Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Risk Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

A novel assay to measure low-density lipoproteins binding to proteoglycans

Background: The binding of low-density lipoprotein (LDL) to proteoglycans (PGs) in the extracellular matrix (ECM) of the arterial intima is a key initial step in the development of atherosclerosis. Although many techniques have been developed to assess this binding, most of the methods are labor-intensive and technically challenging to standardize across research laboratories. Thus, sensitive, and reproducible assay to detect LDL binding to PGs is needed to screen clinical populations for atherosclerosis risk. Objectives: The aim of this study was to develop a quantitative, and reproducible assay to evaluate the affinity of LDL towards PGs and to replicate previously published results on LDL-PG binding. Methods: Immunofluorescence microscopy was performed to visualize the binding of LDL to PGs using mouse vascular smooth muscle (MOVAS) cells. An in-cell ELISA (ICE) was also developed and optimized to quantitatively measure LDL-PG binding using fixed MOVAS cells cultured in a 96-well format. Results: We used the ICE assay to show that, despite equal APOB concentrations, LDL isolated from adults with cardiovascular disease bound to PG to a greater extent than LDL isolated from adults without cardiovascular disease (p<0.05). Conclusion: We have developed an LDL-PG binding assay that is capable of detecting differences in PG binding affinities despite equal APOB concentrations. Future work will focus on candidate apolipoproteins that enhance or diminish this interaction.

59 BASIC BIOLOGICAL SCIENCES↗

Africa Battery Energy Storage Systems (BESS) Capacity Building Utility-Scale Storage: BESS Valuation, Tariffs, and Remuneration [Slides]

Utility-scale Battery Energy Storage Systems (BESS) are key to enhancing grid reliability, integrating renewable energy, and providing operational flexibility. Designing effective valuation, remuneration, and tariff frameworks is essential to ensure both system benefits and financial viability for developers. This presentation outlines a structured methodology for evaluating BESS projects, covering policy and legal considerations, cost and revenue analysis, benchmarking, financial sensitivity, and risk assessment, while ensuring alignment with public interest. It also explores valuation of multiple storage services - bulk energy, ancillary services, and infrastructure support - and monetization strategies through capacity payments, energy tariffs, tolling, arbitrage, and non-wires alternative payments. Technical factors, including round-trip efficiency, degradation, and storage duration, are integrated into financial and operational modeling to quantify both system-wide and project-level benefits. Through case studies and simulation-based approaches, this framework provides regulators, utilities, and developers with practical guidance for tariff design, payment structures, and investment decisions, maximizing the economic and societal value of BESS deployment.

25 ENERGY STORAGE↗

Testing a Run-Time Assurance Framework Coupled with Integrated Risk Mitigation Capabilities for Autonomous Urban UAS Flights

The In-Time Aviation Safety Management System (IASMS) Concept of Operations (ConOps) envisions new capabilities to monitor, assess, and mitigate flight safety risks. Systems will be tailored to mission type, vehicle/equipage type, operational environment, and safety risk tolerance. Within an IASMS framework, several capabilities may be implemented spanning three operational phases (pre-flight, in-flight, and post-flight/off-line); and consisting of lower level functions and information services which may reside onboard the aircraft, on third-party server(s), and/or on ground/operator station(s). Each capability will be designed to produce and disseminate safety-relevant information; perform detection, diagnosis, and prediction of unsafe situations; and/or execute mitigation actions when hazardous events warrant such changes. This paper focuses on recent testing of airborne capabilities that demonstrate inflight aspects of the overarching concept for autonomous unmanned aircraft systems (UAS) operations in urban environments. A flight test architecture is described that applies run-time assurance principles (e.g., executes independent of the unassured autopilot), real-time risk assessment, and a technique to execute contingencies if necessary either automatically or via pilot intervention. Several tests using small UAS were conducted to verify the assured in-flight risk mitigation capability. The paper draws significantly from a larger NASA technical report and recent prior conference papers, providing additional details. Data is analyzed for two representative flights to illustrate the performance for various sequential and simultaneous hazards used during testing. During each automated flight, several hazards are encountered at various points along the flight path. At each point, the hazard is mitigated by the system, with the vehicle then continuing to subsequent points. The paper concludes with lessons-learned regarding relevant aspects of the overarching IASMS concept and how it may be updated and further advanced in the future.

