Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SALT WASTE PROCESSING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Assessment of Options for the Treatment of Nitrate Salt Wastes at Los Alamos National Laboratory - 16541

This paper summarizes the methodology used to evaluate options for treatment of the remediated nitrate salt waste containers at Los Alamos National Laboratory. The method selected must enable treatment of the waste drums, which consist of a mixture of complex nitrate salts (oxidizer) improperly mixed with sWheat Scoop{sup R}, an organic kitty litter and absorbent (fuel), in a manner that renders the waste safe, meets the specifications of waste acceptance criteria, and is suitable for transport and final disposal in the Waste Isolation Pilot Plant located in Carlsbad, New Mexico. A Core Remediation Team was responsible for comprehensively reviewing the options ensuring a robust, defensible treatment recommendation. The evaluation process consisted of two steps. First, a pre-screening process was conducted to cull the list on the basis for a decision of feasibility of certain potential options with respect to the criteria. Then, the remaining potential options were evaluated and ranked against each of the criteria in a consistent methodology. Numerical scores were established by consensus of the review team. Finally, recommendations were developed based on current information and understanding of the scientific, technical, and regulatory situation. A discussion of the preferred options and documentation of the process used to reach the recommended treatment options are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 81: Engaging on Safety at the Work Face - Workers, Front Line Managers, and Subcontractors

This panel focuses on engaging on safety at the work face, with the people who are there every day. This panel will discuss management approaches deployed to directly engage internal and subcontracted workers that have delivered measurable improvements in safety performance and culture. The panelists will share what they did that worked and their perspectives on why. About 24 to 30 people were in attendance. All statements below are paraphrased by the panel reporter and should not be considered direct quotes by the panelists. Presentations proposed include: 1 - Engaging on Safety at the Work Face: Workers, Front Line Managers, and Subcontractors (Jan Preston, Fluor Corporation (USA)); 2 - Responsibility for Safety: Workers and Line Management Joining Together to Improve Performance (Cynthia Williams, Canadian Nuclear Laboratories (Canada)); 3 - Worker Involvement: Trust and the Processing of the Remediated Nitrate Salts (David Funk, Los Alamos National Laboratory (USA)); 4 - Safety Culture: How Employee Engagement is Transforming the Paducah Site (Myrna Espinosa Redfield, Four Rivers Nuclear Partnership (USA)); 5 - Hazard Identification and Control: Subcontractor Performance, Oversight, and Continuous Improvement (Clint Wolfley, URS/CH2M Oak Ridge - UCOR (USA)); 6 - Managing Safety Performance Through Change (Alice Doswell, Fluor (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment Study Plan for Nitrate Salt Waste Remediation Revision 1.0

The two stabilization treatment methods that are to be examined for their effectiveness in the treatment of both the unremediated and remediated nitrate salt wastes include (1) the addition of zeolite and (2) cementation. Zeolite addition is proposed based on the results of several studies and analyses that specifically examined the effectiveness of this process for deactivating nitrate salts. Cementation is also being assessed because of its prevalence as an immobilization method used for similar wastes at numerous facilities around the DOE complex, including at Los Alamos. The results of this Treatment Study Plan will be used to provide the basis for a Resource Conservation and Recovery Act (RCRA) permit modification request of the LANL Hazardous Waste Facility Permit for approval by the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of the proposed treatment process and the associated facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ACTINIDE REMOVAL PROCESS SAMPLE ANALYSIS, CHEMICAL MODELING, AND FILTRATION EVALUATION

