Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Second Target Station”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Hybrid Membrane/Absorption Process for Post-combustion CO2 Capture

This report summarizes scientific/technical progress made for bench-scale membrane contactor technology for post-combustion CO2 capture from DOE Contract No. DE-FE-0004787. Budget Period 1 (BP1) membrane absorber, Budget Period 2 (BP2) membrane desorber and Budget Period 3 (BP3) integrated system and field testing studies have been completed successfully and met or exceeded the technical targets (≥ 90% CO2 removal and CO2 purity of 97% in one membrane stage). Significant breakthroughs are summarized below: BP1 research: The feasibility of utilizing the poly (ether ether ketone), PEEK, based hollow fiber contractor (HFC) in combination with chemical solvents to separate and capture at least 90% of the CO2 from simulated flue gases has been successfully established. Excellent progress has been made as we have achieved the BP1 goal: ≥ 1,000 membrane intrinsic CO2 permeance, ≥ 90% CO2 removal in one stage, ≤ 2 psi gas side pressure drop, and ≥ 1 (sec)-1 mass transfer coefficient. Initial test results also show that the CO2 capture performance, using activated Methyl Diethanol Amine (aMDEA) solvent, was not affected by flue gas contaminants O2 (~3%), NO2 (66 ppmv), and SO2 (145 ppmv). BP2 research: The feasibility of utilizing the PEEK HFC for CO2-loaded solvent regeneration has been successfully established High CO2 stripping flux, one order of magnitude higher than CO2 absorption flux, have been achieved. Refined economic evaluation based on BP1 membrane absorber and BP2 membrane desorber laboratory test data indicate that the CO2 capture costs are 36% lower than DOE’s benchmark amine absorption technology. BP3 research: A bench-scale system utilizing a membrane absorber and desorber was integrated into a continuous CO2 capture process using contactors containing 10 to 20 ft2 of membrane area. The integrated process operation was stable through a 100-hour laboratory test, utilizing a simulated flue gas stream. Greater than 90% CO2 capture combined with 97% CO2 product purity was achieved throughout the test. Membrane contactor modules have been scaled from bench scale 2-inch diameter by 12-inch long (20 ft2 membrane surface area) modules to 4-inch diameter by 60-inch long pilot scale modules (165 ft2 membrane surface area). Pilot scale modules were tested in an integrated absorption/regeneration system for CO2 capture field tests at a coal-fired power plant (Midwest Generation’s Will County Station located in Romeoville, IL). Absorption and regeneration contactors were constructed utilizing high performance super-hydrophobic, nano-porous PEEK membranes with CO2 gas permeance of 2,000 GPU and a 1,000 GPU, respectively. Field tests using aMDEA solvent achieved greater than 90% CO2 removal in a single stage. The absorption mass transfer coefficient was 1.2 (sec)-1, exceeding the initial target of 1.0 (sec)-1. This mass transfer coefficient is over one order of magnitude greater than that of conventional gas/liquid contacting equipment. The economic evaluation based on field tests data indicates that the CO2 capture cost associated with membrane contactor technology is $54.69 (Yr 2011$)/tonne of CO2 captured when using aMDEA as a solvent. It is projected that the DOE’s 2025 cost goal of $40 (Yr 2011$)/tonne of CO2 captured can be met by decreasing membrane module cost and by utilizing advanced CO2 capture solvents. In the second stage of the field test, an advanced solvent, Hitachi’s H3-1 was utilized. The use of H3-1 solvent increased mass transfer coefficient by 17% as compared to aMDEA solvent. The high mass transfer coefficient of H3-1 solvent combined with much more favorable solvent regeneration requirements, indicate that the projected savings achievable with membrane contactor process can be further improved. H3-1 solvent will be used in the next pilot-scale development phase. The integrated absorption/regeneration process design and high performance membrane contactors developed in the current bench-scale program will be used as the base technology for future pilot-scale development.

Coal-Environmental Processes↗

Solar system exploration in the 1990's and beyond

Exploration of Venus by Magellan and Pioneer Venus continues. Additionally, Galileo's Venus-earth-earth gravity assist trajectory to Jupiter has already provided targets of opportunity at Venus and at earth. Additional opportunities exist during the October 29, 1991, flyby of the asteroid Gaspra, the second earth gravity assist on December 8, 1992, and the flyby of the asteroid Ida on October 18, 1993. A fully successful mission through entry of the Jupiter atmospheric probe is anticipated in 1995/1996. The buildup of the Mars Observer spacecraft for a September 1992 launch is accelerating, and the development of the CRAF spacecraft and the orbiter for the NASA-ESA Cassini mission to Saturn is proceeding. Strategic plans to continue this ambitious program include early initiation of a phased program to detect other planetary systems; start of a program of low-cost, near-earth missions beginning with a near-earth asteroid rendezvous; continuation of moon-Mars exploration using sequentially launched single experiment Lunar Scouts and clusters of small landers to build up a Mars network of 16 stations; and finally, start of a major mission late in the century to explore Neptune and/or Pluto.

