Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “human missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Accessing the Lunar Poles for Human Exploration Missions

The National Vision for Space Exploration calls for an American return to the Moon in preparation for the human exploration of Mars and other destinations. The surface environment of the Moon is a challenge for human operations, but recent findings from robotic and Earth-based studies have indicated that the polar regions of the Moon may offer advantages in terms of thermal conditions, availability of solar energy, and access to local resources. While accessing these regions represents a challenge due to orbital dynamics and propulsive performance, methods for accessing the regions with humans are being actively pursued, and environmental data gathering is planned through future robotic missions.

Joosten, B. Kent↗

Human Exploration of Mars Design Reference Architecture 5.0

This document reviews the Design Reference Architecture (DRA) for human exploration of Mars. The DRA represents the current best strategy for human missions. The DRA is not a formal plan, but provides a vision and context to tie current systems and technology developments to potential missions to Mars, and it also serves as a benchmark against which alternative architectures can be measured. The document also reviews the objectives and products of the 2007 study that was to update NASA's human Mars mission reference architecture, assess strategic linkages between lunar and Mars strategies, develop an understanding of methods for reducing cost/risk of human missions through investment in research, technology development and synergy with other exploration plans. There is also a review of the process by which the DRA will continue to be refined. The unique capacities of human exploration is reviewed. The possible goals and objectives of the first three human missions are presented, along with the recommendation that the mission involve a long stay visiting multiple sites.The deployment strategy is outlined and diagrammed including the pre-deployment of the many of the material requirements, and a six crew travel to Mars on a six month trajectory. The predeployment and the Orion crew vehicle are shown. The ground operations requirements are also explained. Also the use of resources found on the surface of Mars is postulated. The Mars surface exploration strategy is reviewed, including the planetary protection processes that are planned. Finally a listing of the key decisions and tenets is posed.

Drake, Bret G.↗

Mars 2001 Cruise Phase Radiation Measurments

Mars 2001 presents an exciting opportunity for advances in radiation risk management of a future human mission to Mars. The mission timing is particularly fortuitous, coming just after solar maxinuun, when there will be a high probability to observe significant solar particle events (SPEs). A major objective of this mission is to characterize the Martian radiation environment to support future human missions to Mars. In addition, the MARIE instruments on the Lander and Orbiter, designed to measure the energetic particle flux at Mars, can be used during the cruise phase to provide multipoint observations of SPEs in the critical region of the heliosphere (1 to 1.5 AU) needed to reduce the in-flight radiation risk to a future Mars-bound crew.

Turner, R. E.↗

Mission Design Considerations for Mars Cargo of the Human Spaceflight Architecture Team's Evolvable Mars Campaign

Recent NASA interest in human missions to Mars has led to an Evolvable Mars Campaign by the agency's Human Architecture Team. Delivering the crew return propulsion stages and Mars surface landers, SEP based systems are employed because of their high specific impulse characteristics enabling missions requiring less propellant although with longer transfer times. The Earth departure trajectories start from an SLS launch vehicle delivery orbit and are spiral shaped because of the low SEP thrust. Previous studies have led to interest in assessing the divide in trip time between the Earth departure and interplanetary legs of the mission for a representative SEP cargo vehicle.

mars missions↗

Mini AERCam Inspection Robot for Human Space Missions

The Engineering Directorate of NASA Johnson Space Center has developed a nanosatellite-class free-flyer intended for future external inspection and remote viewing of human spacecraft. The Miniature Autonomous Extravehicular Robotic Camera (Mini AERCam) technology demonstration unit has been integrated into the approximate form and function of a flight system. The spherical Mini AERCam free flyer is 7.5 inches in diameter and weighs approximately 10 pounds, yet it incorporates significant additional capabilities compared to the 35 pound, 14 inch AERCam Sprint that flew as a Shuttle flight experiment in 1997. Mini AERCam hosts a full suite of miniaturized avionics, instrumentation, communications, navigation, imaging, power, and propulsion subsystems, including digital video cameras and a high resolution still image camera. The vehicle is designed for either remotely piloted operations or supervised autonomous operations including automatic stationkeeping and point-to-point maneuvering. Mini AERCam is designed to fulfill the unique requirements and constraints associated with using a free flyer to perform external inspections and remote viewing of human spacecraft operations. This paper describes the application of Mini AERCam for stand-alone spacecraft inspection, as well as for roles on teams of humans and robots conducting future space exploration missions.

