Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Upgrade”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Optical damage considerations in the design of the matter in extreme condition upgrade (MEC-U) laser systems

The Matter in Extreme Conditions Upgrade (MEC-U) project is a major upgrade to the MEC instrument of the LINAC Coherent Light Source (LCLS) X-ray free electron laser (XFEL) user facility at SLAC National Accelerator Laboratory. Here, the envisioned MEC upgrade will significantly enhance the capabilities of the pump laser sources in current MEC experimental station, boosting the energy of the nanosecond shock driver from 100 J to the kJ level, and increasing the power and repetition rate of the short pulse laser from 25 TW at 5 Hz to 1 PW at 10 Hz rate. Building such high energy/power pump laser systems presents challenges to minimize and mitigate against laser-induced optical damage. Here, as part of the system design, we have identified the optics at high-risk to damage and we have designed the laser systems to mitigate against these damage risks to ensure sustained facility operation.

Coating↗

Upgrading biocrude oil into sustainable aviation fuel using zeolite-supported iron-molybdenum carbide nanocatalysts

Food waste is an underdeveloped source for production of sustainable aviation fuel (SAF). Now, there is no certified conversion process of food waste for SAF by American Society for Testing and Materials (ASTM). We report the use of zeolite-supported molybdenum carbide nanocatalysts in upgrading biocrudes, produced from food wastes through HTL, into SAF precursors. Our data show a complete removal of oxygen from the biocrude through hydrodeoxygenation and a higher heating value of 46.5 MJ/kg, which is comparable to that of Jet A (46.1 MJ/kg). The prescreening tests (tier alpha and beta) show the average carbon number of the distillation cut (150° to 230°C) of upgraded fuel is 10.6, close to the value of 11.4 for average conventional jet fuel, and the specifications of properties including surface tension, viscosity, heating value, flash point, and freezing point were found to meet the standards of SAF. The metal carbide nanocatalysts were reusable in upgrading tests, and the activity of deoxygenation was retained.

10 SYNTHETIC FUELS↗

The RHIC polarized source upgrade

The RHIC polarized H{sup −} ion source is being upgraded to higher intensity and polarization for use in the RHIC polarization physics program at enhanced luminosity RHIC operation. The higher beam intensity will allow reduction of the longitudinal transverse beam emittance at injection to AGS to reduce polarization losses in AGS. There is also a planned RHIC luminosity upgrade by using the electron beam lens to compensate the beam-beam interaction at collision points. This upgrade is also essential for future BNL plans for a high-luminosity electron-proton (ion) Collider eRHIC. The basic limitations on the high-intensity H{sup −} ion beam production in charge-exchange collisions of the neutral atomic hydrogen beam in the Na-vapor jet ionizer cell were experimentally studied.

43 PARTICLE ACCELERATORS↗

Upgrade of hadron endcap calorimeters CMS at LHC

We present the survey of the main tasks in upgrading the hadron endcap (HE) calorimeters of the CMS experiment at LHC. The results of the HE upgrade during the LHC Long Shutdown (2013–2014) and plans for upgrade during LHC Extended Year End Technical Stop (December 2016–May 2017) are discussed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The upgrade of endcap CMS muon system

The configuration and composition of the CMS muon system are presented. The paper is focused on cathode strip chambers (CSC) used as the endcap muon system detectors. The goals and objectives of the endcap muon system upgrade are formulated. The main results of works accomplished for the ME1/1 CSCs upgrade and the new ME4/2 muon station construction during the LHC Long Shutdown-1 (2013–2014) are presented. The improved performances of the endcap muon system are shown using experimental data obtained after the upgrade (Run2 data).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Facility upgrade for superheavy-element research at RIKEN

