Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “chiller”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Advancing Continuous Manufacturing of Metal Organic Frameworks [Abstract]

InnaVenture has succeeded in developing a pilot-scale facility implementing a radically new concept for synthesis of metal-organic framework (MOF) materials based upon a patent-pending evaporative aerosolization-condensation process developed at PNNL. The successful synthesis of kilogram quantities of Ni-MOF-74 in InnaVenture’s facility represents a major step in the advancement of MOFs from being novelty materials to industrial adsorbents. Using this approach, fifteen kilograms of Ni-MOF-74 were synthesized for use in a demonstration adsorption chiller developed for the U.S. Navy. However, the evaporative condensation method for MOF synthesis has so far only been demonstrated for synthesizing MOFs under conditions where the reactants are part of a single homogeneous liquid phase solvent system. For InnaVenture to expand opportunities to support broader commercial applications of MOFs and related nanoporous materials (e.g., metal-aromatic frameworks (MAFs), covalent organic frameworks (COFs)), extension of the method to heterogeneous mixed phase conditions is essential. Examples of commercially promising MOFs that require such synthesis conditions include but are not limited to MIL-101, MIL-88B, MIL-100, MOF-801, MIL-160, MOF-841, and many others. InnaVenture has also informed PNNL that they need to address problems with the low density of MOF particles being generated in their fluidized reactor system. The purpose of this effort is to address both of these challenges.

36 MATERIALS SCIENCE↗

IER-479/547: Low-Temperature TEX Surrogate Testing and Reflector Design [Slides]

This lecture includes a look into progress in surrogate testing. This includes a new chiller that has been fabricated and testing that has resumed. Additional tests are being conducted, including: using formed aluminum gaskets, extended testing with natural uranium, testing with pseudo-spindle, testing with no vacuum. This lecture includes a look into the Reflector Design. Results for detailed model are consistent with results presented in CED-2. Calculations provide flexibility in the physical design of the reflectors (e.g. reflector segment widths and heights). Provided initial CAD models of reflector components.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Future of X-ray Irradiation: Addressing Supply Chain Risks and Opportunities (UUR Edition)

This study supports the Office of Radiological Security’s (ORS) mission of eliminating cesium irradiators by analyzing the supply chain for self-shielded X-ray irradiators (SSXIs), identifying potential risks, and proposing mitigation measures. The research focuses on the primary components of SSXIs, including X-ray tubes, controllers, generators, and coolers or chillers, and evaluates their vulnerabilities using a comprehensive risk matrix framework. The methodology includes subject matter expert (SME) interviews with relevant manufacturers and major stakeholders, a deep literature review, and a meta-analysis of maintenance reports provided by SSXI end users. Results show that while the SSXI market is small, it’s growing, and the highly global nature of the supply chain may create vulnerabilities for critical SSXI components (X-ray tubes are the most vulnerable, followed by generators and controllers). This research communicates necessary information to address concerns of current and future end users, especially those interested in transitioning away from radioactive sources, and informs future policy aimed at supporting the irradiation industry.

07 ISOTOPE AND RADIATION SOURCES↗

Advanced District Energy Controls for Improved Efficiency and Resilience

District energy (DE) systems have efficiently provided heat and cooling to buildings in the US for over a century by leveraging economies of scale through shared generation assets. However, optimizing DE boiler and chiller plants is complex due to the intricate mix of equipment and multiple operating flows. Sophisticated controls are necessary to achieve highest efficiencies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hardware-in-the-loop Laboratory Performance Verification of Flexible Building Equipment in a Typical Commercial Building

This project aims to develop high-resolution equipment performance and occupant data that quantifies demand flexibility in typical commercial buildings. The dataset documented in this report includes comprehensive time-series measurements from hardware-in-the-loop (HIL) experiments conducted across multiple testbeds designed to simulate realistic operational environments for HVAC systems. Specifically, it captures minute-by-minute high-resolution data on the performance of various typical HVAC systems, including a variable-air-volume (VAV) air handling unit (AHU) system with chillers and an ice tank in the Intelligent Building Agents Laboratory (IBAL) at the National Institute of Standards and Technology (NIST), a two-stage air-source heat pump (ASHP) at the NIST, and a water-source heat pump (WSHP) at Texas A&M University (TAMU). The data were generated under a range of controlled conditions reflecting different grid scenarios and climatic influences, as well as various control strategies, building types, occupancy patterns, and occupant behaviors. This dataset provides DE-EE0009153 Final Report 5 detailed insights into the demand flexibility of these systems, including their response to grid signals, occupant behaviors, energy consumption patterns, and operational efficiency under different conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimizing Control for Efficient Load Shifting with Thermal Energy Storage in Existing HVAC Systems