Fredrickson, Steven E.↗

Demonstrating Capabilities for Mars Exploration on the Moon

The U.S. Space Policy Directive of 2017 calls for the United States to lead the return of humans to the Moon for long-term exploration and utilization, followed by human missions to Mars. To achieve these goals, NASA is working with commercial and international partners to develop systems and operational approaches that could be tested on the Moon to prepare for Mars missions. NASA’s human exploration strategy progresses in phases from the ISS in low-Earth orbit, to a sustained presence in cislunar space and on the Moon, to humans in Mars orbit, and finally humans on Mars. There is a huge jump in the capabilities required between the last two phases: humans in Mars orbit and humans on the surface. These include landing large payloads, surface habitation, extra-vehicular activity and crew mobility systems, in-situ resource utilization, and ascent from Mars to return the crew to Earth. Many of these needed capabilities can be tested first on the Moon to reduce the risk for Mars missions. There are a few challenges, however, in extrapolating from capability demonstrations on the Moon to enabling Mars missions such as greater remoteness, the Mars atmosphere, different gravity levels, and planetary protection. Key technologies, concepts for early demonstration of the required capabilities on the Moon, and potential areas for commercial and international partnerships will be discussed.

Moore, Christopher↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations program is transforming Kennedy Space Center into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton (t) Block 1 configuration, and will then evolve to an ultimate capability of 130 t. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS -- Exploration Mission-1 (EM-1), an un-crewed mission to orbit the moon and return. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

In-Situ Navigation and Timing Services for the Human Mars Landing Site Part 1: System Concept

In [1] and [2], we introduce a new geometric trilateration method that simultaneously performs absolute positioning and relative positioning. The relative position is derived from a “differencing” function of two raw-range measurements between a known reference point and of the target from a navigation satellite, thereby eliminating most of the common errors like atmospheric delays, ephemeris errors, and instrument delays in real-time. In the Mars environment this “error-cancellation” function greatly reduces the need to perform extensive orbit determination (OD) of the navigation satellites like the Earth’s GPS, and only requires occasional tracks from the Earth’s large-aperture deep space antennas to perform OD’s. Leveraging on this scheme, we propose a low-cost, low-maintenance regional navigation satellite system architecture that provides in-situ navigation and timing services for robotic and human missions in the vicinity of a Mars landing site. This architecture is built upon the proposed Mars relay network infrastructure, and a number of notional Mars orbiting and surface missions in the human exploration era of Mars. We assume two areostationary Mars relay orbiters that have continuous line-of-sight visibility with the Mars landing site, a Deep Space Habitat (DSH) in an inclined 48-hour circular orbit, and a surface communication lander that could serve as the reference point. These orbiting and surface infrastructure elements broadcast GPS-like ranging signals and other ephemeris information to the mission users. With one or more additional orbiters in areosynchronous orbits that trace around a figure-8 path, a regional navigation satellite system can be realized that provides in-situ course absolute localization and precision relative localization and timing services to the users in the vicinity of a Mars landing site. This paper describes the system concept of the proposed Mars regional navigation satellite system.

Lee, Charles↗

Exploring the Moon: Training Astronauts for Artemis Missions

For the first time in over 50 years, NASA scientists are training astronauts assigned to lunar missions. The successful Artemis 1 test flight in 2022 set the stage for future human missions to the Moon. The Artemis II mission will send astronauts to fly by the Moon, providing the first opportunity since Apollo for humans to directly observe and document the lunar surface from a few thousand kilometers, including the lunar far side. Artemis III will be the first human mission to land and explore the Moon’s surface near the lunar South Pole. To prepare for Artemis exploration, geology training for the Artemis II crew and detailed training plans for Artemis III and beyond are in full swing. NASA scientists have been working for several years with the Flight Operations Directorate (FOD) at the Johnson Space Center on a progressive geology training program that starts with incoming astronaut classes, offers opportunities to maintain the geology proficiency between flight assignments, and trains the broader engineering-operations-management community in geology and field operations. In the spring of 2023, our team developed an introductory week-long class called Lunar Fundamentals and delivered this content to the Artemis II crew, as well as key NASA Flight Control Team members. The Lunar Fundamentals curriculum combines basic geographic and geologic information about the Moon; includes detailed content on major geologic processes, the lunar environment, lunar volatiles, and sample science; provides historical context of our growing knowledge about the Moon; and introduces new lunar data sets and tools for exploring the lunar surface. With the Lunar Fundamentals foundation, we continue development of the advanced planetary science classroom content for the Artemis III crew, together with field training science objectives and plans. Partnering with our FOD colleagues, we are building an integrated training plan for lunar science, exploration field methods, and operational skills to ensure that the Artemis astronauts exploring the Moon will have the necessary foundation in geology and lunar science to achieve mission success.

