Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE APPROVALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Data Package of Samples Collected for Hydrogeologic and Geochemical Characterization: 300 Area RI/FS Sediment Cores

This is a data package for sediment samples received from the 300 FF 5 OU. This report was prepared for CHPRC. Between August 16, 2010 and April 25, 2011 sediment samples were received from 300-FF-5 for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

300 Area, Charaterization, Sediment↗

Report for Batch Leach Analyses on Sediments at 100-FR-3 Operable Unit, Boreholes C7790, C7791, and C7792

This is a data report for CHPRC for the 100-FR-3 operable unit. Between August 15, 2010 and December 2, 2010 sediment samples were received from the 100-FR-3 Operable Unit for geochemical studies. The analyses for this project were performed at the 325 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

100-FR-3, Chemical caracterization, KD↗

Report for Batch Leach Analyses on Sediments at 100-HR-3 Operable Unit, Boreholes C7620, C7621, C7622, C7623, C7626, C7627, C7628, C7629, C7630, and C7866.

This is a data report for sediment samples analyzed for CHPRC. Between November 4, 2010 and April 25, 2011 sediment samples were received from 100-HR-3 Operable Unit for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

58 GEOSCIENCES↗

Report for Batch Leach Analyses on Sediments at 100-KR-4 Operable Unit, Boreholes C7684, C7688, and C7695

This is a data report for sediment samples received by CHPRC from the 100-KR-4 OU. Between December 17, 2010 and February 17, 2011 sediment samples were received from 100-KR-4 Operable Unit for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

58 GEOSCIENCES↗

200-DV-1OU Sediment and Pore Water Analysis and Report for Samples at Borehole C8096

This is an analytical data report for sediment samples received at 200-DV-1 OU. On August 30, 2011 sediment samples were received from 200-DV-1 OU Borehole C8096 for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

54 ENVIRONMENTAL SCIENCES↗

Report for Batch Leach Analyses on Sediments at 100-HR-3 Operable Unit, Boreholes C7620, C7621, C7622, C7623, C7626, C7627, C7628, C7629, C7630, and C7866

This is a revision to a previously released report. This revision contains additional analytical results for the sample with HEIS number B2H4X7. Between November 4, 2010 and October 26, 2011 sediment samples were received from 100-HR-3 Operable Unit for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL. Samples were received with a chain of custody (COC) and were analyzed according to the sample identification numbers supplied by the client. All Samples were refrigerated upon receipt until prepared for analysis. All samples were received with custody seals intact unless noted in the Case Narrative. Holding time is defined as the time from sample preparation to the time of analyses. The prescribed holding times were met for all analytes unless noted in the Case Narrative. All reported analytical results meet the requirements of the CAW or client specified SOW unless noted in the case narrative. Due to the requirements of the statement of work and sampling events in the field, the 28 day and the 48 hr requirements cannot be met. The statement of work requires samples to be selected at the completion of the borehole. It is not always possible to complete a borehole and have the samples shipped to the laboratory within the hold time requirements. Duplicate RPD for Uranium 238 (38.9%) was above the acceptance limit (35) in 1E05003-DUP1 for ICPMS-Tc-U-WE The sample result is less than 10 times the detection limits. Duplicate recoveries are not applicable to this analyte. Duplicate RPD for Silver 107 (68.2%) was above the acceptance limit (35) in 2C06004-DUP1 for ICPMS-RCRA-AE The sample result is less than 10 times the detection limits. Duplicate recoveries are not applicable to this analyte. Matrix Spike Recovery for Chromium, Hexavalent (48.8%) was outside acceptance limits (75-125) in 1E23001-MS1 for Hexavalent Chromium/Soil. Potential Matrix interference. Sample results associated with this batch are below the EQL. There should be no impact to the data as reported. Matrix Spike Recovery for Chromium, Hexavalent (50.2%) was outside acceptance limits (75-125) in 2B22010-MS1 for Hexavalent Chromium/Soil. Potential Matrix interference. Sample results associated with this batch are below the EQL. There should be no impact to the data as reported.