This project developed the integration of a direct-contact heat exchanger (DCHX) based thermal energy storage (TES) system with a chiller–air handling unit (AHU) plant to evaluate its potential for reducing building energy costs. Detailed physical models of the TES unit, building envelope, and HVAC components were developed alongside simplified control-oriented models to support both high-fidelity simulation and real-time optimization. Two control strategies were implemented and compared: a rule-based control (RBC) aligned with utility time-of-use (ToU) rates, and a model predictive control (MPC) framework leveraging forecasts of building load, weather, and internal gains.Simulation results show that the RBC strategy reduced daily electricity costs by around 30% by shifting cooling production from on-peak to off-peak hours. In contrast, the MPC strategy achieved significantly greater performance, reducing daily operating costs by up to 44% and peak-hour costs by more than 60%. Both strategies maintained indoor thermal comfort within acceptable limits, with MPC further improving load distribution and reducing equipment cycling.The outcomes confirm that TES integration, particularly when coordinated with advanced predictive control, can provide substantial cost savings and on-peak demand reduction. . These findings directly support the U.S. Department of Energy’s goals for grid-interactive efficient buildings and demonstrate the potential of TES-enabled HVAC systems for scalable deployment across the commercial building.

99 GENERAL AND MISCELLANEOUS↗

Optimizing Control for Efficient Load Shifting with Thermal Energy Storage in Existing HVAC Systems

This project developed the integration of a direct-contact heat exchanger (DCHX) based thermal energy storage (TES) system with a chiller–air handling unit (AHU) plant to evaluate its potential for reducing building energy costs. Detailed physical models of the TES unit, building envelope, and HVAC components were developed alongside simplified control-oriented models to support both high-fidelity simulation and real-time optimization. Two control strategies were implemented and compared: a rule-based control (RBC) aligned with utility time-of-use (ToU) rates, and a model predictive control (MPC) framework leveraging forecasts of building load, weather, and internal gains. Simulation results show that the RBC strategy reduced daily electricity costs by around 30% by shifting cooling production from on-peak to off-peak hours. In contrast, the MPC strategy achieved significantly greater performance, reducing daily operating costs by up to 44% and peak-hour costs by more than 60%. Both strategies maintained indoor thermal comfort within acceptable limits, with MPC further improving load distribution and reducing equipment cycling. The outcomes confirm that TES integration, particularly when coordinated with advanced predictive control, can provide substantial cost savings and on-peak demand reduction. . These findings directly support the U.S. Department of Energy’s goals for grid-interactive efficient buildings and demonstrate the potential of TES-enabled HVAC systems for scalable deployment across the commercial building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Klickitat Valley Health Central Utility Plant Modernization

This project replaced legacy heating and cooling equipment at Klickitat Valley Health (KVH), a rural hospital in Goldendale, Washington. Work included constructing a new chiller building, installing modern hydronic piping systems, replacing the main Emergency Department air handler (Air Handlining Unit (AHU-1)), upgrading electrical systems, and converting the Emergency Department wing from electric reheat to hydronic heating and cooling. Commissioning, testing, adjusting, and balancing were completed under this grant. These upgrades improve energy efficiency, operational resilience, and system reliability while preparing the campus for future electrification and renewable energy integration. They also support growth in healthcare services for a rural population. The project directly reduces energy costs and provides a foundation for future decarbonization measures, including a FEMA-funded microgrid and a large-scale ground source heat pump (GSHP) project. These follow-on initiatives would not have been possible without the hydronic backbone built through this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integration of Solid Oxide Fuel Cell Systems Into Artificial Intelligence Data Centers

