Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “developing countries”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Worldwide survey of direct-to-listener digital audio delivery systems development since WARC-1992

Each country was allocated frequency band(s) for direct-to-listener digital audio broadcasting at WARC-92. These allocations were near 1500, 2300, and 2600 MHz. In addition, some countries are encouraging the development of digital audio broadcasting services for terrestrial delivery only in the VHF bands (at frequencies from roughly 50 to 300 MHz) and in the medium-wave broadcasting band (AM band) (from roughly 0.5 to 1.7 MHz). The development activity increase was explosive. Current development, as of February 1993, as it is known to the author is summarized. The information given includes the following characteristics, as appropriate, for each planned system: coverage areas, audio quality, number of audio channels, delivery via satellite/terrestrial or both, carrier frequency bands, modulation methods, source coding, and channel coding. Most proponents claim that they will be operational in 3 or 4 years.

Messer, Dion D.↗

Cleantech University Program Regional Competition. Final Report

The Berkeley Cleantech University Program (CUP) provided aspiring student entrepreneurs with the mentorship, business development skills and training, and investor feedback they need to turn their clean energy ideas into businesses offering real-world solutions. Annually for three years, the Berkeley CUP recruited teams of students across the country to develop their clean energy technology and refine their business plan, and provided them with mentorship and training during the crucial incubation phase. Each year, the regional program culminates in a final pitch competition, where two finalists and one grand prize winner are determined. Teams are judged on a variety of factors, including but not limited to technical feasibility, scalability, and impact. A total of 18 teams representing 10 universities have participated in the Berkeley CUP. The contest attracted and sustained a growing body of innovative cleantech ideas, young entrepreneurs, investors, and corporate partners in the western region of the United States.

99 GENERAL AND MISCELLANEOUS↗

E2C Cohorts: Implementation Funding Projects - Impact Summary [Slides]

From August 2024 to October 2025, 11 Clean Cities and Communities coalitions supported projects to advance transportation goals by gathering input from local stakeholders, and using the resulting insights to develop new plans and programs for local partners. This effort leveraged information and best practices shared during the 2024 E2C Cohort on Integrating Community Priorities into Electric Vehicle Plans and Projects. These coalitions supported partners across the country to develop plans for electric vehicle integration through one-on-one technical assistance and tailored local engagement. This deck summarizes the individual projects completed by coalitions, and the overall reach and impact of all of this program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ERTS imagery as a source of environmental information for southern Africa

Southern Africa is faced with a variety of environmental problems that reflect the different states of development of countries in the region. The task of the environmental planner is in many instances complicated by a lack of basic resource information. The acquisition of the necessary data is often impeded by shortage of trained personnel and lack of funds, particularly in developing nations of the region. The range of environmental problems in Southern Africa are described and specific examples are shown of how ERTS type imagery can materially assist in solving these problems. These examples demonstrate that ERTS type data will be of substantial value to both the industrialized and the developing nations of Southern Africa, provided that problems of availability and user education are overcome.

Williamson, D. T.↗

Integrating Variable Renewable Energy Into the Grid: Key Issues

To foster sustainable, low-emission development, many countries are establishing ambitious renewable energy targets for their electricity supply. The variability of solar and wind compared to traditional sources, coupled with growing demand for electricity, requires changes to power system planning and operations to meet these targets. Grid integration is the practice of developing efficient ways to deliver variable renewable energy (VRE), primarily wind and solar, to the grid. Good integration methods maximize the cost-effectiveness of incorporating VRE while maintaining or increasing system stability and reliability. To inform decarbonization strategies, policymakers, regulators, and system operators consider a variety of costs and opportunities associated with VRE integration, which can be organized into five topics: New renewable energy generation and transmission; Power system reliability; Transmission and distribution coordination; Cross-sectoral decarbonization opportunities; Energy equity and justice.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Susceptibility of South Korea to Extremes Affecting the Global Food System

Food security in South Korea is tightly linked to the global food system. The country's production of major grains declined from 5.8 million metric tons (mmt) in 1998 to 4.8 mmt in 2014, which caused the country's grain self suciency to decline from 31.4% to 24%. This decline is a consequence of several factors including reductions in domestic agricultural land, governmental policies supporting industry over agriculture, and a push towards trade liberalization. South Korea's self suciency is now one of the lowest among Organisation for Economic Co-operation and Development (OECD) countries, leaving it vulnerable to disruptions in the global food system.