Filtration within the Actinide Removal Process (ARP) currently limits the throughput in interim salt processing at the Savannah River Site. In this process, batches of salt solution with Monosodium Titanate (MST) sorbent are concentrated by crossflow filtration. The filtrate is subsequently processed to remove cesium in the Modular Caustic Side Solvent Extraction Unit (MCU) followed by disposal in saltstone grout. The concentrated MST slurry is washed and sent to the Defense Waste Processing Facility (DWPF) for vitrification. During recent ARP processing, there has been a degradation of filter performance manifested as the inability to maintain high filtrate flux throughout a multi-batch cycle. The objectives of this effort were to characterize the feed streams, to determine if solids (in addition to MST) are precipitating and causing the degraded performance of the filters, and to assess the particle size and rheological data to address potential filtration impacts. Equilibrium modelling with OLI Analyzer{sup TM} and OLI ESP{sup TM} was performed to determine chemical components at risk of precipitation and to simulate the ARP process. The performance of ARP filtration was evaluated to review potential causes of the observed filter behavior. Task activities for this study included extensive physical and chemical analysis of samples from the Late Wash Pump Tank (LWPT) and the Late Wash Hold Tank (LWHT) within ARP as well as samples of the tank farm feed from Tank 49H. The samples from the LWPT and LWHT were obtained from several stages of processing of Salt Batch 6D, Cycle 6, Batch 16.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the First, Second, and Third Quarter Calendar Year 2015 Tank 50H WAC slurry samples chemical and radionuclide contaminants

This report details the chemical and radionuclide contaminant results for the characterization of the Calendar Year (CY) 2015 First, Second, and Third Quarter sampling of Tank 50H for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. Information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering (D&S-FE) to support the transfer of low-level aqueous waste from Tank 50H to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50H Waste Characterization System. Previous memoranda documenting the WAC analyses results have been issued for these three samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Grout long radius flow testing to support Saltstone disposal Unit 5 design

The Saltstone Facility, located within the Savannah River Site (SRS) near Aiken, South Carolina, consists of two facility segments: The Saltstone Production Facility (SPF) and the Saltstone Disposal Facility (SDF). The SPF receives decontaminated legacy low level sodium salt waste solution that is a byproduct of prior nuclear material processing. The salt solution is mixed with cementitious materials to form a grout slurry known as “Saltstone”. The grout is pumped to the SDF where it is placed in a Saltstone Disposal Unit (SDU) to solidify. SDU 6 is referred to as a “mega vault” and is currently in the design stage. The conceptual design for SDU 6 is a single cell, cylindrical geometry approximately 114.3 meters in diameter by 13.1 meter high and is larger than previous cylindrical SDU designs, 45.7 meters in diameter by 7.01 meters high (30 million gallons versus 2.9 million gallons of capacity). Saltstone slurry will be pumped into the new waste disposal unit through roof openings at a projected flow rate of about 34.1 cubic meters per hour. Nine roof openings are included in the design to discharge material into the SDU with an estimated grout pour radius of 22.9 to 24.4 meters and initial drop height of 13.1 meters. The conceptual design for the new SDU does not include partitions to limit the pour radius of the grout slurry during placement other than introducing material from different pour points. This paper addresses two technical issues associated with the larger diameter of SDU 6; saltstone flow distance in a tank 114.3 meters in diameter and quality of the grout. A long-radius flow test scaled to match the velocity of an advancing grout front was designed to address these technology gaps. The emphasis of the test was to quantify the flow distance and to collect samples to evaluate cured properties including compressive strength, porosity, density, and saturated hydraulic conductivity. Two clean cap surrogate mixes (saltstone premix plus water) were designed to simulate slurry with the reference saltstone rheology and a saltstone with extra water from the process flushing operation. Long-radius flow tests were run using approximately 4.6 cubic meters of each of these mixes. In both tests the pump rate was 0.063 liters/second (1 gpm). A higher pump rate, 0.19 liters/second (3 gpm), was used in a third long-radius flow test. The angle of repose of the grout wedges increased as a function of time in all three tests. The final angles of repose were measured at 3.0º, 2.4º, and 0.72º. The pump rate had the largest effect on the radial flow distance and slope of the grout surface. The slope on the pour placed at 0.19 liters/second (3 gpm) was most representative of the slope on the grout currently being pumped into SDU 2 which is estimated to be 0.7º to 0.9º. The final grout heights at 1/3 of a meter from the discharge point were 115, 105, and 38 cm. Entrapped air (≥ 0.25 cm bubbles) was also observed in all of the mixes. The entrapped air appeared to be released from the flows within about 3.1 meters (10 feet) of the discharge point. The bleed water was clear but had a thin layer of floating particulates. The bleed water should be retrievable by a drain water collection system in SDU 6 assuming the system does not get clogged. Layering was observed and was attributed to intervals when the hopper was being cleaned. Heat from the hydration reactions was noticeable to the touch.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Grout Long Radius Flow Testing to Support Saltstone Disposal Unit 6 Design - 13352

