Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “flexible loads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

Design of a real-time wind turbine simulator using a custom parallel architecture

The design of a new parallel-processing digital simulator is described. The new simulator has been developed specifically for analysis of wind energy systems in real time. The new processor has been named: the Wind Energy System Time-domain simulator, version 3 (WEST-3). Like previous WEST versions, WEST-3 performs many computations in parallel. The modules in WEST-3 are pure digital processors, however. These digital processors can be programmed individually and operated in concert to achieve real-time simulation of wind turbine systems. Because of this programmability, WEST-3 is very much more flexible and general than its two predecessors. The design features of WEST-3 are described to show how the system produces high-speed solutions of nonlinear time-domain equations. WEST-3 has two very fast Computational Units (CU's) that use minicomputer technology plus special architectural features that make them many times faster than a microcomputer. These CU's are needed to perform the complex computations associated with the wind turbine rotor system in real time. The parallel architecture of the CU causes several tasks to be done in each cycle, including an IO operation and the combination of a multiply, add, and store. The WEST-3 simulator can be expanded at any time for additional computational power. This is possible because the CU's interfaced to each other and to other portions of the simulation using special serial buses. These buses can be 'patched' together in essentially any configuration (in a manner very similar to the programming methods used in analog computation) to balance the input/ output requirements. CU's can be added in any number to share a given computational load. This flexible bus feature is very different from many other parallel processors which usually have a throughput limit because of rigid bus architecture.

Hoffman, John A.↗

Hardware-in-the-loop Laboratory Performance Verification of Flexible Building Equipment in a Typical Commercial Building

This project aims to develop high-resolution equipment performance and occupant data that quantifies demand flexibility in typical commercial buildings. The dataset documented in this report includes comprehensive time-series measurements from hardware-in-the-loop (HIL) experiments conducted across multiple testbeds designed to simulate realistic operational environments for HVAC systems. Specifically, it captures minute-by-minute high-resolution data on the performance of various typical HVAC systems, including a variable-air-volume (VAV) air handling unit (AHU) system with chillers and an ice tank in the Intelligent Building Agents Laboratory (IBAL) at the National Institute of Standards and Technology (NIST), a two-stage air-source heat pump (ASHP) at the NIST, and a water-source heat pump (WSHP) at Texas A&M University (TAMU). The data were generated under a range of controlled conditions reflecting different grid scenarios and climatic influences, as well as various control strategies, building types, occupancy patterns, and occupant behaviors. This dataset provides DE-EE0009153 Final Report 5 detailed insights into the demand flexibility of these systems, including their response to grid signals, occupant behaviors, energy consumption patterns, and operational efficiency under different conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Operating a commercial building HVAC load as a virtual battery through airflow control

Virtual battery (VB) is an innovative method to model flexibility of building loads and effectively coordinate them with other resources at a system level. Unlike a real battery with a dedicated power conversion system for charging control, methods are required for operating building loads to deviate from the baseline to respond to grid signals. This paper presents a VB control for a commercial heating, ventilation, and air conditioning (HVAC) system to follow the desired power consumption in real-time by adjusting zonal airflow rates. The proposed method consists of two parts. At the system level, a mixed feedforward and feedback control is used to estimate the desired total airflow rate. At the zone level, two priority-based algorithms are then proposed to distribute the total airflow rate to individual zones. In particular, a zonal airflow limit estimation method is proposed using machine-learning techniques, in contrast to physics-based thermal models in existing studies, to more accurately capture zonal thermal dynamics and improve temperature control performance. An office building on the Pacific Northwest National Laboratory campus is implemented in EnergyPlus, and used to illustrate and validate the proposed control.