This report presents the results of a techno-economic analysis (TEA) that evaluates the economic benefits of integrating solid oxide fuel cell (SOFC) systems with artificial intelligence (AI) data centers. The analysis was completed in two phases: a scoping-level analysis was performed to identify impactful integration opportunities, followed by a more detailed TEA. Results show that, due to their modularity, SOFC can meet the 99.999% availability requirement of data centers with minimal additional costs. Heat integration via absorption chillers decreases data center electricity consumption at the tradeoff of increased water consumption. Higher SOFC exhaust temperatures are important for achieving larger electricity savings. Finally, power electronics integration with SOFC direct current electricity can reduce electricity consumption by 9 percent and reduce water consumption by 6.4 percent.

20 FOSSIL-FUELED POWER PLANTS↗

Thermal Reservoir Networks for Modularly Expandable Thermal Microgrids

The Department of Defense (DoD) faces the substantial challenge of cost-effectively retrofitting one to two installations per month, each comprising approximately 1,000 buildings, to improve resilience, reduce energy consumption, and enhance energy supply security. Achieving these objectives requires optimal system selection and effective risk mitigation during system integration. To address this need, we introduce Platform-Based Design (PBD), a structured, hierarchical methodology adapted from other industrial sectors to the domain of energy system retrofits. We demonstrate the effectiveness of PBD through a techno-economic feasibility study comparing geothermal-coupled thermal energy networks (TENs) with conventional energy systems for heating, cooling, and powering 17 buildings at Joint Base Andrews (JBA) in Maryland. Our analysis illustrates that the PBD approach enables rigorous, data-driven, sequential decision making, resulting in a family of Pareto-optimal systems, among which the TEN emerged as the most promising solution. The selected TEN design integrates geothermal borefields, heat recovery heat pumps, photovoltaic (PV) arrays, and battery storage. Compared to the baseline system – gas heating combined with air-source chillers – the proposed TEN reduces annual imported energy by 74% and peak electricity demand by 45%, achieves a levelized cost of energy of $\$0.210$/kWh, and substantially enhances resilience. Life-cycle costs increase by approximately 6%, and initial investment costs are about 2.5 times higher than the baseline. However, if central plant infrastructure, district loops, and utility-scale PV and battery systems are privately funded and operated, the initial investment would fall below the baseline system cost. Critical to achieving these significant performance improvements were detailed nonlinear dynamic simulations coupling geothermal heat transfer, energy system operation, and realistic feedback control logic. These simulations identified essential design modifications and control strategy refinements that substantially reduced energy use, peak demand, and compressor shortcycling, thereby improving durability and reliability—issues that would have been significantly more expensive to resolve during operation. Additionally, the verification step highlighted sensitivities to key design parameters that could reduce initial investment by approximately $\$2$ million and reduce annual life-cycle costs more than $\$300,000$. We recommend adopting the PBD methodology for future feasibility studies and TEN pilot projects to gain valuable operational experience. Furthermore, we recommend that DoD invest in transferring and scaling the PBD methodology to other installations. This entails developing standardized computational frameworks and component libraries as well as training industry in conducting PBD. Such investments would enable rapid, robust, reliable, and cost-effective retrofits, supporting DoD’s ambitious energy system modernization goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Technical Report for Industrial Assessment Center at West Virginia University

