Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “continuation power flow”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

248 records · Page 14

Modernizing the Nuclear Industry and New Ways of Working

Nuclear energy is recognized as the most feasible energy source towards achieving nation-wide net-zero goals (COP 208, MIT). Additionally, the demand for reliable, consistent energy supply is soaring with the construction of energy hungry data centers and AI tools. This means the construction of new nuclear and the continuation of current nuclear are a high national priority. However, this leaves the nuclear industry with a workforce challenge. The rising demand for nuclear power is threatened by an underpopulated workforce. There exist a few contributors to the decreased workforce such as skewed workforce demographics resulting in large-scale workforce retirement. Also, some plants have observed difficulty hiring and retaining skill sets that typically comprise the nuclear power workforce – specifically skilled craftsman. Those who are graduating with desirable skills are seeking employment in sectors that are more modern and culturally more aligned with younger generational values. Lastly, within the nuclear sector, skilled employees will be a competitive commodity as advanced plants come online offering work environments that incorporate modern technologies, skill sets, and opportunities for career advancement. These factors emphasize the need for legacy plants to modernize with a focus on the workplace environment and culture that meets younger generations’ skills, cultural expectations, and desire for advancement opportunities. Nuclear plants are actively engaged in deploying advancements that improve the management of systems, structures, and components as well as process improvements and technologies that can reduce the costs of operation and maintenance. However, the advancements must also be analyzed, reviewed and deployed in a manner that considers the impact on how people within the organization collaborate, communicate, make decisions, and solve problems. Neglecting to consider the cultural impact of modernization risks poor adoption, unrealized opportunities, or insignificant change toward helping attract new employees. The traditional way of working is not necessarily the way new generations want to engage with their employer. For instance, in a survey performed by North American Young Generation in Nuclear the top three reasons for younger nuclear employees to seek other job opportunities was seeking better work-life balance, a lack of advancement opportunities, and work culture and leadership style differences (Smyth et al. 2022). Integrated Operations for Nuclear (ION) is an approach for the nuclear industry to create long-term strategic modernization plans and analyze each advancement for the impact on people and processes and measure how those impacts flow up to support high-level, long-term plant goals and requirements. One principle of ION is to replace the current labor-centric operation style in legacy nuclear plants with data-centric collaborative operation styles. This paper will explain how transitioning operations to leverage centralized skills and responsibility, multi-skilled teams, and collaborative decision making can flatten the hierarchical structure in plants, enable greater individual efficacy while also offering more experiences and advancement opportunities to staff. Adopting the ION way of working shifts the industry mind-set towards more networked, collaborative, and modern way of working that will attract skilled, next-generation workers to operate the legacy nuclear fleet.

99 - GENERAL AND MISCELLANEOUS↗

Vulcan Test Platform: Demonstrating the Data Center as a Flexible Grid Asset

Explosive data center demand is outpacing grid infrastructure development. AI workloads and hyperscale cloud growth are creating unprecedented power requirements, while traditional grid expansion faces multi-year development timelines, regulatory hurdles, and decarbonization challenges. Sidewalk Infrastructure Partners recognized this impending crisis years ago and founded Verrus to develop an innovative solution: data centers that function as grid assets rather than passive loads. The Verrus approach integrates proprietary grid-aware controls with battery energy storage systems (BESS) in a medium-voltage architecture that delivers three critical capabilities: Fast-responding demand flexibility that can service requests from the utility within 10 seconds, Uninterrupted transition to islanded operation during grid disturbances, Continuous uptime assurance while maintaining all customer service level commitments Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), we validated these capabilities on Vulcan, a 70 MW utility-scale test platform powered by NREL's ARIES Virtual Emulation Environment. This deployment-ready technology has successfully demonstrated that Verrus data centers can deliver meaningful grid services while maintaining mission-critical reliability. This technical report outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can play a pivotal role in enhancing grid flexibility and reliability, without sacrificing service level guarantees.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-temperature seals for supercritical carbon-dioxide (sCO 2 ) turbines (Final Report)

