Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “UNITS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Submicrosecond time transfer between the United States, United Kingdom, and Australia via satellite

During 1972 time transfer experiments were run between the U.S. Naval Observatory and the Royal Greenwich Observatory and, in 1973, between the U.S. Naval Observatory and the Division of National Mapping in Canberra, Australia. In both cases the time transfer agent was the TIMATION 2 satellite, 1969-82B. The satellite ephemerides were computed from data provided by the Defense Mapping Agency TRANET. This net tracked the satellite's Doppler transmissions. The phase of the satellite clock was determined from knowledge of the position of the satellite and of the observer and the computed distance between the two. By monitoring the clock on successive passes the rate of the satellite clock was determined at Washington. By again monitoring the satellite clock at the distant station the satellite clock could be compared to the local clock and this local clock compared to the U.S. Naval Observatory clocks. In 1972 the RMS of observations at Greenwich deviated by approximately 1/4 microsecond from a straight line when compared to the Naval Observatory. In 1973 the observation errors at Canberra were approximately half as great.

Easton, R. L.↗

Microcoding of communications in accident investigation - Crew coordination in United 811 and United 232

Two recent airline accidents that underscored the value of cockpit resource management (CRM) to line operations, especially under stressful, high workload conditions are reviewed. An analysis of the verbal behavior of each crew was conducted to explore how catastrophic events impact upon the dynamics of crew interaction. In both cases the Captain stated that training in CRM contributed significantly to the overall effectiveness of the crews.

Predmore, Steven C.↗

Energy management system, method of controlling one or more energy storage devices and control unit for one or more power storage units

Systems, methods and apparatuses are provided for reducing peak energy demand and to smooth intermittent energy profiles from onsite variable energy sources and loads. Some embodiments use system level and device level analysis and optimization to adaptively adjust the operation of a behind the meter energy storage (BMES) to smooth out energy generation variabilities and follow a reference load signal, including at short time resolutions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Creating a Consortium to Increase minority and Low-Income Community Participation in Alternative Energy Development, Production and Management Melinda Downing, United States Department of Energy Geraldine Herring, United States Department of Agriculture John Rosenthall, Environmental Justice Conference, Inc

America's desire for energy independence places a new demand on alternative fuel production. Additional interest and emphasis are being placed on alternatives such as solar, wind, biofuels and nuclear energy. The nuclear fuel production option brings a new look at risk and residual waste management for a number of communities that have traditionally remained outside the energy debate. With the Federal requirements for environmental justice and public participation in energy and environmental decision-making, proponents of alternative energy production facilities will find themselves participating in discussions of risk, production, storage and disposal of hazardous materials and waste matters with low income and minority members in communities where these facilities are located or wish to locate. The fundamental principal of environmental justice is that all residents should have meaningful and intelligent participation in all aspects of environmental decision-making that could affect their community. Impacted communities must have the resources and ability to effectively marshall data and other information in order to make informed and intelligent decisions. Traditionally, many low-income and minority communities have lacked access to the required information, decision-makers and technical advisers to make informed decisions with respect to various risks that accompany alternative energy production, hazardous materials storage and nuclear waste management. In order to provide the necessary assistance to these communities, the Departments of Energy and Agriculture have teamed with others to cerate the Alternative Energy Consortium. The Alternative Energy Consortium is a collaboration of non-profit organizations, Federal agencies, Historically Black Colleges and Universities and Minority Serving Institutions (HBCU/MSIs), and private sector corporations (energy industry specialists) designed to explore and develop opportunities that empower minorities to own and work in all aspects of the field of alternative energy. The Consortium's primary objectives are to find ways to: - Include minorities in the development and ownership of infrastructure in the alternative energy industry; - Promote research and education programs to inform the public about risks and benefits of various forms of alternative energy; - Build a Mentor/Protege Program between HBCU/MSIs and industry leaders to enhance minority participation in ownership and career success in alternative energy production and distribution. The Consortium will work together to create a process whereby minorities and low income individuals will be recruited, educated, and mentored to maximize alternative energy ownership and job opportunities. Industry specialists and government representatives will work with academicians and others to: 1. research areas and methods where minorities and rural communities can engage in the industry; 2. invest in minorities by serving as mentors to minority serving institutions by offering hands-on experience through apprenticeships; 3. work to identify ownership opportunities for minorities; and 4. work to develop legislation that supports economic development and participation for minorities and rural communities in the industry. To accomplish this goal, the Consortium has set out a three-phase plan. Phase I organized a meeting of professionals to discuss the concept, explore the fundamentals, identify key players, and draft next steps. The group took a critical look at the energy industry: 1) trends, 2) economics, 3) limited number of minorities; and 4) infrastructure. Through that process the group identified four areas that would greatly impact economic development for minorities and rural communities: I Energy; II Broadband Communications; III Education; IV Labor Resources. Phase II presented a roundtable panel discussion that continued to refine the Consortium. The goal of these discussions is to produce a well-balanced Consortium committed to working together to produce effective solutions that bridge the gap between alternative energy and minorities and rural communities. Phase III is the implementation stage that will put the consortium plans into action. This will include the Mentor/Protege Program between HBCU/MSIs and industry leaders, and any additional actions that come from the Phase II roundtable discussion. Phase III will also include a panel discussion at the State of Environmental Justice in America 2008 Conference in Washington, DC in March, 2008. The Consortium's work should facilitate the siting and management of alternative energy production facilities in communities that include a significant number of minority and/or low income individuals. This effort should increase America's prospects for energy independence. (authors)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Federal Emergency Management Agency Mobile Housing Unit Running Gear Testing (Final Report)