The Saltstone Facility, located within the Savannah River Site (SRS) near Aiken, South Carolina, consists of two facility segments: The Saltstone Production Facility (SPF) and the Saltstone Disposal Facility (SDF). The SPF receives decontaminated legacy low level sodium salt waste solution that is a byproduct of prior nuclear material processing. The salt solution is mixed with cementitious materials to form a grout slurry known as 'Saltstone'. The grout is pumped to the SDF where it is placed in a Saltstone Disposal Unit (SDU) to solidify. SDU 6 is referred to as a 'mega vault' and is currently in the design stage. The conceptual design for SDU 6 is a single cell, cylindrical geometry approximately 114.3 meters in diameter by 13.1 meter high and is larger than previous cylindrical SDU designs, 45.7 meters in diameter by 7.01 meters high (30 million gallons versus 2.9 million gallons of capacity). Saltstone slurry will be pumped into the new waste disposal unit through roof openings at a projected flow rate of about 34.1 cubic meters per hour. Nine roof openings are included in the design to discharge material into the SDU with an estimated grout pour radius of 22.9 to 24.4 meters and initial drop height of 13.1 meters. The conceptual design for the new SDU does not include partitions to limit the pour radius of the grout slurry during placement other than introducing material from different pour points. This paper addresses two technical issues associated with the larger diameter of SDU 6; Saltstone flow distance in a tank 114.3 meters in diameter and quality of the grout. A long-radius flow test scaled to match the velocity of an advancing grout front was designed to address these technology gaps. The emphasis of the test was to quantify the flow distance and to collect samples to evaluate cured properties including compressive strength, porosity, density, and saturated hydraulic conductivity. Two clean cap surrogate mixes (Saltstone premix plus water) were designed to simulate slurry with the reference Saltstone rheology and a Saltstone with extra water from the process flushing operation. Long-radius flow tests were run using approximately 4.6 cubic meters of each of these mixes. In both tests the pump rate was 0.063 liters/second (1 gpm). A higher pump rate, 0.19 liters/second (3 gpm), was used in a third long-radius flow test. The angle of repose of the grout wedges increased as a function of time in all three tests. The final angles of repose were measured at 3.0 deg., 2.4 deg., and 0.72 deg.. The pump rate had the largest effect on the radial flow distance and slope of the grout surface. The slope on the pour placed at 0.19 liters/second (3 gpm) was most representative of the slope on the grout currently being pumped into SDU 2 which is estimated to be 0.7 deg. to 0.9 deg. The final grout heights at 1/3 of a meter from the discharge point were 115, 105, and 38 cm. Entrapped air (≥ 0.25 cm bubbles) was also observed in all of the mixes. The entrapped air appeared to be released from the flows within about 3.1 meters (10 feet) of the discharge point. The bleed water was clear but had a thin layer of floating particulates. The bleed water should be retrievable by a drain water collection system in SDU 6 assuming the system does not get clogged. Layering was observed and was attributed to intervals when the hopper was being cleaned. Heat from the hydration reactions was noticeable to the touch. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CRITICALITY SAFETY OF PROCESSING SALT SOLUTION AT SRS

