Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ccus”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Findings from the NETL Well Integrity Workshop: Insights for multiple subsurface energy operations

Wells are a core aspect of subsurface energy infrastructure. Ensuring the resilience of that infrastructure relies on the integrity of wells as engineered pathways that safely extract, inject, and store fluids in the subsurface. To identify areas where focused research can yield new insights to improve integrity and extend the operational life of wells, the United States (US) Department of Energys (DOE) National Energy Technology Laboratory (NETL) organized and hosted a workshop on well integrity research needs in May and June of 2021. The three-day workshop consisted of six technical sessions and 18 presentations from international well integrity experts on topics of geologic storage of carbon dioxide, natural gas, and hydrogen, as well as hydrocarbon and geothermal energy production. There were over 350 registrants from more than 10 countries, 4 major oil & gas companies, 14 US states, 8 US DOE National Laboratories, US Departments of Interior, Transportation, and Energy, and regulators from eight of ten US Environmental Protection Agency (EPA) regions and US EPA headquarters. Through presentations, moderated discussions, and an attendee survey several important areas for future research were identified. In this presentation, we highlight the findings of the NETL well integrity workshop and discuss future well integrity research needs.

carbon capture utilization and storage (CCUS)↗

FEED Study of Carbon Capture Inc. DAC and CarbonCure Utilization Using United States Steel's Gary Works Waste Plant

The University of Illinois Urbana-Champaign (UIUC) is spearheading a front-end engineering design (FEED) study of a Direct Air Capture and Utilization System (DACUS) that can remove 5,000 tonnes/yr net CO2 from ambient air, utilizing it in the production of concrete. The designed system, if built, would be larger than any currently existing DAC collector. Such carbon negative technologies are critical to meeting the goals of the DOE’s program to accelerate climate-critical technology. DAC is a promising new technology for reducing the greenhouse gas in the atmosphere but is expensive, partly due to the energy required to capture and then release CO2 during the process. By integrating CarbonCapture Technologies Inc. DAC collector at United States Steel's Gary Works and utilizing steel plant's waste heat, energy, and location so energy & transportation costs can be minimized. CarbonCapture has developed an innovative DAC system using novel adsorbents to cost- effectively capture CO2. The captured, liquified CO2 will be trucked to ready-mix concrete plants across Illinois, Indiana, & Wisconsin, where CarbonCure will inject it into concrete during the mixing process. The carbon dioxide reacts with concrete, mineralizing into calcium carbonate (CaCO3), sequestering the CO2 into the concrete, and reducing the amount of cement, the manufacturing of which is among the major sources of CO2 emissions. This FEED study demonstrates a full CO2 value chain for DACUS from industrial facilities. It also provided an opportunity to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice.

Carbon management, ccus, carbon capture, utilizati↗

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage technology has significant potential to reduce greenhouse gas emissions and mitigate the impact of climate change, particularly in hard-to-decarbonize industrial and commercial sectors. Unless utilization or storage occurs at the same location as carbon capture, which is rare, carbon must be transported from a point source to a utilization or storage site. Pipelines offer significant advantages for large-scale transportation of carbon dioxide over other methods. While studies show that reaching net-zero carbon emissions in the United States by 2050 will require between 29,000 and 66,000 miles of carbon pipelines, the U.S. had deployed fewer than 6,000 miles of carbon pipelines by 2022. Although closing this gap is important to achieving low-carbon goals, carbon pipelines operate in a complex and uncertain local, state and federal regulatory landscape and face public concerns about safety and siting. This report covers numerous regulatory issues surrounding carbon pipeline development, including the current narrow federal definition of carbon dioxide and the considerable variation in state and local governments’ laws and regulations. The report serves as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure

01 COAL, LIGNITE, AND PEAT↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) Milestone 3.4 Report: Complete Well Design and Drilling Plan

We are pleased to present the following materials, which serve as confirmation of the successful completion of Task 3.4 Complete Well Design and Drilling Plan Milestone, in accordance with the Project OASIS Project Management Plan. More specifically, the following provides confirmation of a team-wide call that was held on September 25, 2023, to discuss the CarbonSAFE Phase II drilling program, the well drilling prognosis, and an overview of risks associated with the program by category as well as probability and impact. A comprehensive Site-Specific Drilling Report will be provided to DOE-NETL 30 days after completion of drilling activities.