The Federal Emergency Management Agency (FEMA) stages manufactured housing units (MHUs) at key locations to be used during disasters when other housing accommodations cannot be arranged for individuals or families. Due to the unpredictability of natural disasters and the limitations of the manufactured housing industry to produce large numbers of MHUs in very short periods of time, it is necessary for FEMA to store a large number of units for many months or years. With these long storage periods come degradation issues with frames, tires, bearing, and braking systems. These types of issues are also of interest to the U.S. Department of Transportation (DOT) Federal Motor Carrier Safety Administration (FMCSA) because regulated carriers normally transport these units and 49 CFR 393.75 Tires specifies tire loading restrictions for manufactured homes. To compare the running gear (tires, brakes, drums, bearings, axles, springs, and spring mounting hardware) currently specified in the 2014 Rugged Based Performance Requirements (RBPR) and the newly recommended running gear specified in the upcoming revision to the RBPR, the Oak Ridge National Laboratory (ORNL) outlined a Longevity Test Plan, which focused on the assessment of component longevity (failure rates by component type). The Test Plan also studied the forces imparted to the MHU from the running gear from interaction with the roadway for both the running gear in the 2014 RBPR and the running gear specified in the upcoming RBPR revision. Since the assessment of component longevity and failures are also issues of concern for FMCSA, both agencies collaborated to support the research presented in this report. The tests and data collection were conducted at the Navistar Proving Grounds (NPG) in New Carlisle (near South Bend), Indiana, during the May-November 2018 period. Four alternatives for the suspension system of a typical three-bedroom MHU were considered in this test. Alternative 0 was the MHU that was selected from the FEMA staging area in Selma, Alabama. Empirical data had shown that, on average, this alternative experiences one tire failure every 150 miles (or 0.0067 tire failures per mile traveled). Before testing, Alternative 0 was equipped with similar running gear hardware, although in new condition and installed following the manufacturer’s specifications. This became the Baseline Unit, or Alternative 1. Another unit, also selected from the FEMA staging area in Selma, Alabama, was equipped with better axles (i.e., axles that were rated for 7,000lbs as opposed to 6,000lbs for the Baseline Unit) and better tires. This became the Upgrade Unit, or Alternative 2. At the end of the Longevity Test, the Upgrade Unit was mounted with radial tires. This became Alternative 3.Alternative 1 (Baseline Unit) had, on average, one tire failure every 251 miles (or 0.0040 tire failures per mile traveled). So, by simply following the correct manufacturer’s specifications for the assembly of the transportation system, a reduction of 41% in the per mile tire failure was achieved. In the same test, Alternative 2 (Upgrade Unit) showed, on average, one tire failure every 728 miles traveled (or 0.0014 tire failure s per mile traveled). When the Upgrade Unit was mounted with radial tires in the last part of the test, no tire failures were observed for the 2,400 miles tested. That is, in the case of the radial tires (Alternative 3) the tire failure was less than one per 2,400 miles traveled (or less than 0.0004 tire failures per mile traveled). The data collected for the Longevity Test showed that the maximum accelerations were registered in all cases at the center of the MHU in the vertical direction. The overall maximum was registered by the Baseline Unit, Alternative 1. If that value is normalized to 100%, then the Upgrade Unit (Alternative 2) showed, on average, 81% at the same location, and Alternative 3 (radial-tire test) 59%. That is, the upgraded transportation system showed a reduction of 19% and 41% in the vertical accelerations transmitted to MHU at its center when regular and radial tires, respectively, were used. As part of the Test Protocol, NPG conducted a visual inspection of the MHUs and transportation system at the end of each test day. ORNL reviewed all the inspection reports in an attempt to determine if there was any difference in the damage that the Baseline and Upgrade MHUs showed during the test. The Upgrade Unit always showed lower accelerations transmitted to the MHU than the Baseline Unit. In most cases, these differences were statistically significant. The FEMA inspection report, conducted by a FEMA certified inspector at the end of the tests, included a shorter list of damaged items for the Baseline Unit than for the Upgrade Unit, although similar type of damages was described for both units. This may be an indication that, although lower than those of the Baseline Unit, the accelerations transmitted by the Upgrade Unit were above the threshold at which MHU elements start to fail.