Huntress, Wesley T., Jr.↗

Final Scientific/Technical Report for project “Geomechanical Monitoring for CO 2 Hub Storage: Production and Injection at Kevin Dome

After learning that the TDS value in the target injection formation at the Kevin Dome site is too low to qualify for an EPA Class VI CO2 injection permit, the BSCSP project was re-scoped such that injection of CO2 is no longer planned. With no injection planned, the Geomechanics project was closed. In this final report, we describe the objective and approach of the project as proposed, and the limited results obtained before stopping work. The objective of the proposed research was the development & validation of an integrated monitoring approach for quantifying the interactions between large-scale geological carbon storage (GCS) and subsurface geomechanical state, particularly perturbations relevant to reservoir integrity such as fault reactivation and induced fracturing. In the short period of work before knowing the fate of the Kevin Dome project, we (1) researched designs for both the proposed InSAR corner reflectors as well as the near-surface 3C seismic stations; (2) developed preliminary elastic geomechanical models; (3) developed a second generation deformation prediction for the BSCSP Kevin Dome injection site; and (4) completed a preliminary map of InSAR monuments and shallow MEQ wells in the vicinity of the BSCSP injection pad.

58 GEOSCIENCES↗

Simulator Investigation of Controls and Display Required for Terminal Phase of Coplanar Orbital Rendezvous

A simulator study was made of presentations and control requirements for a manned astrovehicle employed in the interception of artificial satellites during the terminal phase of an orbital rendezvous of the satellite. The study was considered in terms of a manned interceptor having a home berth at a manned space station which is in circular orbit 500 miles above the earth. Interceptions were restricted to coplanar conditions and ranges of one-half mile. The results are believed to be generally applicable to conditions wherein the target is in the terminal area. Presentations which do not provide for attitude indications of the intercepting vehicle are not satisfactory. A direct-visual-observation presentation employing a screen, a projected star background, and a projected image of the target provided a feeling of "realism" in tracking and would be a satisfactory pilot-training aid. Use of longitudinal-translation and attitude controls alone is inadequate. Use of translation control alone, parallel and normal to the axis of the intercepting vehicle, is effective; the addition of attitude control enhanced the effectiveness, provided the control was used discriminately. Direct-visual-observation interceptions can be performed effectively without the aid of range and rate-of-closure-of-range meters at speeds up to approximately 50 feet per second; however, higher speeds of interception require the use of these instruments.

Wolowicz, Chester H.↗

GROUDWATER REMEDIATION AT THE 100-HR-3 OPERABLE UNIT HANFORD SITE WASHINGTON USA - 11507

The 100-HR-3 Groundwater Operable Unit (OU) at the Hanford Site underlies three former plutonium production reactors and the associated infrastructure at the 100-D and 100-H Areas. The primary contaminant of concern at the site is hexavalent chromium; the secondary contaminants are strontium-90, technetium-99, tritium, uranium, and nitrate. The hexavalent chromium plume is the largest plume of its type in the state of Washington, covering an area of approximately 7 km{sup 2} (2.7 mi{sup 2}) with concentrations greater than 20 {micro}g/L. Concentrations range from 60,000 {micro}g/L near the former dichromate transfer station in the 100-D Area to large areas of 20 to 100 {micro}g/L across much of the plume area. Pump-and-treat operations began in 1997 and continued into 2010 at a limited scale of approximately 200 gal/min. Remediation of groundwater has been fairly successful in reaching remedial action objectives (RAOs) of 20 {micro}g/L over a limited region at the 100-H, but less effective at 100-D. In 2000, an in situ, permeable reactive barrier was installed downgradient of the hotspot in 100-D as a second remedy. The RAOs are still being exceeded over a large portion of the area. The CH2M HILL Plateau Remediation Company was awarded the remediation contract for groundwater in 2008 and initiated a remedial process optimization study consisting of modeling and technical studies intended to enhance the remediation. As a result of the study, 1,400 gal/min of expanded treatment capacity are being implemented. These new systems are designed to meet 2012 and 2020 target milestones for protection of the Columbia River and cleanup of the groundwater plumes.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

CRV Escape Trajectories from the ISS

The Crew Return Vehicle (CRV) slated for use on the International Space Station (ISS) provides a safe return for up to seven crew members under various emergency conditions. One of the most demanding situations for executing the escape involves separating from a tumbling ISS Current requirements specify a maximum Root Sum Square (RSS) tumble rate of 2 degrees/second, with the additional requirement for an expedited departure from any ISS attitude. The design of a trajectory that ensures no re-contact with the ISS poses many challenges on the Guidance, Navigation, and Control (GN&C) system of the vehicle. To ensure no re-contact the trajectory design employs a two burn sequence, with the first burn preventing near-term collision and the second burn preventing far-field re-contact This presentation describes the approach used to design and to evaluate trajectories for CRV departure from the baselined location on the ISS Node 3 starboard. This approach involved performing a parametric search of selected control variables vital in escaping the tumbling ISS The presentation provides a candidate targeting methodology for escape using minimal information from available navigation devices, and presents the quantitative results from the analysis.