The RIKEN Nishina Center (RNC) executed an accelerator upgrade project for the heavy-ion linac (called RILAC). A superconducting RIKEN linear accelerator (SRILAC) and a new superconducting electron-cyclotron-resonance ion source (SC-ECRIS) to boost the final energy and intensity were constructed, aimed at synthesizing a new superheavy element, 119, through a hot fusion reaction. The project included the construction of a gas-filled recoil ion separator (GARIS-III) suitable for detecting the residues of the hot-fusion reaction. To avoid research interruption during the SRILAC construction period (2017–2019) and gain experience in hot-fusion reaction processes, GARIS-II located in the GARIS experimental hall in LINAC building was moved to the E6 experimental hall in Nishina building. Certain exploratory measurements were performed employing the beams accelerated by RILAC2 and the RIKEN ring cyclotron (RRC), which is a part of the existing accelerator complex of the radioactive isotope beam factory (RIBF). Further, commissioning experiments with the upgraded facility (SRILAC and GARIS-III) were performed. The upgrade project and its commissioning results are chronologically described in this article.

43 PARTICLE ACCELERATORS↗

Shielding Analyses for SNS Accelerator Power Upgrade

The Proton Power Upgrade (PPU) project [1] at Spallation Neutron Source (SNS) is aiming at increasing the neutron beam intensities at the First Target Station (FTS) and advancing accelerator capability to additionally power a future Second Target Station (STS) [2]. PPU will involve upgrading the SNS accelerator complex to double the currently available proton beam power from 1.4 to 2.8 MW, by increasing the proton beam energy from 1 GeV to 1.3 GeV and by increasing the proton beam current.PPU will enable new science capabilities enhancing the experiment throughput of the 19 existing FTS instruments, which are heavily oversubscribed. STS will include 22 additional neutron scattering instruments. Numerous neutronics analyses are performed to support PPU evaluating the FTS systems for higher beam power and for system upgrades. Part of the PPU scope is an extension of the Ring to Target Beam Transport (RTBT) line, a stub out of the accelerator tunnel for the future Ring to STS Transport (RTST) line[3]. As the RTST tunnel will not be built within the PPU project, the stub will be shielded by a plug, which is planned to be made from regular concrete.In order to provide radiation protection safety, analyses are required to design adequate plug thickness for the stub. The thickness of the stub is driven by the criterion that the area downstream of the plug is “unrestricted access area”, demanding the dose rate downstream the stub be below 0.25 mrem/h at 30 cm from the surface at normal operation and below 20 Rem/hr for accident cases. Additionally, analyses verifying the amount of soil for shielding the accelerator tunnel to the above stated requirements are performed.

Popova, Irina I.↗

HERO WEC V1 Upgrades - SolidWorks Models (WEC, RO System, and Submersible Pump Housing)

The attached zip files include SolidWorks pack-and-go assemblies of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter), the reverse osmosis (RO) assembly, and the submersible pump assembly that is used to provide flow to the RO assembly in the electric configuration. These 3 models were upgraded in 2023 from their baseline models. The HERO WEC model does not include all aspects of the design (i.e. RO system, electrical enclosure, hose, cable), it only includes the WEC and PTO (power take-off) design. This model supersedes the old MHKDR model submission, linked below. The RO model file includes a SolidWorks (version 2023) pack-and-go assembly of the RO assembly that was used for HERO WEC as it was upgraded in 2023. This model ONLY includes the RO assembly and not the WEC, hoses, etc. The submersible pump enclosure model includes a SolidWorks (version 2023) pack-and-go assembly of the submersible pump assembly that is used to provide flow to the RO assembly in the electric configuration HERO WECas it was upgraded in 2023. This model ONLY includes the submersible pump assembly and not the WEC, RO system, hoses, etc. This work has been developed by the National Renewable Energy Laboratory, operated by Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.