42 ENGINEERING↗

Incorporating FLEX Strategies in Multi-Unit Probabilistic Risk Assessment

The catastrophic Fukushima nuclear accident reminded nuclear community about the possibilities of extreme accident scenarios, including those involving multiple reactor units on the same site. As the responses to the Fukushima accident, the nuclear power industry developed and implemented a series of strategies, including the Diverse and Flexible Coping Strategies (FLEX), to enhance the coping capacities of nuclear power plants (NPPs) under extreme accidents. This study intends to examine the impact of FLEX strategies on the risk from all the reactor units on the same NPP site, including risks from accidents involving a single unit and from accidents involving multiple units. The fundamental, methodological element of this study is Multi-Unit Probabilistic Risk Assessment (MUPRA), which requires a shift in Probabilistic Risk Assessment (PRA) from a “one-reactor-at-a-time” mindset to a “considering all reactors sharing a site as a unity” one. An integrated modeling approach for multi-unit event sequence development will be leveraged to develop MUPRA model and address the intra-unit and inter-unit dependencies. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), a PRA software developed and maintained by Idaho National Laboratory (INL) for the U.S. Nuclear Regulatory Commission (NRC), will serve as the platform for MUPRA modeling. This study selects Loss Of Offsite Power (LOOP) as a representative initiating event, which may occur on a generic two-unit NPP site and impacts both reactor units on the site. First, an MUPRA model, including multi-unit event trees, will be developed to obtain single-unit and multi-unit accident scenarios. Next, different FLEX strategies will be assumed, including FLEX equipment for a unit cannot be used for another unit, FLEX equipment for multiple units can be used in a cross-connected manner, etc. Lastly, the effectiveness of each postulated FLEX strategy will be evaluated by incorporating the corresponding FLEX equipment and deployment logic in the MUPRA model.