20 FOSSIL-FUELED POWER PLANTS↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) Milestone 6.0: Evaluation of Class VI Readiness

Introduction. Project OASIS is approximately 30 miles southeast of Birmingham, Alabama, and approximately 5 miles north-northwest of Alabama Power Company's Plant Gaston. Geologically, the Project area is in the Alabama fold and thrust belt province. This work builds on the initiatives of the Southeast Regional Carbon Utilization and Storage Acceleration Partnership (SECARB-USA, DE-FE0031830) that identified nearly 500 million metric tonnes of CO 2 emitted on an annual basis that is not collocated with prospective storage geology (the Coastal Plain of the Southeastern US in this context). This observation suggests costly investments in connective infrastructure (e.g., pipelines) or exploratory well drilling campaigns to identify CO 2 storage opportunities in under explored areas. While not traditionally thought of for saline storage, these studies suggest that storage prospects in the Valley and Ridge Province occur in relatively flat lying structural panels between thrust faults. For the Project OASIS region, available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The Project OASIS surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment. The purpose of drilling the Westover Stratigraphic Test Well #2 was to collect geologic data to model the feasibility of commercial scale CO 2 injection and storage in an under explored region. This initiative benefits the regions emitters as the data generated from this study can inform their own internal decision making. The field program included geological and geophysical evaluations, reservoir engineering analyses, and risk assessments. This report evaluates existing data, as well as a variety of modeling scenarios to evaluate project readiness. Importantly, the impact of this study is not limited to Alabama as there are numerous large emitters throughout Appalachia, in similar geologic settings, contemplating their decarbonization options.

20 FOSSIL-FUELED POWER PLANTS↗

CarbonSAFE Phase II: Optimizing Alabama’s CO 2 Storage in Shelby County, Alabama (Project OASIS), Milestone M3 - Site Specific Drilling Report

The Phase II Storage Complex Feasibility project, entitled "Optimizing Alabama's CO 2 Storage in Shelby County, Alabama (Project OASIS)," is a part of the DOE/NETL's CarbonSAFE initiative. The Project is managed by the Southern States Energy Board (SSEB), and includes participation from Advanced Resources International, Inc. (ARI), Crescent Resource Innovation, Southern Company, Alabama A&M University, Auburn University, and Oklahoma State University. Project OASIS is working to establish the foundation for a commercial-scale geologic storage complex for CO 2 captured from Plant Gaston (home of the National Carbon Capture Center) and surrounding industrial sources of CO 2 located in Shelby County, Alabama. The Project objectives are: • Demonstrate that the subsurface saline formations at the storage complex can store commercial volumes of CO 2 safely and permanently. • Develop a comprehensive Community Benefits Plan. • Develop the infrastructure framework for a CO 2 storage hub. • Develop a rigorous risk registry and to conduct a comprehensive risk assessment. • Develop a monitoring plan. • Develop a comprehensive site characterization plan to support an Underground Injection Control Class VI Permit in a future Phase III program. • Evaluate the commercial viability of the project. Project OASIS is about 30 miles southeast of Birmingham, Alabama within a geologic province called the Valley and Ridge (Figure 1.1). The Valley and Ridge Province comprises a sequence of Paleozoic carbonate and clastic rocks that underwent structural deformation during the Alleghanian Orogeny. Storage prospects occur in relatively flat lying structural panels located between thrust faults. Available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment. The purpose of drilling the Westover Stratigraphic Test Well #2 was to collect geologic data to model the feasibility of commercial scale CO 2 injection and storage. This includes geological and geophysical evaluations, reservoir engineering analyses, and risk assessments.

20 FOSSIL-FUELED POWER PLANTS↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 4.0 Deliverable – Geologic Analysis Report

Project OASIS (Optimizing Alabama’s CO 2 Storage in Shelby County) is a geologic and reservoir characterization study designed to evaluate deep saline formations for potential long-term carbon dioxide (CO 2 ) storage in central Alabama near the National Carbon Capture Center (NCCC) and Alabama Power’s Plant Gaston. The project centers on the Cambro-Ordovician Knox Group and underlying strata such as the Conasauga and Rome Formations, which were investigated through the drilling of two stratigraphic test wells to obtain electronic well logs, core, and sidewall core plugs. These data provide direct measurements of porosity, permeability, and lithologic variability critical for reservoir characterization. Complementing the well program, a limited 2D seismic survey was acquired to help select the site for Westover #2, and a more regional Seismic Exchange (SEI) seismic survey was licensed and interpreted to define structural and stratigraphic frameworks in a new Static Earth Model (SEM), map reservoir continuity, and identify potential sealing intervals. Integrated with geologic and reservoir modeling, these datasets form the basis for evaluating storage capacity, injectivity, and containment.

