NASA James Webb Space Telescope Engineering of the Primary Mirror Segment Assemblies (PMSA) and the Primary Mirror Backplane Support Structure (PMBSS)
The design, engineering tests of the PMSAs PMBSS show that we have a robust system that not only meets but exceeds (better than) the design requirements for these components. In the next 2 years the Telescope Observatory will be subjected to a simulated launch environment (sine vibeacoustics) and operations tests at cryogenic temperatures. Launch is schedule for the last quarter of 2018.