Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “collaborative grid”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Battery Storage Unlocked: Lessons Learned From Emerging Economies

The Clean Energy Ministerial (CEM) is a global forum that promotes policies and programs that advance clean energy technology. The CEM's mission is to bring together a community of global leaders to scale clean energy, amplifying the impact to all the sectors of the economy and applying a whole-of-society approach to meet collective climate and clean energy goals. At COP28 in Dubai, United Arab Emirates, the CEM announced the Supercharging Battery Storage Initiative as a vehicle to accelerate battery storage deployment around the world. The initiative supports countries around the world in co-creating strategies that enhance policy, regulation, supply chain, manufacturing, and financing solutions for battery energy storage deployment. Additionally, the initiative seeks to reduce the cost of the technology and promote diversified, sustainable, and secure supply chains (CEM n.d.). Through international collaboration, the initiative supports the integration of renewable energy globally, while securing the stability and reliability of the electricity grid.

batteries↗

Renewable Electricity Grid Integration Roadmap for Mexico. Supplement to the IEA Expert Group Report on Recommended Practices for Wind Integration Studies

As a recognized leader in efforts to mitigate global climate change, the Government of Mexico (GOM) works proactively to reduce emissions, demonstrating strong political will and capacity to comprehensively address climate change. Since 2010, the U.S. government (USG) has supported these efforts by partnering with Mexico under the Enhancing Capacity for Low Emission Development Strategies (EC-LEDS) program. Through the program, the USG has partnered with Mexico’s Ministry of Energy (SENER), as well as other government agencies, to support GOM in reaching its clean energy and climate change goals. Specifically, the EC-LEDS program is supporting GOM’s clean energy goal of generating 35% of its electricity from renewable energy (RE) by 2024. EC-LEDS, through the U.S. Agency for International Development (USAID) and the U.S Department of Energy’s (DOE’s) National Renewable Energy Laboratory (NREL), has been collaborating with SENER and GOM interagency working group—the Consejo Consultivo para las Energías Renovables (Consultative Council on Renewable Energy)—to create a grid integration roadmap for variable RE. 1 A key objective in creating a grid integration roadmap is assessing likely impacts of wind and solar energy on the power system and modifying planning and operations accordingly. This paper applies best practices in conducting a grid integration study to the Mexican context.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Flexibility-Environmental Outcomes Tradeoffs Workshop Report and Research Roadmap

The U.S. Department of Energy (DOE) and Norway’s Royal Ministry of Petroleum and Energy signed an Annex to a previously signed memorandum of understanding (MOU) in February 2020 to collaborate on hydropower research and development (R&D). This MOU Annex has brought together the DOE’s Office of Energy Efficiency and Renewable Energy Water Power Technology Office and the Norwegian Research Center for Hydropower Technology (HydroCen) to plan and coordinate hydropower R&D activities to increase our understanding of hydropower’s role in the future energy grid and how to minimize and mitigate the subsequent environmental impacts. As part of this MOU Annex, hydropower researchers from the U.S. and Norway have come together to conduct collaborative research on hydropower markets and value, hydropower plant capabilities and constraints, monitoring and control technologies, environmental design solutions, environmental impacts and tradeoffs, flexible operation and planning, and technology innovations. This report presents background information on hydropower environmental regulation in the U.S. and Norway and summarizes content and conclusions from this series of two, three-hour workshops on hydropower generation flexibility and environmental outcomes, that included structured discussions used to identify research priorities and collaborative research opportunities.

13 HYDRO ENERGY↗

PHEV Distribution Grid Integration and Smart Systems Testing: Cooperative Research and Development Final Report

To continue NREL's mission, which includes preparing technologies and markets with "speed and scale," NREL researchers will collaborate with Toyota on plug-in electric vehicle technology. Toyota will provide a collection of plug-in hybrid electric vehicles ("PHEVs" [and ultimately including PEVs], collectively, the "Vehicles") to conduct infrastructure interaction testing at NREL facilities. NREL will use available resources in the Vehicle Testing and Integration Facility (VTIF), its staff parking garage with numerous commercial Electric Vehicle Supply Equipment ("EVSEs"), and its Energy Systems Integration Facility (ESIF) to safely execute research experiments that highlight potential distribution system power quality challenges related to plug-in electric vehicles. The expected outcome of this project is a better understanding of the correlation of individual vehicle power quality attributes to a system of vehicles on a distribution network. The data collected and the simulations conducted will be used to guide future experiments and project development that aid in the deployment of plug-in electric vehicles ("PEV").