Foti, Tony M.↗

Results from the ASTERIA CubeSat Extended Mission Experiments

Over the past two years, JPL has used the ASTERIA (Arcsecond Space Telescope Enabling Research In Astrophysics) CubeSat as an in-flight test platform during extended missions. ASTERIA successfully completed its prime mission in early 2018, and continued to operate in low Earth orbit (LEO) for an additional twenty months. This paper describes demonstrations that were performed on the spacecraft and on the ground-based testbed during the extended mission. These demonstrations fall into three categories: Autonomy technology maturation, hardware characterization, and science discovery. Autonomy technology maturation supported three development efforts. The first shifted the spacecraft commanding paradigm from time-based sequences to Task Networks (tasknets), which allow simpler commanding and more robust onboard execution. The second demonstrated onboard orbit determination in Low Earth Orbit (LEO) without GPS. This activity used a fully-independent means of spacecraft orbit determination for Earth orbiters using only passive imaging. The third technology provided in situ hardware health state estimation using a model-based reasoning technique. These three technologies were demonstrated either in flight or on the testbed individually, and then were combined to demonstrate the capability to perform autonomous navigation on board without ground intervention, even in the presence of anomalies. Hardware characterization involved both onboard and ground-based activities. On board, nonstandard attitude control modes were commanded to characterize the spacecraft pointing jitter as a function of target brightness, reaction wheel speed, controller gain, and the number of guide stars. The results provide insights into the contribution of jitter to the ASTERIA photometry and inform the feasibility of future astrophysics small satellite missions for which jitter control is an enabling technology. On the ground, the ASTERIA Operations Team coordinated with Amazon Web Services (AWS) to configure their new ground stations to communicate with ASTERIA to prove out their viability. ASTERIA used AWS ground stations for nominal operations for the last four months of the mission. Finally, ASTERIA continued to perform exoplanet science as the spacecraft was well-suited to execute long-term monitoring of stars such as alpha Centauri to search for small transiting planets. The science team also imaged a number of interesting objects including a comet, an asteroid, cities at night, and the moon, and coordinated with other projects on Targets of Opportunity for follow-up confirmations and co-observations. Throughout the prime and the extended missions, the ASTERIA spacecraft proved to be a mighty platform that “will go into history as an innovative milestone.”[1 - Zurbuchen]

Doran, Patrick↗

Dynamic PRA Methods to Evaluate the Impact on Accident Progression of Accident Tolerant Fuels

Accident tolerant fuels (ATFs) are new nuclear fuels developed in response to the accident at the Fukushima power station in March 2011. The goal of ATFs is to withstand accident scenarios through better performance compared to currently employed fuels (e.g., small-scale hydrogen generation). This paper targets a method for evaluating and comparing ATF performance from a probabilistic risk assessment (PRA) perspective by employing a newly developed combination of event trees and dynamic PRA methods. Compared to classical PRA methods based on event trees and fault trees, dynamic PRA can evaluate with higher resolution the safety impacts of physics dynamics and the timing/sequencing of events on the accident progression without the need to introduce overly conservative modeling assumptions and success criteria. In this paper, we analyze the impact on the accident progression of three different cladding configurations for two initiating events [a large break loss-of-coolant accident (LB-LOCA) and a station blackout (SBO)] by employing dynamic PRA methods. The goal is to compare the safety performance of ATFs (FeCrAl and Cr-coated cladding) and the currently employed Zr-based clad fuel. We employ two different strategies. The first focuses on the identification of success criteria discrepancies between the accident sequences generated by the classical PRA model and the set of simulation runs generated by dynamic PRA using ATF. The second one, on the other hand, directly uses dynamic PRA to evaluate the impact of timing of events (e.g., recovery actions) on accident progression. In conclusion, by applying these methods to the LB-LOCA and SBO initiating events, we show how dynamic PRA methods can provide analysts with detailed and quantitative information on the safety impact of ATFs.

