Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WIND PERFORMANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Techbelt Energy Innovation Center

This project consisted of three main components 1) The primary goal of the project was to renovate and upgrade an existing commercial building to the highest possible environmentally sustainable level for the purpose of creating an energy incubator. This initiative was part of the Infrastructure Technologies Program, through which a sustainable energy demonstration facility was to be created and used as a research and community outreach base for sustainable energy product and process incubation; 2) In addition, fundamental energy related research on wind energy was performed; a shrouded wind turbine on the Youngstown State University campus was commissioned; and educational initiatives were implemented; and 3) The project also included an education and outreach component to inform and educate the public in sustainable energy production and career opportunities. Youngstown State University and the Tech Belt Energy Innovation Center (TBEIC) renovated a 37,000 square foot urban building which is now being used as a research and development hub for the region’s energy technology innovation industry. The building houses basic research facilities and business development in an incubator format. In addition, the TBEIC performs community outreach and education initiatives in advanced and sustainable energy. The building is linked to a back warehouse which will eventually be used as a build-out for energy laboratory facilities. The projects research component investigated shrouded wind turbines, and specifically the “Windcube” which was renamed the “Wind Sphere” during the course of the project. There was a specific focus on the development in the theory of shrouded wind turbines. The goal of this work was to increase the potential efficiency of wind turbines by improving the lift and drag characteristics. The work included computational modeling, scale models and full-sized design and construction of a test turbine. The full-sized turbine was built on the YSU campus as a grid-tie system that supplies the YSU research facility. Electrical power meters and weather monitors were installed to record the power generated and aid in continued study. In addition, an education/outreach component to help elicit creative engineering and design from amongst area students, faculty, entrepreneurs, and small business in the energy related fields was performed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The relationship of an integral wind shear hazard to aircraft performance limitations

The development and certification of airborne forward-looking wind shear detection systems has required a hazard definition stated in terms of sensor observable wind field characteristics. This paper outlines the definition of the F-factor wind shear hazard index and an average F-factor quantity, calculated over a specified averaging interval, which may be used to judge an aircraft's potential performance loss due to a given wind shear field. A technique for estimating airplane energy changes during a wind shear encounter is presented and used to determine the wind shear intensity, as a function of the averaging interval, that presents significant hazard to transport category airplanes. The wind shear hazard levels are compared to averaged F-factor values at various averaging intervals for four actual wind shear encounters. Results indicate that averaging intervals of about one kilometer could be used in a simple method to discern hazardous shears.

Lewis, M. S.↗

Systems Performance Analyses of Alaska Wind-Diesel Projects; Kasigluk, Alaska (Fact Sheet)

This fact sheet summarizes a systems performance analysis of the wind-diesel project in Kasigluk, Alaska. Data provided for this project include community load data, average wind turbine output, average diesel plant output, thermal load data, average net capacity factor, average net wind penetration, estimated fuel savings, and wind system availability.

17 WIND ENERGY↗

2018 Wind Technologies Market Report

The U.S. Department of Energy (DOE)’s Wind Technologies Market Report provides an annual overview of trends in the U.S. wind power market. Highlights of this year’s report include: ~Wind power capacity additions continued at a robust pace in 2018: $11 billion was invested in new wind power plants in 2018. In 2018, wind energy contributed 6.5% of the nation’s electricity supply, more than 10% of total electricity generation in fourteen states, and more than 30% in three of those states—Kansas, Iowa, and Oklahoma. 232 gigawatts of wind are seeking transmission interconnection, 2% of which represents proposed wind plants paired with storage. ~Bigger turbines are enhancing wind project performance: Increased blade lengths have dramatically increased wind project capacity factors, one measure of project performance, and taller towers are on the horizon. The average 2018 capacity factor among projects built from 2014 through 2017 was 42%, compared to an average of 31% among projects built from 2004 to 2011 and 24% among projects built from 1998 to 2001. Low wind turbine pricing continues to push down installed project costs: Wind turbine prices have fallen to $700–$900/kW. The average installed cost of wind projects in 2018 was $1,470/kW, down 40 percent since the peak in 2009 and 2010. ~Wind energy prices are at historical lows: After topping out at 7¢/kWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped to below 2¢/kWh—though this nationwide average is dominated by projects that hail from the lowest-priced Interior region of the country. These prices, which are possible in part due to federal tax support, compare favorably to the projected future fuel costs of gas-fired generation. Solar PPA prices have declined precipitously, pressuring wind’s competitive position. ~The grid-system value of wind has declined over the last decade, but rebounded over the last two years. The value of wind in wholesale power markets is impacted by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind in 2018 was the lowest in the Southwest Power Pool and Texas (average of $17/MWh and $18/MWh, respectively) whereas the highest-value market was New England (at $41/MWh). Wind energy prices are generally competitive with these value estimates. ~The domestic supply chain for wind equipment is diverse: For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>90%), towers (75-90%), and blades and hubs (50-70%), but is much lower (<20%) for most components internal to the nacelle. Wind sector employment reached a new high of more than 114,000 full-time workers at the end of 2018. ~Continued strong growth in wind capacity is anticipated in the near term: With federal tax incentives still available, various forecasts for the domestic market show expected wind power capacity additions of 9,000-12,000 MW in 2019 and 11,000-15,000 in 2020, with market contraction anticipated beginning in 2021 as those tax incentives are phased out.