Agriculture↗

Can Radiation Therapy Quality Assurance Improve Nasopharyngeal Cancer Outcomes in Low- and Middle-Income Countries: Reporting the First Phase of a Prospective International Atomic Energy Agency Study

Most new nasopharyngeal cancer cases occur in low-income and middle-income countries, and these patients experience poorer overall survival than that of new nasopharyngeal cancer cases in high-income countries. The goal of this research project is to determine whether the introduction of a radiation therapy quality assurance program can ultimately improve outcomes for nasopharyngeal cancer patients in lower-income and middle-income countries. This study reports the results of the first phase of the International Atomic Energy Agency Coordinated Research Project (325-E3-TM-47712).

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Epidemiologic and economic considerations regarding persistently infected cattle during vaccinate-to-live strategies for control of foot-and-mouth disease in FMD-free regions

Development of a foot-and-mouth disease (FMD) carrier state following FMD virus (FMDV) infection is a well-established phenomenon in cattle. However, the proportion of cattle likely to become carriers and the duration of the carrier state at a herd or population-level are incompletely understood. The objective of this study was to examine the epidemiologic and economic impacts of vaccination-to-live strategy in a disease-free region or country. We developed and simulated scenarios of FMD spread and control in the US livestock population, which included depopulation for a limited period, followed by a vaccinate-to-live strategy with strong biosecurity and movement restrictions. Six scenarios of FMD spread and control were simulated in the InterSpread Plus (ISP) modeling tool. Data on the number of infected and depopulated cattle (by operation types) from ISP model runs were used to estimate the monthly number of infected but not depopulated (potential carrier) cattle after the infection. Using available literature data on the FMD carrier state, we estimated the monthly proportion of carrier cattle (from infected but not depopulated cattle) over time following infection. Among the simulated scenarios, the median (25th, 75th percentile) number of infected cattle ranged from 43,217 (42,819, 55,274) head to 148,907 (75,819, 205,350) head, and the epidemic duration ranged from 20 (11, 30) to 76 (38, 136) days. In general, larger outbreaks occurred when depopulation was carried out through longer periods, and the onset of the vaccination was late (p > 0.05). The estimated proportion of surviving cattle, which were infected and not depopulated and had the potential to become persistently infected ranged from 14 to 35% of total infected cattle. Production losses in beef and dairy sectors were higher when outbreaks started in multiple states simultaneously, but production losses were small compared to trade losses and consumer avoidance losses. These results can be used to inform the consideration of a vaccinate-to-live strategy for FMD outbreaks and the development of appropriate post-outbreak management strategies. Furthermore, this output will enable a more detailed examination of the epidemiologic and economic implications of allowing convalescent cattle to survive and remain in production chains after FMD outbreaks in FMD-free regions.

60 APPLIED LIFE SCIENCES↗

Scaling Up Energy Efficiency Investment in Emerging Markets - Private Sector Perspectives

Since 2000, electricity demand has flattened and decoupled from Gross Domestic Product (GDP) growth in the Organization for Economic Cooperation and Development (OECD) countries. This trend is anticipated to continue for the next several decades and is largely attributed to the implementation of energy efficiency measures. However, non-OECD countries (emerging markets) have experienced, and are projected to continue experiencing, increasing electricity demands. If the world is to meet the requirements of the Paris Agreement, annual investments in clean energy and energy efficiency need to increase by a factor of six by 2050, compared to 2015. Information presented in this paper is based on qualitative and quantitative data collection and analysis methods to provide an empirical understanding of barriers to private sector clean energy investment including microgrid development, energy efficiency, smart grid development, and utility-scale wind and solar in emerging markets. Through literature review, a survey, and a series of webinar dialogues, USAID and the U.S. Department of Energy National Renewable Energy Laboratory (NREL) solicited input from private sector actors, including developers, project financiers, manufacturers and technical assistance service providers, on the challenges they face to market entry in emerging markets, and their suggestions for improving market competitiveness.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cartographic experiment for Latin America