16 TIDAL AND WAVE POWER↗

HIGH VOLTAGE DESIGN AND EVALUATION OF WIEN FILTERS FOR THE CEBAF 200 keV INJECTOR UPGRADE

High-energy nuclear physics experiments at the Jefferson Lab Continuous Electron Beam Accelerator Facility (CEBAF) require highly spin-polarization electron beams, produced from strained super-lattice GaAs photocathodes, activated to negative electron affinity in a photogun operating at 130 kV dc. A pair of Wien filter spin rotators in the injector defines the orientation of the electron beam polarization at the end station target. An upgrade of the CEBAF injector to better support the upcoming MOLLER experiment requires increasing the electron beam energy to 200 keV, to reduce unwanted helicity correlated intensity and position systematics and provide precise control of the polarization orientation. Our contribution describes design, fabrication and testing of the high voltage system to upgrade the Wien spin rotator to be compatible with the 200 keV beam. This required Solidworks modeling, CST and Opera electro- and magnetostatic simulations, upgrading HV vacuum feedthroughs, and assembly techniques for improving electrode alignment. The electric and magnetic fields required by the Wien condition and the successful HV characterization under vacuum conditions are also presented.

Palacios-Serrano, G.↗

New Insertion Device Control System for the APS Upgrade

New Hybrid Permanent Magnet Undulators (HPMUs) have been designed and manufactured using servo motors for precise and reliable gap motion control for the Advanced Photon Source Upgrade (APS-U) project. Meanwhile, existing HPMUs equipped with legacy stepper motors are systematically replaced with servo motors. In parallel with mechanical modifications of the undulators, a comprehensive upgrade has been implemented for the control of the devices. This upgrade includes integration of standardized industrial components for replacement of motor controllers and motor drives using the Kollmorgen Programmable Controller Multi-axis Master (PCMM) controllers and the AKD2G series servo drives. Soft Input Output Controllers (IOCs) are developed and deployed to replace the legacy VME-based IOCs for both single-period undulators and Revolver undulators. In this paper, we will present the architecture of the new insertion device control system, including control mechanisms, interlock protocols, and tools for diagnostics and troubleshooting.

Li, W.↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Upgrade to Fixed and Translating Scintillation-based Loss Detector System in the Fermilab Drift Tube Linac

The closed-off structure of the Fermilab Drift Tube Linac precludes a robust array of instrumentation from directly monitoring the H- beam that is accelerated from 750 keV to 116 MeV. To improve beam tuning and operational assessment of Drift Tube Linac performance, scintillator-based loss monitors were previously installed along the exterior of the first two accelerating cavities to assess low energy beam losses. Here we present a recent upgrade to the loss monitor system, including significant improvements in analog signal processing to address baseline-interfering noise; digitization of the signals to enable regular operational use and tuning; and a new remote operation upgrade of the translating loss monitor with precise positioning of the loss monitor along its nine-foot track. Data from the fixed and translating detectors collected under varying beam conditions validate the utility of the upgrade.

Chen, E. V. [Fermilab]↗

Upgrade of the Fermilab Spoke Test Cryostat for Testing of PIP-II 650 MHz 5-Cell Elliptical Cavities

Design of the high beta 650 MHz prototype cryomodule for PIP-II is currently undergoing at Fermilab. The cryomodule includes six 5-cell elliptical SRF cavities with accelerating voltage up to 20 MV and low heat dissipation (Q₀ > 3·10^{z}EhNZeHn). Characterization of performance of fully integrated jacketed cavities with high power coupler and tuner is crucial for the project. Such a characterization of jacketed cavity requires a horizontal test cryostat. Existing horizontal testing facilities at Fermilab, Horizontal Test Stand (HTS) and Spoke Test Cryostat (STC), are not large enough to accommodate jacketed 650 MHz 5-cell cavity. An upgrade of the STC is proposed to install extension to the cryostat and modify cryogenic connections and RF infrastructure to provide testing of 650 MHz cavities. In this paper we describe STC upgrade and commissioning of the upgraded facility. We discuss mitigation of issues and problems specific for testing of high Q₀ 650 MHz cavities, which require low residual magnetic field and low acoustic and mechanical vibrations environment.

43 PARTICLE ACCELERATORS↗

Physics motivation and detector upgrades for the new era of the ATLAS experiment

The ATLAS experiment at CERN’s Large Hadron Collider (LHC) will be upgraded in two stages to prepare first for the Run~3 data-taking campaign, during which the integrated luminosity will roughly double, and then for the High-Luminosity LHC program with an ultimate integrated luminosity of up to 4 ab ^{{-1}} − 1 . These upgrades and high-statistics datasets will allow ATLAS to perform searches and precision measurements to constrain the Standard Model in yet-unexplored phase spaces and in the Higgs sector. This contribution summarizes the ATLAS detector upgrades and selected physics prospects for Run~3 and the HL-LHC.