97 - MATHEMATICS AND COMPUTING↗

Mission Design Overview for Mars 2003/2005 Sample Return Mission

In May 2003, a new and exciting chapter in Mars exploration will begin with the launch of the first of three spacecraft that will collectively contribute toward the goal of delivering samples from the Red Planet to Earth. This mission is called Mars Sample Return (MSR) and will utilize both the 2003 and 2005 launch opportunities with an expected sample return in October 2008. NASA and CNES are major partners in this mission. The baseline mission mode selected for MSR is Mars orbit rendezvous (MOR), analogous in concept to the lunar orbit rendezvous (LOR) mode used for Apollo in the 1960s. Specifically, MSR will employ two NASA-provided landers of nearly identical design and one CNES-provided orbiter carrying a NASA payload of rendezvous sensors, orbital capture mechanisms, and an Earth entry vehicle (EEV). The high-level concept is that the landers will launch surface samples into Mars orbit, and the orbiter will retrieve the samples in orbit and then carry them back to Earth. The first element to depart for Mars will be one of the two landers. Currently, it is proposed that an intermediate class launch vehicle, such as the Boeing Delta 3 or Lockheed Martin Atlas 3A, will launch this 1800-kg lander from Cape Canaveral during the May 2003 opportunity. The lander will utilize a Type-1 transfer trajectory with an arrival at Mars in mid-December 2003. Landing will be aided by precision approach navigation and a guided hypersonic entry to achieve a touchdown accuracy of 10 km or better. Although the exact landing site has not yet been determined, it is estimated that lander resource constraints will limit the site to between 15 degrees north and south latitudes. Following touchdown, the lander will deploy a six-wheeled, 60-kg rover carrying an extensive suite of instruments designed to aid in the analysis of the local terrain and collection of core samples from selected rocks. The surface mission is currently designed around a concept called the surface traverse. Each traverse will involve the rover exploring a selected area of terrain up to 100 meters from the lander, the collection of rock core samples, and the delivery of the samples from the traverse back to a sample canister on the lander. Planning estimates indicate that up to three traverses may be possible during the expected 90-sol lifetime of the lander. The canister that will receive the samples from the rover will be attached to the top stage of a small solid-fueled rocket mounted to the deck of the lander. This rocket is called the Mars Ascent Vehicle (MAV) and consists of three stages weighing a total of about 140 kg. After the conclusion of the surface mission, the MAV will lift-off and insert the sample canister into a near-circular orbit with an altitude of about 600 km and inclination of 45 degrees. The sample canister will wait in this orbit until it is retrieved by the orbiter sometime in early 2007. In August 2005, the second lander and a CNES-provided orbiter weighing 2700 kg will depart for Mars. Currently, it is proposed that a single Ariane 5 provided by CNES will launch both of these two elements onto a Type-2 transfer trajectory. Although the orbiter and lander will be launched together, they will separate shortly after injection and will fly to Mars as two independent spacecraft. However, both spacecraft will perform a maneuver between 10 and 15 days after launch so that their arrival times at Mars differ by between 12 and 24 hours. This scheme will reduce the operational complexity at the encounter date. A set of four 60-kg surface probes will ride piggyback on the orbiter to Mars. These CNES-provided probes are called Netlanders and will serve as surface stations for scientific investigations independent of the Mars Sample Return goals. Starting approximately one month prior to arrival at Mars, the orbiter will begin to release the Netlanders one at a time. Each release cycle will take several days, and will include time for precision navigation to execute one or two maneuvers that will target the Netlanders to their proper landing site. All four deployment cycles will be completed prior to 10 days before arrival. Both the orbiter and lander will arrive in late-July 2006. Upon arrival, the lander will perform a precision landing and surface mission similar in concept to the one that was executed during the 2003 opportunity. Although the landing site for the 2005 opportunity has not been selected, it is expected to be different from the 2003 site to enhance the diversity of the collected samples. The orbiter's arrival at Mars will be highlighted by the first use of aerocapture to insert a spacecraft into a capture orbit around another planet. The choice of aerocapture, as opposed to a propulsive orbit insertion, was considered mission enabling due to a reduction of over 2000 m/s in mission AV. Aerocapture will be targeted to produce a 250 km x 1400 km capture orbit with an inclination of 45 degrees. Current analysis indicates that achieving this goal will require approximately six minutes of flight deep in the atmosphere with a targeted periapsis of approach of about 43 km. After factoring into account the penalty for carrying a heat shield to survive aerocapture, the net savings compared to a propulsive orbital insertion amounts to several hundred kilograms.

Lee, Wayne J.↗

Next-Generation NASA Earth-Orbiting Relay Satellites: Fusing Microwave and Optical Communications

NASA is currently considering architectures and concepts for the generation of relay satellites that will replace the Tracking and Data Relay Satellite (TDRS) constellation, which has been flying since 1983. TDRS-M, the last of the second TDRS generation, launched in August 2017, extending the life of the TDRS constellation beyond 2030. However, opportunities exist to re-engineer the concepts of geosynchronous Earth relay satellites. The needs of the relay satellite customers have changed dramatically over the last 34 years since the first TDRS launch. There is a demand for greater bandwidth as the availability of the traditional RF spectrum for space communications diminishes and the demand for ground station access grows. The next generation of NASA relay satellites will provide for operations that have factored in these new constraints. In this paper, we describe a heterogeneous constellation of geosynchronous relay satellites employing optical and RF communications. The new constellation will enable new optical communications services formed by user-to-space relay, space relay-to-space relay and space relay-to-ground links. It will build upon the experience from the Lunar Laser Communications Demonstration from 2013 and the Laser Communications Relay Demonstration to be launched in 2019.Simultaneous to establishment of the optical communications space segment, spacecraft in the TDRS constellation will be replaced with RF relay satellites with targeted subsets of the TDRS capabilities. This disaggregation of the TDRS service model will allow for flexibility in replenishing the needs of legacy users as well as addition of new capabilities for future users. It will also permit the U.S. government access to launch capabilities such as rideshare and to hosted payloads that were not previously available. In this paper, we also explore how the next generation of Earth relay satellites provides a significant boost in the opportunities for commercial providers to the communications space segment. For optical communications, the backbone of this effort is adoption of commercial technologies from the terrestrial high-bandwidth telecommunications industry into optical payloads. For RF communications, the explosion of software-defined radio, high-speed digital signal processing technologies and networking from areas such as 5G multicarrier will be important. Future commercial providers will not be limited to a small set of large aerospace companies. Ultimately, entirely government-owned and -operated satellite communications will phase out and make way for commercial business models that satisfy NASAs satellite communications requirements. The competition being provided by new entrants in the space communications business may result in a future in which all NASA communications needs can be satisfied commercially.