High level radioactive liquid waste generated as a result of the production of nuclear material for the United States defense program at the Savannah River Site has been stored as 36 million gallons in underground tanks. About ten percent of the waste volume is sludge, composed of insoluble metal hydroxides primarily hydroxides of Mn, Fe, Al, Hg, and most radionuclides including fission products. The remaining ninety percent of the waste volume is saltcake, composed of primarily sodium (nitrites, nitrates, and aluminates) and hydroxides. Saltcakes account for 30% of the radioactivity while the sludge accounts for 70% of the radioactivity. A pilot plant salt disposition processing system has been designed at the Savannah River Site for interim processing of salt solution and is composed of two facilities: the Actinide Removal Process Facility (ARPF) and the Modular Caustic Side Solvent Extraction Unit (MCU). Data from the pilot plant salt processing system will be used for future processing salt at a much higher rate in a new salt processing facility. Saltcake contains significant amounts of actinides, and other long-lived radioactive nuclides such as strontium and cesium that must be extracted prior to disposal as low level waste. The extracted radioactive nuclides will be mixed with the sludge from waste tanks and vitrified in another facility. Because of the presence of highly enriched uranium in the saltcake, there is a criticality concern associated with concentration and/or accumulation of fissionable material in the ARP and MCU.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Molten Salt Reactor Experiment (MSRE) Lay-Up - 19187

UCOR, an AECOM-led partnership with Jacobs, manages the cleanup of the 2,200-acre East Tennessee Technology Park for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The site was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. 2019 is the 50. anniversary of the shutdown of the Molten Salt Reactor Experiment (MSRE). MSRE ran a brief four years in the 1960's but earned an enduring legacy as an innovative reactor technology concept which has enjoyed a renewal of global interest in the past several years. In 2018, it was given elevated status among advanced reactor programs within DoE's Nuclear Energy office. The MSRE was a graphite-moderated, liquid fueled reactor that operated from June 1965 through December 1969. Although it was shut down nearly 50 years ago, certain systems within the reactor have continued to operate to maintain the facility in a safe and stable condition until it can be demolished as part of the comprehensive cleanup of the Oak Ridge Reservation. These systems are composed of a complex network of pipes, valves, gauges and associated equipment that control air filtration and pressure buildup resulting from fluorine gas generated through radiolysis of the fluoride salt which once fueled the reactor. In 2016, an MSRE Engineering Evaluation Team was chartered to assess current facility conditions and develop recommendations to maintain the facility in a safe state until deactivation and demolition commences. Plans are now underway to 'lay up' the MSRE facility until deactivation and demolition can occur. The proposed MSRE Facility Layup will minimize maintenance costs, reduce personnel risk of injury and exposure, provide reliable electric service to the facility and require zero personnel occupancy at MSRE. In the proposed layup approach a new source of electrical power to required loads will be routed through the facility, and new gas processing and ventilation systems will be installed that will be optimized for safe processing of the constituent hazardous gasses that exist in the legacy vessels at MSRE. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Performance and Processing Property Acceptance Region for Cementitious Low-Level Waste Forms at Savannah River Site - 13174

The Saltstone Production and Disposal Facilities (SPF and SDF) at the Savannah River Site (SRS) have been treating decontaminated salt solution, a low-level aqueous waste stream (LLW) since facility commissioning in 1990. In 2012, the Saltstone Facilities implemented a new Performance Assessment (PA) that incorporates an alternate design for the disposal facility to ensure that the performance objectives of DOE Order 435.1 and the National Defense Authorization Act (NDAA) of Fiscal Year 2005 Section 3116 are met. The PA performs long term modeling of the waste form, disposal facility, and disposal site hydrogeology to determine the transport history of radionuclides disposed in the LLW. Saltstone has been successfully used to dispose of LLW in a grout waste form for 15 years. Numerous waste form property assumptions directly impact the fate and transport modeling performed in the PA. The extent of process variability and consequence on performance properties are critical to meeting the assumptions of the PA. The SPF has ensured performance property acceptability by way of implementing control strategies that ensure the process operates within the analyzed limits of variability, but efforts continue to improve the understanding of facility performance in relation to the PA analysis. A similar understanding of the impact of variability on processing parameters is important from the standpoint of the operability of the production facility. The fresh grout slurry properties (particularly slurry rheology and the rate of hydration and structure formation) of the waste form directly impact the pressure and flow rates that can be reliably processed. It is thus equally important to quantify the impact of variability on processing parameters to ensure that the design basis assumptions for the production facility are maintained. Savannah River Remediation (SRR) has been pursuing a process that will ultimately establish a property acceptance region (PAR) to incorporate elements important to both processability and long-term performance properties. This process involves characterization of both emplaced product samples from the disposal facility and laboratory-simulated samples to demonstrate the effectiveness of the lab simulation. With that basis confirmed, a comprehensive variability study using non-radioactive simulants will define the acceptable PAR, or 'operating window' for Saltstone production and disposal. This same process will be used in the future to evaluate new waste streams for disposal or changes to the existing process flowsheet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank Closure Cesium Removal at Savannah River Site - 19604

