Analog-supported Power Density Methods for Assessing Stratigraphic Geothermal Resources
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.
Not Available
A system-wide assessment of the Puerto Rico power system grid strength is studied when considering high levels of inverter-based resource penetration. This study is carried out in PSSE and assesses the impact of inverter-based resource (IBR) contributions in response to three-phase ground faults. A hypothetical 100% inverter-based generation scenario is created to assess the extreme impact on short circuit levels and a realistic scenario is considered to assess the impact to short circuit ratios. The overall conclusion is that short circuit capacity and current will drastically decrease in a high IBR scenario, an effect that is quantified in this paper. The short circuit ratio metric is typically used to assess the impact of IBR but generally overestimates grid strength due to not accounting for the impact from multiple IBRs. Other methods such as equivalent circuit based short circuit ratio and weighted short circuit ratio offer a more comprehensive consideration for multiple IBRs and can better account for their mutual interactions. The work presented in this paper is part of the PR100 study.
Numerical models have been widely used for the resource characterization and assessment of tidal instream energy. The accurate assessment of tidal stream energy resources at a feasibility or project-design scale requires detailed hydrodynamic model simulations or high-quality field measurements. This study applied a three-dimensional finite-volume community ocean model (FVCOM) to simulate the tidal hydrodynamics in the Passamaquoddy–Cobscook Bay archipelago, with a focus on the Western Passage, to assist tidal energy resource assessment. IEC Technical specifications were considered in the model configurations and simulations. The model was calibrated and validated with field measurements. Energy fluxes and power densities along selected cross sections were calculated to evaluate the feasibility of the tidal energy development at several hotspots that feature strong currents. When taking both the high current speed and water depth into account, the model results showed that the Western Passage has great potential for the deployment of tidal energy farms. The maximum extractable power in the Western Passage was estimated using the Garrett and Cummins method. Different criteria and methods recommended by the IEC for resource characterization were evaluated and discussed using a sensitivity analysis of energy extraction for a hypothetical tidal turbine farm in the Western Passage.
As electric grids decarbonize and distributed energy resources (DERs) become increasingly prevalent, interconnection assessments must evolve to reflect operational variability and control flexibility. This paper highlights key modeling limitations observed in practice and reviews approaches for modeling uncertainty. It then introduces a Probabilistic Deliverability Assessment (PDA) framework designed to complement and extend existing procedures. The framework integrates scenario-based AC optimal power flow (AC OPF), corrective dispatch, and optional multi-temporal constraints. Together, these form a structured methodology for quantifying DER utilization, deliverability, and reliability under uncertainty in load, generation, and topology. Outputs include interpretable metrics with confidence intervals that inform siting decisions and evaluate compliance with reliability thresholds across sampled operating conditions. A case study on Puerto Rico’s publicly available bulk power system model demonstrates the framework’s application using minimal input data, consistent with current interconnection practice. Across staged fossil generation retirements, the PDA identifies high-value DER sites and regions requiring additional reactive power support. Results are presented through mean dispatch signals, reliability metrics, and geospatial visualizations, demonstrating how the framework provides transparent, data-driven siting recommendations. The framework’s modular design supports incremental adoption within existing workflows, encouraging broader use of AC OPF in interconnection and planning contexts.
Efforts to streamline and codify wave energy resource characterization and assessment for regional energy planning and wave energy converter (WEC) project development have motivated the recent development of resource classification systems. Given the unique interplay between WEC absorption and resource attributes, viz, available wave power frequency, directionality, and seasonality, various consensus resource classification metrics have been introduced. However, the main international standards body for the wave energy industry has not reached consensus on a wave energy resource classification system designed with clear goals to facilitate resource assessment, regional energy planning, project site selection, project feasibility studies, and selection of WEC concepts or archetypes that are most suitable for a given wave energy climate. In this work, a primary consideration of wave energy generation is the available energy that can be captured by WECs with different resonant frequency and directional bandwidths. Therefore, the proposed classification system considers combinations of three different wave power classifications: the total wave power, the frequency-constrained wave power, and the frequency-directionally constrained wave power. The dominant wave period bands containing the most wave power are sub-classification parameters that provide useful information for designing frequency and directionally constrained WECs. The bulk of the global wave energy resource is divided into just 22 resource classes representing distinct wave energy climates that could serve as a common language and reference framework for wave energy resource assessment if codified within international standards.
