Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “crew scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Integrated emergency control board including design extended conditions for Krsko NPP - 297

In the aim of implementing post-Fukushima safety measures, Krsko Nuclear Power Plant is developing a Safety Upgrade Program. Krsko NPP is upgrading the remote shutdown capabilities and implementing ways to prevent and mitigate the consequences of potential Severe Accidents. This modification enhances remote shutdown capabilities of the plant to prevent potential severe accidents and improve the ways to mitigate their consequences. Within the set of plant design modifications, addressed the design, construction, and commissioning, of a new Emergency Control Room (EMCB. Tecnatom is the responsible of the design modification of the plant together with Idom, that participates with Tecnatom in the project as a joint venture, who provides a new set of field instrumentation, including its design and the corresponding wiring. EMCB integrates Human- System Interface throughout centralizing capabilities to safety shutdown and cooldown the plant as well as to control the new Design Extension Systems. The process relies on a Human Factors Engineering (HFE) analysis applying a specific methodology based on NUREG-0711 . Tecnatom has developed a specific HFE Program Management Plan to proceed with the analysis in a documented, traceable and reliable way. HFE activities ends with an Integrated System Validation in the actual full scope simulator involving MCR crews. This paper describes different phases of the project, the integrated schedule between HFE and I and C activities, benefits of upgrading main and emergency control rooms beyond design bases and addresses Tecnatom lessons learned obtained during the project execution. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Utilization of the graded universal testing system to increase the efficiency for assessing aerobic and anaerobic capacity

The in-flight exercise test performed by cosmonauts as part of the Russian Exercise Countermeasure Program is limited to 5 minutes due to communication restrictions. During a recent graded exercise test on a U.S. Shuttle flight, the test was terminated early due to an upcoming loss of signal (LOS) with the ground. This exercise test was a traditional test where the subject's exercise capacity dictates the length of the test. For example, one crew member may take 15 minutes to complete the test, while another may take 18 minutes. The traditional exercise test limits the flight schedulers to large blocks of space flight time in order to provide medical and research personnel information on the fitness capacity (maximal oxygen uptake: VO2max) of crew members during flight. A graded exercise test that would take a finite amount of time and a set preparation and recovery time would ease this problem by allowing flight schedulers to plan exercise tests in advance of LOS. The Graded Universal Testing System (GUTS) was designed to meet this goal. Fitness testing of astronauts before and after flight provides pertinent data on many variables. The Detailed Supplemental Objective (DSO608) protocol (6) is one of the graded exercise tests (GXT) currently used in astronaut testing before and after flight. Test times for this protocol have lasted from 11 to 18 minutes. Anaerobic capacity is an important variable that is currently not being evaluated before and after flight. Recent reports (1,2,5) from the literature have suggested that the oxygen deficit at supramaximal exercise is a measure of anaerobic capacity. We postulated that the oxygen deficit at maximal exercise would be an indication of anaerobic capacity. If this postulate can be accepted, then the efficiency of acquiring data from a graded exercise test would increase at least twofold. To examine this hypothesis anaerobic capacity was measured using a modified treadmill test (3,4) designed to exhaust the anaerobic systems in approximately 45 to 75 seconds. Lactate concentration in the blood was analyzed after all tests, since lactate is the end-product of anaerobic energy production. Therefore, the peak lactate response is an additional indication of anaerobic capacity. A preliminary comparison of the GUTS and the DSO608 suggests that the GUTS protocol would increase the efficiency of VO2max testing of astronauts before and after flight. Results for anaerobic capacity have not been tabulated.