This is the final report for project DE-FE0031924 titled “High-temperature seals for supercritical carbon-dioxide (sCO 2 ) turbines.” The report provides a summary of the entire project efforts from October 2020 through December 2024 including the high-temperature commercial dry gas seal (DGS) tests and thermal modeling of Task 2, as well as the high-temperature, large-diameter seal design and high-temperature tests of large-diameter seals in Task 3. A key outcome of Task 2 was the testing completion of specially instrumented commercial DGS in the GE-SwRI Apollo sCO 2 compressor (27,000 rpm). Test data from the DGS showed elevated temperatures upwards of 350 o F, which are close to the higher operating temperature limit of the DGS. The temperature measurements provide insight into the expected thermal loads on DGS operating in high-speed sCO 2 compressor and provided test data for validation of an in-house thermal model of the compressor/seal. Under Task 2.0, this report also presents the development of a steady-state conjugate heat-transfer model of the DGS operating in the sCO 2 compressor – a first of its kind model for modeling heat transfer of sCO 2 in an actual operating compressor. The findings of the thermal model show a reasonable match between temperature predictions of the model and the measured temperature data, also pointing out the validity of the approach and assumptions made in modeling the flows, heat transfer coefficients and windage modeling in the rig. Under Task 3.0, this report presents the preliminary design of a large-diameter hybrid face seal (14 inch and 26-inch diameter) for field testing in a land-based GE turbine. The preliminary seal design effort presented in this report under project DE-FE0031924 builds on the development and successful laboratory testing for such large diameter hybrid face seal under the prior DE-FE0024007 project. Key aspects of seal fluid analyses with CFD, mechanical design considerations and assembly considerations in a land-based turbine are presented. Finally, under Task 3.0, this report also presents the continued high-temperature testing of the 14-inch diameter hybrid face seal developed previously under the DE-FE0024007 program. Specifically, test data demonstrating successful non-contact seal operation and seal effective leakage of 0.001-inch with seal inlet temperatures above 700 o F are presented in this report. Successful hybrid seal operation in a laboratory environment for a large diameter (14-inch) seal at temperatures above 700 o F is a major technological milestone for this technology.

01 COAL, LIGNITE, AND PEAT↗

BWR Spent Nuclear Fuel Acquisition and Testing to Support DOE-NE High Burnup Spent Fuel Data Project

