Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Recovery Act”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Performance Demonstration Program Plan for Nondestructive Assay of Boxed Wastes for the TRU Waste Characterization Program

Each testing and analytical facility performing waste characterization activities for the Waste Isolation Pilot Plant (WIPP) participates in the Performance Demonstration Program (PDP) to comply with the Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC) (DOE/WIPP-02-3122) and the Quality Assurance Program Document (QAPD) (CBFO-94-1012). The PDP serves as a quality control check for data generated in the characterization of waste destined for WIPP. Single-blind audit samples are prepared and distributed to each of the facilities participating in the PDP. Different PDPs evaluate the analyses of simulated headspace gases (HSGs), constituents of the Resource Conservation and Recovery Act (RCRA), and transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Explosive demolition of K East Reactor Stack

Using $420,000 in Recovery Act funds, the Department of Energy and contractor CH2M HILL Plateau Remediation Company topped off four months of preparations when they safely demolished the exhaust stack at the K East Reactor and equipment inside the reactor building on July 23, 2010.

42 ENGINEERING↗

Progress Update: P&R Reactor Stacks Demolition

October 2010 progress update of the Recovery Act at work at the Savannah River Site. The demolition of nuclear reactor stacks and filling the reactors with grout to reduce the site footprint.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Plutonium Finishing Plant (PFP) 241-Z Liquid Waste Treatment Facility Deactivation and Demolition

Fluor Hanford, Inc. (FH) is proud to submit the Plutonium Finishing Plant (PFP) 241-Z liquid Waste Treatment Facility Deactivation and Demolition (D&D) Project for consideration by the Project Management Institute as Project of the Year for 2008. The decommissioning of the 241-Z Facility presented numerous challenges, many of which were unique within the Department of Energy (DOE) Complex. The majority of the project budget and schedule was allocated for cleaning out five below-grade tank vaults. These highly contaminated, confined spaces also presented significant industrial safety hazards that presented some of the most hazardous work environments on the Hanford Site. The 241-Z D&D Project encompassed diverse tasks: cleaning out and stabilizing five below-grade tank vaults (also called cells), manually size-reducing and removing over three tons of process piping from the vaults, permanently isolating service utilities, removing a large contaminated chemical supply tank, stabilizing and removing plutonium-contaminated ventilation ducts, demolishing three structures to grade, and installing an environmental barrier on the demolition site. All of this work was performed safely, on schedule, and under budget. During the deactivation phase of the project between November 2005 and February 2007, workers entered the highly contaminated confined-space tank vaults 428 times. Each entry (or 'dive') involved an average of three workers, thus equaling approximately 1,300 individuals confined -space entries. Over the course of the entire deactivation and demolition period, there were no recordable injuries and only one minor reportable skin contamination. The 241-Z D&D Project was decommissioned under the provisions of the 'Hanford Federal Facility Agreement and Consent Order' (the Tri-Party Agreement or TPA), the 'Resource Conservation and Recovery Act of 1976' (RCRA), and the 'Comprehensive Environmental Response, Compensation, and Liability Act of 1980' (CERCLA). The project completed TPA Milestone M-083-032 to 'Complete those activities required by the 241-Z Treatment and Storage Unit's RCRA Closure Plan' four years and seven months ahead of this legally enforceable milestone. In addition, the project completed TPA Milestone M-083-042 to 'Complete transition and dismantlement of the 241-2 Waste Treatment Facility' four years and four months ahead of schedule. The project used an innovative approach in developing the project-specific RCRA closure plan to assure clear integration between the 241-Z RCRA closure activities and ongoing and future CERCLA actions at PFP. This approach provided a regulatory mechanism within the RCRA closure plan to place segments of the closure that were not practical to address at this time into future actions under CERCLA. Lessons learned from th is approach can be applied to other closure projects within the DOE Complex to control scope creep and mitigate risk. A paper on this topic, entitled 'Integration of the 241-Z Building D and D Under CERCLA with RCRA Closure at the PFP', was presented at the 2007 Waste Management Conference in Tucson, Arizona. In addition, techniques developed by the 241-Z D&D Project to control airborne contamination, clean the interior of the waste tanks, don and doff protective equipment, size-reduce plutonium-contaminated process piping, and mitigate thermal stress for the workers can be applied to other cleanup activities. The project-management team developed a strategy utilizing early characterization, targeted cleanup, and close coordination with PFP Criticality Engineering to significantly streamline the waste- handling costs associated with the project . The project schedule was structured to support an early transition to a criticality 'incredible' status for the 241-Z Facility. The cleanup work was sequenced and coordinated with project-specific criticality analysis to allow the fissile material waste being generated to be managed in a bulk fashion, instead of individual waste packages. This approach negated the need for real-time assay of individual waste packages, greatly improving the efficiency of the cleanup operation. The cleanup and stabilization of the 241-2 Liquid Effluent Treatment Facility reduced radiological risks to the environment and Hanford site workers. It was recognized as a success by regulatory agencies, the media, the DOE-client, and stakeholders. The 241-Z D&D Project demonstrated management excellence in adapting to significant changes in project direction, fostered a safety culture that amassed impressive results on this high-hazard job, maintained excellent communications with the client and stakeholders, and developed and implemented unique cleanup techniques.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Congressman Clyburn Visit