54 ENVIRONMENTAL SCIENCES↗

An Aerial Radiological Survey of the City of North Las Vegas (Downtown) and the Motor Speedway

As part of the proficiency training for the Radiological Mapping mission of the Aerial Measuring System (AMS), a survey team from the Remote Sensing Laboratory-Nellis (RSL-Nellis) conducted an aerial radiological survey on December 11-12, 2007, with the purpose of mapping natural radiation background and locating any man-made radioactive sources. The survey covered 19.4 square miles (9.2 square miles over the downtown area of the City of North Las Vegas and 10.2 square miles over the Las Vegas Motor Speedway [LVMS]). The flight lines over the surveyed areas are presented in Figures 1 and 2. A total of four 2.5-hour-long flights were performed at an altitude of 150 ft above ground level (AGL) with 300 ft of flight line spacing. Water line and test line flights were conducted over the Lake Mead and Government Wash areas to ensure quality control of the data. The data were collected by the AMS data acquisition system-REDAR V using an array of twelve 2-inch x 4-inch x 16-inch sodium iodide (NaI) detectors flown on-board a twin-engine Bell 412 helicopter. Data in the form of gamma energy spectra were collected continually (every second) over the course of the survey and were geo-referenced using a differential Global Positioning System. Collection of spectral data allows the system to distinguish between ordinary fluctuations in natural background radiation levels and the signature produced by man-made radioisotopes sources. Spectral data can also be used to identify specific radioactive isotopes. As a courtesy service with the approval of the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office, RSL-Nellis is providing this summary to the office of the Mayor of City of North Las Vegas and LVMS security along with the gross counts-based exposure rate and man-made counts maps.

07 ISOTOPE AND RADIATION SOURCES↗

Methodology for Assessing the Status of a Physical Protection System on the Basis of Agency Inspections and Site Self-Assessments in Rosatom

The Methodology presents general approaches to the assessment of PPS status including criteria and indicators of such assessment and procedures for evaluating different aspects of physical protection, taking into consideration the significance of the criteria. The regulation includes specific methods of the application of the criteria for the evaluation of different aspects of physical protection (PP), as well as for the comprehensive assessment of the PPS status in the form of text, tables, diagrams and examples. The Methodology is intended to facilitate agency inspections and site self-assessments of PPS at a NS as well as evaluation of their results. This regulation was approved by Rosatom Headquarters in October 2008 and is currently used in the process of agency PP inspections. The Methodology was discussed by Rosatom PP specialists, who take part in agency inspections and site self-assessments, at a workshop in Moscow, June 2009, and was presented at the 4th MPC&A Conference in Obninsk, October 2009. This paper presents the methodology and its practical application during Rosatom agency inspections and site self-assessments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

INNOVATIVE ALARA TOOLS AND WORK PRACTICES USED AT THE DOE HANFORD SITE

The Hanford Nuclear Reservation occupies an area of 586 square miles in southeastern Washington state. The site was created as part of the World War II Manhattan Project to produce weapons grade plutonium. A multitude of old reactor plants, processing facilities, underground tank farms, contaminated soil and ground water remain and are part of an on-going environmental cleanup mission of the site. The Columbia River bisects Hanford, and the concern is that the river will become contaminated if the sources of contamination are not removed. Currently facilities are being removed, the ground water is being treated, and contaminated soil is being transferred to an approved burial ground about 15 miles away from the River located in the center of the Hanford Site The remaining facilities and adjacent structures are undergoing D&D (decontaminate and demolish) and to date, significant progress has been made. During this presentation, I will discuss how we are using innovative tools and work practices to D&D these Hanford Site facilities.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee

The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable waste management practices. The HASP is written to make use of past experience and best management practices to eliminate or minimize hazards to workers or the environment from events such as fires, falls, mechanical hazards, or any unplanned release to the environment.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Use of CAP88 PC to infer differences in the chemical form of I-129 emitted from a fuel reprocessing facility

Emissions of 129I from nuclear fuel separations conducted at the Hanford Site in Washington State have been occurring since the 1940’s. Fuel separation on the Hanford Site stopped in 1988, but emissions of 129I have continued as venting of the building occurred. In this study, atmospheric measurements of 129I concentrations were coupled with an EPA approved plume dispersion model (CAP-88PC) to evaluate the effectiveness of the dispersion model for estimating ambient concentrations at the Hanford Site. This evaluation led to the hypothesis of different chemical forms of iodine being emitted over the years; this hypothesis was developed as an explanation for the model agreeing with measurements over some time periods, but not over all time periods. The model was then run with modified emissions to simulate the short atmospheric half-life of the suspected reactive chemical form of iodine being emitted. This modification resulted in good agreement between the modeled and measured concentrations over the entire 20 year study period, and provided evidence that the hypothesis of a reactive form of iodine being emitted was correct.