The Office of Spent Fuel and Waste Disposition (SFWD) within the US Department of Energy (DOE) Office of Nuclear Energy (NE) established the Spent Fuel and Waste Science and Technology (SFWST) campaign to conduct research and development (R&D) activities related to the storage, transportation, and disposal of spent nuclear fuel (SNF) and high-level radioactive waste. The SFWST program was created within SFWD to address issues of extended or long-term SNF storage and transportation. Some near-term objectives of SFWST are to use a science-based, engineering-driven approach to: Support the enhancement of the technical bases to support the continued safe and secure dry storage of SNF for extended periods; Support the enhancement of the technical bases for retrieving SNF after extended dry storage; Support the enhancement of the technical bases for transporting high burnup (HBU) fuel and transporting low burnup fuel and HBU fuel after dry storage DOE-NE, in partnership with the Electric Power Research Institute, developed the High Burnup Spent Fuel Data Project to perform a large-scale demonstration and laboratory-scale testing of HBU pressurized water reactor (PWR) fuels (exceeding 45 gigawatt-days per metric ton of uranium [GWd/MTU]). Under this project, 25 sister rods—which are rods that have the same design, power histories, and other characteristics—were removed from assemblies at the North Anna Nuclear Power Station and sent to Oak Ridge National Laboratory (ORNL) in January 2016. ORNL performed detailed nondestructive examination (NDE) on all 25 rods. The NDE consisted of visual examinations, gamma and neutron scanning, profilometry and rod length measurements, and eddy current examinations. After completing the NDE, 10 of the sister rods were delivered to Pacific Northwest National Laboratory (PNNL) in a NAC International, Inc. legal-weight truck cask in September 2018 for destructive examination (DE). To date, SFWD work has focused on the PWR fuel that is part of the Sister Rod Test program. No boiling water reactor (BWR) fuel has been tested in the program, and the data needs that were identified for the PWR fuel have not been collected for BWR fuel. The goal to obtain six to nine BWR rods and test them at ORNL will support closing this important data gap. BWR fuel comprises approximately 56% of the total fuel assemblies currently in storage at nuclear power plants in the United States. BWR nuclear fuel and cladding designs and manufacturing are significantly different from PWRs. Differences include the following: BWR fuel pellets are larger than PWR pellets; Variations of Zircaloy-2 (including liners) are used instead of the Zircaloy-4 cladding materials used in PWRs; Clad manufacturing and stress-relief processes are different between PWRs and BWRs; The fuel rod dimensions are different because larger rod diameters and thicker cladding are used in BWRs; BWR fuel typically has lower internal rod pressures and sees vastly different operating conditions than PWR fuel (i.e., two-phase flow); BWR assemblies are “canned,” meaning each assembly is surrounded by a metal fuel channel; BWR cladding is often composed of an inner pure Zr liner that has widely different mechanical properties than the Zircaloy-2 alloy and exhibits a stronger affinity for hydrogen; The BWR SNF generally has more total hydrogen in the cladding/liner than typical PWR fuel; The construction of the PWR and BWR assemblies is vastly different; BWR rods are solidly attached to the assembly nozzles and experience a much different vibration and shock load than PWR rods, which are “floating” within a grid system attached to guide tubes, and the rods sit loosely on the bottom end plates. These numerous differences will affect the way the BWR SNF responds under dry storage preparation processes (e.g., vacuum drying) and during transportation. The results collected in the PWR experimental program must be compared with a subset of similar data collected on BWR SNF to establish a technical basis for whether the larger PWR database is sufficient to bound the BWR SNF end-of-life conditions as is currently assumed for several fuel/clad properties. Changes that occur in both fuel types at HBU could exacerbate any mechanical property differences. As the fuel burnup increases, several changes occur that might affect the performance of the fuel, cladding, and assembly hardware in storage and transportation. These changes include increased cladding corrosion layer thickness, increased cladding hydrogen content, increased cladding creep strains, increased fission gas release, and the formation of the HBU structure at the surface of the fuel pellets. The Nuclear Regulatory Commission (NRC) limits the current maximum rod-averaged burnup to 62 GWd/MTU due to these changes and the lack of data at higher burnups.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

Physics and technology considerations for the deuterium–tritium fuel cycle and conditions for tritium fuel self sufficiency

