Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hardware failure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Corrosion study of bare and coated stainless steel

A program was conducted at Kennedy Space Center from February 1968 to February 1971 to evaluate the performance of austenitic stainless steel alloys used in fluid systems lines. For several years, there had been numerous failures of stainless steel hardware caused by pitting and stress corrosion cracking. Several alloys were evaluated for effectiveness of certain sacrificial-type protective coverings in preventing corrosion failures. Samples were tested in specially designed racks placed 91 meters (100 yards) above high-tide line at Cape Kennedy. It is concluded that: (1) unprotected tubing samples showed evidence of pitting initiation after 2 weeks; (2) although some alloys develop larger pits than others, it is probable that the actual pitting rate is independent of alloy type; (3) the deepest pitting occurred in the sheltered part of the samples; and (4) zinc-rich coatings and an aluminum-filled coating have afforded sacrificial protection against pitting for at least 28 months. It is believed that a much longer effective coating life can be expected.

Morrison, J. D.↗

A case study in nonconformance and performance trend analysis

As part of NASA's effort to develop an agency-wide approach to trend analysis, a pilot nonconformance and performance trending analysis study was conducted on the Space Shuttle auxiliary power unit (APU). The purpose of the study was to (1) demonstrate that nonconformance analysis can be used to identify repeating failures of a specific item (and the associated failure modes and causes) and (2) determine whether performance parameters could be analyzed and monitored to provide an indication of component or system degradation prior to failure. The nonconformance analysis of the APU did identify repeating component failures, which possibly could be reduced if key performance parameters were monitored and analyzed. The performance-trending analysis verified that the characteristics of hardware parameters can be effective in detecting degradation of hardware performance prior to failure.

Maloy, Joseph E.↗

ACIS Door Failure Investigation and Mitigation Procedures

NASA's Chandra X-ray Observatory (formerly AXAF) was launched on July 23, 1999 and is currently in orbit performing scientific studies. Chandra is the third of NASA's Great Observatories to be launched, following the Hubble Space Telescope and the Compton Gamma Ray Observatory. One of four primary science instruments on Chandra, and one of only two focal plane instruments, is the Advanced CCD Imaging Spectrometer, or ACIS. The ACIS focal plane and Optical Blocking Filter (OBF) must be launched under vacuum, so a tightly sealed, functioning door and venting subsystem were implemented. The door was opened two and one-half weeks after launch (after most out-gassing of composite materials) and allowed X-rays to be imaged by the ACIS CCD's in the focal plane. A failure of this door to open on-orbit would have eliminated all ACIS capabilities, severely degrading mission science. During the final pre-flight thermal-vacuum test of the fully integrated Chandra Observatory at TRW, the ACIS door failed to open when commanded to do so. This paper describes the efforts, under considerable time pressure, by NASA, its contractors and outside review teams to investigate the failure and to develop modified hardware and procedures which would correct the problem. Of interest is the fact that the root cause of the test failure was never clearly identified despite massive effort. We ultimately focussed on hardware and procedures designed to mitigate the effects of potential, but unproven, failure modes. We describe a frequent real-world engineering situation in which one must proceed on the best basis possible in the absence of the complete set of facts.

Podgorski, William A.↗

AirSTAR Hardware and Software Design for Beyond Visual Range Flight Research

The National Aeronautics and Space Administration (NASA) Airborne Subscale Transport Aircraft Research (AirSTAR) Unmanned Aerial System (UAS) is a facility developed to study the flight dynamics of vehicles in emergency conditions, in support of aviation safety research. The system was upgraded to have its operational range significantly expanded, going beyond the line of sight of a ground-based pilot. A redesign of the airborne flight hardware was undertaken, as well as significant changes to the software base, in order to provide appropriate autonomous behavior in response to a number of potential failures and hazards. Ground hardware and system monitors were also upgraded to include redundant communication links, including ADS-B based position displays and an independent flight termination system. The design included both custom and commercially available avionics, combined to allow flexibility in flight experiment design while still benefiting from tested configurations in reversionary flight modes. A similar hierarchy was employed in the software architecture, to allow research codes to be tested, with a fallback to more thoroughly validated flight controls. As a remotely piloted facility, ground systems were also developed to ensure the flight modes and system state were communicated to ground operations personnel in real-time. Presented in this paper is a general overview of the concept of operations for beyond visual range flight, and a detailed review of the airborne hardware and software design. This discussion is held in the context of the safety and procedural requirements that drove many of the design decisions for the AirSTAR UAS Beyond Visual Range capability.

