Remote Technology to Retrieve Waste Below the 324 Building at the Hanford Site - 19622

The Waste Technology Engineering Laboratory (324 Building) is a Category 2 Nuclear Facility at Hanford. The 324 Building Disposition Project is responsible for the removal and remedial actions under CERCLA. Additionally, there are RCRA Dangerous Waste Management Units which the CERCLA actions are presumed to satisfy. The Radiochemical Engineering Complex (REC) is a group of four hot cells (A, B, C and D Cells) with an interconnecting airlock inside of the 324 Building. Underneath the REC B-Cell are contaminated soils that have an estimated 12,793 R/Hr dose rate and remediation is under CERCLA 300-FF-2 Operable Unit. The current action consists of debris removal from the floor of B-Cell, B-Cell floor removal, and excavation of the soils beneath the floor to a depth of up to twelve feet with four Remote Excavator Arms (REA). This paper provides insight into the preparation and performance of high tolerance core drilling into a hot cell complex. Installation of the REA Through Support (REA TS) mechanism through the 4'-6' concrete shield walls is a complex series of tasks with demanding tolerances at each of four locations around the perimeter of B-Cell. The use of training mock ups was included in the completion of this work. The REA TS is two 11 inch diameter high strength steel sleeves that have expandable collars at each end allowing the interstitial space between the outside of the sleeve and inside of the core drill to be grouted to form a substantial structural connection, and a 10 inch pipe with hydraulic hoses to power the REA. There are three cores required for each REA location. The REAs themselves are customized excavator arms, mounted on support columns to be used in the excavation and transfer of the contaminated soil into storage facilities. The tasks for the installation of the REA TSs are: 1) Characterization of B-Cell Cubicles. 2) Embedded Pipe Fill. 3) Interference Removal. a. Internal Walls, b. External Walls. 4) Core Drilling. 5) Go/No-Go gauge, and video inspection. 6) Installation of REA Through Support Assembly. The 324 Building REC Hot Cells have internal, external, and embedded utilities throughout the shield walls in conflict with the REA TS locations. Some of the embedded utilities have connection points inside of the B-Cell Cubicles. There were two separate issues at the conflicted locations. The first issue was the core drill cooling water would flow along the embedded utility potentially spreading legacy chemical and radiological contamination to areas of the facility that was unwanted. The second issue was that the REA TS required a substantial structural connection to the B-Cell wall, the cored diameter is larger than the REA TS and these interstitial areas required a full grouted connection. The embedded utilities posed a hazard that if unfilled, the interstitial grout would flow into the embedded utility and destabilize the required grouted structural connection. The B-Cell Cubicles had not been opened in over 10 years. A mockup was completed to install a glovebag over the cubicle opening and then to verify functionality and port requirements. The embedded utility pipe connections in the cubicles were then opened inside a glovebag to verify the correct connection points, connection method for future embedded pipe fill material delivery system, radiological characterization, and air flow to show that the embedded utility pipes were not blocked and would not pressurize. The embedded pipe fill material and grout system was mocked up and run several times to verify methodology and functionality. The B-Cell Cubicles were then reentered and the embedded utility pipe fill was completed using a hand pump. External interferences at the core drill locations were removed using standard interference removal techniques. Internal interferences at the core drill locations were removed using a remote cutting tool that was controlled through the use of the B-Cell crane, remote cameras and remote lighting. The core drilling was mocked up two separate times, the project's purpose built 'Mock Up Facility' was core drilled to verify tolerances and methodology prior to subcontract award, the core drill subcontractor built a 'dummy wall' to train and practice on achieving the demanding tolerances, coordinated alignments between the cores, short term and long term dose shielding techniques, and contamination control techniques. A core drill template, and additional anchoring techniques were used to maximize accuracy and precision of the REA TS core drills. A 'Go/No-Go' gauge was built and installed at each of the four REA TS locations to verify that the core drill met tolerances. The core drill locations were visually inspected using a boroscope. The REA TS installation was mocked up at the projects 'Mock Up Facility' beginning with basic hazard controls, then with intermediate hazard controls, and finally with full occupational safety, industrial hygiene, and radiological controls. The REA TSs were installed and grouted into place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of a Soil Flushing Treatability Test for Hanford Site Hexavalent Chromium Removal - 20446