The tritium aspects of the DT fuel cycle embody some of the most challenging feasibility and attractiveness issues in the development of fusion systems. The review and analyses in this paper provide important information to understand and quantify these challenges and to define the phase space of plasma physics and fusion technology parameters and features that must guide a serious R&D in the world fusion program. We focus in particular on components, issues and R&D necessary to satisfy three 'principal requirements': (1) achieving tritium self-sufficiency within the fusion system, (2) providing a tritium inventory for the initial start-up of a fusion facility, and (3) managing the safety and biological hazards of tritium. A primary conclusion is that the physics and technology state-of-the-art will not enable DEMO and future power plants to satisfy these principal requirements. We quantify goals and define specific areas and ideas for physics and technology R&D to meet these requirements. A powerful fuel cycle dynamics model was developed to calculate time-dependent tritium inventories and flow rates in all parts and components of the fuel cycle for different ranges of parameters and physics and technology conditions. Dynamics modeling analyses show that the key parameters affecting tritium inventories, tritium start-up inventory, and tritium self-sufficiency are the tritium burn fraction in the plasma (f b ), fueling efficiency (η f ), processing time of plasma exhaust in the inner fuel cycle (t p ), reactor availability factor (AF), reserve time (tr) which determines the reserve tritium inventory needed in the storage system in order to keep the plant operational for time t r in case of any malfunction of any part of the tritium processing system, and the doubling time (t d ). Results show that η f f b > 2% and processing time of 1–4 h are required to achieve tritium self-sufficiency with reasonable confidence. For η f f b = 2% and processing time of 4 h, the tritium start-up inventory required for a 3 GW fusion reactor is ~11 kg, while it is <5 kg if η f f b = 5% and the processing time is 1 h. To achieve these stringent requirements, a serious R&D program in physics and technology is necessary. The EU-DEMO direct internal recycling concept that carries fuel directly from the plasma exhaust gas to the fueling systems without going through the isotope separation system reduces the overall processing time and tritium inventories and has positive effects on the required tritium breeding ratio (TBR R ). A significant finding is the strong dependence of tritium self-sufficiency on the reactor availability factor. Simulations show that tritium self-sufficiency is: impossible if AF < 10% for any η f f b , possible if AF > 30% and 1% ≤ η f f b ≤ 2%, and achievable with reasonable confidence if AF > 50% and η f f b > 2%. These results are of particular concern in light of the low availability factor predicted for the near-term plasma-based experimental facilities (e.g. FNSF, VNS, CTF), and can have repercussions on tritium economy in DEMO reactors as well, unless significant advancements in RAMI are made. There is a linear dependency between the tritium start-up inventory and the fusion power. The required tritium start-up inventory for a fusion facility of 100 MW fusion power is as small as 1 kg. Since fusion power plants will have large powers for better economics, it is important to maintain a 'reserve' tritium inventory in the tritium storage system to continue to fuel the plasma and avoid plant shutdown in case of malfunctions of some parts of the tritium processing lines. But our results show that a reserve time as short as 24 h leads to unacceptable reserve and start-up inventory requirements. Therefore, high reliability and fast maintainability of all components in the fuel cycle are necessary in order to avoid the need for storing reserve tritium inventory sufficient for continued fusion facility operation for more than a few hours. The physics aspects of plasma fueling, tritium burn fraction, and particle and power exhaust are highly interrelated and complex, and predictions for DEMO and power reactors are highly uncertain because of lack of experiments with burning plasma. Fueling by pellet injection on the high field side of tokamak has evolved to be the preferred method to fuel a burning plasma. Extrapolation from the DIII-D penetration scaling shows fueling efficiency expected in DEMO to be <25%, but such extrapolations are highly uncertain. The fueling efficiency of gas in a reactor relevant regime is expected to be extremely poor and not very useful for getting tritium into the core plasma efficiently. Gas fueling will nonetheless be useful for feedback control of the divertor operating parameters. Extensive modeling has been carried out to predict burn fraction, fueling requirements, and fueling efficiency for ITER, DEMO, and beyond. The fueling rate required to operate Q = 10 ITER plasmas in order to provide the required core fueling, helium exhaust and radiative divertor plasma conditions for acceptable divertor power loads was calculated. If this fueling is performed with a 50–50 DT mix, the tritium burn fraction in ITER would be ~0.36%, which is too low to satisfy the self-sufficiency conditions derived from the dynamics modeling for fusion reactors. Extrapolation to DEMO using this approach would also yield similarly low burn fraction. Extensive analysis presented shows that specific features of edge neutral dynamics in ITER and fusion reactors, which are different from present experiments, open possibilities for optimization of tritium fueling and thus to improve the burn fraction. Using only tritium in pellet fueling of the plasma core, and only deuterium for edge density, divertor power load and ELM control results in significant increase of the burn fraction to 1.8–3.6%. These estimates are performed with physics models whose results cannot be fully validated for ITER and DEMO plasma conditions since these cannot be achieved in present tokamak experiments. Thus, several uncertainties remain regarding particle transport and scenario requirements in ITER and DEMO. The safety standard requirements for protection of the public and release guidelines for tritium have been reviewed. General safety approaches including minimizing tritium inventories, reducing tritium permeation through materials, and decontaminating material for waste disposal have been suggested.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Membrane Adsorbents Comprising Self-Assembled Inorganic Nanocages (SINCs) for Super-fast Direct Air Capture Enabled by Passive Cooling