Fritz, Brad G.↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Inspection and Monitoring Report for Surface Corrective Action Unit 417 at the Central Nevada Test Area, Nevada, Site

This report documents the biennial postclosure site inspections conducted in June 2018 at the surface Corrective Action Unit (CA U) 417 at the Central Nevada Test Area, Nevada, Site. The UC-I, UC-3, and UC-4 sites are inspected every 2 years, in accordance with the Post-Closure Monitoring Plan provided in the CAU 417 Closure Report published in 2001. The requirements for postclosure monitoring have been modified over the years through negotiations with the Nevada Division of Environmental Protection (NDEP). Modifications were documented through three separate Records of Technical Change to the Closure Report, which were approved by NDEP in 2003, 2011, and 2015. The UC-1, UC-3, and UC-4 sites were all observed as being in good condition during the 2018 inspections. A few minor cracks on the UC-1 Central Mud Pit cover were repaired during the UC- I inspection. A concrete monument at the northeast corner of Mud Pit U3E at the UC-3 site had some damage near the top of the monument, but the damage has not impacted the functionality of the monument or survey pin on top of the monument. No issues were identified at the UC-4 site. No maintenance or additional repair activities are recommended at the UC-1, UC-3, and UC-4 sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site Industrial Sites Project Closeout - 12498

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is responsible for environmental restoration (ER) at the Nevada National Security Site (NNSS). This includes remediation at Industrial Sites where past nuclear testing activities and activities that supported nuclear testing may have or are known to have resulted in the release of contaminants into the environment. Industrial Sites at the NNSS have included nuclear facilities that supported the nuclear rocket/missile development programs, gas stations, landfills, spill sites, ordnance sites, and numerous other waste disposal and release sites. The NNSS Industrial Sites activities neared completion at the end of fiscal year 2011 while other activities required under the Federal Facility Agreement and Consent Order (FFACO) and part of the same NNSS ER Project are forecasted to extend to 2027 or beyond. With the majority of Industrial Sites corrective action units (CAUs) completed (more than 250 CAUs and over 1,800 corrective action sites), it was determined that an activity closeout process should be implemented to ensure that the work completed over the past 15 years is well documented in a comprehensive and concise summary. While the process used to close each individual CAU is described in approved documents, no single document describes in summary fashion the work completed to close the many individual Industrial Sites. The activity closeout process will be used to develop an Industrial Sites closeout document that describes these years of work. This document will summarize the number of Industrial Sites closed under the FFACO and provide general descriptions of projects, contaminants removed, and sites closed in place with corresponding Use Restrictions. Other pertinent information related to Industrial Sites work such as the project history, closure decisions, historical declarations, remediation strategies, and final CAU status will be included in the closeout document, along with a table listing each CAU and corresponding corrective action sites within each CAU. Using this process of conducting the activity closeout and developing a closeout document may prove useful for other ER projects within the DOE complex in describing how a long period of ER can be summarized in a single document. The NNSS Industrial Sites activities were completed over the span of 15 years and involved the investigation, cleanup or Use Restriction, and closure of more than 260 CAUs and over 1,800 sites. These activities will conclude in FY 2012 (with the exception of one CAU). In order to capture the work completed over this length of time and document decisions made during the activities, a closeout effort was initiated. The closeout will review the work conducted during the Industrial Sites activities and produce a single document that summarizes Industrial Sites activities. This closeout is being conducted at an interim stage in the overall NNSA/NSO ER Project since the Soils and UGTA activities will continue for a number of years, but the completion of the Industrial Sites project warrants conducting a closeout now while personnel are available and information is still current. The process followed by NNSA/NSO in conducing project closeout for the Industrial Sites portion of the ER program may prove useful within the DOE complex in demonstrating how a large ER project can be summarized. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Nuclear Divers in Decommissioning of Spent Fuel Pools/Ponds in the United Kingdom - 17431

