Scoping Thermal Response Calculations of RNS Waste During Transport to and Disposal at the WIPP

Sandia National Laboratories (SNL) was contracted by the United States Department of Energy Environmental Management (DOE-EM), Los Alamos Field Office to perform mechanical and thermal scoping calculations as part of a study seeking to understand the ignitability risk of the Remediated Nitrate Salts (RNS) waste drums during transportation from the Waste Control Specialists (WCS) facility to Waste Isolation Pilot Plant (WIPP) and permanent disposal of the waste at WIPP. The scoping thermal simulations described in this report pertain to thermal calculations performed with a packaging system consisting of one Standard Waste Box (SWB) loaded with drums placed inside a Standard Large Box 2 (SLB2). During transportation, the SLB2 is inside Transuranic Package Transporter Model III (TRUPACT-III), which provides the third layer of the packaging. Once at the WIPP, it is assumed the SLB2 is extracted from the TRUPACT-III and maintained above ground, and then subsequently placed underground for permanent disposal. In these proposed configurations, the space between the SLB2 and the SWB is always filled by a layer of insulation consisting of air-filled glass microbubbles except for the bottom which rests directly on the SLB2. The thermal scoping calculations described in this report specifically address whether the introduction of external heat inputs, combined with the contributions from the internally generated radiolytic decay heat and chemical reactions, lead to an unstable thermal state during the time of its movement and placement in the permanent disposal location. The external heat inputs are of two forms: 1) ambient thermal irradiation (e.g., solar and ambient storage/disposal temperatures) and 2) accident-induced fire. Three scoping calculation scenarios were derived as representative, conservative scenarios: 1A) TRUPACT-III transient transportation, 1B) SLB2 48-hour outdoor storage with solar radiation, and 2) fully-engulfing fire during SLB2 handling or emplacement following a steady-state analysis in a 38 °C environment. All the simulated scenarios are conservative relative to the operational conditions expected for handling the waste package during transportation and placement in the WIPP underground disposal unit. The predictions obtained from simulating the three exposure scenarios revealed that adding the SLB2 and the air-filled glass microbubbles to the transport and storage/disposal configurations provides additional thermal protection of the drums beyond what the SWB provides alone, both during long-term above ground insolation and underground during a fire accident. Under the current transportation/storage/disposal concepts, the degree of protection provided by the packaging concept is sufficient to prevent the waste from being ignitable. The simulation results demonstrate that there is adequate margin to safely transport and place the RNS waste from WCS to the WIPP under the current operational concept.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Transuranic Waste Inventory Report – 2015 (Data Cutoff Date 12/31/2014)

The purpose of this Annual Transuranic Waste Inventory Report – 2015 (ATWIR-2015) is to document the updated inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites as of December 31, 2014. This updated inventory information is provided to the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and is available to the DOE TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, supports DOE/CBFO’s input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act analyses), the development of new containers or shipping packages, planned change requests, and other design changes that may take place in the repository. Furthermore, if requested by DOE/CBFO, this report will provide the basis for the Performance Assessment Inventory Report for performance assessment modeling. This report focuses on the TRU waste stored or projected to be generated (up through calendar year [CY] 2033) at the TRU waste generator sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Transuranic Waste Inventory Report – 2016 (Data Cutoff Date 12/31/2015)

The purpose of this Annual Transuranic Waste Inventory Report – 2016 (ATWIR-2016), using a cutoff date of December 31, 2015, is to document the updated inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites in the Annual Transuranic Waste Inventory Report – 2015 (ATWIR-2015) (DOE 2015a) that had a cutoff date of December 31, 2014. This updated inventory information is provided to the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and is available to the DOE TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, and supports DOE/CBFO’s input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act analyses), the development of new containers or shipping packages, planned change requests, and other design changes that may take place in the repository. Furthermore, if requested by DOE/CBFO, this report will provide the basis for the Performance Assessment Inventory Report for performance assessment (PA) modeling. This report focuses on the TRU waste stored or projected to be generated (up through calendar year [CY] 2050) at the TRU waste generator sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Transuranic Waste Inventory Report – 2018 (Data Cutoff Date 12/31/2017)

The purpose of this Annual Transuranic Waste Inventory Report – 2018 (ATWIR-2018) is to document the inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites as of December 31, 2017. This report also notes major changes to the inventory used for the Annual Transuranic Waste Inventory Report – 2017 (ATWIR-2017) (U.S. DOE 2017a) that had a cutoff date of December 31, 2016. This updated inventory information is provided to the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) and is available to the DOE TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, and supports DOE/CBFO’s input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act analyses), planned changes, and other design changes that may take place in the repository. The DOE/CBFO has determined this report will provide the basis for the Performance Assessment Inventory Report for development of the 2019 Compliance Recertification Application (CRA) deferred performance assessment (PA) (Shrader 2018).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Transuranic Waste Inventory Report – 2020 (Data Cutoff Date 12/31/2019)