The objectives of the proposed project were to develop highly porous membrane adsorbents comprising CO 2 -philic polymers and self-assembled inorganic nanocages (SINCs) for rapid temperature swing adsorption using electricity-free solar heating and radiative cooling, enabling an economically viable approach for direct air capture (DAC). Our core technical activities combine three key innovations. (1) Highly porous flat-sheet membrane adsorbents contain CO 2 -philic amines that can be easily produced using a phase inversion method. (2) CO 2 -philic SINCs can be easily dispersed in the polymers with great stability (compared with the metal-organic frameworks or MOFs). (3) The adsorption and desorption are integrated with solar heating and radiative cooling for rapid continuous operation, in contrast to traditional long-cycle separate operation. The membrane adsorbents containing amines, polymers, and SINCs were produced using a one-step industrial process. The porous membranes coupled with porous SINCs offer low resistance for gas flow and fast CO 2 sorption/desorption cycles, while the incorporation of the additional amine groups provides high CO 2 sorption capacity. The key achievements are summarized below. (1) Membrane adsorbents with high PEI loading (>40%), high porosity of >80%, and low gasflow resistance were prepared in one step using commercially available, low-cost materials. (2) Membrane adsorbents based on Solupor and PEI show CO 2 sorption capacity of >1.5 mmol/g using air containing 400 ppm at a relative humidity of 15%. (3) Effect of the adsorbent compositions (such as PEI type, PEI content, SINC content, porosity) on the CO 2 sorption was systematically investigated. (4) Effect of the processing conditions (such as CO 2 content, temperature, and relative humidity) on the CO 2 sorption was systematically investigated; (5) The stability of the membrane adsorption against many cycles of sorption and desorption was studied. The higher molecular weight of PEI (PEI25k) shows better stability than PEI800. (6) Advanced materials with radiative cooling were developed, which can decrease the temperature by 5-7 °C compared to the ambient temperature. (7) Preliminary techno-economic analysis shows that our process may achieve a capture cost of $1,343/tonne CO 2 with a total OPEX cost of $1,112/tonne CO 2 . The adsorbent replacement cost accounted for 52% of the total OPEX cost. Membrane adsorbents with lower costs and longer operation life can significantly decrease the cost. The proposed project directly addresses the requirement of DE-FOA-0002188, i.e., novel materials with CO 2 adsorption capacity for direct air capture with integrated solar heating and radiative cooling to reduce the cost of the DAC. Our future work will focus on the development of low-cost adsorbents that can be stable at the sorption and desorption conditions for long term.

14 SOLAR ENERGY↗

MFIX DEM Enhancement for Industry-Relevant Flows (Final Report)

The overall goal of this two-phase project is to implement performance improvements of the Multiphase Flow with Interphase Exchanges (MFIX) Discrete Element Model (DEM) code that enable a transformative shift for industrial use. Prior to this effort, the largest simulations performed using MFIX are O(10 7 ) particles. This falls short of the O(10 9 ) particle simulations that must be completed on a timescale of days or weeks (vs. months or years) to enable simulations with physically-relevant domain sizes to be incorporated into industrial design cycles within five years. This was accomplished by tailoring best-in-class practices to bear on the unique challenges posed by the MFIX-DEM algorithm and code base. Scientific simulations (e.g., in cosmology, turbulent combustion) routinely use massively parallel computing to update far more particles in short wall clock times. Results from Phase 1 (1.5 years in duration) indicated significant gains in speed were possible for a wide range of benchmark cases. Moreover, a survey sent to >35 companies indicates that the timing is ideal for such an enhanced tool, with >80% of the respondents indicating that DEM is already value-added or will be within the next 5 years, and >70% of the respondents indicating that improved speed is the top computational priority. In Phase 2 (3.5 years in duration), the two major barriers that hinder industry from effectively using multiphase Computational Fluid Dynamics (CFD) to cut costs and improve performance, namely computational overhead and confidence in predictions, continued to be addressed. Regarding the former, the results from Phase 1 to guide the effort, with enhancements focused on an improved time-stepping algorithm and particle sorting. Four target problems of 1 billion particles each and increasing complexity were identified: homogeneous cooling, tumbler with continuous particle size distribution, discharge from a rectangular hopper and a cylindrical riser. Each of these were successfully simulated for relevant time scales (on order of seconds) using less than 24 hours of wall clock time. These represent the first 1-billion particle DEM simulations performed with MFIX, namely using the MFIX-Exa code. This code is currently under development at NETL in collaboration with Lawrence Berkeley National Laboratory. Regarding the second barrier on predictive uncertainty, experiments from Phase 1 (interacting nozzles - hydrodynamics only) and Phase 2 (very small-scale segregation experiments) were used to demonstrate the ability of two simplified approaches to uncertainty quantification (UQ). By limiting the number of particles, UQ based on the simplified treatment was compared to standard UQ, which was shown to have much higher computational demands. Experiments were also performed on a pilot-scale stripper unit to provide validation data for future CFD-DEM simulations and UQ.