The Industrial Assessment Center (IAC) program at West Virginia University (WVU), which is funded by the Industrial Technologies Program (ITP) in the U.S. Department of Energy’s (DOE) Office of Energy Efficiency and Renewable Energy (EERE), has provided a unique opportunity to enhance efficient energy utilization in small to medium-sized manufacturers. It has also provided training to engineering students in the identification and analysis of efficient energy use in each aspect of the manufacturing process and associated supporting elements. The outcomes of the IAC Program at WVU have assisted the manufacturers and the students in having a heightened sensitivity to industrial energy conservation, waste reduction, and productivity improvement, as well as a better understanding of the technical aspects of manufacturing processes and the supporting elements through which efficient energy utilization can be enhanced. The IAC at WVU has conducted 101 energy assessments from 2002 until 2006. The focus of the industrial assessments has been on energy savings. It has been the IAC’s interest to strongly focus on energy savings and on waste minimization and productivity improvements that strictly have an impact on energy. The IAC at WVU was selected as the Center of the year in 2005 from amongst 26 centers and has obtained a ranking within the top 5 in the previous few years. From 2002 to 2006, the total recommended energy savings produced by the IAC at WVU is 1,214,414 MMBtu, of which the electricity accounts for 93,826,067 kWh (equivalent to 320,226 MMBtu) and natural gas for 871,743 MMBtu. The balance is accounted for in savings in other fuels, mainly coal and wood. This results in an average recommended energy savings of 928,971 kWh from electricity and 8,631 MMBtu from natural gas per facility. The total CO2 emissions saved from 2002 to 2006 is 154,462 tons, with an average of 1,529.3 tons per facility. The average recommended energy cost savings per facility is $135,036. The overall implementation rate of the assessment recommendations is 60.6% for the 101 industrial assessments conducted since 2002. The implemented recommendations resulted in total energy savings of 62,328,006 kWh from electricity, 295,241 MMBtu from natural gas, and 43,593 MMBtu from other fuels, totaling 551,557 MMBtu. The average implemented energy savings per industrial facility is 5,461 MMBtu and the average implemented energy cost savings is $ 59,879. The average implemented energy and productivity cost savings exceeds the program average of $ 60,000 per assessment. The IAC at WVU has produced a variety of energy efficiency recommendations in areas of industrial energy consumption such as Boilers and Steam systems (19), Air Compressors (15), HVAC (4), Chillers (12), Furnaces and Ovens (17), Motors (8), Lighting (20), Insulation (3), CHP and Cogeneration (4), and Process Equipment (7). The project has benefited the public by enabling the reduction of CO2 emissions by 89,726 tons due to the implemented energy saving recommendations at 101 small and medium sized manufacturing facilities. Since CO2 is a green house gas, its reduction will improve the quality of the environment significantly. The reduction in operating costs for the manufacturing facilities in terms of energy cost savings will increase the manufacturing facilities’ profits and improve their competitive edge, thus causing possible expansion in the manufacturing activities, leading to increase in good paying jobs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Monitoring and Commissioning Verification Algorithms for CHP Systems

This document provides the algorithms for CHP system performance monitoring and commissioning verification (CxV). It starts by presenting system-level and component-level performance metrics, followed by descriptions of algorithms for performance monitoring and commissioning verification, using the metric presented earlier. Verification of commissioning is accomplished essentially by comparing actual measured performance to benchmarks for performance provided by the system integrator and/or component manufacturers. The results of these comparisons are then automatically interpreted to provide conclusions regarding whether the CHP system and its components have been properly commissioned and where problems are found, guidance is provided for corrections. A discussion of uncertainty handling is then provided, which is followed by a description of how simulations models can be used to generate data for testing the algorithms. A model is described for simulating a CHP system consisting of a micro-turbine, an exhaust-gas heat recovery unit that produces hot water, a absorption chiller and a cooling tower. The process for using this model for generating data for testing the algorithms for a selected set of faults is described. The next section applies the algorithms developed to CHP laboratory and field data to illustrate their use. The report then concludes with a discussion of the need for laboratory testing of the algorithms on a physical CHP systems and identification of the recommended next steps.

20 FOSSIL-FUELED POWER PLANTS↗

Micro Cooling, Heating, and Power (Micro-CHP) and Bio-Fuel Center, Mississippi State University