The purpose of this Annual Transuranic Waste Inventory Report (ATWIR) – 2020 is to document the inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites as of December 31, 2019. This report also notes major changes to the inventory used for the ATWIR-2019 that had a data cutoff date of December 31, 2018. This updated inventory information is available to the U.S. Department of Energy (DOE) TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, and supports the DOE Carlsbad Field Office (CBFO) input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act analyses), planned changes, and other design changes as needed for the WIPP project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Transuranic Waste Inventory Report – 2021 (Data Cutoff Date 12/31/2020)

The purpose of this Annual Transuranic Waste Inventory Report (ATWIR) – 2021 is to document the inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites as of December 31, 2020. This report also notes major changes to the inventory used for the ATWIR-2020 that had a data cutoff date of December 31, 2019. This updated inventory information is available to the U.S. Department of Energy (DOE) TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, and supports the DOE Carlsbad Field Office (CBFO) input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act analyses), planned changes, and other design changes as needed for the WIPP project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Transuranic Waste Inventory Report – 2022 (Data Cutoff Date 12/31/2021)

The purpose of this Annual Transuranic Waste Inventory Report (ATWIR) – 2022 is to document the inventory estimate of transuranic (TRU) waste reported by the TRU waste generator sites as of December 31, 2021. This report also notes major changes to the inventory since the ATWIR-2021, which had a data cutoff date of December 31, 2020. This updated inventory information is available to the U.S. Department of Energy (DOE) TRU waste complex, Waste Isolation Pilot Plant (WIPP) stakeholders, and regulators. The TRU waste inventory information is used for strategic planning, and supports the DOE Carlsbad Field Office (CBFO) input into documents (e.g., WIPP Documented Safety Analysis and National Environmental Policy Act evaluations), performance assessments, planned changes, and other design changes as needed for the WIPP project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Past Approaches for Spent Nuclear Fuel, High-Level, and Transuranic Waste Disposal in the United States—Part 1: Safety Criteria and Treatment of Uncertainty

The United States (US), with its 50-year experience in developing deep geologic disposal for transuranic waste, spent nuclear fuel (SNF), and high-level radioactive waste (HLW), has much to share with other countries. Yet, other countries are better able to translate the US experience and corresponding policy decisions into solutions sensible for their country when they understand the compliance requirements in US laws and regulations. This paper presents past approaches in the generic and site-specific standards of the US Environmental Protection Agency (EPA) and implementing regulations of the US Nuclear Regulatory Commission (NRC) using the framework provided by (1) key questions of the Blue Ribbon Commission on America’s Nuclear Future, and (2) international consensus standards. Both the 1985 EPA generic standards, as updated in 1993 and applied at the operating Waste Isolation Pilot Plant in southern New Mexico for transuranic waste from atomic energy defense activities, and the EPA 2008 site-specific standards and implementing regulations, as applied at the proposed Yucca Mountain repository in southern Nevada for SNF and HLW, adopt the strategy of using quantitative, probabilistic analysis to assess performance and compliance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PUBLIC AND REGULATORY ACCEPTANCE OF BLENDING OF RADIOACTIVE WASTE VS DILUTION

On April 21, 2009, the Energy Facilities Contractors Group (EFCOG) Waste Management Working Group (WMWG) provided a recommendation to the Department of Energy's Environmental Management program (DOE-EM) concerning supplemental guidance on blending methodologies to use to classify waste forms to determine if the waste form meets the definition of Transuranic (TRU) Waste or can be classified as Low-Level Waste (LLW). The guidance provides specific examples and methods to allow DOE and its Contractors to properly classify waste forms while reducing the generation of TRU wastes. TRU wastes are much more expensive to characterize at the generator's facilities, ship, and then dispose at the Waste Isolation Pilot Plant (WIPP) than Low-Level Radioactive Waste's disposal. Also the reduction of handling and packaging of LLW is inherently less hazardous to the nuclear workforce. Therefore, it is important to perform the characterization properly, but in a manner that minimizes the generation of TRU wastes if at all possible. In fact, the generation of additional volumes of radioactive wastes under the ARRA programs, this recommendation should improve the cost effective implementation of DOE requirements while properly protecting human health and the environment. This paper will describe how the message of appropriate, less expensive, less hazardous blending of radioactive waste is the 'right' thing to do in many cases, but can be confused with inappropriate 'dilution' that is frowned upon by regulators and stakeholders in the public. A proposal will be made in this paper on how to communicate this very complex and confusing technical issue to regulatory bodies and interested stakeholders to gain understanding and approval of the concept. The results of application of the proposed communication method and attempt to change the regulatory requirements in this area will be discussed including efforts by DOE and the NRC on this very complex subject.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE Office of Environmental Management, 2017 Year in Review

