Spatiotemporal energy infrastructure datasets for the United States: A review
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Modeling and simulation constitute two important parts in constructing a sensible digital twin to mimic the dynamics of hydropower systems. Because of the physical nature of a hydropower system, the basic modeling should cover the water flow systems from the reservoir to the penstock (inlet water pipes), penstock to hydro turbine, and hydro turbine to generator and from the linkage of the hydropower systems to the grid. This report describes initial attempts to model these dynamic components, including the formulation of the linearized state space model for hydro turbine systems using the well-known six-coefficients linearization method and the formulation of the voltage and power dynamical models of a synchronous generator. To validate the accuracy of the proposed model, data collected from Norwegian University of Science and Technology were used to obtain relevant parameters for the model, and the desired simulation results were obtained. Additionally, neural network modeling and learning were also developed and applied to model the generation torque and water flow rate subsystems to demonstrate a potential learning scheme, which can be used in the development of a digital twin.
Hydropower is the world's largest source of renewable electricity, and hydropower plants are distributed all over the world. Typical major components of a hydropower plant are the governor, excitation, generator, thrust bearing, hydraulic turbine, transformer, the main lead, metering and control, tailwater depression, and dissolved oxygen. For each component, various measures are taken. The measurements are acquired by various heterogeneous systems, including standalone sensors, programmable logic controllers (PLC), Supervisory control and data acquisition (SCADA), Internet of Things (IoT), and data acquisition and integration platforms such as OSI/PI. The measured data are often archived within the plant by a data management platform, and many institutions have cloud-based archive systems, such as Hydropower Research Institution (HRI), U.S. Army Corps of Engineers (USACE), and Columbia River Data Access in Real Time (DART). Object Modeling is a general framework for designing information systems. It focuses on objects, the actions they perform, and the messages they send to one another to cause those actions to be taken. The major differences among object modeling, network modeling, data modeling, and process modeling are that in the first we focus on the actions in response to information, objects which form the system, the actions they perform, and how they pass information to one another, while in the second we concentrate on where, when and how much information is moved, while in the third we focus on what information is moved and where it is moved, while in the last we focus on how it is moved and when it is moved. Object modeling was developed basically as a method to develop object-oriented systems and to support object-oriented programming. It describes the static structure of the system. The object Modeling Technique is easy to draw and use. That is why we choose object modeling to connect physical hydropower plants to Digital Twin. It recognizes the objects and the relationship between them. It identifies the attributes and functions of each class. Dynamic Modeling: It explains how objects respond to events. Functional Modeling indicates the processes executed in an object and how data changes when it moves to objects. It has been used in many applications like telecommunication, transportation, etc.
In this study, we assess global hydropower potential using runoff and stream flow data, along with turbine technology performance, cost assumptions, and environmental considerations. The results provide the first comprehensive quantification of global hydropower potential including gross, technical, economic, and exploitable estimates. Total global potential of gross, technical, economic, and exploitable hydropower are estimated to be approximately 128, 39, 32, and 27 petawatt hours per year, respectively. The economic and exploitable potential of hydropower are calculated at less than 9 cents/kWh. We find that hydropower has the potential to supply a significant portion of the world energy needs, although this potential varies substantially by region. Globally, hydropower can potentially supply about 1.5 times the total electricity demand in 2005. Estimated hydropower resources in a number of countries are sufficient to accommodate their demand for electricity in 2005, e.g., Brazil (5.6 times), Russia (4.6 times), and Canada (3.5 times). A sensitivity analysis indicates that hydropower estimates are not highly sensitive to five key parameters: design flow (varying by -2% to +1% at less than 9 cents/kWh), cost and financing options (by -7% to +6%), turbine efficiency (by -10% to +10%), stream flow (by -10% to +10%), and fixed charge rate (by -6% to 5%). This sensitivity analysis emphasizes the reliable role of hydropower for future energy systems, when compared to other renewable energy resources with larger uncertainty in their future potentials.
Pumped storage hydropower (PSH) is a type of hydropower technology where energy can be stored and generated by moving water between two reservoirs of differing elevations. In addition to providing 97% of the total utility-scale hydropower storage in the United States, PSH plants have operational characteristics - such as high ramp rates and the ability to provide reserves - that contribute to greater flexibility and reliability of the power grid. New PSH technologies can provide additional flexibility beyond existing, fixed-speed units. With the emergence of high levels of variable renewable energy resources (e.g., wind and solar), energy storage is expected to be crucial to the reliability and reliance of the power grid in a low-carbon future. At diurnal and longer durations, PSH plants have some of the lowest costs per unit of energy, have been proven to be reliable and efficient, are not cycle-limited, and typically have long lives, often exceeding 50 years. The work presented here focuses on a new generation of PSH: ternary PSH and quaternary PSH (together referred to as T/Q-PSH). Given recent experience in Europe, grid operators in the United States and elsewhere are increasingly focusing their attention on T/Q-PSH as a proven, financeable technology that can offer utility-scale, long-duration, fast-acting energy storage capabilities and grid services. T/Q-PSH differs from conventional PSH in that it can provide fast-response ancillary services during both generating and pumping operations. This capability together with fast mode switching times are key attributes that make T/Q-PSH technologies attractive for managing and stabilizing electricity systems with high amounts of variable renewable energy.