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Modernization of Cooperatives and Municipal Utilities via Breakthrough System Monitoring, Control and Optimization (CRADA Final Report)

This project aims at developing and demonstrating successful implementation of breakthrough approaches in real-time data visualization as well as real-time distributed DER control and optimization to provide ample benefits to both utilities and end users. The National Renewable Energy Laboratory (NREL), Holy Cross Energy (HCE), National Rural Electric Cooperative Association (NRECA) and Survalent are collaborating to enable Cooperative and Municipal utilities to fully leverage DERs as part of their strategies for providing safe, reliable, and affordable electric services to their customers and help meet DOE Grid modernization goal of achieving at least 10% active devices to provide grid flexibility by 2035. This project will use novel real-time control algorithms and approaches for distributed control recently developed under DOE-funded projects, using the date from the Survalent’s basic SCADA engine, GIS and AMI engines deployed at HCE combined with NRECA’s globally-used MultiSpeak(R) software interoperability specification for seamless and real-time communications between electric utility enterprise software to embrace DER as part of their strategies for providing safe, reliable and affordable electric service to their customers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Progress with the COGENT Edge Kinetic Code: Implementing the Fokker-Plank Collision Operator

Here, COGENT is a continuum gyrokinetic code for edge plasma simulations being developed by the Edge Simulation Laboratory collaboration. The code is distinguished by application of a fourth-order finite-volume (conservative) discretization, and mapped multiblock grid technology to handle the geometric complexity of the tokamak edge. The distribution function F is discretized in v∥ – μ (parallel velocity – magnetic moment) velocity coordinates, and the code presently solves an axisymmetric full-f gyro-kinetic equation coupled to the long-wavelength limit of the gyro-Poisson equation. COGENT capabilities are extended by implementing the fully nonlinear Fokker-Plank operator to model Coulomb collisions in magnetized edge plasmas. The corresponding Rosenbluth potentials are computed by making use of a finite-difference scheme and multipole-expansion boundary conditions. Details of the numerical algorithms and results of the initial verification studies are discussed. (© 2014 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A Science Driven Production Cyberinfrastructure: the Open Science Grid

This article describes the Open Science Grid, a large distributed computational infrastructure in the United States which supports many different high-throughput scientific applications, and partners (federates) with other infrastructures nationally and internationally to form multi-domain integrated distributed systems for science. The Open Science Grid consortium not only provides services and software to an increasingly diverse set of scientific communities, but also fosters a collaborative team of practitioners and researchers who use, support and advance the state of the art in large-scale distributed computing. The scale of the infrastructure can be expressed by the daily throughput of around seven hundred thousand jobs, just under a million hours of computing, a million file transfers, and half a petabyte of data movement. In this paper we introduce and reflect on some of the OSG capabilities, usage and activities.

Altunay, Mine↗

Transforming Power Systems through Global Collaboration

Ambitious and integrated policy and regulatory frameworks are crucial to achieve power system transformation. The 21st Century Power Partnership -- a multilateral initiative of the Clean Energy Ministerial -- serves as a platform for public-private collaboration to advance integrated solutions for the large-scale deployment of renewable energy in combination with energy efficiency and grid modernization.

21st Century Power Partnership↗

First International Workshop on Grid Simulator Testing of Wind Turbine Drivetrains: Workshop Proceedings

This report summarizes the proceedings of the First International Workshop on Grid Simulator Testing of Wind Turbine Drivetrains, held from June 13 to 14, 2013, at the National Renewable Energy Laboratory's National Wind Technology Center, located south of Boulder, Colorado. The workshop was sponsored by the U.S. Department of Energy and cohosted by the National Renewable Energy Laboratory and Clemson University under ongoing collaboration via a cooperative research and development agreement. The purpose of the workshop was to provide a forum to discuss the research, testing needs, and state-of-the-art apparatuses involved in grid compliance testing of utility-scale wind turbine generators. This includes both dynamometer testing of wind turbine drivetrains ('ground testing') and field testing grid-connected wind turbines. Four sessions followed by discussions in which all attendees of the workshop were encouraged to participate comprised the workshop.