Astronauts training↗

Micro Thermal and Chemical Systems for In Situ Resource Utilization on Mars

Robotic sample return missions and postulated human missions to Mars can be greatly aided through the development and utilization of compact chemical processing systems that process atmospheric gases and other indigenous resources to produce hydrocarbon propellants/fuels, oxygen, and other needed chemicals. When used to reduce earth launch mass, substantial cost savings can result. Process Intensification and Process Miniaturization can simultaneously be achieved through the application of microfabricated chemical process systems, based on the rapid heat and mass transport in engineered microchannels. Researchers at NASA's Johnson Space Center (JSC) and the Department of Energy's Pacific Northwest National Laboratory (PNNL) are collaboratively developing micro thermal and chemical systems for NASA's Mission to Mars program. Preliminary results show that many standard chemical process components (e.g., heat exchangers, chemical reactors and chemical separations units) can be reduced in hardware volume without a corresponding reduction in chemical production rates. Low pressure drops are also achievable when appropriate scaling rules are applied. This paper will discuss current progress in the development of engineered microchemical systems for space and terrestrial applications, including fabrication methods, expected operating characteristics, and specific experimental results.

Wegeng, Robert S.↗

Uncertainty Optimization Applied to the Monte Carlo Analysis of Planetary Entry Trajectories

Recently, strong evidence of liquid water under the surface of Mars and a meteorite that might contain ancient microbes have renewed interest in Mars exploration. With this renewed interest, NASA plans to send spacecraft to Mars approx. every 26 months. These future spacecraft will return higher-resolution images, make precision landings, engage in longer-ranging surface maneuvers, and even return Martian soil and rock samples to Earth. Future robotic missions and any human missions to Mars will require precise entries to ensure safe landings near science objective and pre-employed assets. Potential sources of water and other interesting geographic features are often located near hazards, such as within craters or along canyon walls. In order for more accurate landings to be made, spacecraft entering the Martian atmosphere need to use lift to actively control the entry. This active guidance results in much smaller landing footprints. Planning for these missions will depend heavily on Monte Carlo analysis. Monte Carlo trajectory simulations have been used with a high degree of success in recent planetary exploration missions. These analyses ascertain the impact of off-nominal conditions during a flight and account for uncertainty. Uncertainties generally stem from limitations in manufacturing tolerances, measurement capabilities, analysis accuracies, and environmental unknowns. Thousands of off-nominal trajectories are simulated by randomly dispersing uncertainty variables and collecting statistics on forecast variables. The dependability of Monte Carlo forecasts, however, is limited by the accuracy and completeness of the assumed uncertainties. This is because Monte Carlo analysis is a forward driven problem; beginning with the input uncertainties and proceeding to the forecasts outputs. It lacks a mechanism to affect or alter the uncertainties based on the forecast results. If the results are unacceptable, the current practice is to use an iterative, trial-and-error approach to reconcile discrepancies. Therefore, an improvement to the Monte Carlo analysis is needed that will allow the problem to be worked in reverse. In this way, the largest allowable dispersions that achieve the required mission objectives can be determined quantitatively.

