300, 10.5 and 11.1.6 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA-type analysis on the server cluster. The current tasks included verification of the TSPA-LA uncertainty and sensitivity analyses, and preliminary upgrade of the TSPA-LA from Version 9.60.300 to the latest version 11.1. All the TSPA-LA uncertainty and sensitivity analyses modeling cases were successfully tested and verified for the model reproducibility on the upgraded 2014 server cluster (CL2014). The uncertainty and sensitivity analyses used TSPA-LA modeling cases output generated in FY15 based on GoldSim Version 9.60.300 documented in Hadgu et al. (2015). The model upgrade task successfully converted the Nominal Modeling case to GoldSim Version 11.1. Upgrade of the remaining of the modeling cases and distributed processing tasks will continue. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Test Plan: Reducing Soft Costs of Rooftop Solar Installations Attributed to Structural Considerations

This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

Dwyer, Stephen F.↗

Modal Testing of Seven Shuttle Cargo Elements for Space Station

From December 1996 to May 2001, the Modal and Control Dynamics Team at NASA's Marshall Space Flight Center (MSFC) conducted modal tests on seven large elements of the International Space Station. Each of these elements has been or will be launched as a Space Shuttle payload for transport to the International Space Station (ISS). Like other Shuttle payloads, modal testing of these elements was required for verification of the finite element models used in coupled loads analyses for launch and landing. The seven modal tests included three modules - Node, Laboratory, and Airlock, and four truss segments - P6, P3/P4, S1/P1, and P5. Each element was installed and tested in the Shuttle Payload Modal Test Bed at MSFC. This unique facility can accommodate any Shuttle cargo element for modal test qualification. Flexure assemblies were utilized at each Shuttle-to-payload interface to simulate a constrained boundary in the load carrying degrees of freedom. For each element, multiple-input, multiple-output burst random modal testing was the primary approach with controlled input sine sweeps for linearity assessments. The accelerometer channel counts ranged from 252 channels to 1251 channels. An overview of these tests, as well as some lessons learned, will be provided in this paper.

Kappus, Kathy O.↗

Installed nacelle drag-improvement tests of an M = 0.8 turboprop transport configuration

An unpowered semispan model of a representative turboprop configuration was tested to determine the effect of configuration modifications on the the nonmetric body and wing juncture. It is indicated that the jet off nacelle-installation drag can be approximately 25% of the cruise drag. However, the losses can be reduced to 17% by changes to the wing leading edge and nacelle intersection. Comparison of test results from a semispan nonmetric fuselage model with those from a full span metric fuselage show differences in angles of attack produced the same lift. It is found that the constant lift drag rise of the semispan model is higher because of the increased angle of attack to achieve the same lift.

Levin, A. D.↗

FY17 Status Report on the Computing Systems for the Yucca Mountain Project TSPA-LA Models.

Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014), Hadgu et al. (2015) and Hadgu and Appel (2016). The TSPA computing hardware (CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of GoldSim with Versions 9.60.300, 10.5, 11.1 and 12.0 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA- type analysis on the server cluster. The current tasks included preliminary upgrade of the TSPA-LA from Version 9.60.300 to the latest version 12.0 and address DLL-related issues observed in the FY16 work. The model upgrade task successfully converted the Nominal Modeling case to GoldSim Versions 11.1/12. Conversions of the rest of the TSPA models were also attempted but program and operational difficulties precluded this. Upgrade of the remaining of the modeling cases and distributed processing tasks is expected to continue. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

97 MATHEMATICS AND COMPUTING↗

FY 18 Status Report on the Computing Systems for the Yucca Mountain Project TSPA-LA Models and Inventory of Software used for Process Models

Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014), Hadgu et al. (2015) and Hadgu and Appel (2016), and Hadgu et al. (2017). The TSPA computing hardware (2014 server cluster -CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of Gold Sim with Versions 9.60.300, 10.5, 11.1 and 12.0 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA-type analysis on the server cluster. The FY18 task included developing an inventory of software used for the Yucca Mountain Project process models and preliminary assessment of status of the software; enhancing security of the cluster and setting a backup system. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