In 2017, the Office of Environmental Management (EM) made significant accomplishments across the entire DOE complex. At the Waste Isolation Pilot Plant (WIPP) which reopened early this year, waste replacement was resumed and the 12,000th shipment to date of transuranic (TRU) waste for safe permanent disposal was received. At Los Alamos National Laboratory, workers safely and successfully completed treatment of a set of remediated nitrate salt drums - one of the most dangerous waste streams in EM - to prepare them for disposal at WIPP. Oak Ridge broke ground on the Mercury Treatment Facility, which will enable EM to carry out additional cleanup activities at the Y-12 National Security Complex. Information on these and other EM sites is provided in this Annual Report. The focus on more efficient decision-making has resulted in complex-wide improvements. This approach has served as a catalyst for progress at EM sites, leading to more opportunities to reduce the greatest amount of risk possible with the resources available. The benefits will only increase as EM finalizes more decisions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Repackaging of High Fissile TRU Waste at the Transuranic Waste Processing Center - 13240

Twenty-six drums of high fissile transuranic (TRU) waste from Oak Ridge National Laboratory (ORNL) operations were declared waste in the mid-1980's and placed in storage with the legacy TRU waste inventory for future treatment and disposal at the Waste Isolation Pilot Plant (WIPP). Repackaging and treatment of the waste at the TRU Waste Packaging Center (TWPC) will require the installation of additional equipment and capabilities to address the hazards for handling and repackaging the waste compared to typical Contact Handled (CH) TRU waste that is processed at the TWPC, including potential hydrogen accumulation in legacy 6M/2R packaging configurations, potential presence of reactive plutonium hydrides, and significant low energy gamma radiation dose rates. All of the waste is anticipated to be repackaged at the TWPC and certified for disposal at WIPP. The waste is currently packaged in multiple layers of containers which presents additional challenges for repackaging activities due to the potential for the accumulation of hydrogen gas in the container headspace in quantities than could exceed the Lower Flammability Limit (LFL). The outer container for each waste package is a stainless steel 0.21 m{sup 3} (55-gal) drum which contains either a 0.04 m{sup 3} or 0.06 m{sup 3} (10-gal or 15-gal) 6M drum. The inner 2R container in each 6M drum is ∼12 cm (5 in) outside diameter x 30-36 cm (12-14 in) long and is considered to be a > 4 liter sealed container relative to TRU waste packaging criteria. Inside the 2R containers are multiple configurations of food pack cans, pipe nipples, and welded capsules. The waste contains significant quantities of high burn-up plutonium oxides and metals with a heavy weight percentage of higher atomic mass isotopes and the subsequent in-growth of significant quantities of americium. Significant low energy gamma radiation is expected to be present due to the americium in-growth. Radiation dose rates on inner containers are estimated to be 1-3 mSv/hr (100-300 mrem/hr) with an unshielded dose rate on the waste itself of over 10 mSv/hr (1 rem/hr). Additional equipment to be installed at the TWPC will include a new perma-con enclosure and a shielded/inert glovebox in the process building to repackage and stabilize the waste. All of the waste will be repackaged into Standard Pipe Overpacks. Most of the waste (21 of the 26 drums) is expected to be repackaged at the food-pack can level (i.e. the food-pack cans will not be opened). Five of the incoming waste containers are expected to be repackaged at the primary waste level. Three of the containers exceed the 200 gram Pu-239 Fissile Gram Equivalent (FGE) limit for the Standard Pipe Overpack. These three containers will be repackaged down to the primary waste level and divided into eight Standard Pipe Overpacks for shipment to WIPP. Two containers must be stabilized to eliminate any reactive plutonium hydrides that may be present. These containers will be opened in the inert, shielded glovebox, and the remaining corroded plutonium metal converted to a stable oxide form by using a 600 deg. C tube furnace with controlled oxygen feed in a helium carrier gas. The stabilized waste will then be packaged into two Standard Pipe Overpacks. Design and build out activities for the additional repackaging capabilities at the TWPC are scheduled to begin in Fiscal Year 2013 with repackaging, stabilization, and certification activities scheduled to begin in Fiscal Year 2014. Following repackaging and stabilization activities, the Standard Pipe Overpacks will be certified for disposal at WIPP utilizing Non-Destructive Examination (NDE) to verify the absence of prohibited items and Non-Destructive Assay (NDA) to verify the isotopic content under the TWPC WIPP certification program implemented by the Central Characterization Project (CCP). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TRU waste inventory collection and work-off plans for the centralization of TRU waste characterization at INL - on your mark - get set - 9410