population activity↗

DSS Security Assessment

The Discovery and Synchronization service (DSS) has implemented some reasonable technical controls that help improve security and there are very few technical findings. The use of Docker and Kubernetes helps simplify the deployment process, and the DSS uses mutual TLS (mTLS) to connect. Much of the security risk across the DSS is a factor of its nature, a distributed environment that relies on all members to secure their parts correctly. As such, the DSS team should attempt to emphasize security controls that reduce complexity for securing entities’ Cockroach DB (CRDB) instances properly and improve coordination among DSS members for things like security patching, incident response, detecting, and removing bad actors. The DSS team must recognize that operating a DSS instance securely will require a combination of technical and procedural controls. Each DSS entity must configure their instance properly and follow standard operating procedures to ensure that the DSS service is secure.

threat modeling↗

Non-GEO mobile satellite systems: A risk assessment

Since 1991, The MITRE Corporation has performed several independent evaluations of proposed mobile satellite service (MSS) systems that would operate from low Earth orbit (LEO) or medium Earth orbit (MEO), also known as intermediate circular orbit (ICO). This paper introduces a top level Risk Taxonomy tailored to summarize the technical and programmatic risks that MITRE has identified. In general, as risks are identified and addressed, a system's technical characteristics, cost and schedule are affected. This paper traces changes in three key parameters - satellite launch mass, system cost, and system schedule - for each of the five original non-GEO MSS systems for which license applications were made to the U.S. Federal Communications Commission (FCC) from November 1990 until June 1991. Finally, specific risk areas are identified using the Risk Taxonomy as a framework for discussion.

Gaffney, Leah M.↗

A Model-Based Systems Engineering Evaluation of the Evolution to an In-Time Aviation Safety Management System

In 2018, as result of a recommendation from the National Academies, NASA began to prototype an In-Time Aviation Safety Management System(IASMS). The purpose of the IASMS is to enable innovative aviation operations and greater heterogeneity of the overall National Airspace (NAS) by automating much of the safety monitoring, assessment, and risk and hazard mitigation functionspresent in today’s Safety Management Systems (SMS). NASA has worked together with early industry collaborators to understand how such a system might work and has published several early Concepts of Operation (ConOps) and other technical memoranda that illustrate the primary considerations for selected aviation domains. The shift from an SMS to an IASMS is predicated on several assumptions, including: 1.) automating safety functions will decrease the amount of time necessary for risk and hazard identification and analysis, making it more likely that safety concerns are understood ‘in-time’ to mitigate them, and 2.) an IASMS will allow easier tailoring of safety management processes to the particular risks and hazards inherent to that aviation operation. In this paper, we begin to validate these assumptions through the use of Model-Based Systems Engineering (MBSE).

In-time Aviation Safety Management System↗

Chemically Enabled CO 2 -Enhanced Oil Recovery in Multi-Porosity, Hydrothermally Altered Carbonates in the Southern Michigan Basin - Task 2 Topical Report

This attachment A is a detailed Topical Report for Task 2 (Advanced Field Characterization and Machine Learning Based Data Integration) under the project "Chemically Enabled CO 2 -Enhanced Oil Recovery in Multi-Porosity, Hydrothermally Altered Carbonates in the Southern Michigan Basin." The overall project activity and finding, including the field pilot testing of CO 2 injection are summarized in the companion Final Technical Report The Advanced Field Characterization and Machine Learning Based Data Integration task (Task 2) involved a systematic geologic characterization of the Trenton-Black River (TBR) play in the SMB which included the development of comprehensive datasets, advanced data analytics, risk assessment, and piggyback field characterization. These activities aimed to address the complex carbonate systems by evaluating the extent of fractures, dolomitization, facies, and reservoir properties with the primary objective of informing the static and dynamic modeling, field injection test, and providing input into the development strategy plan. The task was divided into four subtasks: • Subtask 2.1 – Data compilation, review, and analysis • Subtask 2.2 – Risk Assessment • Subtask 2.3 – Advanced Field Characterization • Subtask 2.4 – Integrated Physics-Based Machine Learning and Advanced Data Analytics