Savannah River Remediation (SRR) has developed a supplemental at-tank ion exchange capability for the removal of cesium from liquid salt waste. Building on the development of previous ion exchange initiatives and the experience of commercial nuclear plant decontamination services, and following the disaster response associated with Fukushima, the technology has matured to deploy a modular at-tank treatment system for the selective removal of cesium from bulk salt waste. If feasible, this Tank Closure Cesium Removal (TCCR) initiative would provide a supplemental treatment capability to existing and future salt processing and improve confidence in supporting the desired acceleration of waste retrieval and tank closure efforts. In addition to accelerating waste retrieval and tank closure activities, demonstration of this capability has several other benefits. Deployment of commercially available technologies with minor modification can expand Department of Energy (DOE) utilization of commercially supplied treatment processes. This 'at-tank' treatment system could be modified to evaluate and demonstrate removal of other radioactive constituents (strontium, technetium, iodine, etc.) of bulk waste. The modular aspect of this capability can allow for additional units to be delivered and deployed at SRS, as well as, provide supplemental treatment capabilities for waste treatment at other DOE sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety Basis Development for the Tank Closure Cesium Removal (TCCR) Demonstration - 19596

The Tank Closure Cesium Removal (TCCR) system has been installed at Savannah River Site (SRS) to supplement the existing salt waste treatment facilities. The TCCR system is intended to demonstrate the capability of ion exchange (IX) technology to remove Cs-137 from high level liquid waste. Separation is performed by Crystalline Silicotitanate (CST) IX media. The media is stored in shielded columns within a small enclosure. Following processing in the TCCR system, decontaminated waste can receive further treatment and be dispositioned at other SRS facilities. The Cesium-laden columns will instead be removed from the enclosure and transported to another location on site for interim storage. Developing the safety basis for the TCCR system and integrating it into the documented safety analysis for existing facilities presented a unique challenge. Most notably, utilizing new methodologies to analyze new hazards resulted in unexpectedly high consequences. The TCCR system therefore required more rigorous controls than had initially been anticipated. However, the integrated control set developed for the TCCR system should have little impact on its operating capabilities and will allow it to begin operating in 2019. This may lay the foundations for future utilization of similar systems at SRS and across the Department of Energy complex. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Audit Report The Procurement of Safety Class/Safety-Significant Items at the Savannah River Site