Initially, most micro-CHP systems will likely be designed as constant-power output or base-load systems. This implies that at some point the power requirement will not be met, or that the requirement will be exceeded. Realistically, both cases will occur within a 24-hour period. For example, in the United States, the base electrical load for the average home is approximately 2 kW while the peak electrical demand is slightly over 4 kW. If a 3 kWe micro- CHP system were installed in this situation, part of the time more energy will be provided than could be used and for a portion of the time more energy will be required than could be provided. Jalalzadeh-Azar [6] investigated this situation and presented a comparison of electrical- and thermal-load-following CHP systems. In his investigation he included in a parametric analysis addressing the influence of the subsystem efficiencies on the total primary energy consumption as well as an economic analysis of these systems. He found that an increase in the efficiencies of the on-site power generation and electrical equipment reduced the total monthly import of electricity. A methodology for calculating performance characteristics of different micro-CHP system components will be introduced in this article. Thermodynamic cycles are used to model each individual prime mover. The prime movers modeled in this article are a spark-ignition internal combustion engine (Otto cycle) and a diesel engine (Diesel cycle). Calculations for heat exchanger, absorption chiller, and boiler modeling are also presented. The individual component models are then linked together to calculate total system performance values. Performance characteristics that will be observed for each system include maximum fuel flow rate, total monthly fuel consumption, and system energy (electrical, thermal, and total) efficiencies. Also, whether or not both the required electrical and thermal loads can sufficiently be accounted for within the system specifications is observed. Case study data for various micro-CHP system configurations have been discussed and compared. Comparisons are made of the different prime mover/fuel combinations. Also, micro- CHP monthly energy cost results are compared for each system configuration to conventional monthly utility costs for equivalent monthly building power, heating, and cooling requirements.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report November 2008.

FISH PRODUCTION: Final shocking of eggs was finished in the incubation. Egg enumeration for the 2008 brood was completed and the eggs are being incubated in 38 degree Fahrenheit chilled water. Don Larsen of NOAA made a request of eggs for research purposes and was able to acquire supplemental line eggs 10,555. Estimated density at the time of ponding in Mid-March of 2009 is approximately 43,869 fry per raceway after calculating an average fry loss of 2%. The end of the month totals for the 2007 brood reports 773,807 juveniles on hand with an overall average of 31.4 fish per pound. Tagging continues on the 2007 brood and is on pace to wrap up in early December. FISH CULTURE: Ponds are cleaned as needed and due to the colder water temperatures, the feeding frequency has been changed to three days a week. All ponds are sampled at the end of the month. Growth for production fish are adjusted accordingly as temperature dictates feeding levels. Torrential rain on the 12th turned the Yakima River extremely turbid. Fish tagging operations were halted and the ensuing conditions at the facility intake screens became a concern. Water flow to the wet well became restricted so the decision was made to shut the surface water (river) pumps down and turn on well pumps No.1, No.4 and No.6 to run water to the facility head box. This operation continued for twenty-four hours at which point normal operations were optimal and fish tagging resumed, although the river didn't clear up enough to feed the fish until the 17th. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,822 gallons/minute. Well No.2 is pumping water at a rate of 530 gallons per minute. All four river pumps are in operation and pumping 14,292 gallons/minute. ACCLIMATION SITES: Cle Elum staff has been working to prep the acclimation sites for the upcoming fish transfer before the snow falls. Thermographs at each site are changed weekly. AMB Tools performed routine maintenance on the compressor and Brown and Jackson pumped out the septic tank at the Jack Creek acclimation site. VEHICLE MAINTENANCE: Snow tires are now on all vehicles and snow blowers were installed on the John Deere tractor and lawn tractor. The snowplow was also installed on the Ford one ton. The four Snowmobiles were serviced by Yamaha Jacks of Ellensburg. MAINTENANCE BUILDING MAINTENANCE: Clean up occurs on Fridays of each week. HATCHERY BUILDING MAINTENANCE: Water has been turned on to vertical incubator islands one and two. After eggs were transferred to vertical stacks cleaning of troughs began. WDFW crew inventoried eggs from isolettes and then transferred them to the vertical incubators. RIVER PUMP STATION MAINTENANCE: All four pumps are in operation and supplying the facility with 14,292 gallons/minute of water to rearing ponds. WELL FIELD MAINTENANCE: Well pumps No.1, No.4 and No.6 were turned on to supplement water flow to the facility as mentioned previously. Well No.5 was powered up but a winterizing valve malfunction wouldn't allow operation, we are currently working on it at this time. Well No.2 is pumping 530 gallons per minute and supplies well water to incubation and chiller. The pumps meter is recorded weekly. Test holes are monitored weekly and results are faxed to CH2MHILL afterward. SAFETY AND TRAINING: Ice melt and sand bags are popular items at the facility this month as freezing temperatures cause ground to become slippery and hazardous. GROUNDS: Van Alden's Plumbing installed a new commode in resident house No.411 and also inspected a plumbing problem at resident No.1131. Cle Elum staff along with WDFW staff worked to locate the spawning channel building back to the position it was at to have Greg Wallace of Wallace Electric hook electricity back up to the spawning shed. MEETINGS AND TOURS: Charlie attended a policy meeting at Cle Elum on the 18th. The Internal projects annual review took place at Cle Elum on the 19th and 20th. Bill Bosch continues to visit monthly to incorporate data into the YKFP data base. PERSONNEL: IHS employees traveled to Cle Elum to administer flu shots to YN staffers and families as well as WDFW staffers.