02 PETROLEUM↗

A Model-Based Systems Engineering Evaluation of the Evolution to an In-Time Aviation Safety Management System

In 2018, as result of a recommendation from the National Academies, NASA began to prototype an In-Time Aviation Safety Management System (IASMS). The purpose of the IASMS is to enable innovative aviation operations and greater heterogeneity of the overall National Airspace (NAS) by automating much of the safety monitoring, assessment, and risk and hazard mitigation function present in today’s Safety Management Systems (SMS). NASA has worked together with early industry collaborators to understand how such a system might work and has published several early Concepts of Operation (ConOps) and other technical memoranda that illustrate the primary considerations for selected aviation domains. The shift from an SMS to an IASMS is predicated on several assumptions, including: 1.) automating safety functions will decrease the amount of time necessary for risk and hazard identification and analysis, making it more likely that safety concerns are understood ‘in-time’ to mitigate them, and 2.) an IASMS will allow easier tailoring of safety management processes to the particular risks and hazards inherent to that aviation operation. In this paper, we begin to validate these assumptions through the use of Model-Based Systems Engineering (MBSE).

IASMS↗

Applying AI/ML Techniques to U.S. Nuclear Operating Experience Program

Idaho National Laboratory (INL) has provided technical assistance to the U.S. Nuclear Regulatory Commission (NRC) in reliability and risk analysis including the operating experience (OpE) program since the 1980s. The U.S. nuclear OpE program provides input parameters to the NRC Standardized Plant Analysis Risk models and the industry probabilistic risk assessment (PRA) models. While earlier PRA focuses were on at-power, internal event analysis, the risks from external hazards and during low power shutdown (LPSD) operation could be significant and the needs to develop LPSD PRA and external hazards PRA are on the rise. One issue in developing LPSD PRA is the reasonable estimation of shutdown initiative event (SDIE) frequencies. INL has developed and is maintaining an SDIE database for the NRC. However, this database is based on the reviewing of Licensee Event Reports (LERs), which is believed to be only a subset of “actual” shutdown initiating events occurred in the industry. This paper investigates a new approach to identify and characterize shutdown initiating events from the Institute of Nuclear Power Operations (INPO) industry database using machine learning techniques. The main process in this approach is to find out the relationship between key words in event descriptions and the SDIE categories as in the NRC SDIE database. The relationship can then be applied to the INPO database and search for SDIEs.