20 FOSSIL-FUELED POWER PLANTS↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS), Task 5.0 Deliverable: Infrastructure Assessment Report

The “Optimizing Alabama’s CO 2 Storage in Shelby County: Project OASIS” CarbonSAFE Phase II Project seeks to build on regional data sets that demonstrate that the subsurface within Shelby County, Alabama has the potential to store commercial volumes of CO 2 safely, permanently, and economically. This work builds on the initiatives of the Southeast Regional Carbon Utilization and Storage Acceleration Partnership (SECARB-USA, DE-FE0031830) that identified nearly 500 million metric tonnes of CO 2 emitted on an annual basis that is not collocated with prospective storage geology (the Coastal Plain of the Southeastern U.S. in this context). This observation suggests costly investments in connective infrastructure (e.g., pipelines) or exploratory well drilling campaigns to identify CO 2 storage opportunities in under explored areas. While not traditionally thought of for saline storage, these studies suggest that storage prospects in the Valley and Ridge Province occur in relatively flat lying structural panels between thrust faults. For the Project OASIS region, available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The Project OASIS surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment.

20 FOSSIL-FUELED POWER PLANTS↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 6.0 Deliverable – CarbonSAFE Phase III Readiness

The OASIS CarbonSAFE Phase II Project OASIS (Optimizing Alabama’s CO 2 Storage in Shelby County) is a geologic and reservoir characterization study designed to evaluate deep saline formations for potential long-term carbon dioxide (CO 2 ) storage in central Alabama near the National Carbon Capture Center (NCCC) and Alabama Power’s Plant Gaston. The project centers on understanding the potential of the Cambro-Ordovician Knox Group and underlying strata such as the Conasauga and Rome Formations for geologic storage of CO 2 . These formations were investigated as part of SECARB-USA (DE-FE0031830) and Project OASIS through the drilling of two stratigraphic test wells to obtain electronic well logs, core, and sidewall core plugs. These data provide direct measurements of porosity, permeability, and lithologic variability critical for reservoir characterization. Complementing the well program, a limited 2D seismic survey was conducted to help select the site for Westover #2 as part of SECARB-USA (DE-FE0031830), and a more regional Seismic Exchange (SEI) seismic survey was licensed and interpreted to define structural and stratigraphic frameworks in a new Static Earth Model (SEM), map reservoir continuity, and to identify potential sealing intervals. Integrated with geologic and reservoir modeling, these datasets form the basis for evaluating storage capacity, injectivity, and containment. While this document endeavors to provide readers with a high-level overview of Project OASIS activities and its suitability for subsequent CarbonSAFE Phases, such as a Phase III effort. Other project deliverables and milestones will provide more details on individual subjects.

20 FOSSIL-FUELED POWER PLANTS↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) - Deliverable Task 7: Risk Assessment

The “Optimizing Alabama’s CO 2 Storage in Shelby County: Project OASIS” CarbonSAFE Phase II Project seeks to build on regional data sets that demonstrate that the subsurface within Shelby County, Alabama has the potential to store commercial volumes of CO 2 safely, permanently, and economically. The primary target CO 2 Storage Complex is the deep Ketona Dolomite located within a 140 square mile area of the Valley and Ridge Region of Alabama. This deep saline reservoir is beneath a confining system encompassing at least 6,500 ft of shales and other low permeability sediments. Project OASIS drilled a deep stratigraphic test well to confirm the geological properties of the confining system and storage reservoir(s) within the Storage Complex. The geological data was incorporated into numerical models to establish the areal extent of the CO 2 plume and help design the storage site and its monitoring system. The project is managed by the Southern States Energy Board (SSEB), an interstate compact organization consisting of governors and state legislative leaders from sixteen southern states, Puerto Rico, and the U.S. Virgin Islands, as well as an appointee by the President of the United States. The organizational compact provides it with access to state government organizations and legislatures. The Board also maintains an Associate Members program comprised of energy resource companies, utilities, trade groups, academic R&D science and technology experts and energy consultants. Further, the SSEB staff is experienced in managing and coordinating complex energy and environmental programs, from research programs to full-scale design and demonstrations of new and innovative technologies. Project OASIS is a public-private partnership of six entities with multiple principal investigators (PIs). SSEB’s Lead PI and Co-PI are responsible for all aspects of project performance in accordance with the DOE-NETL Cooperative Agreement. SSEB has issued subgrants to Advanced Resources International, Inc., Alabama A&M University, Auburn University, Crescent Resource Innovation, and Oklahoma State University. Advanced Resources International, Inc., issued subgrants to Baker Hughes and Loudon Technical Services for field services