13 HYDRO ENERGY↗

Cle Elum and Supplementation Research Facility : Monthly Progress Report October 2008.

FISH PRODUCTION: On October 7th the 2008 spawning season was completed. 823 adults were transferred to the facility for the 2008 season. The overall adult mortality was 6.9% (1.3% pre-spawning mortality and 5.6% encountered after sorting). Wild/natural salmon collected included 278 females, 173 males, and 29 jacks for a total 480 fish for the 2008 brood. Supplemented brood stock collected included 149 adults (85 females, 35 males and 29 jacks). Hatchery control brood collected for research included 194 adults (91 females, 68 males and 35 jacks). Eggs will be inventoried in November with an actual summary of eggs numbers to be submitted for the November report. The estimated egg takes (production) for the 2008 season was 1,375,146 eggs with 1,006,063 comprising of W x W crosses and 250,755 eggs of H x H crosses with 118,328 supplement crosses. Total fish on hand for the 2007 brood is 768,751 with an average fish per pound of 30.6 f/lb. FISH CULTURE: The marking and pit-tagging operation started on October 13th. The pit-tagging portion was completed on October 23rd. A total 40,000 juveniles were pit-tagged (2,000 from each of the production ponds and 4,000 each for the hatchery juvenile ponds 9 & 10). Cle Elum staff began shocking, sorting, counting and splitting eggs in incubation. Shocking eggs will separate live eggs from dead eggs. Eggs are treated with formalin three times a week to control fungus. The focus for the culturists during the month of October entail completing the final spawn (egg take) on the 7th, pond cleaning, keeping the marking trailers supplied with fish and end of month sampling. The adult holding ponds were power washed and winterized for the shut down period. Facility crew members Greg Strom and Mike Whitefoot assisted Joe Blodgett and his crew with fish brood collection on the 22nd of October. Fall Chinook and Coho salmon were seined up and put in tanker trucks from Chandler canal and transported to holding ponds for later spawning. Charlie, Simon and Vernon assisted with sorting and spawning Summer Chinook at the Wells hatchery for the Summer Chinook reintroduction program on the lower Yakima River. WATER PRODUCTION: The current combined well and river water supply to the complex is 12,909 gallons/min. Four river pumps (12,400gpm) and one well pump No.2 (509gpm) are supplying water to the facility main head box and the egg incubation building. ACCLIMATION SITES: Easton had much activity in October, the electrical power panel that's switches commercial power operation to generator power (transfer switch) malfunctioned. Charlie called Wallace Electric as well as ASCO Services to trouble shoot the problem which has yet to be determined. Heaters have been turned on in all service buildings at the acclimation sites. Pacific States Marine Fisheries Commission traveled to Easton to install a pole to mount a satellite and a new ups backup system with new monitors and computers for pit tag data recording and transmitting. Brown and Jackson pumped out the septic tanks at Easton and Clark Flat. AMB Tools performed maintenance on the compressors at the acclimation sites as well as Cle Elum (5 total). VEHICLE MAINTENANCE: Day Wireless performed maintenance on all handheld and vehicle radios. Day Wireless repaired radio communications (static noise) on the 6th also. All vehicles mileages and conditions are reported monthly to Toppenish. Cle Elum staff continues to clean and maintain all facility vehicles weekly. MAINTENANCE BUILDING MAINTENANCE: Kevin of Raincountry was called in response to repairs needed to the water chiller system. Cle Elum staff winterized all irrigation as well as shop grounds. Brown and Jackson pumped out the septic tank at the hatchery on the 22nd. HATCHERY BUILDING MAINTENANCE: The incubation room has been set up for transfer of eggs from isolation buckets to vertical stacks, temperature units are recorded daily. RESENTDENTIAL HOUSING: Residents irrigation has been winterized and fall fertilizer was applied to all grass on facility. Four Seasons performed maintenance on all heating systems and replaced a thermostat on resident house No.391. Alden Plumbing replaced a water faucet in a sink at resident house No.1001. Shaw's Furniture & Appliance replaced three faulty microwaves in residents No.391, 411 and 871. RIVER PUMP STATION MAINTENANCE: All river pumps are in operation and supply river water to the main facility. Approximately 12,400 gallons per minute are being pumped to eighteen raceways. Weekly cleaning and upkeep is performed by Cle Elum staff. WELL FIELD MAINTENANCE: Weekly test holes are measured, recorded and sent to CH2MHILL. Pump No.1 is in operation and the flow meter is recorded weekly. On the 3rd well pumps 5 and 6 were shut down and winterized for the season. Well pump No.2 had fence damage repaired on the 16th. SAFETY AND TRAINING: A safety meeting was held on the 21st. On the 15th ABC Fire Prevention did maintenance on all fire extinguishers.