99 GENERAL AND MISCELLANEOUS↗

Lay and Expert Perceptions of Planetary Protection

As space scientists and engineers plan new missions to Mars and other planets in our solar system, they will face critical questions about the potential for biological contamination of planetary surfaces. In a society that places ever-increasing importance on the role of public involvement in science and technology policy, questions about risks of biological contamination will be examined and debated in the media, and will lead to the formation of public perceptions of planetary-contamination risks. These perceptions will, over time, form an important input to the development of space policy. Previous research in public and expert perceptions of technological risks and hazards has shown that many of the problems faced by risk-management organizations are the result of differing perceptions of risk (and risk management) between the general public and scientific and technical experts. These differences manifest themselves both as disagreements about the definition (and level) of risk associated with a scientific, technological or industrial enterprise, and as distrust about the ability of risk-management organizations (both public and private) to adequately protect people's health and safety. This report presents the results of a set of survey studies designed to reveal perceptions of planetary exploration and protection from a wide range of respondents, including both members of the general public and experts in the life sciences. The potential value of this research lies in what it reveals about perceptions of risk and benefit that could improve risk-management policies and practices. For example, efforts to communicate with the public about Mars sample return missions could benefit from an understanding of the specific concerns that nonscientists have about such a mission by suggesting areas of potential improvement in public education and information. Assessment of both public and expert perceptions of risk can also be used to provide an advanced signal of aspects of planetary exploration and protection that may be particularly sensitive or controversial and that could prove problematic from a risk-management standpoint, perhaps warranting a more stringent risk-management approach than would otherwise be the case based on technical considerations alone. The design of the study compares perceptions and attitudes about space exploration relevant to a Mars sample return mission between three respondent groups: (1) members of The Planetary Society, a group representing individuals with a strong interest in space-related issues, (2) a group of university-aged students, representing a population relatively sensitive to environmental hazards, and (3) a group of life scientists outside of the space research community. Members of The Planetary Society received the survey as part of a special issue of The Planetary Report on planetary protection, which contained a number of background articles on planetary protection and related topics. A synopsis of the issue was prepared as an introduction to the survey for the other two groups.

Race, Margaret S.↗

Private Astronaut Post-Mission Debrief Interviews Study

BACKGROUND The commercialization of space will increasingly include individuals that are not rigorously-selected, highly-trained professional astronauts. Private astronaut missions (PAMs), such as Axiom-1 in 2022, will continue to travel to the International Space Station in the coming years, but the risk of integrating private astronauts with NASA astronauts has not been clearly quantified nor mitigated. An earlier internal NASA operations assessment, which consisted of a comprehensive literature review and interviews of current NASA experts, found that PAMs are likely to increase the risk to NASA astronauts during integrated missions (Landon, Whiting, Russell, Schorn, Passmore, & Roma, 2022). There are ongoing efforts at NASA to mitigate concerns from a medical, psychological, and technical perspective. NASA experts are working closely with PAM providers to offer recommendations and best practices beyond the limits of requirements to ensure crew health and safety. However, efforts are siloed between groups to some extent, and with the rate of PAMs likely to increase, a more comprehensive and integrated process is needed to reduce the burden on NASA resources. AIMS The purpose of this project is to understand private astronauts’ motivations for journeying to space, their pre-mission preparation period, and their experiences in space. Data will be collected via private astronaut post-mission debrief interviews. This data will inform training needs and in-mission support needed for missions that include private astronauts; the preparation NASA astronauts and mission support personnel will need to work with these integrated crews; and gaps in knowledge to guide research and countermeasure development. Our study aims to (1) Characterize risks posed by commercialization and private astronaut crew integration in spaceflight operations, as it relates to Team, Human Systems Integration Architecture (HSIA), and Behavioral Medicine (BMed) Risks, (2) Recommend potential countermeasures and identify gaps in current research. Countermeasures may be related to crew selection and composition, training, crew support systems (e.g., medical/psychological support, support from Mission Control, on-board resources), and habitability and human factors design. METHOD The BHP Lab will conduct 30-minute interviews with up to eight (8) private astronaut mission (PAM) astronauts (e.g., Axiom) and spaceflight participants (e.g., SFPs or “free flyers” on Polaris Dawn) per year from 2024-2030 to discuss knowledge gaps and needs related to selection and assessment, crew composition, training, crew support systems (e.g., medical/psychological support, support from Mission Control, onboard resources), and habitability and human factors design, which may influence the risk to NASA astronauts. Interviews will then be coded using thematic analysis and interpreted with the assistance of lexical analysis software (e.g., LIWC). As of the end of 2024, we have collected data from one PAM crew. At the conclusion of data collection in 2030, a final report will be prepared integrating all data collected by 2031. SUMMARY Post-return interviews of private astronauts are being conducted to understand their experiences and inform training and countermeasures to ensure the safety of all who journey to the ISS.