The Department of Energy operates several nuclear facilities at its Savannah River Site, and several additional facilities are under construction. This includes the National Nuclear Security Administration's Tritium Extraction Facility (TEF) which is designated to help maintain the reliability of the U.S. nuclear stockpile. The Mixed Oxide Fuel Fabrication Facility (MOX Facility) is being constructed to manufacture commercial nuclear reactor fuel assemblies from weapon-grade plutonium oxide and depleted uranium. The Interim Salt Processing (ISP) project, managed by the Office of Environmental Management, will treat radioactive waste. The Department has committed to procuring products and services for nuclear-related activities that meet or exceed recognized quality assurance standards. Such standards help to ensure the safety and performance of these facilities. To that end, it issued Departmental Order 414.1C, Quality Assurance (QA Order). The QA Order requires the application of Quality Assurance Requirements for Nuclear Facility Applications (NQA-1) for nuclear-related activities. The NQA-1 standard provides requirements and guidelines for the establishment and execution of quality assurance programs during the siting, design, construction, operation, and decommissioning of nuclear facilities. These requirements, promulgated by the American Society of Mechanical Engineers, must be applied to 'safety-class' and 'safety-significant' structures, systems and components (SSCs). Safety-class SSCs are defined as those necessary to prevent exposure off site and to protect the public. Safety-significant SSCs are those whose failure could irreversibly impact worker safety such as a fatality, serious injury, or significant radiological or chemical exposure. Due to the importance of protecting the public, workers, and environment, we initiated an audit to determine whether the Department of Energy procured safety-class and safety-significant SSCs that met NQA-1 standards at the Savannah River Site. Our review disclosed that the Department had procured and installed safety-class and safety-significant SSCs that did not meet NQA-1 quality standards. Specifically, we identified multiple instances in which critical components did not meet required quality and safety standards. For example: (1) Three structural components were procured and installed by the prime contractor at Savannah River during construction of the MOX Facility that did not meet the technical specifications for items relied on for safety. These substandard items necessitated costly and time consuming remedial action to, among other things, ensure that nonconforming materials and equipment would function within safety margins; (2) In six instances, items used in the construction of TEF failed to satisfy quality standards. In one of these situations, operating procedures had to be modified to ensure that the problem item did not compromise safety; and (3) Finally, at the ISP, one component that did not meet quality standards was procured. The failure of the item could have resulted in a spill of up to 15,000 gallons of high-level radioactive waste. Based on an extensive examination of relevant internal controls and procurement practices, we concluded that these failures were attributable to inadequate attention to quality assurance at Savannah River. Simply put, Departmental controls were not adequate to prevent and/or detect quality assurance problems. For example, Federal and prime contractor officials did not expressly require that subcontractors or lower-tiered vendors comply with quality assurance requirements. Additionally, management did not effectively communicate quality assurance concerns between the several Departmental program elements operating at Savannah River. The procurement and installation of these nonconforming components resulted in cost increases. For example, as of October 2008, the MOX Facility had incurred costs of more than $680,000 due to problems associated with the procurement of $11 million of nonconforming safety-class reinforcing steel. In general, the internal control weaknesses we discovered could have permitted, without detection, the procurement and installation of safety critical components that did not meet quality assurance standards. In a worst case scenario, undetected, nonconforming components could fail and injure workers or the public. In certain instances, the Department took steps to ensure that the prime contractors at Savannah River began action to remediate nonconforming components and to strengthen policies and procedures. Additionally, the Department took actions to ensure that critical components necessary for projects worked as designed by requiring that the prime contractor place personnel at manufacturers' locations. Further, the Department had suspended work with certain other manufacturers due to quality assurance problems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integrated Salt Waste Processing at the Savannah River Site - 18549

An intricate shoring system to provide protection to the workers and to critical components in the area was designed and installed. Designing and installing shoring systems is commonplace around the world, but installing it adjacent to high-level radioactive waste transfer lines nearly twenty feet in depth with tolerances within one-one thousandths of an inch required a more robust design. Upon completion, approximately 671 square meters (or 7,225 square feet) of sheet piling was installed without issue. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing Temperature and Brine Inflow Measurements to Constrain Reservoir Parameters During a Salt Heater Test

Brine availability in salt has multiple implications for the safety and design of a nuclear waste storage facility. Brine availability includes both the distribution and transport of brine through a damaged zone around boreholes or drifts excavated into the salt. Coupled thermal, hydrological, mechanical, and chemical processes taking place within heated bedded salt are complex; as part of DECOVALEX 2023 Task E this study takes a parsimonious modeling approach utilizing analytical and numerical one-dimensional simulations to match field measurements of temperature and brine inflow around a heater. The one-dimensional modeling results presented arrive at best-fit thermal conductivity of intact salt, and the permeability and porosity of damaged salt of 5.74 W/m∙K, 10 –17 m 2 , and ≈ 0.02, respectively.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TRIPLICATE SODIUM IODIDE GAMMA RAY MONITORS FOR THE SMALL COLUMN ION EXCHANGE PROGRAM