20 FOSSIL-FUELED POWER PLANTS↗

Development of Self-Assembly Supports Enabling Transformational Membrane Performance for Cost-Effective Carbon Capture

This final technical report describes work conducted by Membrane Technology and Research, Inc. (MTR) for the U.S. Department of Energy (DOE), National Energy Technology Lab (NETL) on the development of membranes with transformational performance for carbon capture under award number DE-FE0031596. The work was performed from June 1, 2018 through May 31, 2024. For more than a decade, MTR has worked in partnership with DOE to develop an innovative membrane-based CO 2 capture process. This effort has included the first test of membrane modules with coal-fired flue gas at the Arizona Public Services (APS) Cholla plant in 2010; the accumulation of >11,000 hours of flue gas operation for Polaris modules on a bench-scale 1 tonne/day (TPD) system at the National Carbon Capture Center (NCCC); scale-up of first-generation (Gen-1) Polaris to a 20 TPD small pilot system, and successful operation of this system on a flue gas slipstream at NCCC and in integrated boiler testing at Babcock & Wilcox (B&W). Through continued development efforts, a second-generation (Gen-2) version of the Polaris membrane has been scaled-up to pilot production. This membrane offers 70% higher CO 2 permeance with similar selectivity to the base case Polaris. MTR also developed planar modules designed specifically for the low-pressure, high-volumetric flow rate process conditions of flue gas operation. These new modules have significantly lower pressure-drop values compared to the type originally used (spiral-wound modules), which results in significant energy savings. The goal of the work described in this report was to improve on the Polaris Gen-2 membrane with the ultimate aim to reduce the cost of carbon capture. The majority of the effort was to develop improved support membranes for the multi-layer composite structure of MTR’s Polaris membrane. Earlier work at MTR had identified the support structure as limiting membrane permeances, not because the support itself represents a permeation resistance, but because the distribution of pores at the surface of the support imposes a geometric restriction to diffusion in the layers above it. Support membranes were prepared from a range of polymers, including commercially available block copolymers and a custom synthesized block copolymer alternative. The best support membranes developed in this project reduced the geometric restriction by a factor of two to three. These supports then were used to produce Polaris composite membranes with improved permeances. The second topic was to create a high-selectivity version of the Polaris membrane. The high-selectivity version uses a novel selective polymeric material and high selectivities were confirmed in experiments at MTR. The material is not easily made into very thin films. Consequently, the permeances are significantly lower than the Polaris Gen-2 membrane. The utility of this membrane is therefore limited to the carbon dioxide purification step that produces liquid CO 2 . A Technical and Economic Analysis (TEA) was performed for a carbon capture system that uses both advanced membrane types. The TEA shows the novel advanced membranes reduce the cost of capture by 10%, from $63.32/tonne CO 2 to $56.90/tonne CO 2 (2022 USD). Most of the development work was carried out with laboratory-scale casting and coating equipment. A number, but not all, of the improvements identified have been implemented on commercial-scale manufacturing equipment. The focus of future work at MTR is to incorporate the advancements made into the Polaris membrane manufacturing process.