17 WIND ENERGY↗

Pecan Street Grid Demonstration Program. Final technology performance report

This document represents the final Regional Demonstration Project Technical Performance Report (TPR) for Pecan Street Inc.’s (Pecan Street) Smart Grid Demonstration Program, DE-OE-0000219. Pecan Street is a 501(c)(3) smart grid/clean energy research and development organization headquartered at The University of Texas at Austin (UT). Pecan Street worked in collaboration with Austin Energy, UT, Environmental Defense Fund (EDF), the City of Austin, the Austin Chamber of Commerce and selected consultants, contractors, and vendors to take a more detailed look at the energy load of residential and small commercial properties while the power industry is undergoing modernization. The Pecan Street Smart Grid Demonstration Program signed-up over 1,000 participants who are sharing their home or businesses’s electricity consumption data with the project via green button protocols, smart meters, and/or a home energy monitoring system (HEMS). Pecan Street completed the installation of HEMS in 750 homes and 25 commercial properties. The program provided incentives to increase the installed base of roof-top solar photovoltaic (PV) systems, plug-in electric vehicles with Level 2 charging, and smart appliances. Over 200 participants within a one square mile area took advantage of Austin Energy and Pecan Street’s joint PV incentive program and installed roof-top PV as part of this project. Of these homes, 69 purchased or leased an electric vehicle through Pecan Street’s PV rebate program and received a Level 2 charger from Pecan Street. Pecan Street studied the impacts of these technologies along with a variety of consumer behavior interventions, including pricing models, real-time feedback on energy use, incentive programs, and messaging, as well as the corresponding impacts on Austin Energy’s distribution assets.The primary demonstration site was the Mueller community in Austin, Texas. The Mueller development, located less than three miles from the Texas State Capitol, is a 711-acre LEED Neighborhood Development mixed-use, urban infill redevelopment on the site of Austin’s former airport, currently under development through a public-private project between the City of Austin, and Catellus Austin LLC. Currently, Mueller is less than 50% complete and more than 3,500 people live or work at Mueller. At full build-out, the project will include more than 3 million square feet of commercial and institutional space, more than 13,000 residents from approximately 5,700 single-family and multi-family dwelling units. Figure 1 shows a Google Map image of the Mueller community, zoomed in on the residential streets participating in the project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Laboratory and Field Arrays (ALFA)/Lab Collaboration Project (LCP) for Marine Energy (Final Scientific/Technical Report)

The objective of the Advanced Laboratory and Field Arrays (ALFA) project was to reduce the Levelized Cost of Energy (LCOE) of Marine and Hydrokinetic (MHK) energy by leveraging research, development, and testing capabilities at Oregon State University, University of Washington, and the University of Alaska, Fairbanks. ALFA is a project within the Pacific Marine Energy Center (PMEC; formerly NNMREC), a multi-institution entity with a diverse funding base that focuses on research and development for marine renewables. The ALFA project aimed to accelerate the development of next-generation arrays of wave energy conversion (WEC) and tidal energy conversion (TEC) devices through a suite of field-focused R&D activities spanning a broad range of strategic opportunity areas identified in the Funding Opportunity Announcement: • Device and/or array operation and maintenance (O&M) logistics development; • High-fidelity resource characterization and/or modeling technique development and validation; • Array-specific component technology development (e.g. moorings and foundations, transmission, and other offshore grid components); • Array performance testing and evaluation; and • Novel cost-effective environmental monitoring techniques and instrumentation testing and evaluation. The objective of the Lab Collaboration Project (LCP) was to accelerate the development of next-generation marine energy conversion systems. The LCP aimed to achieve these project objectives in collaboration with the national laboratories by: • Developing concept generation and assessment tools; • Improving access to existing testing resources; • Validating collision risk models between fish and turbines; and • Advancing analysis and simulation capabilities for wave-WEC interactions and PTO analysis in nonlinear ocean waves. The ALFA portion of the project was comprised of six overarching technical tasks: • Task 1: Debris Modeling, Detection and Mitigation; • Task 2: Autonomous Monitoring & Intervention; • Task 3: Resource Characterization for Extreme Conditions; • Task 4: Robust Models for Design of Offshore Anchoring and Mooring Systems; • Task 5: Performance Enhancement for Marine Energy Converter (MEC) Arrays; and • Task 6: Evaluating Sampling Techniques for MHK Biological Monitoring. The LCP was divided into four overarching technical tasks: • Task 7: Project Management and Reporting • Task 8: Novel Design and Assessment Methodologies for Wave Energy Converter Design (Wave- SPARC) • Task 9: Testing Access for Commercial Marine Renewable Energy Technology Developers • Task 10: Quantifying Collision Risk for Fish and Turbines • Task 11: Nonlinear Ocean Waves and PTO Control Strategy Each ALFA/LCP task listed above functioned as a separate and discreet project. A final Technical Report was written for each individual task and these reports were uploaded to OSTI, after receiving DOE approval. The following document is a compilation of each of these final, approved reports arranged as individual chapters.