Nielsen, Jason↗

Cyclotron Institute Upgrade Project

The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88”) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

43 PARTICLE ACCELERATORS↗

Upgrades to the Polarized Neutron Reflectometer Asterix at LANSCE

We have upgraded the polarized neutron reflectometer, Asterix, at the Lujan Neutron Scattering Center at Los Alamos for the benefit of the research communities that study magnetic and complex-fluid films, both of which play important roles in support of the DOE’s energy mission. The upgrades to the instrument include: A secondary spectrometer that was integrated with a Huber sample goniometer purchased with other funds just prior to the start of our project. The secondary spectrometer provides a flexible length for the scattered flight path, includes a mechanism to select among 3 alternative polarization analyzers as well as a support for new neutron detectors. Also included is an optic rail for reproducible positioning of components for Spin Echo Scattering Angle Measurement (SESAME). The entire secondary spectrometer is now non-magnetic, as required for neutron Larmor labeling. • A broad-band neutron polarizer for the incident neutron beam based on the V geometry. • A wide-angle neutron polarization analyzer • A 2d position-sensitive neutron detector • Electromagnetic coils (Wollaston prisms) for SESAME plus the associated power supplies, cooling, safety systems and integration into the data acquisition system. The upgrades allowed a nearly effortless transition between configurations required to serve the polarized neutron reflectometry community, users of the 11 T cryomagnet and users of SESAME.

36 MATERIALS SCIENCE↗

Using Qualified Energy Conservation Bonds for Public Building Upgrades. Reducing Energy Bills in the City of Philadelphia

Qualified Energy Conservation Bonds (QECBs) are federally-subsidized bonds that enable state, tribal, and local government issuers to borrow money to fund a range of energy conservation projects, including public building upgrades that reduce energy use by at least 20 percent, at very attractive borrowing rates and long terms. As part of the American Recovery and Reinvestment Act (ARRA), the City of Philadelphia received a $\$$15 million QECB award from the U.S. Department of the Treasury (Treasury). The city leveraged $\$$6.25 million of its QECB allocation to finance half of a $\$$12.6 million initiative to upgrade the energy efficiency of City buildings. The upgrades to four city facilities are expected to deliver over $10 million of net savings, and are a major step towards achieving the city’s goal of reducing government energy consumption by 30 percent by 2015.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Using Retrofit Nail Base Panels to Expand the Market for Wall Upgrades

This project evaluated the effectiveness and affordability of integrating retrofit insulated panels into a re-siding project. The Partnership for Home Innovation (PHI) teamed with New York State Energy Research and Development Authority (NYSERDA), the Albany Housing Authority (AHA), and the New York State Weatherization Assistance Program (WAP) administered by Albany Community Action Partnership to demonstrate an energy retrofit and siding upgrade on a two-story, seven unit, multifamily building in Albany New York (CZ 5). The project focused on accomplishing three goals - doubling the existing wall thermal resistance (from approximately R-13 to a weighted average of R-27), reduction of building air leakage, and completion of the retrofit within a budget where the additional cost for upgrading wall's thermal resistance is equal to the cost of the standard re-siding effort (i.e., the total cost of the energy efficient re-siding scope of work is not more than double the cost of the standard re-siding effort). Lessons learned from the project strongly indicate that the retrofit panel technology can be installed using common installation practices and with minimal training. Other lessons learned include limitation on the use of standard air sealing materials during cold weather installations and the need to develop better installation guidance for trades working with the level of tolerances that may be present in the existing structure. This technology demonstration showed that exterior retrofit panels provide a viable and reasonable option for the siding trades to increase market opportunities and achieve synergistic benefits for aesthetic upgrades to a building's exterior.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