Wang, Jiyu↗

Experimental Evidence on Latency in a Fleet of Controllable Water Heaters

Demand response is an important emerging part of smart grids with wide coverage in theoretical and modeling research. However, experimental evidence on the real-life behavior of controllable loads is still limited. We present observations regarding latency and communication aspects of the operation on a fleet of residential water heaters in a smart neighborhood in Atlanta, GA. Our analysis shows that latency in water heaters is not constant and does not follow a Gaussian distribution. We also find that there is a systematic relationship between latency and hour of the day. Latency was found to increase during morning and evening hours compared to the afternoon. These findings could help better plan deployment of control for demand response programs. Understanding delays associated with controlling smart devices is crucial for proper design and algorithm development for optimization, frequency of dispatch, and override detection.

communication delay↗

Impact of Control on Availability and Cycling of Residential HVAC in a Real-World Experiment

Demand response is an important emerging part of smart grids and there is a large stream of research from theoretical and modeling perspectives. However, there is relatively little experimental evidence that could help researchers and building operators make informed decisions on best practices for modeling, developing, and deployment of control mechanisms. We contribute to the body of experimental research by providing numerical insights into the role and availability of residential HVAC systems for control. We share the findings on the duration of the cooling cycle, off cycle, and temperature settling time of HVAC systems from data collected from a smart neighborhood located in Atlanta, GA.

cycling↗

Special Issue: Thermal Energy Storage for Buildings

This special issue (SI) of the ASME Journal of Engineering for Sustainable Buildings and Cities (JESBC) features peer-reviewed papers specific to technologies and applications of thermal energy storage (TES) for buildings. TES systems store energy in materials as a heat source or a cold sink and then discharge the stored energy hours or weeks later to enhance thermal comfort or reduce utility bills [1]. As buildings and cities are facing increasing energy consumption and extreme weather events, TES offers a powerful solution to balance supply and demand, reduce operational energy costs, and strengthen energy resilience during power outages.

25 ENERGY STORAGE↗

Design and Analysis of a Floating-Wind Shallow-Water Mooring System Featuring Polymer Springs

This paper presents a mooring system design featuring polymer springs for the VolturnUS-S 15-MW reference floating wind turbine in site conditions for the New York Bight at a 50-m water depth. Polymer springs have a nonlinear stress-strain curve that allows a stiffer response at low loads and a more flexible response at higher loads, potentially reducing peak mooring line tensions. The mooring dynamics model MoorDyn has been extended to model springs with nonlinear tension-strain curves from a user-inputted look-up table. This MoorDyn modeling advancement is verified against OrcaFlex simulation results. Using MoorDyn's updated capabilities, a spring-equipped catenary mooring system is designed for the 15-MW floating system, along with a baseline catenary mooring system that does not use polymer springs. The floating wind turbine simulator OpenFAST is used to simulate the mooring systems in design-driving load cases to show the effect of polymer springs on key dynamic behaviours. The results show that the spring-equipped design reduces peak tensions by up to 60%, whereas the turbine offsets stay within a maximum of 7.2 m, which is still a reasonable offset limit for cable considerations. The reduction in peak tensions results in a significant decrease in damage equivalent loads - on the order of 50% for upwind lines in fully loaded conditions. These results show that polymer springs can effectively reduce peak tensions and fatigue loads in mooring systems at shallow water depths.

floating offshore wind↗

Market Brief: Customer-sited Distributed Energy Resources

This market brief summarizes key takeaways from interviews with vendors and service providers in one or more areas of the DER market: DER controls, battery storage, solar photovoltaic, thermal energy storage, combined heat and power, flexible building loads, and electric vehicle charging. Back-up generators used only in emergencies are not in the scope of this market brief.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimizing an Integrated Renewable-Electrolysis System