17 WIND ENERGY↗

2017 Wind Technologies Market Report

The U.S. Department of Energy (DOE)’s Wind Technologies Market Report provides an annual overview of trends in the U.S. wind power market. Highlights of this year’s report include: -Wind power capacity additions continued at a rapid pace in 2017: $11 billion was invested in new wind power plants in 2017. In 2017, wind energy contributed 6.3% of the nation’s electricity supply, more than 10% of total electricity generation in fourteen states, and more than 30% in four of those states—Iowa, Kansas, Oklahoma, and South Dakota. -Bigger turbines are enhancing wind project performance: Increased blade lengths have dramatically increased wind project capacity factors, one measure of project performance, and taller towers appear to be on the horizon. The average 2017 capacity factor among projects built from 2014 through 2016 was 42%, compared to an average of 31.5% among projects built from 2004 to 2011 and 23.5% among projects built from 1998 to 2001. -Low wind turbine pricing continues to push down installed project costs: Wind turbine prices have fallen from their highs in 2008 to $750–$950/kW. Overall, the average installed cost of wind projects in 2017 was $1,610/kW, down $795/kW from the peak in 2009 and 2010. -Wind energy prices remain low: After topping out at 7¢/kWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped to around 2¢/kWh—though this nationwide average is dominated by projects that hail from the lowest-priced Interior region of the country (such as Oklahoma, Nebraska, Kansas). These prices, which are possible in part due to federal tax support, compare favorably to the projected future fuel costs of gas-fired generation. -The domestic supply chain for wind equipment is diverse: Wind sector employment reached a new high of more than 105,000 full-time workers at the end of 2017. For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>90%), towers (70-90%), and blades and hubs (50-70%), but is much lower (<20%) for most components internal to the turbine. -Continued strong growth in wind capacity is anticipated in the near term: With federal tax incentives still available, various forecasts for the domestic market show expected wind power capacity additions of 8,000 to 11,000 MW/year from 2018 to 2020, with market contraction anticipated beginning in 2021 as those tax incentives are phased out.

17 WIND ENERGY↗

Automated Post-Mold Operations for Wind Blade Manufacturing

Three post-mold operations performed in wind blade manufacturing include: trimming, to remove excess flashing; grinding, to shape the leading edge; and sanding, to prepare the are for bonding of over-lamination or paint. This work focuses on automating these three operations. Each operation scans the blade to build a point cloud, plans a tool path for the operation, and executes the toolpath using an industrial robot arm. The results are analyzed to determine the operational speed and the finish quality.

advanced manufacturing↗

Systems Performance Analyses of Alaska Wind-Diesel Projects; Toksook Bay, Alaska (Fact Sheet)

This fact sheet summarizes a systems performance analysis of the wind-diesel project in Toksook Bay, Alaska. Data provided for this project include community load data, average wind turbine output, average diesel plant output, thermal load data, average net capacity factor, optimal net capacity factor based on Alaska Energy Authority wind data, average net wind penetration, estimated fuel savings, and wind system availability.

17 WIND ENERGY↗

Flexible PCB Windings Size Optimization for Winding AC Resistance Minimization Under the Sinusoidal Voltage Regime

In this paper, optimization of the winding AC resistance of the flexible printed circuit board (FPCB) wire windings is performed. A one-dimensional model of the FPCB winding is introduced and an equation for the FPCB winding AC resistance and its low and medium frequency approximation are derived. The approximate FPCB winding AC resistance equation is used to derive optimum thickness of the FPCB winding conductor thickness at which minimum of winding AC resistance (global optimum) is achieved. The Finite Element Method analysis and experimental verification of derived equations (winding resistance, impedance, power loss, and temperature measurements) is performed in order validate derived model and winding resistance equation.

42 ENGINEERING↗

Power Performance Test Report for the SWIFT Wind Turbine

This report summarizes the results of a power performance test that NREL conducted on the SWIFT wind turbine. This test was conducted in accordance with the International Electrotechnical Commission's (IEC) standard, Wind Turbine Generator Systems Part 12: Power Performance Measurements of Electricity Producing Wind Turbines, IEC 61400-12-1 Ed.1.0, 2005-12. However, because the SWIFT is a small turbine as defined by IEC, NREL also followed Annex H that applies to small wind turbines. In these summary results, wind speed is normalized to sea-level air density.