Assessing the sustainability of natural resource management choices for agricultural and forest lands requires quantification of potential changes to a set of environmental and socioeconomic indicators selected to characterize reference scenarios relative to projected future scenarios. Correctly framing the questions with local stakeholders is a critical first step in the sustainability assessment, and the questions that can be addressed are often limited by data availability. Selecting and prioritizing indicators with stakeholders to address their needs and concerns improves the likelihood of investment in monitoring and evaluation of those indicators over time. Computational techniques for analyzing interactions between the selected indicators are inherently affected by the scales and formats of the assembled indicator datasets. Data analytics have the potential to improve understanding of the potential synergies and tradeoffs involved with meeting multiple environmental and socioeconomic goals simultaneously, but timely and appropriate indicator datasets are not always available—even in this new era of “big data.” Continued improvements in data science and data analytics are needed to broaden understanding and acceptance of problems and to provide valuable information for natural resource management. Advances in these areas will enable society to design future landscapes that meet multiple objectives, including the provisioning of agricultural and forest resources along with a variety of ecosystem services (e.g., clean water and healthy soils).
Critical minerals (CM) supply raw materials that constitute many of our essential infrastructure, defense, technology, and electrification needs. Currently, production and refinement of these materials from conventional sources is limited to few regions globally, which makes supply of these resources particularly venerable to disruption. To help overcome these risks and meet growing demand, attention has focused on identifying and developing resource potential of unconventional geologic CM sources, such as rare-earth elements in sedimentary systems. However, the unconventional nature of these types of sources means they are often poorly characterized and/or under-explored with respect to conventional counterparts. We present a regional case study for an Unconventional Rare-earth and Critical minerals (URC) assessment method for predicting and identifying REE resource potential and occurrence in unconventional systems in the Central Appalachian Basin (CAB). The method utilizes a geologic and geospatial data-driven approach, informed and guided by knowledge of REE enrichment processes, to systematically predict and identify areas of higher enrichment. Results from the test case indicate locations with potential for different types of coal-REE deposits, demonstrating its utility for reducing the area of exploration and identifying sites for more detailed investigation. Building upon the regional scale assessment capability, ongoing science-based enhancements to the method will allow for finer-scale (e.g., mine-scale) predictions required to support technical and economic assessments.
Explore the source record for details and available documents.
Not Available
Floating offshore wind is being considered in northern California as indicated by the Bureau of Ocean Energy Management’s issuance of a lease consideration in the Humboldt Call Area. Humboldt County offers access to this enormous resource, but local electric load and transmission are limited. The potential impacts of offshore wind generators at three different scales were studied using a regional grid model of Humboldt County. Offshore wind generation was calculated using modeled wind speed data and 12-MW turbine specifications and integrated with projected load and historical generation. Offshore wind farms deployed in the Humboldt Call Area achieve annual capacity factors between 45% and 54% after losses and maintenance. Power output is variable between and within seasons, with full power output 30% of the time and no output approximately 20% of the time. Electricity from a 48-MW wind farm provides 22% of regional load with limited exports. A 144-MW wind farm serves 38% of local load, exporting 40% of its electricity with the extant 70-MW transmission capacity. A full build-out of 1836 MW would result in 88% curtailment with existing transmission. Across scenarios, offshore wind variability necessitates reliance on existing power plants to meet local demand in periods of low wind.
The Renewable Energy Potential (reV) model is a platform for the detailed assessment of renewable energy resources and their geospatial intersection with grid infrastructure and land use characteristics. The reV model currently supports photovoltaic (PV), concentrating solar power (CSP), and land-based wind turbine technologies. Modules in the reV framework function at different spatial and temporal resolutions, allowing for the assessment of resource potential, technical potential, and supply curves at varying levels of detail. The platform runs on the National Renewable Energy Laboratory’s (NREL’s) high-performance computing system, providing scalable and efficient performance from a single location up to a continent, for a single year or decades of time-series resource data. Coupled with NREL’s System Advisor Model (SAM), reV supports resource assessments from 5-minute to hourly temporal resolutions and supports the analysis of long-term (i.e., year-on-year) variability of renewable generation (e.g., interannual variability and exceedance probabilities).