Hydrogen is a versatile energy carrier that is used in a wide variety of chemical and industrial processes. Producing hydrogen using electrolysis can enable integration of multiple sectors including electricity, heating, and industrial sectors; however, the cost of producing hydrogen from electrolysis remains a challenge for encouraging greater adoption. With growing amounts of renewable generation on the California grid, there is downward pressure on wholesale electricity prices, particularly during the afternoon from photovoltaics (PV). These lower, or even potentially negative prices, challenge the business cases for new and existing PV plants. In addition, as the grid transitions to less flexible generation, there is greater need for system flexibility. To help improve the economics for both solar PV and hydrogen production using electrolyzers, we explore the benefit of combining PV and electrolysis systems. The optimal breakeven hydrogen production cost for six unique market participation configurations is calculated at six candidate locations where PV is already installed. The six market configurations include islanded, separated, retail, net energy metering (NEM), hybrid retail/wholesale and wholesale. Using the Revenue Operation and Device Optimization Model (RODeO) model, the optimal breakeven hydrogen price over the lifetime of the equipment is calculated. The cost includes production, storage, and compression in preparation for gaseous delivery trucks. Revenue streams include the sale of hydrogen, low carbon fuel standard (LCFS) credits, renewable electricity sold to the grid, and Renewable Energy Credits (REC). The costs included are the electricity costs, capital and fixed operation and maintenance cost (FOM) for the electrolyzer, PV, and storage and compression systems as well as taxes and financing costs. In addition, cost reductions are achieved through retail and wholesale rate optimization, by which electricity is purchased at the lowest price and sold, if possible, at the highest price. For all locations, the breakeven hydrogen production cost results show that, in the order of decreasing cost, the system configurations are islanded (highest), separated, NEM, retail, hybrid retail/wholesale, and wholesale (lowest). The resulting system design balances between the capital and maintenance cost components, the operation costs (i.e., electricity costs) and the additional market revenues. The integration of solar PV and electrolysis is shown to provide a mutually beneficial relationship. For PV, integration with electrolysis offers the potential to hedge against wholesale market price volatility, and integration with electrolysis may offer the potential to defer or avoid transmission investment to deliver power to the point-of-use and instead use it on-site. When compared with SMR without considering any renewable hydrogen premiums, this study finds that PV + Electrolysis systems with current costs are likely not competitive; however, with cost reductions for electrolysis equipment consistent with DOE projections, it was found that systems with wholesale market access would be competitive, largely on account of both low capital costs and low-cost electricity. The electrolysis units can provide greater flexibility than is required based on retail rate optimization, so there is an opportunity for a utility or CAISO to increase system flexibility with PV + Electrolysis systems in return for commensurate compensation. In this way, there are potentially several solutions that fall between the hybrid configuration and the wholesale configuration that could provide sufficient compensation for a PV + Electrolysis unit to compete with SMR while also providing greater flexibility to the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid-interactive Efficient Buildings Projects Summary

Through its grid-interactive efficient building (GEB) research, DOE’s Building Technologies Office seeks to build on existing energy-efficiency efforts to optimize the interplay among energy efficiency, demand response, behind-the-meter generation and energy storage to increase the flexibility of demand-side management. BTO envisions a future where buildings dynamically operate as part of a low cost, reliable electricity grid while meeting the needs and expectations of building occupants.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Innovative Technologies for a Low Carbon Electricity System

The electricity sector represents the centerpiece of decarbonization pathways for the state. Decrease in the cost of renewable electricity generation, combined with ample solar energy, wind and other renewable resources, presents a realistic way to achieve electricity generation that is nearly free of CO 2 emissions by mid-century. Expansion of renewable electricity supply could allow replacement of many CO 2 -emitting technologies with ones that use electricity—in transportation, buildings, and possibly industry. Key elements of the path for California’s electricity sector are: restrain electricity demand through higher efficiency, rapidly expand renewable electricity generation, develop electricity storage to complement renewable electricity, manage flexible electricity loads for a low-carbon electricity system, electrify where appropriate to reduce CO 2 emissions, and maintain reliable and resilient electricity supply. This report provides an overview of a multitude of innovative technologies in each of the above areas that have the potential to help the state meet its decarbonization goals, while lowering costs and promoting greater reliability. The information presented provides a portrait of the landscape of technology innovation that can help policymakers, state agencies, and interested parties develop strategies to meet the state’s goals and to target efforts to support and nurture technology innovation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Coating Compositions and Microstructures to Improve Uptime and Operational Flexibility in Cyclic, Low-Load Thermal Utility Plants