Laughter, Sean↗

Man-rated flight software for the F-8 DFBW program

The design, implementation, and verification of the flight control software used in the F-8 DFBW program are discussed. Since the DFBW utilizes an Apollo computer and hardware, the procedures, controls, and basic management techniques employed are based on those developed for the Apollo software system. Program Assembly Control, simulator configuration control, erasable-memory load generation, change procedures and anomaly reporting are discussed. The primary verification tools--the all-digital simulator, the hybrid simulator, and the Iron Bird simulator--are described, as well as the program test plans and their implementation on the various simulators. Failure-effects analysis and the creation of special failure-generating software for testing purposes are described. The quality of the end product is evidenced by the F-8 DFBW flight test program in which 42 flights, totaling 58 hours of flight time, were successfully made without any DFCS inflight software, or hardware, failures.

Bairnsfather, R. R.↗

Space Transportation System Availability Requirements and Its Influencing Attributes Relationships

It is essential that management and engineering understand the need for an availability requirement for the customer's space transportation system as it enables the meeting of his needs, goal, and objectives. There are three types of availability, e.g., operational availability, achieved availability, or inherent availability. The basic definition of availability is equal to the mean uptime divided by the sum of the mean uptime plus the mean downtime. The major difference is the inclusiveness of the functions within the mean downtime and the mean uptime. This paper will address tIe inherent availability which only addresses the mean downtime as that mean time to repair or the time to determine the failed article, remove it, install a replacement article and verify the functionality of the repaired system. The definitions of operational availability include the replacement hardware supply or maintenance delays and other non-design factors in the mean downtime. Also with inherent availability the mean uptime will only consider the mean time between failures (other availability definitions consider this as mean time between maintenance - preventive and corrective maintenance) that requires the repair of the system to be functional. It is also essential that management and engineering understand all influencing attributes relationships to each other and to the resultant inherent availability requirement. This visibility will provide the decision makers with the understanding necessary to place constraints on the design definition for the major drivers that will determine the inherent availability, safety, reliability, maintainability, and the life cycle cost of the fielded system provided the customer. This inherent availability requirement may be driven by the need to use a multiple launch approach to placing humans on the moon or the desire to control the number of spare parts required to support long stays in either orbit or on the surface of the moon or mars. It is the intent of this paper to provide the visibility of relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability, but also provide the capability to bound the variables providing engineering the insight required to control the system's engineering solution. An example of this visibility will be the need to provide integration of similar discipline functions to allow control of the total parts count of the space transportation system. Also the relationship visibility of selecting a reliability requirement will place a constraint on parts count to achieve a given inherent availability requirement or accepting a larger parts count with the resulting higher reliability requirement. This paper will provide an understanding for the relationship of mean repair time (mean downtime) to maintainability, e.g., accessibility for repair, and both mean time between failure, e.g., reliability of hardware and the system inherent availability. Having an understanding of these relationships and resulting requirements before starting the architectural design concept definition will avoid considerable time and money required to iterate the design to meet the redesign and assessment process required to achieve the results required of the customer's space transportation system. In fact the impact to the schedule to being able to deliver the system that meets the customer's needs, goals, and objectives may cause the customer to compromise his desired operational goal and objectives resulting in considerable increased life cycle cost of the fielded space transportation system.

Rhodes, Russel E.↗

Application of Fault Containment Principles to EMC

A hardware fault in aerospace is an undesired response to a designed engineering function in hardware. Therefore, in aerospace systems fault management is of prime importance. An important aspect of hardware faults is fault propagation. Fault propagation (also known as failure propagation) is a condition where a fault will not only produce an undesired hardware response, at its location of origin, but the fault will also propagate to other interfaced hardware and cause additional faults, or failures. Fault containment is necessary to avoid fault propagation. A fault containment region is an electronic or electromechanical region within a given hardware assembly where a fault in that region will not physically propagate to other regions of the assembly, and beyond. Rather, the fault will cause a functional failure of the hardware, where the fault occurred, without causing any additional propagated failures. Electromagnetic Compatibility (EMC) is a desired state in aerospace hardware. Electromagnetic Interference (EMI) in aerospace hardware is a fault condition of EMC. Like other faults EMI can also propagate to other aerospace hardware unless it occurs inside an EMI containment region. The paper addresses the concepts of fault containment region and introduces the concept of EMI containment region with examples of both.