Rodgers, Sandra L.↗

User modeling techniques for enhanced usability of OPSMODEL operations simulation software

The PC based OPSMODEL operations software for modeling and simulation of space station crew activities supports engineering and cost analyses and operations planning. Using top-down modeling, the level of detail required in the data base can be limited to being commensurate with the results required of any particular analysis. To perform a simulation, a resource environment consisting of locations, crew definition, equipment, and consumables is first defined. Activities to be simulated are then defined as operations and scheduled as desired. These operations are defined within a 1000 level priority structure. The simulation on OPSMODEL, then, consists of the following: user defined, user scheduled operations executing within an environment of user defined resource and priority constraints. Techniques for prioritizing operations to realistically model a representative daily scenario of on-orbit space station crew activities are discussed. The large number of priority levels allows priorities to be assigned commensurate with the detail necessary for a given simulation. Several techniques for realistic modeling of day-to-day work carryover are also addressed.

Davis, William T.↗

Asteroid Crewed Segment Mission Lean Development

The next generation of human spaceflight missions presents numerous challenges to designers that must be addressed to produce a feasible concept. The specific challenges of designing an exploration mission utilizing the Space Launch System and the Orion spacecraft to carry astronauts beyond earth orbit to explore an asteroid stored in a distant retrograde orbit around the moon will be addressed. Mission designers must carefully balance competing constraints including cost, schedule, risk, and numerous spacecraft performance metrics including launch mass, nominal landed mass, abort landed mass, mission duration, consumable limits and many others. The Asteroid Redirect Crewed Mission will be described along with results from the concurrent mission design trades that led to its formulation. While the trades presented are specific to this mission, the integrated process is applicable to any potential future mission. The following trades were critical in the mission formulation and will be described in detail: 1) crew size, 2) mission duration, 3) trajectory design, 4) docking vs grapple, 5) extravehicular activity tasks, 6) launch mass and integrated vehicle performance, 7) contingency performance, 8) crew consumables including food, clothing, oxygen, nitrogen and water, and 9) mission risk. The additional Orion functionality required to perform the Asteroid Redirect Crewed Mission and how it is incorporated while minimizing cost, schedule and mass impacts will be identified. Existing investments in the NASA technology portfolio were leveraged to provide the added functionality that will be beneficial to future exploration missions. Mission kits are utilized to augment Orion with the necessary functionality without introducing costly new requirements to the mature Orion spacecraft design effort. The Asteroid Redirect Crewed Mission provides an exciting early mission for the Orion and SLS while providing a stepping stone to even more ambitious missions in the future.

Gard, Joe↗

Ares I-X Flight Test Vehicle Similitude to the Ares I Crew Launch Vehicle

The Ares I-X Flight Test Vehicle is the first in a series of flight test vehicles that will take the Ares I Crew Launch Vehicle design from development to operational capability. The test flight is scheduled for April 2009, relatively early in the Ares I design process so that data obtained from the flight can impact the design of Ares I before its Critical Design Review. Because of the short time frame (relative to new launch vehicle development) before the Ares I-X flight, decisions about the flight test vehicle design had to be made in order to complete analysis and testing in time to manufacture the Ares I-X vehicle hardware elements. This paper describes the similarities and differences between the Ares I-X Flight Test Vehicle and the Ares I Crew Launch Vehicle. Areas of comparison include the outer mold line geometry, aerosciences, trajectory, structural modes, flight control architecture, separation sequence, and relevant element differences. Most of the outer mold line differences present between Ares I and Ares I-X are minor and will not have a significant effect on overall vehicle performance. The most significant impacts are related to the geometric differences in Orion Crew Exploration Vehicle at the forward end of the stack. These physical differences will cause differences in the flow physics in these areas. Even with these differences, the Ares I-X flight test is poised to meet all five primary objectives and six secondary objectives. Knowledge of what the Ares I-X flight test will provide in similitude to Ares I as well as what the test will not provide is important in the continued execution of the Ares I-X mission leading to its flight and the continued design and development of Ares I.

Huebner, Lawrence D.↗

Advanced construction management for lunar base construction - Surface operations planner

The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.

