Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Resource management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Establishing a scientific and technical information program: Planning and resource management

In the last 50 years, technological advances have accelerated at a rate unprecedented in history. We are experiencing a tremendous expansion of scientific and technological effort in many directions, and the result is a fantastic increase in the accumulation of scientific and technical information (STI) and knowledge. An integral part of the research and development (R&D) process is the STI associated with it. STI is both a raw material (input) and a product (output) of this process. The topics addressed include the following: the value of STI, management of an STI program, program policy and guidance, organizational structure, data sources, training/orientation, and the current information environment.

Blados, Walter R.↗

The effects of Crew Resource Management (CRM) training in airline maintenance: Results following three year's experience

An airline maintenance department undertook a CRM training program to change its safety and operating culture. In 2 1/2 years this airline trained 2200 management staff and salaried professionals. Participants completed attitude surveys immediately before and after the training, as well as two months, six months, and one year afterward. On-site interviews were conducted to test and confirm the survey results. Comparing managers' attitudes immediately after their training with their pretraining attitudes showed significant improvement for three attitudes. A fourth attitude, assertiveness, improved significantly above the pretraining levels two months after training. The expected effect of the training on all four attitude scales did not change significantly thereafter. Participants' self-reported behaviors and interview comments confirmed their shift from passive to more active behaviors over time. Safety, efficiency, and dependability performance were measured before the onset of the training and for some 30 months afterward. Associations with subsequent performance were strongest with positive attitudes about sharing command (participation), assertiveness, and stress management when those attitudes were measured 2 and 12 months after the training. The two month follow-up survey results were especially strong and indicate that active behaviors learned from the CRM training consolidate and strengthen in the months immediately following training.

Taylor, J. C.↗

NASA Information Resources Management Long Range Plan, FY 1994-1998

Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Program Specific IRM Activities by Program Office; Major IRM Program Accomplishments for FY 1992; Information Collection Budget; Summary of Computer Security Plans; and Appendix: Acronym List.

LONG RANGE PLANNING↗

DOI Use of AVIRIS Data in Natural Resources Management: A Technology Transfer Project Status Report

A meeting was held in December 1996, attended by representatives from Department of the Interior (DOI) and National Aeronautical and Space Administration (NASA) at the request of Department of the Interior Secretary, Bruce Babbitt and NASA, Administrator Director Dan Goldin, to discuss the use of hyperspectral systems and related remote sensing technologies in addressing environmental issues of environmental importance to the (DOI). It was determined that NASA/DOI Coordination be established, comprised of representatives from each agency, designated to address the environmental issues and resulting technologies. A steering committee was formed consisting of representatives from NASA Headquarters, NASA PI's from University California-Davis, University of Colorado-Boulder, University of New Hampshire and DOI Bureaus (Indian Affairs, Land Management, Reclamation, National Park Service, and US Geological Survey).

Getter, James R.↗

Preserving the Finger Lakes for the Future: A Prototype Decision Support System for Water Resource Management, Open Space, and Agricultural Protection

As described herein, this project has progressed well, with the initiation or completion of a number of program facets at programmatic, technical, and inter-agency levels. The concept of the Virtual Management Operations Center has taken shape, grown, and has been well received by parties from a wide variety of agencies and organizations in the Finger Lakes region and beyond. As it has evolved in design and functionality, and to better illustrate its current focus for this project, it has been given the expanded name of Watershed Virtual Management Operations Center (W-VMOC). It offers the advanced, compelling functionality of interactive 3D visualization interfaced with 2D mapping, all accessed via Internet or virtually any kind of distributed computer network. This strong foundation will allow the development of a Decision Support System (DSS) with anticipated enhanced functionality to be applied to the myriad issues involved in the wise management of the Finger Lakes region.

Brower, Robert↗

Orbital Express Mission Operations Planning and Resource Management using ASPEN

As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less man-power rises.Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. The Automated-Scheduling and Planning Environment (ASPEN)tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the ASE project's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

Automated Scheduling and Planning Environment (ASP↗

Orbital Express Mission Operations Planning and Resource Management using ASPEN

The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

automated planning scheduling↗

Space Flight Resource Management Training for International Space Station Flight Controllers

Training includes both SFRM-dedicated lessons and SFRM training embedded into technical lessons. Goal is to reduce certification times by 50% and integrated simulations by 75-90%. SFRM is practiced, evaluated and debriefed in part task trainers and full-task simulation lessons. SFRM model and training are constantly being evaluated against student/management feedback, best practices from industry/ military, and latest research.

O'Keefe, William S.↗

Costa Rica & Panama Ecological Forecasting II: Identifying Current and Future Areas of Environmental Concern in La Amistad International Park to Inform Resource Management

Seven percent of all scientifically known life forms lie within the 202,230 square miles of Central America, making this area ecologically unique and increasing the need for environmental management. The Mesoamerican Biological Corridor forms a conservation partnership throughout Central America to establish a forested corridor of over 600 protected areas. Although conservation programs exist, deforestation still afflicts the area, putting strain on these diverse ecosystems. La Amistad International Park in southern Costa Rica and northern Panama in particular faces conflicting land use changes. Expanding agricultural development and urbanization, combined with concern over indigenous land rights, have raised questions about the implementation of sustainability goals and communication strategies within the region. To help address these issues, the NASA DEVELOP Costa Rica & Panama Ecological Forecasting II team continued a partnership with the Ministry of Environment and Energy in Costa Rica and the National Environmental Authority in Panama. The team created a Land Use Conflict Identification Strategy (LUCIS) model based on land cover maps for 2019 and 2029 that were created in term I using imagery from Landsat 8 Operational Land Imager (OLI). With partner input, the team applied weights to different objectives and combined suitability maps to identify areas of potential biodiversity conflict. Additionally, the team created a Short-term Forest Change (SFTC) Tool using Terra Moderate Resolution Imaging Spectroradiometer, Landsat 8 OLI, and Sentinel-2 Multispectral Instrument to help the partners identify areas of immediate, major forest changes. The LUCIS model indicated higher agricultural growth when compared to the ecological category.