Perez, Reinaldo↗

International Space Station (ISS) Major Constituent Analyzer (MCA) On-Orbit Performance

The Major Constituent Analyzer (MCA) is an essential part of the International Space Station (ISS) environmental control and life support system. The analyzer provides continuous readout of the partial pressures of six gases, nitrogen (N2), oxygen (O2), hydrogen (H2), carbon dioxide (CO2), methane (CH4) and water vapor (H2O) in the various ISS US. on-orbit modules. Continuous readout of the partial pressures of these gases is critical to verifying safe operation of the Atmosphere Revitalization (AR) system, Atmosphere Control System (ACS), and crew safety for Airlock Extravehicular Activities (EVAs). The MCA encountered some operational interruptions since being launched to orbit on Flight 5A in February 2001. Electronic, software, and hardware modifications and on-orbit crew maintenance of the MCA were necessary to restore its capability. This paper describes the modifications and the on-orbit maintenance performed to return the MCA to operational status, including brief explanations of the MCA failures and the associated hardware and electronic modifications. Operational procedures that were required to return the MCA to operational status, and the more recent successes of supporting both Russian and U.S. ISS EVA preparations, are also discussed

Reysa, Richard↗

Autonomous failure detection and correction on Landsat-4

An integrated hardware/software fault tolerant system for an earth oriented, computer controlled spacecraft is described. The design philosophy as well as the rationale behind the chosen fault tolerant system is outlined. In-flight performance of the system is included for several different instances where the Failure Detection and Correction system acted autonomously to protect the spacecraft. This system exceeded the expectations of the designers by demonstrating the capability to provide a measure of safety to the spacecraft for inadvertent and undesirable ground commands as well as satisfying its primary function of monitoring the flight hardware and software for failures.

Welch, R. V.↗

Redundancy management of inertial systems.

The paper reviews developments in failure detection and isolation techniques applicable to gimballed and strapdown systems. It examines basic redundancy management goals of improved reliability, performance and logistic costs, and explores mechanizations available for both input and output data handling. The meaning of redundant system reliability in terms of available coverage, system MTBF, and mission time is presented and the practical hardware performance limitations of failure detection and isolation techniques are explored. Simulation results are presented illustrating implementation coverages attainable considering IMU performance models and mission detection threshold requirements. The implications of a complete GN&C redundancy management method on inertial techniques are also explored.

Mckern, R. A.↗

Lunar module program system safety

The application of system safety principles to the Lunar Module Program is summarized. Objectives of the program include elimination or reduction of risk to personnel, material, and facilities resulting from failures or malfunctions in hardware or procedures. Data also cover design, production, and test activity.

William E. Scarborough↗

Nondestructive evaluation of electroformed outer shells for regeneratively cooled thrust chambers

Electroforming is presently a prime technique for producing the outer jackets of regeneratively cooled thrust chambers for rocket engines. Good bond integrity of the electroformed joints adjacent to the coolant passages is important to the useful service life of these aerospace systems. This investigation demonstrated that nondestructive evaluation techniques such as ultrasonic 'C' scan, holography, and acoustic emission are capable of detecting low integrity bonds which could lead to premature failures in the subject hardware.

Malone, G. A.↗

Galileo spacecraft power distribution and autonomous fault recovery

There is a trend in current spacecraft design to achieve greater fault tolerance through the implemenation of on-board software dedicated to detecting and isolating failures. A combination of hardware and software is utilized in the Galileo power system for autonomous fault recovery. Galileo is a dual-spun spacecraft designed to carry a number of scientific instruments into a series of orbits around the planet Jupiter. In addition to its self-contained scientific payload, it will also carry a probe system which will be separated from the spacecraft some 150 days prior to Jupiter encounter. The Galileo spacecraft is scheduled to be launched in 1985. Attention is given to the power system, the fault protection requirements, and the power fault recovery implementation.

Detwiler, R. C.↗

Fault-tolerant, embedded CLIPS applications

The enhancements to CLIPS4.3 presented in this paper provide an embedded CLIPS application with the ability to continue operation with minimal to no loss of information in the event of a hardware or a software failure. Given an arbitrary failure, the CLIPS application's environment (fact-list, agenda, and pattern matching network) will be reconstructed to the point at which the failure was experienced. The environment reconstruction is based on state files to which the application periodically checks environment information (fact-list and agenda). The routine for checkpointing the state of the application is as efficient as possible so that the overhead introduced to normal execution of the application is minimal. The only assumptions made by the CLIPS application are that it is running under an operating system that guarantees it access to uncorrupt state files and that the application will be automatically restarted should it terminate abnormally.