20 FOSSIL-FUELED POWER PLANTS↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 8 Deliverable 8.0 - Commercialization Plan

The “Optimizing Alabama’s CO 2 Storage in Shelby County: Project OASIS” CarbonSAFE Phase II Project seeks to build on regional data sets that demonstrate that the subsurface within Shelby County, Alabama has the potential to store commercial volumes of CO 2 safely, permanently, and economically. This work builds on the initiatives of the Southeast Regional Carbon Utilization and Storage Acceleration Partnership (SECARB-USA, DE-FE0031830) that identified nearly 500 million metric tonnes of CO 2 emitted on an annual basis from industrial facilities that are not collocated with prospective storage geology (i.e., the Coastal Plain of the Southeastern U.S. in this context). This observation suggests costly investments in connective infrastructure (e.g., pipelines) or exploratory well drilling campaigns are required to identify CO 2 storage opportunities in under-developed areas. While not traditionally thought of for saline storage, these studies suggest that storage prospects in the Valley and Ridge Province of the Appalachian Fold and Thrust Belt occur in relatively flat lying structural panels between thrust faults. For the Project OASIS region, available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale.

20 FOSSIL-FUELED POWER PLANTS↗

Illinois Basin Regional DAC Hub TA-1: Feasibility (Phase-0) (Final Scientific/Technical Report)

The overall objective of this project was to complete a feasibility study for a Regional Direct Air Capture (DAC) Hub that encompasses Illinois, Indiana, and Kentucky. The geographic construct of this hub was based on the Illinois Basin – a geological area where at least seven (7) geological storage studies were conducted. The Hub was designed to assure a capacity to capture, store, and utilize at least 1,000,000 metric tons (tonnes) of CO2 from the atmosphere annually 1 metric tonnes per annum (MTA), starting from an initial capacity of 200,000 tonnes of CO2 per annum (KTA). The Hub also included:(1) clean energy providers to supply renewable energy to the DAC units; (2) geological storage facilities to inject and sequestrate the captured CO2; (3) CO2 utilization facilities that would uptake the captured CO2 and convert it into products; and (4) small business organizations that would assist in workforce development efforts for the region. This closeout report consolidates the tasks undertaken and accomplished as deliverables for the project. The project team had successfully completed all required tasks of phase 0a, confirming that the project is feasible based on the preliminary conceptual designs and operational requirements of the DAC systems. Of particular interest, the hub ownership structure was identified and was implemented in follow on projects that would transition the hub infrastructure to a build/operate phase.

36 MATERIALS SCIENCE↗

Colorado (Pueblo) Regional DAC Hub TA-1: Feasibility (Phase 0a) (Final Technical Report)

This project supports the U.S. Department of Energy's (DOE) mission to reduce the environmental and climate impacts of fossil fuels and industrial processes, contributing to the goal of achieving net-zero emissions across the U.S. economy. The primary objective is to conduct a feasibility study for a Regional Direct Air Capture (DAC) Hub in the Southern Colorado region, northeast of Pueblo. The geographic construct of this hub is based on the Denver-Julesburg Basin – a geological area where a significant number of geological storage studies have been conducted (See Figure 1). The project will leverage the work of Project Eos, a CarbonSAFE Phase III study led by the Colorado School of Mines and CarbonAmerica. The DAC Hub aims to capture, store, and/or utilize at least 1,000,000 tonnes of CO 2 from the atmosphere annually. To achieve this, the project team is designing a system with an initial capacity of 100,000 tonnes per year. This feasibility-stage project will formulate the Regional DAC Hub concept and team to conduct the relevant analysis, networking and community stakeholder engagement necessary to advance the project to the design stage.

42 ENGINEERING↗