Private Astronaut Missions↗

NASA Engineering and Safety Center Lunar Rover Design Concepts Assessments

Mass is a significant risk to programs and projects as they transition from formulation to implementation, especially in larger human space systems where delivery mass or volume can be a constrained commodity. • Concepts developed without an adequate systems-engineering basis, including design and operations experience, may miss significant functionality and subsequent mass required for integration or operations. • Further uncertainty can be associated with not fully understanding design best practices and standards that drive mass, such as design for minimum risk or fault tolerance.1 • Finally, the appropriate systems engineering mass properties management rigor and technical discipline insight are required to set the mass baseline, including appropriate mass growth allowance (MGA) to ensure program success. Mass is a key quantity that should be constantly monitored by the systems engineer and the program/project management stakeholder to ensure mission compatibility throughout the project life cycle. In addition, mass is a key programmatic performance metric monitored by the NASA Chief Financial Officer for current and future program cost estimating. NASA Exploration Systems sought an assessment of reasonableness with respect to different potential rover concepts that balances mass needs and human-class cargo lander capabilities. Appropriate systems engineering mass properties management rigor and technical discipline insight were used, and are required to set the mass baseline, including appropriate MGA to ensure program success. Two independent Lunar rover concepts were evaluated, with a goal to understand concept credibility and the Lunar rover designs potential extensibility for Mars surface operations. A notional generic rover concept is shown in Figure 1.

Systems Engineering↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Regolith Simulant Preparation and Geotechnical Characterization for Plume Surface Interaction Testing

Descent engine plumes interact with the lunar surface and accelerate regolith particles to potentially high velocities. These ejecta create risks to surface assets that have yet to be fully assessed. To better understand these risks, plume surface interactions can be simulated on the ground by firing a test engine plume into a bin of lunar regolith simulant under vacuum conditions. The dynamics of the resultant ejecta can then be recorded. In this technical memorandum we discuss the processes used in preparing a 150 kg bin of lunar regolith simulant for plume surface interaction ground tests under vacuum conditions for the NASA STMD Plume Surface Interaction project. We present our approach to mitigating regolith simulant eruptions during pump-down, the methods used to fill and reset the regolith simulant bin for each test, and the techniques used to characterize the consistency of regolith simulant geotechnical properties before each new firing. The challenges of preparing a regolith simulant test bin below an ambient pressure of one atmosphere, particularly on the large scale, could largely be overcome with a system that could fill the test bin with simulant inside the chamber and under vacuum conditions.

lunar regolith↗

Characterization of Arsenic and Selenium in Coal Fly Ash to Improve Evaluations for Disposal and Reuse Potential (Final Technical Report)