Congressman James Clyburn visits the new employees of the Savannah River Site. These new jobs the graduates have received are a result of the Recovery Act at work. Lisa Jackson of the Environmental Protection Agency speaks about how the ARRA is in line with President Obama's vision of a better economy and cleaner environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Further Development and Application of GEOFRAC-FLOW to a Geothermal Reservoir

GEOFRAC is a three-dimensional, geology-based, geometric-mechanical, hierarchical, stochastic model of natural rock fracture systems. The main characteristics of GEOFRAC are its use of statistical input representing fracture patterns in the field in form of the fracture intensity P32 (fracture area per volume) and the best estimate fracture size E(A). This information can be obtained from boreholes or scanlines on the surface, on the one hand, and from window sampling of fracture traces on the other hand. In the context of this project, “Recovery Act - Decision Aids for Geothermal Systems”, GEOFRAC was further developed into GEOFRAC-FLOW as has been reported in the reports, “Decision Aids for Geothermal Systems - Fracture Pattern Modelling” and “Decision Aids for Geothermal Systems - Fracture Flow Modeling”. GEOFRAC-FLOW allows one to determine preferred, interconnected fracture paths and the flow through them.

15 GEOTHERMAL ENERGY↗

Weatherizing America

As Recovery Act money arrives to expand home weatherization programs across the country, Zachary Stewart of Phoenix, Ariz., and others have found an exciting opportunity not only to start working again, but also to find a calling.

99 GENERAL AND MISCELLANEOUS↗

Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

13 HYDRO ENERGY↗

RCRA Part A Permit Application for Waste Management Activities at the Nevada National Security Site Hazardous Waste Storage Unit (HWSU), Explosive Ordnance Disposal Unit (EODU), Mixed Waste Storage Unit (MWSU), and Mixed Waste Disposal Unit (MWDU)

This document is the first volume in a Resource Conservation Recovery Act (RCRA) Permit Application to the Nevada Division of Environmental Protection for continued operation of certain facilities on the Nevada National Security Site (NNSS), owned by the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO). This RCRA permit application pertains to the Hazardous Waste Storage Unit (HWSU), the Explosive Ordnance Disposal Unit (EODU), the Mixed Waste Storage Unit (MWSU), and the Mixed Waste Disposal Unit (MWDU). This volume lists the relevant permits for each of these facilities and provides maps and drawings of many aspects of them. The companion volumes, which provide descriptive text and discussion and additional graphics, are jointly considered Part B of the permit application. Those volumes are identified by the following document numbers: DOE/NV/25946--2442, DOE/NV/25946--2448, DOE/NV/25946--2425, and DOE/NV/25946--2429.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HWMA/RCRA Closure Plan for the CPP-602 Laboratory Lines