Ecological Forecasting↗

Costa Rica & Panama Ecological Forecasting II: Identifying Current and Future Areas of Environmental Concern in La Amistad International Park to Inform Resource Management

Seven percent of all scientifically known life forms lie within the 202,230 square miles of Central America, making this area ecologically unique and increasing the need for environmental management. The Mesoamerican Biological Corridor forms a conservation partnership throughout Central America to establish a forested corridor of over 600 protected areas. Although conservation programs exist, deforestation still afflicts the area, putting strain on these diverse ecosystems. La Amistad International Park in southern Costa Rica and northern Panama in particular faces conflicting land use changes. Expanding agricultural development and urbanization, combined with concern over indigenous land rights, have raised questions about the implementation of sustainability goals and communication strategies within the region. To help address these issues, the NASA DEVELOP Costa Rica & Panama Ecological Forecasting II team continued a partnership with the Ministry of Environment and Energy in Costa Rica and the National Environmental Authority in Panama. The team created a Land Use Conflict Identification Strategy (LUCIS) model based on land cover maps for 2019 and 2029 that were created in term I using imagery from Landsat 8 Operational Land Imager (OLI). With partner input, the team applied weights to different objectives and combined suitability maps to identify areas of potential biodiversity conflict. Additionally, the team created a Short-term Forest Change (SFTC) Tool using Terra Moderate Resolution Imaging Spectroradiometer, Landsat 8 OLI, and Sentinel-2 Multispectral Instrument to help the partners identify areas of immediate, major forest changes. The LUCIS model indicated higher agricultural growth when compared to the ecological category.

Ecological Forecasting↗

Costa Rica & Panama Ecological Forecasting II: Identifying Current and Future Areas of Environmental Concern in La Amistad International Park to Inform Resource Management

Seven percent of all scientifically known life forms lie within the 202,230 square miles of Central America, making this area ecologically unique and increasing the need for environmental management. The Mesoamerican Biological Corridor forms a conservation partnership throughout Central America to establish a forested corridor of over 600 protected areas. Although conservation programs exist, deforestation still afflicts the area, putting strain on these diverse ecosystems. La Amistad International Park in southern Costa Rica and northern Panama in particular faces conflicting land use changes. Expanding agricultural development and urbanization, combined with concern over indigenous land rights, have raised questions about the implementation of sustainability goals and communication strategies within the region. To help address these issues, the NASA DEVELOP Costa Rica & Panama Ecological Forecasting II team continued a partnership with the Ministry of Environment and Energy in Costa Rica and the National Environmental Authority in Panama. The team created a Land Use Conflict Identification Strategy (LUCIS) model based on land cover maps for 2019 and 2029 that were created in term I using imagery from Landsat 8 Operational Land Imager (OLI). With partner input, the team applied weights to different objectives and combined suitability maps to identify areas of potential biodiversity conflict. Additionally, the team created a Short-term Forest Change (SFTC) Tool using Terra Moderate Resolution Imaging Spectroradiometer, Landsat 8 OLI, and Sentinel-2 Multispectral Instrument to help the partners identify areas of immediate, major forest changes. The LUCIS model indicated higher agricultural growth when compared to the ecological category.

Ecological Forecasting↗

Southwest Water Resources: Monitoring Surface Water Extents of Remote Stock Ponds in the Southwestern United States Using Earth Observing Systems for Enhanced Water Resources Management

Due to increasingly frequent and severe drought conditions in the southwestern US, land managers and livestock producers need to monitor stock ponds with increasing regularity. The ability to assess stock pond water levels with Earth observing satellite systems would enhance monitoring efforts of partners at the US Forest Service, Arizona Department of Game and Fish, and the Diablo Trust. This study employed Landsat 8 Operational Land Imager (OLI), Sentinel-1 C-band Synthetic Aperture Radar (C-SAR), and Sentinel-2 Multispectral Instrument (MSI) to monitor surface water extent for hundreds of critical stock ponds in Arizona. Using methods adapted from previously developed image processing workflows, this project conducted a time-series analysis to capture seasonal and interannual variations in surface water area between 2013 to 2021. In addition, end users can monitor the surface water extent of stock ponds through the developed Google Earth Engine software tool called Surface Water Identification and Forecasting Tool (SWIFT). SWIFT incorporates the Automated Water Extraction Index, Modified Normalized Difference Water Index, and Tasseled Cap-Wetness Index for optical imagery and the incidence angle, VV and VH polarization bands for Sentinel-1 imagery to detect small water bodies in the study area with an overall accuracy range of 88-93%. These tools will empower our partners to monitor the extents of water in their stock ponds remotely, enabling them to develop data-informed and sustainable management solutions for decades to come.

Rainey Aberle↗