The author has identified the following significant results. The two experiments clearly demonstrate the practical application of the Skylab photography to update existing maps at an optimum scale of 1:100,000. The photography can even be used, by employing first order photogrammetric instruments, for updating the cultural features in 1:50,000 scale mapping. The S190A imagery has also shown itself to be most economical in preparing new photomap products over previously unmapped areas, such as Concepcion, Paraguay. These maps indicate that Skylab quality imagery is invaluable to the Latin American cartographers in their efforts to provide the mapping products required to develop their countries. In Latin America, where over 5,000 people are employed in map production and where the Latin American governments are expending over $20 million in this effort, the use of such systems to maintain existing mapping and publish new mapping over previously unmapped areas, is of great economic value and could release the conventional Latin American mapping resources to be utilized to produce large scale 1:25,000 and 1:1,000 scale mapping that is needed for specific development projects.

Staples, J. E.↗

A Decade of Friction Stir Welding R and D at NASA's Marshall Space Flight Center and a Glance into the Future

Welding at NASA's Marshall Space Flight Center (MSFC), Huntsville, Alabama, has taken a new direction through the last 10 years. Fusion welding processes, namely variable polarity plasma arc (VPPA) and tungsten inert gas (TIG) were once the corner stone of welding development in the Space Flight Center's welding laboratories, located in the part of MSFC know as National Center for Advanced Manufacturing (NCM). Developed specifically to support the Shuttle Program's External Tank and later International Space Station manufacturing programs, was viewed as the paragon of welding processes for joining aluminum alloys. Much has changed since 1994, however, when NASA's Jeff Ding brought the FSW process to the NASA agency. Although, at that time, FSW was little more than a "lab curiosity", NASA researchers started investigating where the FSW process would best fit NASA manufacturing programs. A laboratory FSW system was procured and the first welds were made in fall of 1995. The small initial investment NASA made into the first FSW system has certainly paid off for the NASA agency in terms of cost savings, hardware quality and notoriety. FSW is now a part of Shuttle External Tank (ET) production and the preferred weld process for the manufacturing of components for the new Crew Launch Vehicle (CLV) and Heavy Lift Launch Vehicle (HLLV) that will take this country back to the moon. It is one of the solid state welding processes being considered for on-orbit space welding and repair, and is of considerable interest for Department of Defense @OD) manufacturing programs. MSFC involvement in these and other programs makes NASA a driving force in this country's development of FSW and other solid state welding technologies. Now, a decade later, almost the entire on-going welding R&D at MSFC now focuses on FSW and other more advanced solid state welding processes.

Ding, Jeff↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since.Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter for a given ECM taken in the performance period. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the estimated (and guaranteed) savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

International assessment of priority environmental issues for land-based and offshore wind energy development

Non-technical summary A substantial increase in wind energy deployment worldwide is required to help achieve international targets for decreasing global carbon emissions and limiting the impacts of climate change. In response to global concerns regarding the environmental effects of wind energy, the International Energy Agency Wind Technical Collaborative Program initiated Task 34 – Working Together to Resolve Environmental Effects of Wind Energy or WREN. As part of WREN, this study performed an international assessment with the global wind energy and environmental community to determine priority environmental issues over the next 5‒10 years and help support collaborative interactions among researchers, developers, regulators, and stakeholders. Technical summary A systematic assessment was performed using feedback from the international community to identify priority environmental issues for land-based and offshore wind energy development. Given the global nature of wind energy development, feedback was of interest from all countries where such development is underway or planned to help meet United Nations Intergovernmental Panel on Climate Change targets. The assessment prioritized environmental issues over the next 5–10 years associated with wind energy development and received a total of 294 responses from 28 countries. For land-based wind, the highest-ranked issues included turbine collision risk for volant species (birds and bats), cumulative effects on species and ecosystems, and indirect effects such as avoidance and displacement. For offshore wind, the highest-ranked issues included cumulative effects, turbine collision risk, underwater noise (e.g. marine mammals and fish), and displacement. Emerging considerations for these priorities include potential application to future technologies (e.g. larger turbines and floating turbines), new stressors and species in frontier regions, and cumulative effects for multiple projects at a regional scale. For both land-based and offshore wind, effectiveness of minimization measures (e.g. detection and deterrence technologies) and costs for monitoring, minimization, and mitigation were identified as overarching challenges. Social media summary Turbine collisions and cumulative effects among the international environmental priorities for wind energy development.