Representing energy-limited resources in power system probabilistic resource adequacy assessment introduces new considerations that invalidate classical modeling assumptions. In particular, such resources have multi-period operating objectives and constraints that in real systems are addressed via a sequence of rolling intertemporal optimizations. Ideally, adequacy models would develop dispatch decisions by solving a similar sequence of problems, but this approach has historically been too computationally intensive for practical use in Monte Carlo simulations, with studies making use of simplifying approximations instead. These simplifications have the potential to distort the assessed value of energy-limited resources on the system.This work describes three classes of storage dispatch assumptions in current use and discusses their theoretical differences. It then provides an empirical analysis of their differences on test systems with different levels of storage, assessing the potential for a study's modeling assumptions to influence the perceived contribution of energy-limited resources.
Future bulk power systems are expected to operate with a high penetration of inverter-based resources (IBR). This is anticipated to fundamentally change the system’s short-circuit behaviors and demand a change in existing transmission line protection settings or schemes. Phasor-domain short circuit programs (e.g., ASPEN, CAPE, and CYME) remain the mainstream tools for developing protection settings. However, the system protection community has shared concerns about the accuracy of IBR models in short-circuit programs. This report compares the performance of existing generic IBR models in short-circuit programs with detailed electro-magnetic transient (EMT) models provided by several different IBR manufacturers in PSCAD, to quantify the short-circuit program’s IBR model accuracy, assess their ability to replicate individual IBR controls such as negative sequence current injections, and identify specific gaps in the existing generic phasor-domain IBR models that are currently available.
Small water resource recovery facilities (WRRFs) serving communities with populations of less than 10,000 people account for 70% of centralized wastewater treatment systems in the United States. Here, with growing interest globally in improving the sustainability of these systems, this study evaluated the environmental life cycle impact and land use tradeoffs of different lagoon and mechanical WRRFs across the diverse climate of Nebraska. Life cycle inventory including construction and operations was collected for 35 existing systems representing a range of commonly used mechanical WRRFs: oxidation ditch, extended aeration, and sequencing batch reactors, and lagoon treatment systems: complete retention, irrigation, and controlled discharge lagoons.
Sustainable water management is essential to increasing water availability and decreasing water pollution. The wastewater sector is expanding globally and beginning to incorporate technologies that recover nutrients from wastewater. Nutrient recovery increases energy consumption but may reduce the demand for nutrients from virgin sources. We estimate the increase in annual global energy consumption (1,100 million GJ) and greenhouse gas emissions (84 million t CO2e) for wastewater treatment in the year 2030 compared to today’s levels to meet sustainable development goals. To capture these trends, integrated assessment and computable general equilibrium models that address the energy-water nexus must evolve. We reviewed 16 of these models to assess how well they capture wastewater treatment plant energy consumption and GHG emissions. Only three models include biogas production from the wastewater organic content. Four explicitly represent energy demand for wastewater treatment, and eight include explicit representation of wastewater treatment plant greenhouse gas emissions. Of those eight models, six models quantify methane emissions from treatment, five include representation of emissions of nitrous oxide, and two include representation of emissions of carbon dioxide. Our review concludes with proposals to improve these models to better capture the energy-water nexus associated with the evolving wastewater treatment sector.
Energy sustainability and redundancy for surface habitats, life support systems and scientific instrumentation represent one of the highest-priority issues for future crewed missions to Mars. However, power sources utilized for the current class of robotic missions to Mars may be potentially dangerous near human surface habitats (for example, nuclear) or lack stability on diurnal or seasonal timescales (for example, solar) that cannot be easily compensated for by power storage. Here, we evaluate the power potential for wind turbines as an alternative energy resource on the Mars surface. Using a state-of-the-art Mars global climate model, we analyse the total planetary Martian wind potential and calculate its spatial and temporal variability. We find that wind speeds at some proposed landing sites are sufficiently fast to provide a stand-alone or complementary energy source to solar or nuclear power. While several regions show promising wind energy resource potential, other regions of scientific interest can be discarded based on the natural solar and wind energy potential alone. We demonstrate that wind energy compensates for diurnal and seasonal reductions in solar power particularly in regions of scientific merit in the midlatitudes and during regional dust storms. Critically, proposed turbines stabilize power production when combined with solar arrays, increasing the percent time that power exceeds estimated mission requirements from ~40% for solar arrays alone to greater than 60-90% across a broad fraction of the Mars surface. We encourage additional study aimed at advancing wind turbine technology to operate efficiently under Mars conditions and to extract more power from Mars winds.