This Hazardous Waste Management Act/Resource Conservation and Recovery Act Closure (HWMA/RCRA) Plan for the CPP-602 laboratory lines was developed to meet the tank system closure requirements of the Idaho Administrative Procedures Act 58.01.05.008 and 40 Code of Federal Regulations 264, Subpart G. CPP-602 is located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The lines in CPP-602 were part of a liquid hazardous waste collection system included in the Idaho Nuclear Technology and Engineering Center Liquid Waste Management System Permit. The laboratory lines discharged to the Deep Tanks System in CPP-601 that is currently being closed under a separate closure plan. This closure plan presents the closure performance standards and the methods for achieving those standards. The closure approach for the CPP-602 laboratory lines is to remove the lines, components, and contaminants to the extent practicable. Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Site CPP-117 includes the CPP-602 waste trench and the area beneath the basement floor where waste lines are direct-buried. Upon completion of rinsing or mopping to remove contamination to the extent practicable from the waste trench and rinsing the intact buried lines (i.e., stainless steel sections), these areas will be managed as part of CERCLA Site CPP-117 and will not be subject to further HWMA/RCRA closure activities. The CPP-602 building is being decontaminated and decommissioned under CERCLA as a non-time critical removal action in accordance with the Federal Facility Agreement/Consent Order. As such, all waste generated by this CERCLA action, including closure-generated waste, will be managed in coordination with that CERCLA action in substantive compliance with HWMA/RCRA regulations. All waste will be subject to a hazardous waste determination for the purpose of supporting appropriate management and will be managed in accordance with this plan. ii

36 MATERIALS SCIENCE↗

Nevada National Security Site 2018 Data Report: Groundwater Monitoring Program, Area 5 Radioactive Waste Management Site

This report is a compilation of the groundwater and waste cell leachate sampling results from the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site, Nye County, Nevada. Groundwater samples from the aquifer immediately below the Area 5 RWMS have been collected and analyzed and static water levels have been measured in this aquifer since 1993. These groundwater data are evaluated for evidence of effects on the aquifer related to the Area 5 RWMS. Leachate from one lined mixed waste cell at the Area 5 RWMS (Cell 18) has been sampled since the cell opened in 2011. These leachate data are analyzed for hazardous contaminants to determine appropriate leachate handling and disposal. A second lined mixed waste cell at the Area 5 RWMS (Cell 25) began receiving waste in August 2018, but no leachate samples were collected or analyzed during 2018. This report includes data from 2014 through 2018 but focuses on the 2018 data. During 2018, groundwater samples were collected and static water levels were measured at three wells surrounding the Area 5 RWMS. Groundwater samples were collected at wells UE5PW-1, UE5PW-2, and UE5PW-3 on March 6 and August 14, 2018. Static water levels were measured at each of these wells on March 5, June 4, August 13, and October 25, 2018. Groundwater monitoring at the Area 5 RWMS complies with Title 40 Code of Federal Regulations (CFR) Part 264.97, General ground-water monitoring requirements , and 40 CFR 264.98, Detection monitoring program. Groundwater samples were analyzed for indicators of contamination (pH, specific conductance [SC], total organic carbon, total organic halides, and tritium) and, beginning in 2017, toxicity characteristic metals (arsenic, barium, cadmium, chromium, lead, mercury, selenium, and silver). General water chemistry parameters (calcium, iron, magnesium, manganese, potassium, sodium, sulfate, chloride, fluoride, bicarbonate, and silicate) were also measured. Results from samples collected in 2018 are within the limits for each parameter established by the Nevada Division of Environmental Protection in Resource Conservation and Recovery Act (RCRA) Permit NEV HW0101, Revision 6. Data from the shallow aquifer indicate there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS, and there were no significant changes in measured groundwater parameters compared to previous years. Leachate from lined mixed waste Cell 18 drains into a sump and is pumped into an above ground tank. Samples are collected from the tank when the leachate volume approaches the 3,000-gallon tank capacity. During 2018, leachate samples were collected on March 1, 2018 and August 1, 2018. All leachate analysis results are below the regulatory levels for toxicity characteristic contaminants (40 CFR 261.24) and below the investigation levels for polychlorinated biphenyls (PCBs), tritium, pH, and SC specified in RCRA Permit NEV HW0101, Revision 6. No quantifiable PCB levels were detected in any leachate sample. Based on the leachate analysis results, RCRA Permit NEV HW0101 allowed all leachate collected from Cell 18 to be pumped from the collection tank and used for dust control at Cell 18.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RCRA PART B Permit Application Nevada National Security Site (NNSS) for Waste Management Activities at the NNSS Explosive Ordnance Disposal Unit (EODU)