Hydropower facilities are important assets for the electric power sector and represent a key source of flexibility for electric grids with large amounts of variable generation. As variable renewable generation sources expand, understanding the capabilities and limitations of the flexibility from hydropower resources is important for grid planning. Appropriately modeling these resources, however, is difficult because of the wide variety of constraints these plants face that other generators do not. These constraints can be broadly categorized as environmental, operational, and regulatory. This report highlights several key issues involving incorporating these constraints when modeling hydropower operations in terms of production cost and capacity expansion. Many of these challenges involve a lack of data to adequately represent the constraints or issues of model complexity and run time. We present several potential methods for improving the accuracy of hydropower representation in these models to allow for a better understanding of hydropower's capabilities.
Understanding the future changes in projected water supplies is a vital objective for federal hydropower facilities tasked with providing low-cost, reliable electricity across a large regional footprint that encompasses a growing customer base, alternative market structures for marketing the electricity, and a more diverse generation asset mix than was historically present when a majority of federal hydropower facilities were built. This study, The Third Assessment of the Effects of Climate Change on Federal Hydropower, directed by Section 9505 of the SECURE Water Act of 2009 (SWA), is the third quinquennial report on evaluating the effects of climate change on hydroelectric energy generated from 132 US federal hydropower plants marketed by four US Department of Energy (DOE) Power Marketing Administrations (PMAs). The technical assessment is conducted by DOE’s Oak Ridge National Laboratory, Pacific Northwest National Laboratory, and Texas A&M University under the guidance of DOE’s Water Power Technologies Office. This study is the result of extensive consultation with the four federal PMAs (Bonneville Power Administration [BPA], Western Area Power Administration [WAPA], Southwestern Power Administration [SWPA], and Southeastern Power Administration [SEPA]), as well as other agencies, including federal hydropower owners/operators (the US Army Corps of Engineers, US Bureau of Reclamation [Reclamation]), US Geological Survey, and National Oceanic and Atmospheric Administration). The main findings of this assessment, along with the PMA administrators’ recommendations, will be included in a subsequent DOE report to Congress. The assessment method and the technical findings are described in this report.
Idaho Falls Power (IFP) utility has local generation portfolio comprising of 56.3MVA of run-of-the-river (ROR) hydropower that can serve typically 25%-30% of the total load demand. The remaining load is served by importing power from Bonneville Power Administration through two Pacificorp transmission interconnections. In case of emergencies (power disruption or directed load reduction), the capability to island from transmission grid and stably serve critical loads in the IFP distribution grid can be a huge advantage. In this direction, the capability to black start with ROR is an essential requirement, and a challenge due to limited dispatchability and requires re-tuning of hydro-governor and excitation system controls. This paper presents the field experience from the testing done for black start of 8.9 MW ROR hydro plant in the IFP distribution grid using an adjustable load bank in December 2017. The lessons from the successful black start testing is presented along with test results to establish the potential value and requirements to develop black start capability with a ROR hydro plant.