This technical report contains recommendations from the Analytical Development (AD) organization of the Savannah River National Laboratory (SRNL) for a system of triplicate Sodium Iodide (NaI) detectors to be used to monitor Cesium-137 ({sup 137}Cs) content of the Decontaminated Salt Solution (DSS) output of the Small Column Ion Exchange (SCIX) process. These detectors need to be gain stabilized with respect to temperature shifts since they will be installed on top of Tank 41 at the Savannah River Site (SRS). This will be accomplished using NaI crystals doped with the alpha-emitting isotope, Americium-241({sup 241}Am). Two energy regions of the detector output will be monitored using single-channel analyzers (SCAs), the {sup 137}Cs full-energy {gamma}-ray peak and the {sup 241}Am alpha peak. The count rate in the gamma peak region will be proportional to the {sup 137}Cs content in the DSS output. The constant rate of alpha decay in the NaI crystal will be monitored and used as feedback to adjust the high voltage supply to the detector in response to temperature variation. An analysis of theoretical {sup 137}Cs breakthrough curves was used to estimate the gamma activity expected in the DSS output during a single iteration of the process. Count rates arising from the DSS and background sources were predicted using Microshield modeling software. The current plan for shielding the detectors within an enclosure with four-inch thick steel walls should allow the detectors to operate with the sensitivity required to perform these measurements. Calibration, testing, and maintenance requirements for the detector system are outlined as well. The purpose of SCIX is to remove and concentrate high-level radioisotopes from SRS salt waste resulting in two waste streams. The concentrated high-level waste containing {sup 137}Cs will be sent to the Defense Waste Processing Facility (DWPF) for vitrification and the low-level DSS will be sent to the Saltstone Production Facility (SPF) to be incorporated into grout.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FOAM FORMATION IN THE SALTSTONE PRODUCTION FACILITY: EVALUATION OF SOURCES AND MITIGATION

The Saltstone Production Facility receives waste from Tank 50H for treatment. Influents into Tank 50H include the Effluent Treatment Project waste concentrate, H-Canyon low activity waste and General Purpose Evaporator bottoms, Modular Caustic Side Solvent Extraction Unit decontaminated salt solution, and salt solution from the Deliquification, Dissolution and Adjust campaign. Using the Waste Characterization System (WCS), this study tracks the relative amounts of each influent into Tank 50H, as well as the total content of Tank 50H, in an attempt to identify the source of foaming observed in the Saltstone Production Facility hopper. Saltstone has been using antifoam as part of routine processing with the restart of the facility in December 2006. It was determined that the maximum admix usage in the Saltstone Production Facility, both antifoam and set retarder, corresponded with the maximum concentration of H-Canyon low activity waste in Tank 50H. This paper also evaluates archived salt solutions from Waste Acceptance Criteria analysis for propensity to foam and the antifoam dosage required to mitigate foaming. It was determined that Effluent Treatment Project contributed to the expansion factor (foam formation) and General Purpose Evaporator contributed to foaminess (persistence). It was also determined that undissolved solids contribute to foam persistence. It was shown that additions of Dow Corning Q2-1383a antifoam reduced both the expansion factor and foaminess of salt solutions. The evaluation of foaming in the grout hopper during the transition from water to salt solution indicated that higher water-to-premix ratios tended to produce increased foaming. It was also shown that additions of Dow Corning Q2-1383a antifoam reduced foam formation and persistence.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of ISDP Batch 2 Qualification Compliance to 512-S, DWPF, Tank Farm, and Saltstone Waste Acceptance Criteria

The purpose of this report is to document the acceptability of the second macrobatch (Salt Batch 2) of Tank 49H waste to H Tank Farm, DWPF, and Saltstone for operation of the Interim Salt Disposition Project (ISDP). Tank 49 feed meets the Waste Acceptance Criteria (WAC) requirements specified by References 11, 12, and 13. Salt Batch 2 material is qualified and ready to be processed through ARP/MCU to the final disposal facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