99 GENERAL AND MISCELLANEOUS↗

Final Status Survey Report for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201, Nevada National Security Site, Nevada

This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 – Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values and corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or “clean,” building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, “Final Status Survey Plan for Corrective Action Unit 117 – Pluto Disassembly Facility, Building 2201”) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room into one of three categories: Class 1, Class 2 or Class 3 (a fourth category is a “Non-Impacted Class” which in the case of Building 2201 only pertained to exterior surfaces of the building.) The majority of the rooms were determined to fall in the less restrictive Class 3 category, however, Rooms 102, 104, 106, and 107 were identified as containing Class 1 and 2 areas. Building 2201 was divided into “survey units” and surveyed following the requirements of the Final Status Survey Plan for each particular class. As each survey unit was completed and documented, the survey results were evaluated. Each sample (static measurement) with units of counts per minute (cpm) was corrected for the appropriate background and converted to a value with units of dpm/100 cm2. With a surface contamination value in the appropriate units, it was compared to the surface contamination limits, or in this case the derived concentration guideline level (DCGLw). The appropriate statistical test (sign test) was then performed. If the survey unit was statistically determined to be below the DCGLw, then the survey unit passed and the null hypothesis (that the survey unit is above limits) was rejected. If the survey unit was equal to or below the critical value in the sign test, the null hypothesis was not rejected. This process was performed for all survey units within Building 2201. A total of thirty-three “Class 1,” four “Class 2,” and one “Class 3” survey units were developed, surveyed, and evaluated. All survey units successfully passed the statistical test. Building 2201 meets the release criteria commensurate with the Waste Acceptance Criteria (for radiological purposes) of the U10C landfill permit residing within NNSS boundaries. Based on the thorough statistical sampling and scanning of the building’s interior, Building 2201 may be considered radiologically “clean,” or free of contamination.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Combustion systems and power plants incorporating parallel carbon dioxide capture and sweep-based membrane separation units to remove carbon dioxide from combustion gases

Disclosed herein are combustion systems and power plants that incorporate sweep-based membrane separation units to remove carbon dioxide from combustion gases. In its most basic embodiment, the invention is a combustion system that includes three discrete units: a combustion unit, a carbon dioxide capture unit, and a sweep-based membrane separation unit. In a preferred embodiment, the invention is a power plant including a combustion unit, a power generation system, a carbon dioxide capture unit, and a sweep-based membrane separation unit. In both of these embodiments, the carbon dioxide capture unit and the sweep-based membrane separation unit are configured to be operated in parallel, by which we mean that each unit is adapted to receive exhaust gases from the combustion unit without such gases first passing through the other unit.

20 FOSSIL-FUELED POWER PLANTS↗

Characterization of Venera 15/16 Geologic Units from Pioneer Venus Reflectivity and Roughness Data

Geologic units have been defined for the surface of Venus from Venera 15/16 image data. A characterization of these geologic units is carried out using information on surface properties derived from Pioneer Venus (PV) reflectivity and rms slope data. The geologic context provided by Venera 15/16 units allows additional, more specific interpretations of surface radar properties to be made. Characterization of Venera units results in the definition of four groups of Venera units: (1) smooth rocky units, 2) rough rocky units, (3) rough high dielectric units, and (4) diffusely scattering units. On the basis of correlations of surface morphology to spatial and statistical distributions in rms slope and reflectivity data, we test models for the origin of the surface properties of some units. We conclude that plains and tectonic units can be contrasted in terms of the average roughness of the surface and that tectonic deformation appears to roughen the surface at 0.5- to 10-m and 5- to 50-cm scales. This tectonic weathering process appears to dominate the erosional regime of Venus. Unlike Earth or Mars, production and transport of soils dominates only a small portion (less than or equal to 5%) of the surface. Some of the Venera units display distinctive spatial and statistical distributions of PV radar data. In particular, apparent low reflectivity in the tesserae appears to be caused by small (5-50 cm) rock fragments on the surface which cause diffuse scattering at Pioneer Venus wavelengths. Analysis of models for the formation of these fragments suggests that they are due to the pervasive deformation undergone by the tesserae. Finally, aspects of this study have been used to extend results of Venera image data analysis southward of 30 deg. N lat, resulting in it prediction of the distribution of tessera. Such results can aid in Magellan investigations.

Bindschadler, D. L.↗