U.S. Department of Energy contractor CH2M Hill Plateau Remediation Company has made significant progress remediating hexavalent chromium in groundwater near the Columbia River through the operation of pump and treat facilities and source removal activities. To mitigate risks associated with hexavalent chromium contamination, which was identified in a CERCLA interim action record of decision as the primary groundwater contaminant of concern for the 100-KR-4 Operable Unit from discharging to the Columbia River, three ion-exchange pump and treat systems were installed between 1997 and 2009. Between 2010 and 2016, operation of the K West pump and treat system, located near the former 105K West plutonium production reactor, reduced concentrations below the groundwater remediation target for hexavalent chromium. In 2016, a rebound study was performed to evaluate the effectiveness of the pump and treat remedy and assess the potential for any residual hexavalent chromium sources continuing to contribute to groundwater contamination. As a result of the rebound study, a source of continued groundwater contamination was identified. To address this condition, a soil flushing treatability test was written and approved by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The test included saturating about a 1-acre area of soil with treated water with the goal of forcing the residual hexavalent chromium to groundwater where existing extraction wells could remove it for treatment, accelerating the cleanup process. In spring and summer 2019, CH2M Hill Plateau Remediation Company installed and began operating a shallow underground leach system to support the treatability test. Preliminary sampling data show the test was effective in removing the residual contamination. Following further evaluation and analysis from the initial test, the process will be considered for implementation elsewhere on the Hanford Site, particularly at locations where there is a known or suspected continuing contamination source in the soil column. The paper will cover the goals of the study, as well as more details about the following: - Overview of pump and treat exit strategy (using U.S. Environmental Protection Agency guidance); - The design and installation of the soil flushing technology in the 100-K Area; - The testing process and results of sampling data; - Post-study evaluation and potential for implementation in other locations at the Hanford Site. Innovative solutions for cleanup, such as the soil flushing technology, have resulted in substantial progress in the removal of groundwater contaminants at the Hanford Site, potentially shortening the time frame required to meet cleanup goals and resulting in significant cost savings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HANFORD REGULATORY EXPERIENCE REGULATION AT HANFORD A CASE STUDY

Hanford has played a pivotal role in the United States' defense for more than 60 years, beginning with the Manhattan Project in the 1940s. During its history, the Hanford Site has had nine reactors producing plutonium for the United States' nuclear weapons program. All the reactors were located next to the Columbia River and all had associated low-level radioactive and hazardous waste releases. Site cleanup, which formally began in 1989 with the signing of the Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement, involves more than 1,600 waste sites and burial grounds, and the demolition of more than 1,500buildings and structures, Cleanup is scheduled to be complete by 2035. Regulatory oversight of the cleanup is being performed by the U.S. Environmental Protection Agency (EPA) and the Washington State Department of Ecology(Ecology) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Revised Code of Washington, 'Hazardous Waste Management.' Cleanup of the waste sites and demolition of the many buildings and structures generates large volumes of contaminated soil, equipment, demolition debris, and other wastes that must be disposed of in a secure manner to prevent further environmental degradation. From a risk perspective, it is essential the cleanup waste be moved to a disposal facility located well away from the Columbia River. The solution was to construct very large engineered landfill that meets all technical regulatory requirements, on the Hanford Site Central Plateau approximately 10kilometers from the river and 100metersabovegroundwater. This landfill, called the Environmental Restoration Disposal Facility or ERDF is a series of cells, each 150x 300 meters wide at the bottom and 20 meters deep. This paper looks at the substantive environmental regulations applied to ERDF, and how the facility is designed to protect the environment and meet regulatory requirements. The paper describes how the U.S. Department of Energy(DOE),EPA, and Ecology interact in its regulation. In addition, the response to a recent $1 million regulatory fine is described to show actual interactions and options in this aspect of the regulatory process. The author acknowledges the significant contributions by Messrs. Clifford Clark and Owen Robertson. Ms. Nancy Williams provided graphics support and Ms. Laurie Kraemer edited the report.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Plutonium Finishing Plant (PFP) 241-Z Liquid Waste Treatment Facility Deactivation and Demolition