Kehoe, Robert P.↗

STS-106 Crew Interviews: Edward T. Lu

Live footage of a preflight interview with Mission Specialist Edward T. Lu is seen. The interview addresses many different questions including why Lu became interested in the space program, the events that led to his interest, the transition from an engineer to research scientist, and finally to getting selected into the astronaut program. Other interesting information that this one-on-one interview discusses are the main goals of the STS-106 mission, its scheduled docking with the new International Space Station (ISS), making the Zvezda Service Module ready for entrance, and crew training both in the United States and Russia. Lu mentions his responsibilities during the much-anticipated docking as well as his scheduled space-walk with Yuri Ivanovich Malenchenko. Lu also discusses the use of the Robotic Arm during his space-walk, installation of a magnetometer on the Zvezda Module, and work that will have to take place inside the Service Module.

Source record↗

Earth orbital operations supporting manned interplanetary missions

The orbital operations required to accumulate, assemble, test, verify, maintain, and launch complex manned space systems on interplanetary missions from earth orbit are as vital as the flight hardware itself. Vast numbers of orbital crew are neither necessary nor desirable for accomplishing the required tasks. A suite of robotic techniques under human supervisory control, relying on sensors, software and manipulators either currently emergent or already applied in terrestrial settings, can make the job tractable. The mission vehicle becomes largely self-assembling, using its own rigid aerobrake as a work platform. The Space Station, having been used as a laboratory testbed and to house an assembly crew of four, is not dominated by the process. A feasible development schedule, if begun soon, could emplace orbital support technologies for exploration missions in time for a 2004 first interplanetary launch.

Sherwood, Brent↗

Design Concepts for Zero-G Whole Body Cleansing on ISS Alpha: Individual Design Project - Part 2

Johnson Space Center, the Mecca of manned Space Programs, is now abuzz with preparations for the International Space Station—ISS Alpha. The work on the various systems and subsystems for the U.S. Habitation Module is scheduled to begin in l998. As a prelude to that, the Flight Crew Support Division perceived the need to take a closer and more critical look at the planning for the Whole Body Cleansing function onboard the ISS. This report is an endeavour to dig and delve all data available on Whole Body Cleansing mechanisms used in the past and the present, by the Russians and the Americans, analyze it and come up with design concepts for products/ product systems for Zero-g Whole Body Cleansing onboard ISS Alpha, for typical stay duration of about 90 days. This report takes a close look at the Skylab collapsible shower, the Mir shower/ sauna, the full body cleansing methods currently in use onboard the Space Shuttle and Mir and at the Whole Body Shower designed and tested for Space Station Freedom. It attempts to "listen" carefully to what the Mir astronauts—Norman Thagard, Shannon Lucid and John Blaha¾have to say about their personal hygiene experiences during their recent long-duration stays on the Russian station Mir. The findings in the report call for a change in paradigm. What is good for Earth conditions is not necessarily good for Zerog! It concludes that a shower is not a good idea for the ISS. The final concept that is proposed reflects very strongly what the Mir astronauts would like to have and to use onboard a station like the ISS. The report concludes with directions of how to take the "idea" further and realize it in the form of a product system for Whole Body Cleansing onboard the ISS.

Susmita Mohanty↗

Documentation: No Substitute for Communication

SO WHAT IS AN RFI? IT WAS ONE OF THE FIRST THINGS I learned about back when I started my project management career with my first large construction firm. I learned how to use these forms as a convenient and effective means of documenting the many legitimate clarifications needed on a major project. However, like most other young engineers, I also learned to use the RFI as a weapon in the ongoing battle between owners. or their designer and the construction contractors. Recently, our project team has done a few simple things to greatly reduce the waste and frustration that comes from this type of battle. The RFI form can be a great tool if used properly, and I certainly don t recommend that they be eliminated entirely. The RFI form was created to document the many clarifications that are commonly required on projects. Typically, the contractor uses the top half of the form to clarify-or request permission to vary from-the contract documents. The bottom half of the form is used to record the answer. But this seemingly simple process is plagued by a number of problems. From the contractor s perspective, RFIs are needed to secure information that should have been in the contract documents in the first place. The missing information keeps their crews from working effectively, and it makes hitting already demanding cost and schedule targets even more difficult. Owners, or their design firms, often view the RFI as a means of harassment. Both sides of the issue have legitimate complaints, and both sides cause most of their own pain.