Space Communications↗

Next-Generation NASA Earth-Orbiting Relay Satellites: Fusing Optical and Microwave Communications

NASA is currently considering architectures and concepts for the generation of relay satellites that will replace the Tracking and Data Relay Satellite (TDRS) constellation, which has been flying since 1983. TDRS-M, the last of the second TDRS generation, launched in August 2017, extending the life of the TDRS constellation beyond 2030. However, opportunities exist to re-engineer the concepts of geosynchronous Earth relay satellites. The needs of the relay satellite customers have changed dramatically over the last 34 years since the first TDRS launch. There is a demand for greater bandwidth as the availability of the traditional RF spectrum for space communications diminishes and the demand for ground station access grows. The next generation of NASA relay satellites will provide for operations that have factored in these new constraints. In this paper, we describe a heterogeneous constellation of geosynchronous relay satellites employing optical and RF communications. The new constellation will enable new optical communications services formed by user-to-space relay, space relay-to-space relay and space relay-to-ground links. It will build upon the experience from the Lunar Laser Communications Demonstration from 2013 and the Laser Communications Relay Demonstration to be launched in 2019.Simultaneous to establishment of the optical communications space segment, spacecraft in the TDRS constellation will be replaced with RF relay satellites with targeted subsets of the TDRS capabilities. This disaggregation of the TDRS service model will allow for flexibility in replenishing the needs of legacy users as well as addition of new capabilities for future users. It will also permit the U.S. government access to launch capabilities such as rideshare and to hosted payloads that were not previously available.In this paper, we also explore how the next generation of Earth relay satellites provides a significant boost in the opportunities for commercial providers to the communications space segment. For optical communications, the backbone of this effort is adoption of commercial technologies from the terrestrial high-bandwidth telecommunications industry into optical payloads. For RF communications, the explosion of software-defined radio, high-speed digital signal processing technologies and networking from areas such as 5G multicarrier will be important. Future commercial providers will not be limited to a small set of large aerospace companies. Ultimately, entirely government-owned and -operated satellite communications will phase out and make way for commercial business models that satisfy NASA's satellite communications requirements. The competition being provided by new entrants in the space communications business may result in a future in which all NASA communications needs can be satisfied commercially.

Space Communications↗

SU-E-T-349: Verification of a Monte Carlo Simulation Tool as a Second Check for TomoTherapy Treatment Planning

Purpose: To verify a virtual source model used in Monte Carlo (MC) TomoTherapy simulations and to provide a tool for the dose distribution second check for TomoTherapy treatment planning. Methods: Published studies adopted the full MC model to simulate helical TomoTherapy which use phase space files (PSFs) at different scoring planes to facilitate patient dose calculations. We have developed a simple virtual source model (VSM) based on the commissioning data of helical TomoTherapy unit which can be exported from the treatment planning station (TPS). To calculate the patient dose distribution, TPS-generated sinograms are extracted from archived patient XML files and fluence maps are created by incorporating the openclose leaf time with leaf filter, jaw penumbra, and leaf latency. The VSM has been validated for various geometrical set-ups including open fields, heterogeneous media and clinical DQA cases. Results: Good agreement was obtained between our VSM and a published full MC model for the test case of heterogeneous media. For the complex clinical head and neck (HN) case, the MC simulation of the DQA plan agreed with the film measurement with 98% of planar dose pixels passing the 2%/2 mm gamma value test. For the patient treatment plan itself, the MC simulation showed comparable DVHs for the planning target volumes (PTVs) and organs-at-risk (OARs). Deviations observed were consistent with literature. Conclusion: The proposed VSM can be used in the MC method to accurately simulate the patient dose distributions for helical TomoTherapy.

60 APPLIED LIFE SCIENCES↗

Ppb-level mid-infrared ethane detection based on three measurement schemes using a 3.34-μm continuous-wave interband cascade laser

A ppb-level mid-infrared ethane (C 2 H 6 ) sensor was developed using a continuous-wave, thermoelectrically cooled, distributed feedback interband cascade laser emitting at 3.34 μm and a miniature dense patterned multipass gas cell with a 54.6-m optical path length. The performance of the sensor was investigated using two different techniques based on the tunable interband cascade laser: direct absorption spectroscopy (DAS) and second-harmonic wavelength modulation spectroscopy (2f-WMS). Three measurement schemes, DAS, WMS and quasi-simultaneous DAS and WMS, were realized based on the same optical sensor core. A detection limit of ~7.92 ppbv with a precision of ±30 ppbv for the separate DAS scheme with an averaging time of 1 s and a detection limit of ~1.19 ppbv with a precision of about ±4 ppbv for the separate WMS scheme with a 4-s averaging time were achieved. An Allan–Werle variance analysis indicated that the precisions can be further improved to 777 pptv @ 166 s for the separate DAS scheme and 269 pptv @ 108 s for the WMS scheme, respectively. For the quasi-simultaneous DAS and WMS scheme, both the 2f signal and the direct absorption signal were simultaneously extracted using a LabVIEW platform, and four C 2 H 6 samples (0, 30, 60 and 90 ppbv with nitrogen as the balance gas) were used as the target gases to assess the sensor performance. A detailed comparison of the three measurement schemes is reported. Here, atmospheric C 2 H 6 measurements on the Rice University campus and a field test at a compressed natural gas station in Houston, TX, were conducted to evaluate the performance of the sensor system as a robust and reliable field-deployable sensor system.