Olds, John↗

Impacts of Launch Vehicle Fairing Size on Human Exploration Architectures

Human missions to Mars, particularly to the Martian surface, are grand endeavors that place extensive demands on ground infrastructure, launch capabilities, and mission systems. The interplay of capabilities and limitations among these areas can have significant impacts on the costs and ability to conduct Mars missions and campaigns. From a mission and campaign perspective, decisions that affect element designs, including those based on launch vehicle and ground considerations, can create effects that ripple through all phases of the mission and have significant impact on the overall campaign. These effects result in impacts to element designs and performance, launch and surface manifesting, and mission operations. In current Evolvable Mars Campaign concepts, the NASA Space Launch System (SLS) is the primary launch vehicle for delivering crew and payloads to cis-lunar space. SLS is currently developing an 8.4m diameter cargo fairing, with a planned upgrade to a 10m diameter fairing in the future. Fairing diameter is a driving factor that impacts many aspects of system design, vehicle performance, and operational concepts. It creates a ripple effect that influences all aspects of a Mars mission, including: element designs, grounds operations, launch vehicle design, payload packaging on the lander, launch vehicle adapter design to meet structural launch requirements, control and thermal protection during entry and descent at Mars, landing stability, and surface operations. Analyses have been performed in each of these areas to assess and, where possible, quantify the impacts of fairing diameter selection on all aspects of a Mars mission. Several potential impacts of launch fairing diameter selection are identified in each of these areas, along with changes to system designs that result. Solutions for addressing these impacts generally result in increased systems mass and propellant needs, which can further exacerbate packaging and flight challenges. This paper presents the results of the analyses performed, the potential changes to mission architectures and campaigns that result, and the general trends that are more broadly applicable to any element design or mission planning for human exploration.

Jefferies, Sharon↗

Enabling Universal Access to Power on the Lunar Surface

The National Aeronautics and Space Administration (NASA) Artemis Missions will return human astronauts to the lunar surface, demonstrate technologies that establish a sustained presence on the lunar surface and enable human missions to Mars, and help create a lunar commercial economy. Creating a sustained permanent presence on the lunar surface will require access to continuous and highly reliable power to support mission needs. During Artemis, lunar surface operations will evolve and grow over time (years), requiring an increase in the amount of power needed (100s of kW) and distance that the power must be transmitted (up to 10 km during early Artemis missions). A lunar commercial economy is likely to exceed this power demand to the MW level and distance in the 100s of km. This increased distance and demand for highly reliable power drives the need to create an electric power grid by connecting localized lunar power systems (e.g., habitats, in-situ resource utilization plants, etc.), each containing one or more loads and/or sources. Developing a lunar surface power grid will allow lunar surface operations to resemble electrical utility operations on Earth; it allows power to be generated where it is convenient and allows power to be consumed where it is convenient and required. A lunar surface electric power grid will facilitate the growth of a lunar commercial economy because it provides a means to connect new loads to an existing electrical power system. A common standardized interface to the grid and a set of standardized voltages is required to take full advantage of the benefits of an electric power grid, similar to the terrestrial power grid. NASA Glenn Research Center is leading an effort to create universal access to power through the development of the Universal Modular Interface Converter (UMIC). The UMIC is designed to have a common interface that connects sources and loads compliant with the International Space Power System Interoperability Standard (ISPSIS) to a higher voltage AC transmission system or power grid. This presentation will further discuss the evolution of power during the Artemis missions, challenges associated with creating a sustained presence on the lunar surface, progress made on the UMIC, and future opportunities for technology development and standards.

space power systems↗

Operational Aspects of Space Radiation

In this session, Session FA4, the discussion focuses on the following topics: Solar Particle Events and the International Space Station; Radiation Environment on Mir and ISS Orbits During the Solar Cycle; New approach to Radiation Risk Assessment; An Industrial Method to Predict Major Solar Flares for a Better Protection of Human Beings in Space; Description of the Space Radiation Control System for the Russian Segment of ISS; Orbit Selection and Its Impact on Radiation Warning Architecture for a Human Mission to Mars; and Space Nuclear Power - Technology, Policy and Risk Considerations in Human Missions to Mars.