Magnox Ltd. (Operated by the Cavendish Fluor Partnership) has initiated decommissioning of spent fuel pools/ponds utilizing divers. This decommissioning technique is being employed to disassemble and size reduce underwater equipment and furniture, as well as the collection of sludge and debris prior to draining of the pool. This technique has proven to be highly effective at reducing the radiological exposure to the workforce over previously implemented methods and is expected to significantly reduce overall decommissioning durations and costs. The decommissioning of the UK Nuclear Decommissioning Authority's (NDA) Dungeness A power station spent fuel ponds was initiated in 2015 to eliminate the mobile hazards and prepare the facilities for entry into a Care and Maintenance period. This dual reactor site has two spent fuel ponds each containing 1000 m{sup 3} of water, with the fuel removed since April 2012, which will utilize divers to remove solid wastes from the ponds prior to drain down. This technique has overcome many challenges to implementation including regulatory approval and high airborne contamination. The use of divers for decommissioning was a new technique for the Magnox Sites and required early engagement with the UK Office for Nuclear Regulation (ONR) and the Health and Safety Executive (HSE). The use of plasma arc cutting underwater required the pond area to be classified as an airborne contamination area. The implementation of local ventilation has controlled this hazard. The initial demonstration dives at Dungeness A were completed in April 2016 and the decommissioning dives are expected to be completed in March 2017. This is a substantial improvement to the project schedule and will allow the project completion 5 1/2 years ahead of the Licence Condition milestone. This technique is planned to be implemented at two further NDA Magnox power stations over the next three years. This paper provides the accomplishments and lessons learned to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Material Properties of Aged Rigid Polyurethane Foam

Polyurethane foams are organic materials which can be classified as mechanically rigid or flexible. They are chemically inert, relatively unaffected by the presence of water (cracking, swelling, absorption), and can be manufactured in densities from 3-40 lb/ft 3 . In addition, polyurethane foams have exceptional mechanical and thermal properties, which support use of polyurethane foams in the 9977 shipping packages. These packages are designed for shipment of special nuclear material and are approved for storage in the K-area complex (KAC) at Savannah River Site. Through the analysis of conditioned foams, a service life ofFR-3700 can be estimated for the storage of the 9977 packages. Thus, considering anticipated temperatures of the 9977 packages in the KAC, FR-3700 was conditioned at 160°F, 185°F, 215°F, 250°F, and 160°F with 50% relative humidity, which remains within the service temperature of-320°F - 250°F of the FR-3700 foam in the 9977 packages. Prior studies have analyzed foams after 7, 20, and 30 months of conditioning with the current study analyzing foams up to 55 months of conditioning. Considering the limited information on the effects of radiation on FR-3700, samples were irradiated with a cobalt-60 source at a high and low dose rate of 90.9 krad/hr and 16.67 krad/hr, respectively, to examine the effects of irradiation and dose rate on thermal properties. It was found that foams conditioned up to 55 months had comparable heat capacity values to FR-3700, with a slight increase due to humidity. Results suggest that fire additives began decomposing at higher conditioning temperatures, reducing the average percent mass loss. Overall, irradiation and humidity had minimal effects on thermal properties of FR-3700.

36 MATERIALS SCIENCE↗

Improvements in the On-Orbit Response Versus Scan Angle Characterization of the Aqua MODIS Reflective Solar Bands

The Aqua Moderate Resolution Imaging Spectroradiometer (MODIS) has been chosen by the Global Space-based Inter-Calibration System operational community as the reference sensor in cross-sensor calibration. A number of geostationary orbit and low-earth orbit sensors use the 0.64-μm band from Aqua MODIS as a calibration reference. After over 15 years on-orbit, the performance characteristics of the MODIS instrument have changed, with effects evident at short wavelengths. MODIS employs a reflectance-based calibration using the solar diffuser measurements with the monthly lunar observations facilitating a response versus scan angle characterization on-orbit. As the instrument continues to operate beyond its design lifetime of 6 years, the on-board calibrators alone are insufficient to accurately characterize the instrument's response at all scan angles. This results in a long-term reflectance drift, particularly observed in the 0.64- and 0.85-μm bands, while observing the temporally invariant desert sites. Long-term reflectance drifts of up to 2% and 3% are observed at the beginning of scan for the 0.64- and 0.85-μm bands, respectively. An approach using earth-view response to supplement the on-board calibrator measurements has been shown to overcome these inadequacies and is now implemented for the 0.64-, 0.85-, 0.46-, and 0.55-μm land bands of Aqua MODIS. This paper presents the details related to the algorithm implementation and an independent evaluation using the Dome Concordia site and deep-convective clouds. This approach has been reviewed, tested, and approved by the MODIS science team and has been implemented in the forward production of the MODIS L1B Collection 6 starting July 9, 2016. This enhanced approach has also been adopted in the MODIS L1B Collection 6.1 reprocess for the entire mission to facilitate an improved quality of downstream science products. The results with the enhanced approach reduce the reflectance drifts to within 0.5% for most cases.

Angal, Amit↗