13 HYDRO ENERGY↗

Advanced Building Efficiency Testbed Initiative/Intelligent Workplace Energy Supply System; ABETI/IWESS

ABETI/IWESS is a project carried out by Carnegie Mellon's Center for Building Performance and Diagnostics, the CBPD, supported by the U.S. Department of Energy/EERE, to design, procure, install, operate, and evaluate an energy supply system, an ESS, that will provide power, cooling, heating and ventilation for CBPD's Intelligent Workplace, the IW. The energy sources for this system, the IWESS, are solar radiation and bioDiesel fuel. The components of this overall system are: (1) a solar driven cooling and heating system for the IW comprising solar receivers, an absorption chiller, heat recovery exchanger, and circulation pump; (2) a bioDiesel fueled engine generator with heat recovery exchangers, one on the exhaust to provide steam and the other on the engine coolant to provide heated water; (3) a ventilation system including an enthalpy recovery wheel, an air based heat pump, an active desiccant wheel, and an air circulation fan; and (4) various convective and radiant cooling/heating units and ventilation air diffusers distributed throughout the IW. The goal of the ABETI/IWESS project is to demonstrate an energy supply system for a building space that will provide a healthy, comfortable environment for the occupants and that will reduce the quantity of energy consumed in the operation of a building space by a factor of 2 less than that of a conventional energy supply for power, cooling, heating, and ventilation based on utility power and natural gas fuel for heating.

03 NATURAL GAS↗

THE CO2 ABATEMENT POTENTIAL OF CALIFORNIA'S MID-SIZED COMMERCIAL BUILDINGS

The Ernest Orlando Lawrence Berkeley National Laboratory (LBNL) is working with the California Energy Commission (CEC) todetermine the potential role of commercial sector distributed generation (DG) with combined heat and power (CHP) capability deployment in greenhouse gas emissions (GHG) reductions. CHP applications at large industrial sites are well known, and a large share of their potential has already been harvested. In contrast, relatively little attention has been paid to the potential of medium-sized commercial buildings, i.e. ones with peak electric loads ranging from 100 kW to 5 MW. We examine how this sector might implement DG with CHP in cost minimizing microgrids that are able to adopt and operate various energy technologies, such as solar photovoltaics (PV), on-site thermal generation, heat exchangers, solar thermal collectors, absorption chillers, and storage systems. We apply a mixed-integer linear program (MILP) that minimizes a site?s annual energy costs as its objective. Using 138 representative mid-sized commercial sites in California (CA), existing tariffs of three major electricity distribution ultilities, and performance data of available technology in 2020, we find the GHG reduction potential for this CA commercial sector segment, which represents about 35percent of total statewide commercial sector sales. Under the assumptions made, in a reference case, this segment is estimated to be capable of economically installing 1.4 GW of CHP, 35percent of the California Air Resources Board (CARB) statewide 4 GW goal for total incremental CHP deployment by 2020. However, because CARB?s assumed utilization is far higher than is found by the MILP, the adopted CHP only contributes 19percent of the CO2 target. Several sensitivity runs were completed. One applies a simple feed-in tariff similar to net metering, and another includes a generous self-generation incentive program (SGIP) subsidy for fuel cells. The feed-in tariff proves ineffective at stimulating CHP deployment, while the SGIP buy down is more powerful. The attractiveness of CHP varies widely by climate zone and service territory, but in general, hotter inlandareas and San Diego are the more attractive regions because high cooling loads achieve higher equipment utilization. Additionally, large office buildings are surprisingly good hosts for CHP, so large office buildings in San Diego and hotter urban centers emerge as promising target hosts. Overall the effect on CO2 emissions is limited, never exceeding 27 percent of the CARB target. Nonetheless, results suggest that the CO2 emissions abatement potential of CHP in mid-sized CA buildings is significant, and much more promising than is typically assumed.