GE, the University of Tennessee, and Oak Ridge National Laboratory collaborated from 2020 to 2023 developing two key technologies for improving the viability of fuel switching and load following in thermal utility plants: a) cost-effective weld overlay compositions for boiler tubing b) cathodic arc coatings that deliver improvements in both erosion resistance and oxidation resistance in high temperature steam for HP turbine blades The team worked through a robust, logical project map to de-risk these two technologies and advance them from TRL 3 to TRL 6. For the cost-effective weld overlay, the team developed a ferritic filler material which was fabricated at a vendor for 18% the average market cost of Inconel 625 wire, had a corrosion rate 3x lower in conditions simulating a biomass-fired superheater and 10x lower in conditions simulating a coal-fired superheater, and was fabricated into prototype overlaid tubing that passed ASME requirements including transverse bending, dye penetrant inspection, and ASTM G-76 evaluation. For the cathodic arc coatings applied to steam turbine blades, the team developed a novel composition that was successfully transferred to a qualified vendor. The vendor was able to produce coated prototypes with 4x the as-deposited erosion resistance and 10.4x the post-steam-exposure erosion resistance of the TiN coating the vendor currently applies on GE steam turbine components, without significantly increasing process cost. These coated prototypes also passed a GE inspection and showed favorable performance in high temperature erosion, nanoindentation, sliding wear, scratch adhesion, and high cycle fatigue testing. If successfully deployed by GE, it is anticipated that the technologies will enable the following: • 25%-50% increase in time between outages for both boilers and HP turbines. • 50% decrease in cost for weld overlay on a per foot basis relative to todays NiCr alloys. • Adequate oxidation resistance and erosion for HP turbine inlet steam at >620°C and >220 bar. • No need for changes in component supply chain or any notable Capital Expenditures. 5 Decreasing component cost, increasing performance, and extending time between outages represent direct value propositions to GE and their customers. For the American consumer, these objectives translate into increased grid reliability (fewer unexpected outages), decreased Levelized Cost of Electricity, and improved environmental health (low-loading/load following to accelerate penetration of renewables). The results also have implications for wear resistant tooling, wire arc additive manufacturing, more durable components for syngas cleanup, and deployment of more efficient thermochemical pathways for carbon negative fuel production

09 BIOMASS FUELS↗

Virtual Power Plants and Distributed Energy Resource Management Systems

Virtual Power Plants (VPPs) are aggregations of DERs that can balance electrical loads and provide utility-scale and utility-grade grid services like a traditional power plant. This presentation covers VPP definition, State-of-the-Art, Grid Architectures, Example VPP studies, VPP Standards, and VPP Roadmap.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design procedures for flutter-free surface panels

An approach for the design of lightweight external surface panel configurations to preclude panel flutter was developed. Design procedures were developed for flat orthotropic panels under the interacting influence of parameters such as support flexibility, inplane loads, pressure differential, and flow angularity. The basic relationships required to define these design procedures were based on theoretical panel flutter analyses. Where possible, the design procedures were verified through comparison with available experimental panel flutter data.

Laurenson, R. M.↗

Combined strength and aeroelastic wing synthesis via constraint approximation

A numerical optimization program using constraint approximations for preliminary sizing of wing structural design parameters to satisfy simultaneous strength and aeroelastic requirements is described. The effects of wing flexibility on loads and flutter are included. The iterative procedure approximates wing internal load distributions and flutter response in generating design constraints. Though a linear Taylor series approximation to the variation of flutter speed is made, constraints in general are formulated as nonlinear and solved in a minimum weight problem using a feasible directions search. The technique is demonstrated for the determination of the optimal ply orientations and for simultaneous sizing for strength and flutter with simple constraint approximations.

Mullen, J., Jr.↗

Application of decomposition techniques to the preliminary design of a transport aircraft

A nonlinear constrained optimization problem describing the preliminary design process for a transport aircraft has been formulated. A multifaceted decomposition of the optimization problem has been made. Flight dynamics, flexible aircraft loads and deformations, and preliminary structural design subproblems appear prominently in the decomposition. The use of design process decomposition for scheduling design projects, a new system integration approach to configuration control, and the application of object-centered programming to a new generation of design tools are discussed.

Rogan, J. E.↗

Application of decomposition techniques to the preliminary design of a transport aircraft

A multifaceted decomposition of a nonlinear constrained optimization problem describing the preliminary design process for a transport aircraft has been made. Flight dynamics, flexible aircraft loads and deformations, and preliminary structural design subproblems appear prominently in the decomposition. The use of design process decomposition for scheduling design projects, a new system integration approach to configuration control, and the application of object-centered programming to a new generation of design tools are discussed.

Rogan, J. E.↗