17 WIND ENERGY↗

Infrastructure inequality is a characteristic of urbanization

Urbanization can challenge sustainable development if it produces unequal outcomes. Infrastructure is an important urbanization dimension, providing services to support diverse urban activities. However, it can lock in unequal outcomes due to its durable nature. This paper studies inequalities in infrastructure distributions to derive insights into the structure and characteristics of unequal outcomes associated with urbanization. We analyzed infrastructure inequalities in two emerging economies in the Global South: India and South Africa. We developed and applied an inequality measure to understand the structure of inequality in infrastructure provisioning (based on census data) and infrastructure availability (based on satellite nighttime lights [NTLs] data). Consistent with differences in economic inequality, results show greater inequalities in South Africa than in India and greater urban inequalities than rural inequalities. Nevertheless, inequalities in urban infrastructure provisioning and infrastructure availability increase from finer to coarser spatial scales. NTL-based inequality measurements additionally show that inequalities are more concentrated at coarse spatial scales in India than in South Africa. Finally, results show that urban inequalities in infrastructure provisioning covary with urbanization levels conceptualized as a multidimensional phenomenon, including demographic, economic, and infrastructural dimensions. Similarly, inequalities in urban infrastructure availability increase monotonically with infrastructure development levels and urban population size. Together, these findings underscore infrastructure inequalities as a feature of urbanization and suggest that understanding urban inequalities requires applying an inequality lens to urbanization.

54 ENVIRONMENTAL SCIENCES↗

Foundations of an Electric Mobility Strategy for the City of Mexicali

The Foundations of an Electric Mobility Strategy for the city of Mexicali aligns with numerous energy, environmental, and transport plans and will help Mexicali meet multiple related goals. Mexicali’s energy mix, with 28% renewables, already enables plugin electric vehicles (PEVs) to reduce the mass of greenhouse gases (GHGs) per km driven 2/3 below that of their conventional counterparts. This GHG benefit will increase should Mexicali take steps to further increase their share of renewables in their electricity supply. Beyond increasing renewables, Mexicali could possibly deploy PEVs so that electric load is added in the right location (depending on further analysis of substations and feeders) and at the right time (between 21:00 and 11:00) in order to minimize grid upgrade costs. There are a handful of charge timing control mechanisms –at various stages of development– that Mexicali could implement. Transport electrification can facilitate mass transit by powering buses, trains, and small vehicles that get people from their homes or work to the transit stations and vice versa. Mexicali could utilize fleets as early PEV adopters in order to gain acceptance and add electric vehicle supply equipment (EVSE). Recommended prioritization of different types of fleets are suggested in this report: transit buses, school buses, airport ground support equipment (GSE), refuse trucks, taxis, shuttle buses, campus vehicles, delivery trucks, utility trucks, and finally semitrailers. There are a handful of policy options that Mexicali could use to incentivize fleets to purchase PEVs, including mandates, economic incentives, energy performance contracts, waivers to access restrictions, electricity discounts, and EVSE requirements in building codes. Mexicali’s taxi fleet was an early adopter of PEVs and had experienced some challenges—mostly related to the insufficient range of the taxis due to hot weather. In this report, we strategize ways to extend the range of the current electric taxis, including ways to make charging more convenient to the drivers, and more suggestions for appropriate vehicles to purchase in the future. This report also includes the groundwork of geotracking Mexicali’s taxi fleet so that more detailed recommendations can be made in the future. Once fleets have increased PEV acceptance and EVSE installations, the market will be ready to expand to private vehicle owners. In order to do this, more EVSE needs to be installed in the right locations. This mobility strategy lays out general local areas where EVSE could be well utilized, based on traffic patterns, land use, and demographic data. Mexicali could approach businesses within these areas that would likely make suitable hosts, based on how well they can profit from the additional business that EVSE would bring. Mexicali could then adopt a series of purchase incentives (including sales tax waivers or access to high-occupancy vehicles [HOV] lanes) that would encourage private vehicle owners to purchase PEVs. Purchase incentives run the risk of creating equity issues, which can be countered by promoting electrification in mass transit, creating more HOV lanes that have PEV exemptions, and installing EVSEs in underserved communities. Private PEV ownership will require a set of experts that Mexicali can help train, including PEV repair technicians, EVSE installation electricians, and first responders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Physical and Operational Status of the Photovoltaic Systems in the Municipality of Pinotepa de Don Luis, Oaxaca, One Year after Their Installation [Estado fisico y operativo de los sistemas fotovoltaicos en el municipio de Pinotepa de Don Luis, Oaxaca un ano despues de su instalacion]