Hicks, Jaye↗

Preloaded joint analysis methodology for space flight systems

This report contains a compilation of some of the most basic equations governing simple preloaded joint systems and discusses the more common modes of failure associated with such hardware. It is intended to provide the mechanical designer with the tools necessary for designing a basic bolted joint. Although the information presented is intended to aid in the engineering of space flight structures, the fundamentals are equally applicable to other forms of mechanical design.

Chambers, Jeffrey A.↗

Work on Planetary Atmospheres and Planetary Atmosphere Probes

A summary final report of work accomplished is presented. Work was performed in the following areas: (1) Galileo Probe science analysis, (2) Galileo probe Atmosphere Structure Instrument, (3) Mars Pathfinder Atmosphere Structure/Meteorology instrument, (4) Mars Pathfinder data analysis, (5) Science Definition for future Mars missions, (6) Viking Lander data analysis, (7) winds in Mars atmosphere Venus atmospheric dynamics, (8) Pioneer Venus Probe data analysis, (9) Pioneer Venus anomaly analysis, (10) Discovery Venus Probe Titan probe instrument design, and (11) laboratory studies of Titan probe impact phenomena. The work has resulted in more than 10 articles published in archive journals, 2 encyclopedia articles, and many working papers. This final report is organized around the four planets on which there was activity, Jupiter, Mars, Venus, and Titan, with a closing section on Miscellaneous Activities. A major objective was to complete the fabrication, test, and evaluation of the atmosphere structure experiment on the Galileo probe, and to receive, analyze and interpret data received from the spacecraft. The instrument was launched on April 14, 1989. Calibration data were taken for all experiment sensors. The data were analyzed, fitted with algorithms, and summarized in a calibration report for use in analyzing and interpreting data returned from Jupiter's atmosphere. The sensors included were the primary science pressure, temperature and acceleration sensors, and the supporting engineering temperature sensors. Computer programs were written to decode the Experiment Data Record and convert the digital numbers to physical quantities, i.e., temperatures, pressures, and accelerations. The project office agreed to obtain telemetry of checkout data from the probe. Work to extend programs written for use on the Pioneer Venus project included: (1) massive heat shield ablation leading to important mass loss during entry; and (2) rapid planet rotation, which introduced terms of motion not needed on Venus. When the Galileo Probe encountered Jupiter, analysis and interpretation of data commenced. The early contributions of the experiment were to define (1) the basic structure of the deep atmosphere, (2) the stability of the atmosphere, (3) the upper atmospheric profiles of density, pressure, and temperature. The next major task in the Galileo Probe project was to refine, verify and extend the analysis of the data. It was the verified, and corrected data, which indicated a dry abiabatic atmosphere within measurement accuracy. Temperature in the thermosphere was measured at 900 K. Participation in the Mars atmospheric research included: (1) work as a team member of the Mars Atmosphere Working Group, (2) contribution to the Mars Exobiology Instrument workshop, (3) asssistance in planning the Mars global network and (4) assitance in planning the Soviet-French Mars mission in 1994. This included a return to the Viking Lander parachute data to refine and improve the definition of winds between 1.5 and 4 kilometer altitude at the two entry sites. The variability of the structure of Mars atmosphere was addressed, which is known to vary with season, latitude, hemisphere and dust loading of the atmosphere. This led to work on the Pathfinder project. The probe had a deployable meteorology mast that had three temperature sensors, and a wind sensor at the tip of the mast. Work on the Titan atmospheric probe was also accomplished. This included developing an experiment proposal to the European Space Agency (ESA), which was not selected. However, as an advisor in the design and preparation of the selected experiment the researcher interacted with scientist on the Huygens Probe Atmosphere Structure Experiment. The researcher also participated in the planning for the Venus Chemical Probe. The science objectives of the probe were to resolve unanswered questions concerning the minor species chemistry of Venus' atmosphere that control cloud formation, greenhouse effectiveness, and the thermal structure. The researcher also reviewed problems with the Pioneer Venus Probe, that caused anomalies which occurred on the Probes at and below 12.5 km level of the Venus' atmosphere. He convened and participated in a workshop that concluded the most likely hardware cause was insulation failure in the electrical harness outside the Probes' pressure vessels. It was discovered that the shrink tubing material failed at 600K. This failure could explain the anomalies experienced by the probes. The descent data of the Pioneer probes, and the Soviet Vega Lander was analyzed to evaluate the presence of small scale gravity waves in and below the Venus cloud layer.

Lester, Peter↗