This volume of the Resource Conservation and Recovery Act (RCRA) permit application by the Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) seeks continued operation of the Explosive Ordnance Disposal Unit (EODU) at the Nevada National Security Site (NNSS). Explosives, explosive materials, and unexploded ordnance are declared waste explosives if they are damaged, are defective, have exceeded their shelf life, are the result of environmental restoration (legacy), or are discarded explosive material from research or testing projects. This document provides a description of the regulated waste codes accepted for treatment (controlled detonations), the general design of the unit, and the processes used to safely detonate onsite-generated waste explosives and unexploded ordnance, which are defined as hazardous waste under specific regulations. The Area 11 EODU consists of a firing point (controlled access area where firing of explosives is conducted), firing pad (prepares site where explosives hazardous waste is fired), and ancillary equipment that includes an explosives magazine and firing point area. Additionally, live explosives training is conducted to ensure proficiency of the EODU operations personnel, explosives handlers, and the firing system components. Training detonations do not include waste explosives and are limited in respect to explosives volume and frequency personnel, explosives handlers, and the firing system components. Training detonations do not include waste explosives and are limited in respect to explosives volume and frequency. For safety and security reasons, some of the contents of the full application are not available for public viewing. This public version of the application contains most, but not all, of the contents as submitted to the regulatory agencies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RCRA Part B Permit Application Nevada National Security Site (NNSS) for Waste Management Activities at the NNSS Mixed Waste Disposal Unit (MWDU)

This volume of the Resource Conservation and Recovery Act (RCRA) permit application to the Nevada Division of Environmental Protection provides facility information on the design, processes, and security features associated with the Cell 18 Mixed Waste Disposal Unit (MWDU) at the Nevada National Security Site, under the auspices of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO). Onsite and offsite containerized low-level mixed waste (LLMW) that has an approved DOE nexus, DOE non-radioactive classified hazardous waste, U.S. Department of Defense (DoD) and other government agency non-radioactive classified hazardous waste (hereafter called waste) are disposed in the unit. Classified waste is the only non-radioactive waste accepted for disposal and is required to meet waste acceptance criteria for radioactive waste. The MWDU is located in the southeast portion of the Nevada National Security Site (NNSS) at the Area 5 Radioactive Waste Management Complex (RWMC). The RWMC includes transuranic waste storage units, breaching and re-packaging facilities, and the Area 5 Radioactive Waste Management Site (RWMS). The RWMS is an active disposal site for waste. Polychlorinated biphenyls (PCBs) and friable and non-friable asbestos are accepted for disposal. The MWDU has been compliantly operating since January 26, 2011, and approximately 60 percent of its capacity has been used for disposal. In addition to the requirements of the RCRA, the MWDU is also subject to DOE orders, U.S. Department of Transportation (DOT) regulations (for receipt of offsite waste), and State of Nevada requirements. General information and hazardous waste codes identified for disposal at the MWDU are described. State-only designated hazardous waste may also be received at the NNSS as hazardous waste. For safety and security reasons, some of the contents of the full application are not available for public viewing. This public version of the application contains most, but not all, of the contents as submitted to the regulatory agencies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

INFORMATION: Management Alert on Environmental Management's Select Strategy for Disposition of Savannah River Site Depleted Uranium Oxides