Fluor Hanford, Inc. (FH) is proud to submit the Plutonium Finishing Plant (PFP) 241-Z liquid Waste Treatment Facility Deactivation and Demolition (D&D) Project for consideration by the Project Management Institute as Project of the Year for 2008. The decommissioning of the 241-Z Facility presented numerous challenges, many of which were unique within the Department of Energy (DOE) Complex. The majority of the project budget and schedule was allocated for cleaning out five below-grade tank vaults. These highly contaminated, confined spaces also presented significant industrial safety hazards that presented some of the most hazardous work environments on the Hanford Site. The 241-Z D&D Project encompassed diverse tasks: cleaning out and stabilizing five below-grade tank vaults (also called cells), manually size-reducing and removing over three tons of process piping from the vaults, permanently isolating service utilities, removing a large contaminated chemical supply tank, stabilizing and removing plutonium-contaminated ventilation ducts, demolishing three structures to grade, and installing an environmental barrier on the demolition site. All of this work was performed safely, on schedule, and under budget. During the deactivation phase of the project between November 2005 and February 2007, workers entered the highly contaminated confined-space tank vaults 428 times. Each entry (or 'dive') involved an average of three workers, thus equaling approximately 1,300 individuals confined -space entries. Over the course of the entire deactivation and demolition period, there were no recordable injuries and only one minor reportable skin contamination. The 241-Z D&D Project was decommissioned under the provisions of the 'Hanford Federal Facility Agreement and Consent Order' (the Tri-Party Agreement or TPA), the 'Resource Conservation and Recovery Act of 1976' (RCRA), and the 'Comprehensive Environmental Response, Compensation, and Liability Act of 1980' (CERCLA). The project completed TPA Milestone M-083-032 to 'Complete those activities required by the 241-Z Treatment and Storage Unit's RCRA Closure Plan' four years and seven months ahead of this legally enforceable milestone. In addition, the project completed TPA Milestone M-083-042 to 'Complete transition and dismantlement of the 241-2 Waste Treatment Facility' four years and four months ahead of schedule. The project used an innovative approach in developing the project-specific RCRA closure plan to assure clear integration between the 241-Z RCRA closure activities and ongoing and future CERCLA actions at PFP. This approach provided a regulatory mechanism within the RCRA closure plan to place segments of the closure that were not practical to address at this time into future actions under CERCLA. Lessons learned from th is approach can be applied to other closure projects within the DOE Complex to control scope creep and mitigate risk. A paper on this topic, entitled 'Integration of the 241-Z Building D and D Under CERCLA with RCRA Closure at the PFP', was presented at the 2007 Waste Management Conference in Tucson, Arizona. In addition, techniques developed by the 241-Z D&D Project to control airborne contamination, clean the interior of the waste tanks, don and doff protective equipment, size-reduce plutonium-contaminated process piping, and mitigate thermal stress for the workers can be applied to other cleanup activities. The project-management team developed a strategy utilizing early characterization, targeted cleanup, and close coordination with PFP Criticality Engineering to significantly streamline the waste- handling costs associated with the project . The project schedule was structured to support an early transition to a criticality 'incredible' status for the 241-Z Facility. The cleanup work was sequenced and coordinated with project-specific criticality analysis to allow the fissile material waste being generated to be managed in a bulk fashion, instead of individual waste packages. This approach negated the need for real-time assay of individual waste packages, greatly improving the efficiency of the cleanup operation. The cleanup and stabilization of the 241-2 Liquid Effluent Treatment Facility reduced radiological risks to the environment and Hanford site workers. It was recognized as a success by regulatory agencies, the media, the DOE-client, and stakeholders. The 241-Z D&D Project demonstrated management excellence in adapting to significant changes in project direction, fostered a safety culture that amassed impressive results on this high-hazard job, maintained excellent communications with the client and stakeholders, and developed and implemented unique cleanup techniques.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FINAL FRONTIER AT HANFORD TACKLING THE CENTRAL PLATEAU