13 HYDRO ENERGY↗

Enabling On-Demand Scientific Workflows on a Federated Cloud

The Fermilab Grid and Cloud Computing Department and the KISTI Global Science experimental Data hub Center are working on a multi-year Collaborative Research and Development Agreement.With the knowledge developed in the first year on how to provision and manage a federation of virtual machines through Cloud management systems. In this second year, we expanded the work on provisioning and federation, increasing both scale and diversity of solutions, and we started to build on-demand services on the established fabric, introducing the paradigm of Platform as a Service to assist with the execution of scientific workflows. We have enabled scientific workflows of stakeholders to run on multiple cloud resources at the scale of 1,000 concurrent machines. The demonstrations have been in the areas of (a) Virtual Infrastructure Automation and Provisioning, (b) Interoperability and Federation of Cloud Resources, and (c) On-demand Services for ScientificWorkflows.

97 MATHEMATICS AND COMPUTING↗

Research, Development and Demonstration of Peak Load Reduction on Distribution Feeders Using Distributed Energy Resources for the City of Fort Collins

This project titled “Research, Development and Demonstration of Peak Load Reduction on Distribution Feeders Using Distributed Energy Resources for the City of Fort Collins” evolved in response to the Department of Energy’s (DOE) Funding Opportunity Announcement (FOA) Number DE-PS26-07NT43119. Also referred to as the Fort Collins Renewable and Distributed System Integration (RDSI) Project, the effort was undertaken by a diverse group of local government, higher education and business organizations; and was driven by three overarching goals: I. Fulfill the requirements of the DOE FOA’s Area of Interest 2: Renewable and Distributed System Integration; most notably, to demonstrate the ability to reduce electric system distribution feeder peak load by 15% or more through the coordinated use of Distributed Energy Resources (DER). II. Advance the expertise, technologies and infrastructure necessary to support the long term vision of the Fort Collins Zero Energy District (FortZED) and move towards creating a zero energy district in the Fort Collins “Old Town” area. III. Further the goals of the City of Fort Collins Energy Policy, including the development of a Smart Grid-enabled distribution system in Fort Collins, expanded use of renewable energy, increased energy conservation, and peak load reduction. Through the collaborative efforts of the partner organizations, the Fort Collins RDSI project was successful in achieving all three of these goals. This report is organized into two distinct sections corresponding to the two phases of the project: • Part 1: Feeder Peak Load Reduction and the FortZED Initiative. • Part 2: Forming and Operating Utility Microgrids and Managing Load and Production Variability The original project scope addressed the Part 1 feeder peak load reduction. That work took place from 2009 through 2011 and was largely complete when the project scope was amended to include a demonstration of microgrid operations. While leveraging the assets, partner relationships, and lessons learned from Part 1, Part 2 was managed and executed as a distinct and substantially independent sub-project during the spring and summer of 2013. Both Parts 1 and 2 of the overall RDSI project can be viewed as cohesive stand-alone bodies of work and are presented as such within this report. In addition to the narratives, this document includes two Appendices that were compiled to supplement information about the various aspects of activities performed during Parts 1 and 2 of the project. Moreover, these Appendices are organized (as outlined below) so as to directly relate to the narratives in Part 1 and 2 of this report. • Appendix - Part 1: describes the roles of each project participant in regards to the feeder peak load reduction effort, and • Appendix - Part 2: deals with the microgrid research/demonstration.

14 SOLAR ENERGY↗

New Predictive Capabilities for Nuclear Weapons in Composite Fires

The prevalence of flammable carbon-based composite airframe materials and their use in high-temperature nuclear weapon re-entry systems requires analysts to address the abnormal thermal environment hazards associated with composite material fires. These fires tend to burn very differently than conventional fuel fires, usually burning less intensely, but much longer. This could lead to challenges in understanding margins in classic safety themes. The technical challenges in modeling the phenomena associated with these new types of fires are considerable, but new models have been developed. Their predictions have been compared with well-documented measurements of a vertical porous burner fire, known as a "wall fire" (a "wall-fire" validation simulation is reflected in the figures below). These measurements were conducted at FMGlobal, a mutual insurance company with a strong fire risk management program, as part of an ongoing collaboration between Sandia and FMGlobal. To date, the "wall-fire" scenario has been set up and initial model assessments with grid refinement studies have been conducted focusing on mesh resolutions suitable for full weapon system simulations. This work will continue with further verification and validation tasks assessing the predictions of the new model. Future work will address specific aspects of the wall models that are lacking in their predictive ability.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Digital Divide in Sub-Saharan African Universities: Recommendations and Monitoring