17 WIND ENERGY↗

Altitude-Wind-Tunnel Investigation of Performance of Several Propellers on YP-47M Airplane at High Blade Loadings V - Curtiss 836-14C2-18R1 Four-Blade Propeller

An investigation of the performance of several propellers on the YP-47M airplane at high blade loadings has been conducted in the Cleveland altitude wind tunnel at the request of the Air Materiel Command, Army Air Forces. As part of the program, a study was made of a Curtiss 836-14C2-18R1 four-blade propeller. The investigation was made for a range of power coefficients from 0.10 to 1.00 at free-stream Mach numbers of 0.30, 0.40, and 0.50 for density altitudes from 10,000 to 45,000 feet, engine powers from 150 to 2500 brake horsepower, and for engine speeds from 1000 to 2900 rpm. The propeller efficiencies were obtained from force measurements and the blade thrust load distribution was obtained by two diametrically opposed slipstream survey rakes shown in this paper.

Saari, Martin J.↗

Systems Performance Analyses of Alaska Wind-Diesel Projects; St. Paul, Alaska (Fact Sheet)

This fact sheet summarizes a systems performance analysis of the wind-diesel project in St. Paul, Alaska. Data provided for this project include load data, average wind turbine output, average diesel plant output, dump (controlling) load, average net capacity factor, average net wind penetration, estimated fuel savings, and wind system availability.

17 WIND ENERGY↗

The development of CACTUS : a wind and marine turbine performance simulation code.

CACTUS (Code for Axial and Cross-flow TUrbine Simulation) is a turbine performance simulation code, based on a free wake vortex method, under development at Sandia National Laboratories (SNL) as part of a Department of Energy program to study marine hydrokinetic (MHK) devices. The current effort builds upon work previously done at SNL in the area of vertical axis wind turbine simulation, and aims to add models to handle generic device geometry and physical models specific to the marine environment. An overview of the current state of the project and validation effort is provided.

17 WIND ENERGY↗

Assess Floating Offshore Wind Energy Costs and Performance - FLOWIN Voucher: Cooperative Research and Development Final Report, CRADA Number CRD-23-23792

In support of the FLOWIN Phase One Winner Voucher Utilization, NREL will assist with assessing floating offshore wind energy installation logistics and costs for several sites using the floating substructure design developed by the University of Maine. This will help inform understanding of floating offshore wind energy technology cost drivers.

17 WIND ENERGY↗

Impact of Ultra-Conducting Winding on the Power Density and Performance of Non-Heavy Rare Earth Traction Motors

The emergence of carbon nanotube-copper composite conductors has opened a new degree of freedom in the electric machine design to improve the machine's performance: the conductivity of the winding. The goal of the present study is: 1) to determine how much improvement in power per unit volume and performance can be achieved with the increase in winding conductivity; and 2) to investigate any physical limitations on the effectiveness of this degree of freedom in improving the power per unit volume and performance of electric traction motors. Conventional electric motor topologies affected by ferromagnetic saturation as well as slotless topology that is not affected by saturation are analyzed. It was found that the ferromagnetic saturation of the lamination materials reduces the effectiveness of highly conductive winding in improving the power per unit volume. For machine topologies that are not affected by ferromagnetic saturation, the power density improvement reaches the theoretical expectation. In both cases, highly conductive winding improves the efficiency map by enlarging high efficiency operating area into light load as well as high speed operations.

Raminosoa, Tsarafidy↗

IEA Wind Task 26. Wind Technology, Cost and Performance Trends in Denmark, Germany, Ireland, Norway, the European Union, and the United States. 2007 - 2012

This report builds from a similar previous analysis (Schwabe et al., 2011) exploring the differences in cost of wind energy in 2008 among countries participating in IEA Wind Task 26 at that time. The levelized cost of energy (LCOE) is a widely recognized metric for understanding how technology, capital investment, operations, and financing impact the life-cycle cost of building and operating a wind plant. Schwabe et al. (2011) apply a spreadsheet-based cash flow model developed by the Energy Research Centre of the Netherlands (ECN) to estimate LCOE. This model is a detailed, discounted cash flow model used to represent the various cost structures in each of the participating countries from the perspective of a financial investor in a domestic wind energy project. This model is used for the present analysis as well, and comparisons are made for those countries who contributed to both reports, Denmark, Germany, and the United States.

17 WIND ENERGY↗

Technology, Performance, and Market Report of Wind-Diesel Applications for Remote and Island Communities: Preprint

This paper describes the current status of wind-diesel technology and its applications, the current research activities, and the remaining system technical and commercial challenges. System architectures, dispatch strategies, and operating experience from a variety of wind-diesel systems will be discussed, as well as how recent development to explore distributed energy generation solutions for wind generation can benefit from the performance experience of operating systems. The paper also includes a detailed discussion of the performance of wind-diesel applications in Alaska, where 10 wind-diesel stations are operating and additional systems are currently being implemented. Additionally, because this application represents an international opportunity, a community of interest committed to sharing technical and operating developments is being formed. The authors hope to encourage this expansion while allowing communities and nations to investigate the wind-diesel option for reducing their dependence on diesel-driven energy sources.

02 PETROLEUM↗