The Administration and the Congress, through policy statements and passage of the American Recovery and Reinvestment Act of 2009 (Recovery Act), have signaled that they hope that proactive actions by agency Inspectors General will help ensure that Federal Recovery Act activities are transparent, effective and efficient. In that context, the purpose of this management alert is to share with you concerns that have been raised to the Office of Inspector General regarding the planned disposition of the Savannah River Site's (SRS) inventory of Depleted Uranium (DU) oxides. This inventory, generated as a by-product of the nuclear weapons production process and amounting to approximately 15,600 drums of DU oxides, has been stored at SRS for decades. A Department source we deem reliable and credible recently came to the Office of Inspector General expressing concern that imminent actions are planned that may not provide for the most cost effective disposition of these materials. During April 2009, the Department chose to use funds provided under the Recovery Act to accelerate final disposition of the SRS inventory of DU oxides. After coordination with State of Utah regulators, elected officials and the U.S. Nuclear Regulatory Commission, the Department initiated a campaign to ship the material to a facility operated by EnergySolutions in Clive, Utah. Although one shipment of a portion of the material has already been sent to the EnergySolutions facility, the majority of the product remains at SRS. As had been planned, both for the shipment already made and those planned in the near term, the EnergySolutions facility was to have been the final disposal location for the material. Recently, a member of Congress and various Utah State officials raised questions regarding the radioactive and other constituents present in the DU oxides to be disposed of at the Clive, Utah, facility. These concerns revolved around the characterization of the material and its acceptability under existing licensing criteria. As a consequence, the Governor of Utah met with Department officials to voice concerns regarding further shipments of the material and to seek return of the initial shipment of DU oxides to SRS. Utah's objections and the Department's agreement to accede to the State's demands effectively prohibit the transfer of the remaining material from South Carolina to Utah. In response, the Department evaluated its options and issued a draft decision paper on March 1, 2010, which outlined an alternative for temporary storage until the final disposition issue could be resolved. Under the terms of the proposed option, the remaining shipments from SRS are to be sent on an interim basis to a facility owned by Waste Control Specialists (WCS) in Andrews, Texas. Clearly, this choice carries with it a number of significant logistical burdens, including substantial additional costs for, among several items, repackaging at SRS, transportation to Texas, storage at the interim site, and, repackaging and transportation to the yet-to-be-determined final disposition point. The Department source expressed the concern that the proposal to store the material on an interim basis in Texas was inefficient and unnecessary, asserting: (1) that the materials could remain at SRS until a final disposition path is identified, and that this could be done safely, securely and cost effectively; and, (2) that the nature of the material was not subject to existing compliance agreements with the State of South Carolina, suggesting the viability of keeping the material in storage at SRS until a permanent disposal site is definitively established. We noted that, while the Department's decision paper referred to 'numerous project and programmatic factors that make it impractical to retain the remaining inventory at Savannah River,' it did not outline the specific issues involved nor did it provide any substantive economic or environmental analysis supporting the need for the planned interim storage action. The only apparent driver in this case was a Recovery Act-related goal established by the Department to accelerate the general disposition of the SRS material. We recognize that decisions such as the one proposed for the SRS inventory of DU oxides are often more complex and nuanced than might appear on the surface. Consideration of factors such as cost, state interest, posture of local regulators, etc., are important elements in this process. Although, we have not completed sufficient work to reach an independent judgment on the merits of this matter, we wanted to ensure that the Department was aware of the concerns that have been raised before imminent decisions and resource commitments were made regarding the path forward.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Summary and Guide for Stakeholders

Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723). DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume1

Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723).DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations:Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho;Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume 2

Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723). DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cumulative Impact Evaluation Technical Approach Document

This document presents the technical approach for developing a set of tools to perform a cumulative impact evaluation (CIE) on the effects of cleanup decisions regarding groundwater quality in the Hanford Site Central Plateau. Due to the complexity and large number of waste sites in noncontiguous source operable units (OUs), the computational tools used for the CIE must be capable of representing a range of site conditions and source terms in the vadose zone while also efficiently computing the impact that cleanup decisions have on the underlying aquifer. These tools will support remedial and closure decisions across the Central Plateau by providing cumulative information, but without replacing or displacing any part of those decision processes. The objective of this document is to describe the major components required for the CIE, the approach for developing these tools, and the plan for implementation. The Central Plateau has more than 1,300 waste sites, active and inactive burial grounds, and active and inactive waste processing facilities that are regulated under a combination of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); the Resource Conservation and Recovery Act of 1976 (RCRA); and other waste disposal regulatory frameworks. Figure 1-1 shows the source OUs on the Central Plateau and illustrates the geographical intermixing of sites within different source OUs. Groundwater OUs have several overlying source OUs, and actions taken within source OUs may affect groundwater across the entire Central Plateau. Waste site proximity between and within source OUs has resulted in contaminants commingling in the vadose and saturated zones in complex ways (Figure 1-2). Plume commingling requires cleanup decisions to be evaluated considering the surrounding waste sites and existing groundwater contamination, therefore demonstrating the need to evaluate cumulative impacts from the vadose zone to groundwater. Soil (vadose zone) and groundwater (saturated zone) contamination across the Central Plateau is undergoing investigation and remediation, and decisions need to be made regarding how to most efficiently disposition and remediate sites. Because contaminants intermingle among the OUs, decisions should be evaluated considering the context of the surrounding sites and facilities and not in isolation. Thus, the CIE of Central Plateau groundwater contamination should consider the integrated effects of numerous contaminant sources and prospective remedies. For this CIE, cumulative impacts of an action (e.g., groundwater remediation or placement of an evapotranspiration barrier over a waste site) will be viewed as the total effects on groundwater from that action, considering all other activities or likely future activities for source or groundwater OUs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