01 COAL, LIGNITE, AND PEAT↗

High Temperature Erosion Modeling in Particle Based CSP Systems

1. Introduction. Wear and erosion damage of materials from solid particle and surface interactions is a major issue in various industries. Although more common in mining and oil and gas production, erosion is becoming a critical issue in renewable technologies as well such as particle based concentrated solar thermal power (CSP) systems. In particle based CSP systems, solid particles are used to absorb solar energy and as thermal storage. However, these particles may cause significant amount of wear to system components while through the system at high temperatures. This damage can be costly, and therefore, requires a greater understanding of solid particle erosion in CSP systems. Throughout the years, models and tools have been developed to predict and control erosion in industries such as oil and gas production. However, these erosion models and erosion prediction tools have been mainly developed based on erosion data for much higher velocities and lower temperatures, i.e. the operating conditions for which the existing models have been built are not pertinent to those expected in CSP system. It is known that erosion depends on many factors such as material properties, erodent particle properties, and particle impact speed and angle. However, the effect of temperature on erosion is not vastly investigated. In this work, a temperature-based correlation is introduced that will be used to modify the existing erosion models to predict erosion rates at velocities and temperatures relevant to Gen3 CSP systems. The existing models are first validated against erosion experiments run at low temperatures and low velocities. Subsequently, a temperature correction term is developed that can extend the existing models to high temperatures, based on the available experimental data showing the effect of temperature on impact erosion. 2. Erosion Models. Continuing sequence of impacts from solid particles on surfaces would result in loss of material due to mechanical interaction between solid surface and particles. Erosion equations have been developed to predict erosion under different conditions and erosion mechanism, including cutting and deformation erosion. These models are mainly either mechanistic, empirical, and semi-mechanistic models, when the latter combine the theory of the erosion mechanism and particle motion with the available experimental data. One of the first empirical correlation was introduced by American Petroleum Institute (API) Recommended Practice (RP) 14E [1]. This correlation was very conservative, and several improved empirical and semi-mechanistic equations were developed in the years following. More recently, the models introduced by Erosion/Corrosion Research Center (E/CRC) at the University of Tulsa and Arabnejad. et al. [2] are frequently used in the literature and industry, as they account for many parameters affecting erosion including particle impact speed and angle, material density and hardness, and particle size and shape. However, both these models were developed based on data at relatively high velocities and also do not take into account any mechanical changes in material associated with thermal cycling at high temperatures. 3. Erosion Prediction at High Temperatures. In this work, the accuracy of Arabnejad et al. model and E/CRC model is investigated to predict impact erosion at conditions relevant to Gen3 CSP systems. Two significant deviations expected in Gen3 systems compared to operating conditions used to build these models are particle impact velocities and system temperature. As a first step, the performance of these models was validated at low velocities and temperatures. Impact erosion experiments were conducted on SS316 coupons using HSP 40/70 ceramic particles. Assuming particle rate of 1 kg/s/m, 0.0254 m of particle curtain thickness, and particle velocity of 1.5 m/s in the system, an overall erosion of 0.59 mm/year was calculated. The experimental results were subsequently compared to those from computational simulations and erosion of 0.47 mm/year was obtained using the Arabnejad et al. model. The results indicated that the models work well at low velocities and low temperature conditions. To account for temperature effect, a mathematical correlation was developed using data published by DUCOM [3] for Inconel 600 eroded by alumina particles at high velocities. The correlation was applied to both Arabnejad et. al model and the E/CRC model. The prediction results from these modified models were within 20% of this experimental data. Predictions of of erosion by the modified E/CRC model at three different temperatures are made. Similar to the calculation at low temperature, a typical CSP system with 1 kg/s/m of particle flow rate per unit length of the particle curtain and a curtain thickness of 0.0254 m is assumed. The annual thickness loss calculations were run for different particle impact velocities, assuming a uniform particle impact area equal to the cross-sectional area of the curtain (particle-particle interactions and dispersion of particles are not considered in obtaining the results). It is observed that erosion increases exponentially as temperature increases. Furthermore, it is also noted that, erosion changes non-linearly with impact velocity. Currently, experiments are also being conducted to measure erosion of SS316 at 800 ºC with HSP 40/70 particles at low impact velocities. We expect to use the results from high temperature testing to further improve the temperature correlation function. Similar models are also being developed for abrasion erosion resulting from particle sliding along the surfaces as well as attrition from particle to particle and particle to surface interactions. References. [1] Institute, A. P. (1991). API Recommended Practice for Design and Installation of Offshore Production Platform Piping System, API RP 14E. [2] Arabnejad, H., Mansouri, A., Shirazi, S. A., and McLaury, B. S. (2015a). Development of mechanistic erosion equation for solid particles. Wear, 332–333, 1044–1050. http://doi.org/10.1016/j.wear.2015.01.031. [3] https://ducom.com/high-temperature-erosion-evaluating-sample-wear/

14 SOLAR ENERGY↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