The Digital Divide prevents Africa from taking advantages of new information technologies. One of the most urgent priorities is to bring the Internet in African Universities, Research, and Learning Centers to the level of other regions of the world. eGY-Africa, and the Sharing Knowledge Foundation are two bottom-up initiatives by scientists to secure better cyber-infrastructure and Internet facilities in Africa. Recommendations by the present scientific communities are being formulated at national, regional and international levels. The Internet capabilities are well documented at country level overall, but this is not the case at the University level. The snapshot of the Internet status in universities in 17 African countries, obtained by a questionnaire survey, is consistent with measures of Internet penetration in the corresponding country. The monitoring of Internet performance has been proposed to those African universities to provide an information base for arguing the need to improve the coverage for Africa. A pilot program is recommended that will start scientific collaboration with Europe in western Africa using ICT. The program will lay the foundations for the arrival of new technologies like Grids.

99 GENERAL AND MISCELLANEOUS↗

Use of glide-ins in CMS for production and analysis

With the evolution of various grid federations, the Condor glide-ins represent a key feature in providing a homogeneous pool of resources using late-binding technology. The CMS collaboration uses the glide-in based Workload Management System, glideinWMS, for production (ProdAgent) and distributed analysis (CRAB) of the data. The Condor glide-in daemons traverse to the worker nodes, submitted via Condor-G. Once activated, they preserve the Master-Worker relationships, with the worker first validating the execution environment on the worker node before pulling the jobs sequentially until the expiry of their lifetimes. The combination of late-binding and validation significantly reduces the overall failure rate visible to CMS physicists. We discuss the extensive use of the glideinWMS since the computing challenge, CCRC-08, in order to prepare for the forthcoming LHC data-taking period. The key features essential to the success of large-scale production and analysis on CMS resources across major grid federations, including EGEE, OSG and NorduGrid are outlined. Use of glide-ins via the CRAB server mechanism and ProdAgent, as well as first hand experience of using the next generation CREAM computing element within the CMS framework is discussed.

99 GENERAL AND MISCELLANEOUS↗

Smart Grid Interoperability Maturity Model Beta Version

The GridWise Architecture Council was formed by the U.S. Department of Energy to promote and enable interoperability among the many entities that interact with the electric power system. This balanced team of industry representatives proposes principles for the development of interoperability concepts and standards. The Council provides industry guidance and tools that make it an available resource for smart grid implementations. In the spirit of advancing interoperability of an ecosystem of smart grid devices and systems, this document presents a model for evaluating the maturity of the artifacts and processes that specify the agreement of parties to collaborate across an information exchange interface. You are expected to have a solid understanding of large, complex system integration concepts and experience in dealing with software component interoperation. Those without this technical background should read the Executive Summary for a description of the purpose and contents of the document. Other documents, such as checklists, guides, and whitepapers, exist for targeted purposes and audiences. Please see the www.gridwiseac.org website for more products of the Council that may be of interest to you.

Beta Version↗

Second release of the CoRe database of binary neutron star merger waveforms

Abstract We present the second data release of gravitational waveforms from binary neutron star (BNS) merger simulations performed by the Computational Relativity ( CoRe ) collaboration. The current database consists of 254 different BNS configurations and a total of 590 individual numerical-relativity simulations using various grid resolutions. The released waveform data contain the strain and the Weyl curvature multipoles up to ℓ = m = 4 . They span a significant portion of the mass, mass-ratio, spin and eccentricity parameter space and include targeted configurations to the events GW170817 and GW190425. CoRe simulations are performed with 18 different equations of state, seven of which are finite temperature models, and three of which account for non-hadronic degrees of freedom. About half of the released data are computed with high-order hydrodynamics schemes for tens of orbits to merger; the other half is computed with advanced microphysics. We showcase a standard waveform error analysis and discuss the accuracy of the database in terms of faithfulness. We present ready-to-use fitting formulas for equation of state-insensitive relations at merger (e.g. merger frequency), luminosity peak, and post-merger spectrum.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