The large land area in the center of the vast Department of Energy (DOE) Hanford Site in southeast Washington State is known as 'the plateau'--aptly named because its surface elevations are 250-300 feet above the groundwater table. By contrast, areas on the 585-square mile Site that border the Columbia River sit just 30-80 feet above the water table. The Central Plateau, which covers an ellipse of approximately 70 square miles, contains Hanford's radiochemical reprocessing areas--the 200 East and 200 West Areas--and includes the most highly radioactive waste and contaminated facilities on the Site. Five 'canyons' where chemical processes were used to separate out plutonium (Pu), 884 identified soil waste sites (including approximately 50 miles of solid waste burial trenches), more than 900 structures, and all of Hanford's liquid waste storage tanks reside in the Central Plateau. (Notes: Canyons is a nickname given by Hanford workers to the chemical reprocessing facilities. The 177, underground waste tanks at Hanford comprise a separate work scope and are not under Fluor's management). Fluor Hanford, a DOE prime cleanup contractor at the Site for the past 12 years, has moved aggressively to investigate Central Plateau waste sites in the last few years, digging more than 500 boreholes, test pits, direct soil 'pushes' or drive points; logging geophysical data sets; and performing electrical-resistivity scans (a non-intrusive technique that maps patterns of sub-surface soil conductivity). The goal is to identify areas of contamination areas in soil and solid waste sites, so that cost-effective and appropriate decisions on remediation can be made. In 2007, Fluor developed a new work plan for DOE that added 238 soil waste-site characterization activities in the Central Plateau during fiscal years (FYs) 2007-2010. This number represents a 50 percent increase over similar work previously done in central Hanford. Work Plans are among the required steps in the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) cleanup process. The CERCLA process is used to oversee the investigation, decision-making and remediation of 'past practices' (historical) sites, as opposed to sites in active use. For the first several years of Hanford's cleanup work, everyone concerned--the Department, contractors, regulatory agencies, stakeholders and Indian nations and tribes--focused efforts on the rivershore. The magnificent Columbia River--eighth largest in the world--flows through and by the Hanford Site for 52 miles. Two million people live downstream from Hanford along the Columbia before it empties into the Pacific Ocean. Further, the part of the river known as the 'Hanford Reach' is a prime habitat for salmon, steelhead, sturgeon and other species of fish. In fact, it provides a spawning ground to more salmon than any other stretch of river in the United States outside of Alaska. For these reasons, protecting the Columbia by cleaning up waste directly along its shoreline was an early priority in Hanford's Federal Facility Agreement and Consent Order (or Tri-Party Agreement) signed in 1989 among the DOE, U.S. Environmental Protection Agency (EPA) and Washington State to govern cleanup. However, Tri-Party Agreement signatories and others concerned with Hanford and the Columbia River, knew that the waste located in, and beneath, the Central Plateau could also pose dangers to the waterway. While the waste in central Hanford might move more slowly, and pose fewer immediate threats, it would have to be dealt with as cleanup progressed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ESTABLISHING FINAL END STATE FOR A RETIRED NUCLEAR WEAPONS PRODUCTION REACTOR; COLLABORATION BETWEEN STAKEHOLDERS, REGULATORS AND THE FEDERAL GOVERNMENT

The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River (SRS) near Aiken, South Carolina. Nuclear weapons material production began in the early 1950s, utilizing five production reactors. In the early 1990s all SRS production reactor operations were terminated. The first reactor closure end state declaration was recently institutionalized in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 318,000 square foot 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U. S. Environmental Protection Agency (US EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized/immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the upfront planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 200 mile radius) with stakeholder and SRS Citizens Advisory Board participation. These meetings were conducted over an eight month period as the end state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four SRS reactors and other hardened facilities such as the chemical processing canyons.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