The U.S. Department of Energy (DOE) amended the Record of Decision (ROD) for the Waste Management Program: Treatment and Storage ofTransuranic Waste to centralize transuranic (TRU) waste characterization/certification from fourteen TRU waste sites. This centralization will allow for treatment, characterization and certification ofTRU waste from the fourteen sites, thirteen of which are sites with small quantities ofTRU waste, at the Idaho National Laboratory (INL) prior to shipping the waste to the Waste Isolation Pilot Plant (WIPP) for disposal. Centralization ofthis TRU waste will avoid the cost ofbuilding treatment, characterization, certification, and shipping capabilities at each ofthe small quantity sites that currently do not have existing facilities. Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Nuclear Technology and Engineering Center (INTEC) will provide centralized shipping facilities, to WIPP, for all ofthe small quantity sites. Hanford, the one large quantity site identified in the ROD, has a large number ofwaste in containers that are overpacked into larger containers which are inefficient for shipment to and disposal at WIPP. The AMWTP at the INL will reduce the volume ofmuch of the CH waste and make it much more efficient to ship and dispose of at WIPP. In addition, the INTEC has a certified remote handled (RH) TRU waste characterization/certification program at INL to disposition TRU waste from the sites identified in the ROD.

54 ENVIRONMENTAL SCIENCES↗

WIPP missionMoment

The video commemorates the ten-year anniversary of the Waste Isolation Pilot Plant (WIPP) and its first shipment of waste to the site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiscal Year 2010 Well Plugging and Abandonment Reconfiguration Program Description for WIPP Wells 25 and H-4b

This work plan describes an addendum to the program for plugging and abandonment (P&A) or reconfiguration of groundwater monitoring wells at the Waste Isolation Pilot Plant (WIPP) for fiscal year 2009. The addendum adds work scope to the previously developed program plan (DOE/WIPP-08-3376, Fiscal Year 2008 Well Plugging and Abandonment and Reconfiguration Program). Over the years, a number of wells have been installed to monitor temporal and spatial changes in groundwater elevation and chemistry. Many of the wells used for this purpose were cased with carbon steel pipe that has deteriorated to varying degrees. For some wells, the integrity has failed and they must be either reconfigured or completely plugged, according to regulatory requirements, to prevent possible commingling of water from different water bearing formations. Others are nearing the end of their useful life and/or are no longer needed for monitoring. This work plan presents the field activities and objectives, requisite documentation, project organization, and project team roles and responsibilities. Work described in this plan will be performed by a New Mexico licensed drilling contractor. The term "Contractor" refers to the driller, who will be supervised by the Site Technical Representative (STR) or designee. This Contractor will arrange lower-tier subcontracts, to include geophysics, tool rental, and waste containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiscal Year 2010 Well Plugging and Abandonment Reconfiguration Program Description Addendum

This work plan describes an addendum to the program for plugging and abandonment (P&A) or reconfiguration of groundwater monitoring wells at the Waste Isolation Pilot Plant (WIPP) facility for fiscal year 2010. The addendum adds work scope to the previously developed program plan (DOE/WIPP 08-3376). Over the years a number of wells have been installed to monitor temporal and spatial changes in groundwater elevation and chemistry. Many of the wells used for this purpose were cased with carbon steel pipe that has deteriorated to varying degrees. For some wells, the integrity has failed and they must be either reconfigured or completely plugged, according to regulatory requirements, to prevent possible commingling of water from different water bearing formations. Others are nearing the end of their useful life and/or are no longer needed for monitoring. This work plan presents the field activities and objectives, requisite documentation, project organization, and project team roles and responsibilities. Work described in this plan will be performed by a New Mexico well drilling contractor holding a valid and current well driller license. The term "Contractor" refers to the licensed well driller and /or registered drill rig supervisor assigned by the well drilling contractor, who will be directed by the WIPP Subcontract Technical Representative (STR) or designee at the drilling site. This Contractor will arrange lower-tier subcontracts, to include geophysics, tool rental, and waste containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geotechnical Analysis Report for July 2008-June 2009

This Geotechnical Analysis Report (GAR) presents and interprets geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2008, to June 30, 2009. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and hole observations. Chapter 8 summarizes the results of geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists references.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geotechnical Analysis Report for July 2007-June 2008

This Geotechnical Analysis Report (GAR) presents and interprets geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2007, to June 30, 2008. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and hole observations. Chapter 8 summarizes the results of geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists references.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Program Guidance (Rev. 3.1)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the Remote-Handled Transuranic (RH-TRU) 72-B Waste Shipping Package (also known as the "RH-TRU 72-B") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states, "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "…each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Department of Energy Carlsbad Field Office or the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliances," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.