The objectives of FOA DE- FOA-0001836- “Standard Modular Hydropower” included designing a standardized, modular, and environmentally compatible hydropower schematic for implementation in greenfield sites that generate up to 10 MW of capacity. Utilizing funds competitively awarded under DOE’s Water Power Technologies Office, the Natel Energy team developed a concept for modular new stream reach (NSR) hydropower that incorporates multi species upstream and downstream fish passage, improved river channel connectivity, and recreational modules. The in-stream design of the collective modules minimized site specific design and maximized the opportunities for modularity. Financial data was also presented using actual costs from regional suppliers, with figures provided in 2022 dollars. While the project team did not address potential permitting process improvements, the site selection criteria did consider established barriers to hydropower development such as tribal and preserved lands, interconnection proximity, and endangered species to exclude or deprioritize. The project’s design schematic met the objectives of the FOA, and presented a unique solution that targets alluvial pockets as natural features for sustainable development. Natel’s concept also incorporated the company's fish-safe Restoration Hydro Turbine for safe downstream passage, while featuring a rock arch that integrates fish passage, water, recreation, and grade control modules (including sediment). Alignment with the Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) “Innovative Design Concepts for Standard Modular Hydropower and Pumped-Storage Hydropower” Program: According to the Hydropower Vision (DOE, 2016), approximately 16 GW of hydropower growth is possible with the development of technology solutions that balance efficiency, economics, and environmental sustainability. The desired outcome of the SMH program is transformational innovation specifically in the site identification, conceptual, and detailed design phases of technology development lifecycles (DOE, 2018). In developing the SMH design schematic, the team aimed to address the opportunities outlined in the Vision through an inverted design philosophy; rather than singularly prioritizing efficiency and power production, the team focused on integrating hydropower with restoration of degraded streams to optimal ecosystem function and provision of exceptional recreation value as design criteria. To achieve this, Restoration Hydro incorporates the principles of nature-based engineering (WWAP, 2018) and biomimicry (Biomimicry NL.) to strategically deploy complementary combinations of permanent, semi-permanent, and ephemeral low-head structures - such as natural and engineered log jams - that harness geomorphological and hydrological processes at the landscape-scale. Primary applications of Restoration Hydro include: 1) restoration of degraded watersheds’ natural ecological function and enhancement of hydrological connectivity; and 2) creation of associated co-benefits to hydro production, including increased groundwater recharge, improved sediment transport and management, improved water security and water quality. Restoration Hydro projects build upon proven watershed restoration engineering techniques by integrating hydropower turbines into low-head structures using innovative and evolving civil works concepts that facilitate fish and sediment passage, and in some cases create additional revenue-generating recreational opportunities. Powering low-head structures creates a directly monetizable layer of economic value in the form of flexible, reliable, renewable energy on top of the already high-value water, environmental and recreational benefits of watershed and river restoration. The approach aims to create a virtuous, self-reinforcing cycle whereby Restoration Hydro projects support the scaling of ecosystem restoration activities, creating a water-energy-carbon multiplier effect that, through the principles of adaptive change management: 1) improves the resilience of landscapes and downstream population centers for changing hydrological cycles; 2) creates a reliable energy resource that facilitates the integration of intermittent renewable power sources into grids; and 3) supports climate change mitigation through grid decarbonization and enhanced ecosystem carbon capture and retention.
Identifying the sensitivity of future power systems to climate extremes must consider the concurrent effects of changing climate and evolving power systems. We investigated the sensitivity of a Western U.S. power system to isolated and combined heat and drought when it has low (5%) and moderate (31%) variable renewable energy shares, representing historic and future systems. We used an electricity operational model combined with a model of historically extreme drought (for hydropower and freshwater-reliant thermoelectric generators) over the Western U.S. and a synthetic, regionally extreme heat event in Southern California (for thermoelectric generators and electricity load). We found that the drought has the highest impact on summertime production cost (+10% to +12%), while temperature-based deratings have minimal effect (at most +1%). The Southern California heat wave scenario impacting load increases summertime regional net imports to Southern California by 10-14%, while the drought decreases them by 6-12%. Combined heat and drought conditions have a moderate effect on imports to Southern California (-2%) in the historic system and a stronger effect (+8%) in the future system. Southern California dependence on other regions decreases in the summertime with the moderate increase in variable renewable energy (-34% imports), but hourly peak regional imports are maintained under those infrastructure changes. By combining synthetic and historically driven conditions to test two infrastructures, we consolidate the importance of considering compounded heat wave and drought in planning studies and suggest that region-to-region energy transfers during peak periods are key to optimal operations under climate extremes.
The HOMER® energy modeling software is a tool for designing and analyzing hybrid power systems, which contain a mix of conventional generators, cogeneration, wind turbines, solar photovoltaic, hydropower, batteries, fuel cells, hydropower, biomass and other inputs.
The HOMER® energy modeling software is a tool for designing and analyzing hybrid power systems, which contain a mix of conventional generators, cogeneration, wind turbines, solar photovoltaic, hydropower, batteries, fuel cells, hydropower, biomass and other inputs.
The HOMER® energy modeling software is a tool for designing and analyzing hybrid power systems, which contain a mix of conventional generators, cogeneration, wind turbines, solar photovoltaic, hydropower, batteries, fuel cells, hydropower, biomass and other inputs.
Use of surrogacy remains a useful method for prioritizing research on representatives of at-risk groups of fishes, yet quantifiable evidence in support of its use is generally not available. Blade strike impact represents one of the most traumatic stressors experienced by fish during non-volitional movements through hydropower turbines. Here, we use data generated from laboratory trials on blade strike impact experiments to directly test use of surrogacy for salmonid and clupeid fishes. Results of logistic regression indicated that a -taxonomic (genus) variable was not a significant predictor of mortality among large rainbow trout and brook trout. Similar results were found for young-of-the-year shad species, but genus-level taxonomy was a significant predictor of mortality while species was not. Multivariate analysis of morphometric data showed that shad clustered together based on similarities in fish shape which was also closely associated with genus. Logistic regression including size as a major covariate suggested total fish length was not a significant predictor of mortality, yet dose–response data suggest differential susceptibility to lower strike velocities. We suggest that use of surrogacy among species is justifiable but should be avoided within a species since the effects of size remain unclear.