In November 1990, an inspection visit was made to the residential lighting photovoltaic systems that had been installed approximately one year before in the rural communities of the Municipality of Pinotepa de Don Luis, in the State of Oaxaca. The main purpose of the visit was to evaluate the physical and operational status of these systems. The systems typically consist of a photovoltaic module with a capacity of 30 or 35 Watts, an automotive type battery, an indicator of the status of charge of the battery, 3 fluorescent lamps and the corresponding installation, including cables, connection or outlet box and switches. It can be seen that the systems are in good physical condition and do not show any signs of intentionally caused damage. However, the incidence of failures is higher than what had been expected; therefore the operational status of these systems is considered to be below a level that could be accepted, with a tendency to getting worse. The main problem that has been detected is the lack of automatic charge controllers. This problem has caused other important failures. Serious deficiencies were appreciated in the installations, which show evidence of the poor workmanship of the installers. The lack of system standardization is evident, both regarding the components and the installation. As a consequence, there are technical factors which indicate that the installed systems will keep deteriorating at a rate faster than normal, and will stop operating in a short time unless urgent preventive and corrective measures are taken. The attitude of the users with respect to the systems is generally positive. However, there are elements that make the correct operation and maintenance of these systems a very difficult task. The users did not receive any training regarding the best way to operate and take care of their systems, nor any other information in relation to their technical limitations.

14 SOLAR ENERGY↗

Recommendations for Establishing Local Rural Electrification Programs Using Photovoltaic Systems [Recomendaciones Para la Implantacidn de Programas Locales de Electrificacidn Rural con Sistemas Fotovoltaicos]

Photovoltaic (PV) technology is becoming one the best options for supplying electricity to rural communities far from electrical networks and which have a small and disperse demand for electricity. As the cost of the technology goes down and its development advances, opportunities for applying it continue to grow. As a result, in the near future we will probably see an increase in massive application programs of this technology in rural Mexico. This document presents some of the most relevant problems needing immediate solution to increase the possibility of success in establishing photovoltaic programs for rural electrification in Mexico. These problems are influenced by economic, technological, engineering, infrastructural, social and political issues. The paper presents the requirements for an industrial center based on PV technology, the accessibility of replacement parts and maintenance service, development of financial solutions, training of the users and introducing norms and technical regulations. The document summarizes the issue of rural electrification in Mexico, emphasizing the low population density in these areas. A brief description is given of photovoltaics showing different configurations that can be utilized for supplying electricity to the rural areas. The issues involved and recommendations for introducing PV systems to the rural area are described.

14 SOLAR ENERGY↗