47 OTHER INSTRUMENTATION↗

Autonomous Hydrogen Fueling Station

This project “Autonomous Hydrogen Fueling Station” covered the autonomous refueling with both gaseous hydrogen and liquid hydrogen. The part on gaseous hydrogen focused on the development of an autonomous robotic fueling arm that would couple to a fuel cell engine for hydrogen refueling without guidance from the forklift operator and budget period. Research was also covered for the robotic fueling with a commercial vehicle. The second phase of the project created the baseline for an autonomous liquid hydrogen transfer system that would minimize boil off losses by operating at thermodynamically efficient state points. For the development of the robotic fueling arm, testing was conducted to establish a baseline measurement of the accuracy and repeatability of a human operator positioning a lift truck in front of a dispenser. The goal was to establish the range of motion required for an autonomous fueling mechanism to mate a hydrogen nozzle with a receptacle on a fuel cell system installed in a forklift. The final design comprised a selective compliance articulated robot arm (SCARA)-type mechanism with two arms for horizontal motion and a ball screw for vertical movement and color and LIDAR cameras were used for marker identification and proximity awareness to guide the robotic arm to its target receptacle. Initial tests resulted in 199 out of 200 successful attempts at autonomous coupling of the dispensing coupler and a fuel cell engine, without hydrogen. The dispenser prototype was modified to include tubing for both hydrogen fuel and air purge lines, but subsequent tests were confounded by the shoulder motor over current errors which limited the robot from getting to the fully inserted position to achieve a positive latch. Robotic hydrogen refueling was successfully demonstrated over 1.5 hours of testing, Plug completed 29 successful latches with an average number of 4 sequential latches before failure. However, a robot capable of placing the nozzle with more force is required for higher reliability. For budget period two, a small scale (10 kg / transfer) automated control system was designed that would operate valves to control pressure and flow of liquid nitrogen between a source and receiving tank with an aim to minimize boil off losses by operating at the most thermodynamically efficient state points. Control system logic flow and a P&ID were developed prior to system safety characterization via HAZOP. A control narrative and system state points were defined. Delays in approval for a change of project objective and procurement issues precluded the construction and test of the final prototype system.

08 HYDROGEN↗

Miniature Exercise Device-2 (MED-2): Preliminary ISS Evaluation Results for a Compact Motorized Resistive and Aerobic Rowing Exercise Device

Future human missions beyond Low Earth Orbit (LEO) will require onboard equipment to provide exercise capabilities for the crew to counter the adverse physiological effects of long-duration microgravity. To accomplish this within the physical constraints of a space vehicle or transit module, a single miniature device that provides both resistive and aerobic exercise modalities is required. To meet this need, Johnson Space Center’s (JSC) Software, Robotics, and Simulation Division (ER) developed the Miniature Exercise Device-2 (MED-2). MED-2 integrates a torque-controlled servomotor and a series-elastic actuator to provide highly-controllable load profiles and a large magnitude output performance in a very small package. This innovative technology is derived from years of JSC/ER design, development and operational experience with cutting-edge robotics, motor controllers, software and actuator/sensor miniaturization, including Robonaut 2 and MED-1. MED-2 was presented at the 2016 ISS R&D Conference. This is an update now that the last of six crewmembers will have completed planned MED-2 sessions on the International Space Station (ISS) in May 2018.Current state-of-the-art ISS exercise equipment consists of two treadmills, a resistive exercise device and two cycle ergometers with a total mass of several thousand pounds and a total volume of several cubic yards. This equipment has proven vital to mitigate the musculoskeletal and cardiovascular degradation effects of microgravity. However, due to the large operational volume and mass of these ISS devices, tailoring them for smaller vehicles, such as Orion, is not possible. In addition, each of the current ISS devices targets a single specific modality. Compared to the existing spaceflight (and even terrestrial) exercise equipment, MED-2 is a new archetype altogether. The combined features of compact size, multi-modality and high-performance is attributable to its innovative series elastic actuator and motor controller. Following its arrival on ISS in 2016, MED-2 was evaluated in two parts. The first and shorter evaluation was an engineering functional checkout of the hardware. As this was a novel exercise device previously never used on ISS, the initial checkout assessed the operation of the hardware and ensured the motion and dynamic range of the crew did not present any collision or other hazards. The second portion of the study collected the heart rates, kinematics and utilized operational volumes of six astronauts to determine the quality of both the resistive and aerobic exercise modalities as delivered by MED-2. Investigators from JSC Biomedical Research and Environmental Science Division (SK) and Glenn Research Center are currently evaluating the data and preparing preliminary results. For the resistive exercise modality, MED-2 demonstrated a range of constant resistive loads from 10-150 lbf. With a displacement range of 84 inches, the MED-2 accommodates users from 5th percentile Japanese female through 95th percentile American male for all of its certified exercises. The displacement measurement accuracy has also been verified within 2.5 percent full range. The crew was able to successfully perform all prescribed resistive exercises, except Goblet Squats which were not feasible with a constant load profile. For the aerobic exercise modality, MED-2 simulated a rowing motion with prescribed and user-selected resistance levels. It has demonstrated rates up to 60 strokes per minute on the ground. MED-2 loads and displacements performance are the same as those cited for the resistive modality. Although each of the crew was able to perform the prescribed aerobic rowing sets, there was considerable variability in the rowing motion among different crewmembers. Also, as expected, the crew was unable to get the full benefits of a typical terrestrial rowing stroke because the current configuration does not allow the user to reach past their feet. These observations have already informed the requirements for other microgravity rowing devices currently in development. One of the unique features of the MED-2 device is the intuitive touch-screen control system. This One Portal graphical user interface (GUI) was developed based on JSC/ER’s heritage knowledge and experience of developing and sustaining the current ISS exercise equipment. Through this interface, the crew easily performed prepared prescriptions as well as had the ability to adjust exercise modality, load and other exercise details such as number of repetitions and number of sets. This touch-screen and GUI fulfilled the MED-2 project goal to simplify the interaction between the user and the device. Furthermore, the extent to which MED-2 utilizes a touchscreen and GUI to control exercise equipment is unmatched among the existing ISS exercise devices. As a motorized device, MED-2 technology can provide a customizable force profile that can be varied as a function of strap displacement, strap velocity or a combination of these and other variables. During 2017, JSC/ER developed and flight-certified a resistive exercise algorithm that mimics the 1-G inertial effects of free-weights and enables adjustable eccentric-to-concentric loading ratios. Subsequent development will explore varying the load profiles and incorporating additional exercises beyond the current list of certified movements.