Strickland, John↗

Abstract - Belbas, Nicholas (EC2)

Originally, I was brought into the Design and Analysis Branch in the Crew and Thermal Systems to work on administrative tasks like archiving and scheduling. However, I ended up splitting my time between secretarial tasks and a technical project. My technical project was originally meant to be a wireless sensor package for the 20ft Spacecraft Thermal Vacuum Chamber in the B7 High Bay. I would be using a miniature wifi development board and a temperature/humidity sensor along with custom 3D modeling to accomplish this. However, after some discussion with my technical mentor, the plan was changed to a mobile autonomous self-charging sensor platform. A mobile platform will allow the sensors to be moved around without depressurizing the chamber. Also, the self-charging aspect of the package allows for almost unlimited time in the chamber. If the on-board battery runs low, the robot can easily be driven to its charging dock and continue to transmit while charging. The driving base is based around a Raspberry Pi 3 board with a 12C PMW DC Motor controller and a PWM controller driving two small gear motors. The sensor transmitter itself is a RHT03 temperature and humidity sensor and Cozir CO2 sensor connected to an ESP8266 Huzzah board. The power distribution system utilizes a pair of 3.7v 3600mah lipo batteries wired to Powerboost 500 boards. Also, the self-charging mechanism utilizes two 12v-max inductive charging coils wired into the same Powerboost boards as the battery. The Raspberry pi is running Python 3.3 for the driving base and Javascript MJPEG library for transmitting live video from the onboard camera. The sensor package is running Arduino-based C++ and the program capturing the data is running PyqtGraph Python and HTML. The shell of the robot itself is a 3D printed case that will (work in progress) snap together. The photo to the left shows the two halves separated from each other. The black shell contains the power distribution boards and connectors while the white shell contains the driving base and data systems.

Belbas, Nicholas↗

Innovative IO Psychology Research for Future Space Exploration

Crewed space exploration is evolving. The commercialization of space includes Private Astronauts who interact with NASA astronauts on the International Space Station. Astronauts are scheduled to complete a variety of tasks within a fast paced timeline. Future exploration missions to Mars will include challenges such as a small crew living and working in an isolated and confined environment for up to 2 ½ years, with significant communication delays from Earth. This symposium brings together four innovative studies designed to mitigate the risks associated with space flight.

Suzanne Tamara Bell↗

A Combined Repair Crew Dispatch Problem for Resilient Electric and Natural Gas System Considering Reconfiguration and DG Islanding

Resilience is an overarching concept that requires combined efforts from interdependent critical infrastructures to achieve. As the interdependence between the power system and the natural gas system grows, the roles of coordination in post-disaster repair will be unneglectable to improve the resilience of the two systems. In this paper, a combined repair crew dispatch problem for the interdependent power and natural gas systems is proposed. The repair schedule of the two systems is coordinated and co-optimized. Both power system topology reconfiguration and intentional DG islanding are modeled as operational measures to further improve the resilience of the interdependent systems. Case studies validate the effectiveness of the proposed method in reducing load shedding and repair duration, and prove that the interdependence has a significant impact on the repair sequence and crew coordination.