Coal fly ash is a high volume waste material that is discarded in landfills and surface water impoundments across the U.S. and is also widely recycled for a variety of applications. The leaching of potential of contaminants of concern, such as arsenic (As) and selenium (Se), is often the driver of risk assessments for coal ash disposal and reuse. The extent of leachable As and Se depends on several factors related to environmental conditions and fly ash characteristics. Previous studies employed various methods to delineate the concentration, chemical form, and distribution of As and Se in fly ash materials. However, few studies have attempted to directly correlate these properties to mobilization parameters relevant to disposal and reuse. Instead, the coal residuals industries often rely upon standardized leaching protocols that can be laborious or involve hazardous chemicals. The goals of the project were to: 1) Develop and evaluate a characterization protocol that can be used to screen fly ash samples for leachability of As and Se; 2) Characterize As, Se, and associated constituents of fly ash particles at multiple length scales (nanometer to micrometer) to determine if elemental associations differ as a function of the resolution of characterization; and 3) Establish a predictive model for the chemical composition of coal ash produced annually at major U.S. coal fired power facilities on 50-year national coal supply records. For the first objective, we performed leaching experiments with 52 fly ash samples collected from 15 different U.S. power plants and representing coal feedstocks from the three major domestic coal regions. For this work, we assessed the mobilization potential of As and Se in fly ash based on standardized leaching protocols and performed multivariate and lasso regression analyses to explore correlations of leachable As and Se contents with characteristics such as major element contents, loss on ignition (LOI) and pH. The results of regression models indicated that major elements (Fe, Ca, Al) for a wide range of fly ashes can serve as predictor variables for the leaching potential of As, but not for Se. LOI and pH were not important predictive variables in the models. Both regression approaches resulted in relatively strong fits for leachable As (correlation coefficient R 2 = 0.78 for both models) compared to models for leachable Se (R 2 = 0.49). Overall, these results suggest that correlation models combined with on-site elemental analysis with portable analyzers may enable a screening method for leachable As in coal ash. For the second objective, we utilized nanoscale 2-D imaging (30-50 nm spot size) with the Hard X-ray Nanoprobe (HXN) in combination with microprobe X-ray capabilities (~5 µm resolution) to determine As and Se elemental associations in fly ash particles. Speciation of As and Se was also measured at the nano- to microscale with X-ray absorption spectroscopy. The enhanced resolution of HXN showed As and Se that were diffusely located around or comingled with Ca- and Fe-rich particles. The results also showed nanoparticles of Se attached to the surface of fly ash grains. Overall, a comparison of As and Se species across scales highlights the heterogeneity and complexity of chemical associations for these trace elements of concern in coal fly ash. For the final objective, we developed a predictive model for major element composition of coal ash in reserve at disposal sites of major U.S. coal fired power plants. This model was constructed from coal purchase records of 705 power stations from 1973-2022 and was trained on coal ash composition data showing that coal ash elemental composition is strongly associated with the source of feedstock coal. The model showed regional shifts in the major element contents of ash produced by power plants in the last 50 years, particularly for calcium and iron (expressed as %CaO and %Fe 2 O 3 ), as coal-fired power stations changed their source of coal over this time frame. Our approach enables an estimation of coal ash chemical composition that is stored in waste impoundments at individual power stations. Such information can help delineate the regional market potential for material applications that would utilize coal ash harvested from disposal sites across the U.S.

01 COAL, LIGNITE, AND PEAT↗

Assessment of medical risk in space flight

Among the various manned space missions expected during the next 10 years are flights of up to 6 months duration in low earth orbit as well as short excursions to geosynchronous orbit. Research activities are described which cover the full spectrum of physiological and psychological problems presented by such flights as well as by ongoing Shuttle flights. This paper includes a summary of the major technical thrusts needed for habitation in space. It concludes that there is a high probability of developing countermeasures that will alleviate the neurophysiological and cardiovascular effects encountered during Shuttle flights and that the resolution of musculoskeletal, psychological and radiobiological problems will also prove possible.

Nicogossian, A.↗

Space-based solar power conversion and delivery systems study. Volume 1: Executive summary

The technical and economic aspects of satellite solar power systems are presented with a focus on the current configuration 5000 MW system. The technical studies include analyses of the orbital system structures, control and stationkeeping, and the formulation of program plans and costs for input to the economic analyses. The economic analyses centered about the development and use of a risk analysis model for a system cost assessment, identification of critical issues and technologies, and to provide information for programmatic decision making. A preliminary economic examination of some utility interface issues is included. Under the present state-of-knowledge, it is possible to formulate a program plan for the development of a satellite solar power system that can be economically justified. The key area of technological uncertainty is man's ability to fabricate and assemble large structures in space.

Hazelrigg, G. A., Jr.↗

Technology alternatives for the SPS

Emerging technologies may offer advantages over those selected for the reference design adopted for the SPS. While it is not possible to list all the technological innovations that may affect the SPS, it is feasible to develop a systematic methodology for assessing technical alternatives. This may be of value in evaluating proposed technologies and identifying high priority areas for research. Such a methodology includes involves (1) variation of guidelines; (2) analysis of system functions; (3) analysis of system sensitivity; (4) analysis of technology status and risk; and (5) external costs, problem areas, and criticisms of the SPS concept. The methodology is a first step towards the creation of a formal decision analytic framework which can support design choices and program decisions as development proceeds.

Glaser, P.↗