03 NATURAL GAS↗

SLUDGE BATCH 6/TANK 51 SIMULANT CHEMICAL PROCESS CELL SIMULATIONS

Qualification simulant testing was completed to determine appropriate processing conditions and assumptions for the Sludge Batch 6 (SB6) Shielded Cells demonstration of the DWPF flowsheet using the qualification sample from Tank 51 for SB6 after SRNL washing. It was found that an acid addition window of 105-139% of the DWPF acid equation (100-133% of the Koopman minimum acid equation) gave acceptable Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) results for nitrite destruction and hydrogen generation. Hydrogen generation occurred continuously after acid addition in three of the four tests. The three runs at 117%, 133%, and 150% stoichiometry (Koopman) were all still producing around 0.1 lb hydrogen/hr at DWPF scale after 42 hours of boiling in the SRAT. The 150% acid run reached 110% of the DWPF SRAT limit of 0.65 lb H{sub 2}/hr, and the 133% acid run reached 75% of the DWPF SME limit of 0.223 lb H{sub 2}/hr. Conversely, nitrous oxide generation was subdued compared to previous sludge batches, staying below 25 lb/hr in all four tests or about a fourth as much as in comparable SB4 testing. Two other processing issues were noted. First, incomplete mercury suspension impacted mercury stripping from the SRAT slurry. This led to higher SRAT product mercury concentrations than targeted (>0.45 wt% in the total solids). Associated with this issue was a general difficulty in quantifying the mass of mercury in the SRAT vessel as a function of time, especially as acid stoichiometry increased. About ten times more mercury was found after drying the 150% acid SME product to powder than was indicated by the SME product sample results. Significantly more mercury was also found in the 133% acid SME product samples than was found during the SRAT cycle sampling. It appears that mercury is segregating from the bulk slurry in the SRAT vessel, as mercury amalgam deposits for example, and is not being resuspended by the agitators. The second processing issue was significant ammonium ion formation as the acid stoichiometry was increased due to the high noble metal-high mercury feed conditions. Ammonium ion was found partitioned between the SRAT product slurry and the condensate from the lab-scale off-gas chiller downstream of the SRAT condenser. The ammonium ion was produced from nitrate ion by formic acid. Formate losses increased with increasing acid stoichiometry reaching 40% at the highest stoichiometry tested. About a third of the formate loss at higher acid stoichiometries appeared to be due to ammonia formation. The full extent of ammonia formation was not determined in these tests, since uncondensed ammonia vapor was not quantified; but total formation was bounded by the combined loss of nitrite and nitrate. Nitrate losses during ammonia formation led to nitrite-to-nitrate conversion values that were negative in three of the four tests. The negative results were an artifact of the calculation that assumes negligible SRAT nitrate losses. The sample data after acid addition indicated that some of the initial nitrite was converted to nitrate, so the amount of nitrate destroyed included nitrite converted to nitrate plus some of the added nitrate from the sludge and nitric acid. It is recommended that DWPF investigate the impact of SME product ammonium salts on melter performance (hydrogen, redox). It was recommended that the SB6 Shielded Cells qualification run be performed at 115% acid stoichiometry and allow about 35 hours of boiling for mercury stripping at the equivalent of a 5,000 lb/hr boil-up rate.

08 HYDROGEN↗