Source record↗

Options for Staging Orbits in Cis-Lunar Space

NASA has been studying options to conduct missions beyond Low Earth Orbit, but within the Earth‐Moon system, in preparation for deep space exploration including human missions to Mars. Referred to as the Proving Ground, this arena of exploration activities will enable the development of human spaceflight systems and operations to satisfy future exploration objectives beyond the cis‐lunar environment. One option being considered includes the deployment of a habitable element or elements, which could be used as a central location for aggregation of supplies and resources for human missions in cis‐lunar space and beyond. Characterizing candidate orbit locations for this asset and the impacts on system design and mission operations is important in the overall assessment of the options being considered. The orbits described in this paper were initially selected by taking advantage of previous studies conducted by NASA and the work of other authors. In this paper orbits are assessed for their relative attractiveness based on various factors. A set of constraints related to the capability of the combined Orion and SLS system to deliver humans and cargo to and from the orbit are evaluated. Deployed assets intended to spend multiple years in the Proving Ground would ideally require minimal station keeping costs to reduce the mass budget allocated to this function. Additional mission design drivers include eclipse frequency, potential for uninterrupted communication with deployed assets, thermal, attitude control, communications, and other operational implications. Also the ability to support potential lunar surface activities and excursion missions beyond Earth‐Moon space is considered. The results of the characterization and evaluation of the selected orbits indicate a Near Rectilinear Orbit (NRO) is an attractive candidate as an aggregation point or staging location for operations. In this paper, the NRO is further described in terms which balance a number of key attributes that favor a variety of mission classes to meet multiple, sometimes competing, constraints.

Martinez, Roland↗

Modeling and Testing of Non-Nuclear, Highpower Simulated Nuclear Thermal Rocket Reactor Elements

When the President offered his new vision for space exploration in January of 2004, he said, "Our third goal is to return to the moon by 2020, as the launching point for missions beyond," and, "With the experience and knowledge gained on the moon, we will then be ready to take the next steps of space exploration: human missions to Mars and to worlds beyond." A human mission to Mars implies the need to move large payloads as rapidly as possible, in an efficient and cost-effective manner. Furthermore, with the scientific advancements possible with Project Prometheus and its Jupiter Icy Moons Orbiter (JIMO), (these use electric propulsion), there is a renewed interest in deep space exploration propulsion systems. According to many mission analyses, nuclear thermal propulsion (NTP), with its relatively high thrust and high specific impulse, is a serious candidate for such missions. Nuclear rockets utilize fission energy to heat a reactor core to very high temperatures. Hydrogen gas flowing through the core then becomes superheated and exits the engine at very high exhaust velocities. The combination of temperature and low molecular weight results in an engine with specific impulses above 900 seconds. This is almost twice the performance of the LOX/LH2 space shuttle engines, and the impact of this performance would be to reduce the trip time of a manned Mars mission from the 2.5 years, possible with chemical engines, to about 12-14 months.

Kirk, Daniel R.↗

A Water Rich Mars Surface Mission Scenario

The surface of Mars once had abundant water flowing on its surface, but now there is a general perception that this surface is completely dry. Several lines of research have shown that there are sources of potentially large quantities of water at many locations on the surface, including regions considered as candidates for future human missions. Traditionally, system designs for these human missions are constrained to tightly recycle water and oxygen, and current resource utilization strategies involve ascent vehicle oxidizer production only. But the assumption of relatively abundant extant water may change this. Several scenarios were constructed to evaluate water requirements for human Mars expeditions to assess the impact to system design if locally produced water is available. Specifically, we have assessed water resources needed for 1) ascent vehicle oxidizer and fuel production, 2) open-loop water and oxygen life support requirements along with more robust usage scenarios, and 3) crew radiation protection augmentation. In this assessment, production techniques and the associated chemistry to transform Martian water and atmosphere into these useful commodities are identified, but production mass and power requirements are left to future analyses. The figure below illustrates the type of water need assessment performed and that will be discussed. There have been several sources of feedstock material discussed in recent literature that could be used to produce these quantities of water. This paper will focus on Mars surface features that resemble glacier-like forms on Earth. Several lines of evidence indicate that some of these features are in fact buried ice, likely remnants from an earlier ice age on Mars. This paper examines techniques and hardware systems used in the polar regions of Earth to access this buried ice and withdraw water from it. These techniques and systems will be described to illustrate options available. A technique known as a Rodriguez Well is assessed as a likely method for extracting water from these bodies of ice. The figure below is a sample of results from this assessment that will be discussed.

Hoffman, Stephen↗