COMPOSITE ANALYSIS OF LLW DISPOSAL FACILITIES AT THE U.S. DEPARTMENT OF ENERGY'S SAVANNAH RIVER SITE

Composite Analyses (CA's) are required per DOE Order 435.1 [1], in order to provide a reasonable expectation that DOE low-level waste (LLW) disposal, high-level waste tank closure, and transuranic (TRU) waste disposal in combination with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA), and deactivation and decommissioning (D&D) actions, will not result in the need for future remedial actions in order to ensure radiological protection of the public and environment. This Order requires that an accounting of all sources of DOE man-made radionuclides and DOE enhanced natural radionuclides that are projected to remain on the site after all DOE site operations have ceased. This CA updates the previous CA that was developed in 1997. As part of this CA, an inventory of expected radionuclide residuals was conducted, exposure pathways were screened and a model was developed such that a dose to the MOP at the selected points of exposure might be evaluated.

54 ENVIRONMENTAL SCIENCES↗

AUTOMATING GROUNDWATER SAMPLING AT HANFORD

Until this past October, Fluor Hanford managed Hanford's integrated groundwater program for the U.S. Department of Energy (DOE). With the new contract awards at the Site, however, the CH2M HILL Plateau Remediation Company (CHPRC) has assumed responsibility for the groundwater-monitoring programs at the 586-square-mile reservation in southeastern Washington State. These programs are regulated by the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). The purpose of monitoring is to track existing groundwater contamination from past practices, as well as other potential contamination that might originate from RCRA treatment, storage, and disposal (TSD) facilities. An integral part of the groundwater-monitoring program involves taking samples of the groundwater and measuring the water levels in wells scattered across the site. More than 1,200 wells are sampled each year. Historically, field personnel or 'samplers' have been issued pre-printed forms that have information about the well(s) for a particular sampling evolution. This information is taken from the Hanford Well Information System (HWIS) and the Hanford Environmental Information System (HEIS)--official electronic databases. The samplers used these hardcopy forms to document the groundwater samples and well water-levels. After recording the entries in the field, the samplers turned the forms in at the end of the day and the collected information was posted onto a spreadsheet that was then printed and included in a log book. The log book was then used to make manual entries of the new information into the software application(s) for the HEIS and HWIS databases. This is a pilot project for automating this tedious process by providing an electronic tool for automating water-level measurements and groundwater field-sampling activities. The automation will eliminate the manual forms and associated data entry, improve the accuracy of the information recorded, and enhance the efficiency and sampling capacity of field personnel. The goal of the effort is to eliminate 100 percent of the manual input to the database(s) and replace the management of paperwork by the field and clerical personnel with an almost entirely electronic process. These activities will include the following: scheduling the activities of the field teams, electronically recording water-level measurements, electronically logging and filing Groundwater Sampling Reports (GSR), and transferring field forms into the site-wide Integrated Document Management System (IDMS).

54 ENVIRONMENTAL SCIENCES↗

IMPROVING CONSISTENCY OF PERFORMANCE ASSESSMENTS IN THE DOE COMPLEX

The low-level waste (LLW) performance assessment (PA) process has been traditionally focused on disposal facilities at a few United States Department of Energy (USDOE) sites and commercial disposal facilities. In recent years, there has been a dramatic increase in the scope of the use of PA-like modeling approaches, involving multiple activities, facilities, contractors and regulators. The scope now includes, for example: (1) National Environmental Policy Act (NEPA) assessments, (2) CERCLA disposal cells, (3) Waste Determinations and High-Level Waste (HLW) Closure activities, (4) Potential on-site disposal of Transuranic (TRU) waste, and (5) In-situ decommissioning (including potential use of existing facilities for disposal). The dramatic increase in the variety of activities requiring more detailed modeling has resulted in a similar increase in the potential for inconsistency in approaches both at a site and complexwide scale. This paper includes a summary of USDOE Environmental Management (EM) sponsored initiatives and activities for improved consistency. New initiatives entitled the Performance Assessment Community of Practice and Performance Assessment Assistance Team are also introduced.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