24 POWER TRANSMISSION AND DISTRIBUTION↗

STS-93 / Columbia Flight Crew Photo Op & QA at Pad for TCDT

The primary objective of the STS-93 mission was to deploy the Advanced X-ray Astrophysical Facility, which had been renamed the Chandra X-ray Observatory in honor of the late Indian-American Nobel Laureate Subrahmanyan Chandrasekhar. The mission was launched at 12:31 on July 23, 1999 onboard the space shuttle Columbia. The mission was led by Commander Eileen Collins. The crew was Pilot Jeff Ashby and Mission Specialists Cady Coleman, Steve Hawley and Michel Tognini from the Centre National d'Etudes Spatiales (CNES). This videotape shows a pre-flight press conference. Prior to the astronauts' arrival at the bunker area in front of the launch pad, the narrator discusses some of the training that the astronauts are scheduled to have prior to the launch, particularly the emergency egress procedures. Commander Collins introduces the crew and fields questions from the assembled press. Many questions are asked about the experiences of Commander Collins, and Mission Specialist Coleman as women in NASA. The press conference takes place outside in front of the Shuttle Columbia on the launch pad.

Source record↗

STS-103 Crew Activities Report: Flight Day 7 Highlights

Today Discovery's astronauts begin preparing the spacecraft for it's scheduled return to Earth by checking out the flight control system and reaction control jets that support re-entry. Later in the day the astronauts begin stowing equipment used during the past week and start buttoning up on-orbit systems. The Ku-band antenna which provides most of the capacity for data and television relay was stowed around 8:45 p.m. The recently refurbished Hubble Space Telescope moves slowly through it's checkout sequence before resuming science operations. Both the flight control system (FCS) and the reaction control jets (RCS) were without issue, with all systems ready to support Discovery's return to Earth.

Source record↗

Ares I-X Flight Test Vehicle Similitude to the Ares I Crew Launch Vehicle

The Ares I-X Flight Test Vehicle is the first in a series of flight test vehicles that will take the Ares I Crew Launch Vehicle design from development to operational capability. Ares I-X is scheduled for a 2009 flight date, early enough in the Ares I design and development process so that data obtained from the flight can impact the design of Ares I before its Critical Design Review. Decisions on Ares I-X scope, flight test objectives, and FTV fidelity were made prior to the Ares I systems requirements being baselined. This was necessary in order to achieve a development flight test to impact the Ares I design. Differences between the Ares I-X and the Ares I configurations are artifacts of formulating this experimental project at an early stage and the natural maturation of the Ares I design process. This paper describes the similarities and differences between the Ares I-X Flight Test Vehicle and the Ares I Crew Launch Vehicle. Areas of comparison include the outer mold line geometry, aerosciences, trajectory, structural modes, flight control architecture, separation sequence, and relevant element differences. Most of the outer mold line differences present between Ares I and Ares I-X are minor and will not have a significant effect on overall vehicle performance. The most significant impacts are related to the geometric differences in Orion Crew Exploration Vehicle at the forward end of the stack. These physical differences will cause differences in the flow physics in these areas. Even with these differences, the Ares I-X flight test is poised to meet all five primary objectives and six secondary objectives. Knowledge of what the Ares I-X flight test will provide in similitude to Ares I - as well as what the test will not provide - is important in the continued execution of the Ares I-X mission leading to its flight and the continued design and development of Ares I.

Huebner, Lawrence D.↗

Visual light flash phenomenon, part C

The Apollo 16 mission provided the opportunity to obtain additional data on the characteristics and frequency of the light flashes and also provided the first opportunity to obtain a direct physical record of incident cosmic ray particles with the Apollo light flash moving emulsion detector (ALFMED). The ALFMED is an electromechanical device that is worn on the head like a helmet and supports cosmic radiation-sensitive emulsions around the head of the test subject. Two light flash observation sessions were conducted during the mission: one during translunar coast and the second during transearth coast. Characteristics of the light flashes observed and reported by the Apollo crew members were generally similar to those reported on previous missions. Analyses of the ALFMED emulsion plates are proceeding as scheduled, although results are not yet available. The ALFMED results should provide conclusive evidence establishing the correlation, if any, between the incident cosmic ray particles and the perception of light flashes as reported by Apollo crew members.

Richard E. Benson↗