Hydropower is one of several types of generating assets that provides energy, capacity, and services to electric power systems. It does so under rubrics and objectives—market driven and regulated, internal and external to asset and fleet owners—that address reliability, cost, price, and, increasingly, flexibility of output. The aggregation of data from multiple hydropower units can provide insights into asset operations and maintenance practices and needs and assist in meeting hydropower objectives. This paper examines the concept and potential benefits of aggregating hydropower asset data—primarily supervisory control and data acquisition (SCADA) information—with examples of insights developed from data aggregated by the Hydropower Research Institute (HRI). Data aggregation as discussed herein, and as implemented by the HRI, extends beyond multiple units in a powerhouse and beyond multiple hydropower facilities in an electric utility fleet or river system. Examples of research and analytics from such aggregated datasets range from unit load dependency analyses to modeling sensor measurements to detect and diagnose anomalies in assets. These examples showed the benefits of utilizing the entire dataset for insights into how the sensor layout of a single unit or set of units compares to the hydropower industry overall. Such insights include whether additional sensors are needed to complete analyses or to make decisions. In addition, utilizing multiple sensors of the same kind within a unit can provide an indication of possible current or upcoming problems with equipment. Although other analyses are possible, their use requires the development of complex models and, potentially, access to types of data that are currently not included with the example dataset used in this study. However, the examples studied herein confirmed the value of data aggregation in the fleet and unit contexts, and the value extends beyond multiple units in a powerhouse and beyond multiple hydropower facilities in an electric utility fleet or river system. The assessments also provided insights into potential extensions to the data aggregation concept that could further add to their value to the hydropower community, and these are included in this document as a set of recommendations.
By using best practices to manage unit and plant efficiency, hydro owner/operators can achieve significant improvements in overall plant performance, resulting in increased generation and profitability and, frequently, reduced maintenance costs. The Hydropower Advancement Project (HAP) was initiated by the Wind and Hydropower Technologies Program within the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy to develop and implement a systematic process with standard methodology, based on the best practices of operations, maintenance and upgrades; to identify the improvement opportunities at existing hydropower facilities; and to predict and trend the overall condition and improvement opportunity within the U.S. hydropower fleet. The HAP facility assessment includes both quantitative condition ratings and data-based performance analyses. However, this paper, as an overview document for the HAP, addresses the general concepts, project scope and objectives, best practices for unit and plant efficiency, and process and methodology for best practices implementation for hydropower efficiency and utilization improvement.
Hydropower with a small elevation change from inlet to outlet, known as “low-head” hydropower, is a relatively untapped resource for reliable green power generation. One major barrier to entry is the cost of the components needed to generate the power. Each installation site is unique, with various head levels, flow rates, and other unique site characteristics that drive up the cost of development and installation. As a result, custom-made components are necessary because the sites are intrinsically inefficient. However, customized parts are generally more expensive to manufacture than ready-made parts. Often times, the cost of custom-made components is so high that the low-head hydropower installation becomes non-viable. Additive manufacturing offers the ability to make custom components, ideal for one-off applications, at low costs that are well suited for the needs of low-head hydropower. Indirect additive manufacturing, such as making tools or dies rather than end use components, can also be used to make low-cost composite tooling as needed for these custom applications. This paper explores the use of additive manufacturing, both directly and indirectly, to produce the components of a turbine system for a low-head hydropower site. The parts were designed to form a unique modular system, which saves time for future designs and iterations. The system has operated for more than three years without failure at a test site in Wisconsin, USA. This work serves as a basis for future application of AM to low-head systems, in which the modular components can be customized for each unique hydropower installation.
Timing of generation is becoming more and more valuable. This creates greater potential tension between environmental and power system objectives since both systems require their own flow patterns. Identifying win–win outcomes in this context requires being able to discuss the value of flexibility across stakeholder groups. This research proposes a two-stage optimization method to understand hydropower flexibility to meet both environmental and power system requirements. The tool simulates the two-settlement market process in the U.S. by maximizing revenues from both the day-ahead and real-time markets, subject to plant operational limits, regulatory flow and ramping requirements, and uncertainties associated with water availability and market prices. The model is formulated as linear programming problems and solved using IBM ILOG CPLEX optimizer. By examining a range of flow requirements, ramping constraints, and storage capacities, the proposed tool shows how to make more informed decisions to weigh the cost of specific flow requirements in the context of the overall license requirements. Results from the case study show that revenue is more sensitive to the ramping constraints than the minimum flow constraints. We also demonstrate that removing flow constraints in a dry month increases monthly revenue by up to 118%, as opposed to only 1% in a wet month. In addition, our results suggest that using a learning-based water flow forecast results in an increase of monthly revenue up to 6.4% compared with persistence forecast.