Exercise↗

Final Report for Intravenous Fluid Generation (IVGEN) Spaceflight Experiment

NASA designed and operated the Intravenous Fluid Generation (IVGEN) experiment onboard the International Space Station (ISS), Increment 23/24, during May 2010. This hardware was a demonstration experiment to generate intravenous (IV) fluid from ISS Water Processing Assembly (WPA) potable water using a water purification technique and pharmaceutical mixing system. The IVGEN experiment utilizes a deionizing resin bed to remove contaminants from feedstock water to a purity level that meets the standards of the United States Pharmacopeia (USP), the governing body for pharmaceuticals in the United States. The water was then introduced into an IV bag where the fluid was mixed with USP-grade crystalline salt to produce USP normal saline (NS). Inline conductivity sensors quantified the feedstock water quality, output water purity, and NS mixing uniformity. Six 1.5-L bags of purified water were produced. Two of these bags were mixed with sodium chloride to make 0.9 percent NS solution. These two bags were returned to Earth to test for compliance with USP requirements. On-orbit results indicated that all of the experimental success criteria were met with the exception of the salt concentration. Problems with a large air bubble in the first bag of purified water resulted in a slightly concentrated saline solution of 117 percent of the target value of 0.9 g/L. The second bag had an inadequate amount of salt premeasured into the mixing bag resulting in a slightly deficient salt concentration of 93.8 percent of the target value. The USP permits a range from 95 to 105 percent of the target value. The testing plans for improvements for an operational system are also presented.

McQuillen, John B.↗

James Webb Space Telescope Navigation Optimization Challenges

The James Webb Space Telescope (JWST) is a NASA flagship mission launched on December 25, 2021. The early orbit phase was highlighted by three midcourse correction burns that were performed to maneuver the vehicle into a libration orbit at the second Sun-Earth-Moon (SEM) libration point (L2). During the coast to L2, the vehicle’s primary observatory and sunshield were deployed. Once the tennis-court-sized sunshield was unfurled and tensioned into place, the large area exposed to solar radiation pressure (SRP) dictated that the SRP force model would need to account for the vehicle’s geometry, reflective properties, and orientation relative to the Sun. Following the insertion of JWST into its L2 libration orbit on January 24, 2022, the commissioning phase for the vehicle’s observatory commenced along with the first cycle of routine station-keeping maneuvers. The NASA Goddard Space Flight Center’s Flight Dynamics Facility (FDF) provides navigation services for the JWST mission. The FDF serves as the prime or backup navigation operations center for more than 30 active missions spanning a wide array of flight regimes performing orbit determination, maneuver planning, trajectory optimization, and tracking data evaluation. Definitive orbit determination for JWST is performed by the FDF using an Extended Kalman Filter (EKF) to estimate the vehicle’s trajectory and reflective properties using Deep Space Network (DSN) TRK-2-34 tracking data and spacecraft attitude telemetry. For the purposes of orbit prediction and station-keeping maneuver targeting, the sensitivity of the SRP force to the vehicle’s orientation requires that predictive attitude information must be incorporated to generate accurate orbit predictions and maneuver plans. Predictive attitude plans are provided to the FDF by the JWST Spacecraft Operations Center (SOC). Short-term (28 day) orbit predictions are propagated using a Short Range Attitude Plan (SRAP) to model the vehicle’s future attitude states for up to a week. SRAP attitude data is highly reliable, as it reflects finalized planned attitude states that the vehicle will be commanded to attain during the ensuing week. A Long Range Attitude Plan (LRAP) can be implemented to model predicted attitude states beyond one week, but these predictions are tentative and subject to revision due to changes in science operations plans. Instead, a conservative approach of applying a Sun-Pointing Neutral (SPN) attitude configuration is utilized for long-term (2 year) orbit predictions where reliable planned attitude data is not available. SPN attitude mode aligns the net SRP force along the JWST-to-Sun vector where it becomes independent of the vehicle’s angle of rotation about this vector, defined as the Sun yaw. Given the dynamic instability of the libration orbit, station-keeping thrust must be applied in either the sunward or anti-sunward direction to balance the resulting orbit. The attitude constraints of the vehicle also impose limits on the available pointing directions for station-keeping thrusters. The thrusters cannot be aligned with the optimal pointing direction for sunward maneuvers, rendering sunward maneuvers to be significantly less fuel efficient than anti-sunward maneuvers. Consequently, station-keeping maneuvers must be targeted to balance the orbit while ensuring that the next maneuver will also be performed in the anti-sunward direction to optimize propellant usage. When targeting a station-keeping maneuver, the attitude and SRP modeling configuration which is applied to the predicted post-maneuver trajectory will dictate the direction of the subsequent station-keeping maneuver, assuming nominal propulsion system performance. If the predicted post-maneuver attitude states result in an SRP model which under-predicts the cumulative SRP impact on the post-maneuver orbit, a targeted anti-sunward maneuver will be larger than necessary and the next maneuver will need to be executed sunward in order to compensate. In contrast, an anti-sunward maneuver which is targeted using an SRP model which over-predicts the cumulative SRP impact will achieve station-keeping while ensuring that the next maneuver will likewise be performed anti-sunward. For this reason, station-keeping maneuvers are targeted while applying the SPN attitude mode, as this mode entails the largest possible SRP area cross-section and therefore a larger modeled cumulative SRP impact. This paper documents the NASA Goddard Space Flight Center’s FDF support for JWST on-orbit operations and the analysis projects undertaken utilizing the experiences and data accumulated throughout the first full year of routine science operations. The results of these analysis efforts have been used to implement improvements to orbit prediction accuracy and maneuver efficiency which have the potential to prolong the lifespan of JWST to continue to conduct ground-breaking infrared astronomy for decades to come.

Flight Dynamics↗

Application of X-Ray Pulsar Navigation: A Characterization of the Earth Orbit Trade Space

The potential for pulsars as a navigation source has been studied since their discovery in 1967. X-ray pulsar navigation (XNAV) is a celestial navigation system that uses the consistent timing nature of x-ray photons from milli-second pulsars (MSP) to perform space navigation. By comparing the detected arrival of x-ray photons to a reference database of expected pulsar lightcurve timing models, one can infer a range and range rate measurement based on light time delay. Much of the challenge of XNAV comes from the faint signal, availability, and distant nature of pulsars. This is a study of potential pulsar XNAV measurements to measure extended Kalman filter (EKF) tracking performance with a wide trade space of bounded Earth orbits, using a simulation of existing x-ray detector space hardware. An example of an x-ray detector for XNAV is the NASA Station Explorer for X-ray Timing and Navigation (SEXTANT) mission, a technology demonstration of XNAV set to perform on the International Space Station (ISS) in late 2016early 2017. XNAV hardware implementation is driven by trajectory and environmental influences which add noise to the x-ray pulse signal. In a closed Earth orbit, the radiation environment can exponentially increase the signal noise from x-ray pulsar sources, decreasing the quality and frequency of measurements. The SEXTANT mission in particular improves on the signal to noise ratio by focusing an array of 56 x-ray silicon drift detectors at one pulsar target at a time. This reduces timing glitches and other timing noise contributions from ambient x-ray sources to within a 100 nanosecond resolution. This study also considers the SEXTANT scheduling challenges inherent in a single target observation. Finally, as the navigation sources are now relatively inertial targets, XNAV measurements are also subject to periods of occultation from various celestial bodies. This study focuses on the characterization of these drivers in closed Earth orbits and is not a tuning analysis of the EKF. The study shows that the closed Earth orbit for XNAV performance is reliant on the orbit semi-major axis and eccentricity as well as orbit inclination. These parameters are the primary drivers of pulsar measurement availability and significantly influence the natural spacecraft orbit dynamics. Sensitivity to initial orbit determination error growth due to the scarcity of XNAV measurements within an orbital period require appropriate timing of initial XNAV measurements. The orbit angles of argument of perigee and right ascension of the ascending node, alongside the other orbit parameters, complete the initial cadence of XNAV measurements. The performance of initial XNAV measurements then propagates throughout the experimental period. The study provides a basis to missions who wish to consider XNAV as a potential navigation source in a closed Earth orbit design. It provides a family of orbit trajectories as well as other modeling considerations needed to effectively evaluate if XNAV is an effective navigation source for a potential mission. As an EKF is sensitive to a linearized estimated state, this study has a direct benefit of providing effective XNAV measurements to maintain spacecraft tracking, independent of other navigation sources. In the particular use case of the SEXTANT mission, it also provides a novel scheduling algorithm which addresses the need to prioritize and manage pulsar observations for effective navigation.

PULSAR↗