Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ROCKET TEST STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

242 records · Page 14

In-Flight Operation of the Dawn Ion Propulsion System Through the Low Altitude Mapping Orbit at Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ΔV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to the Approach phase, survey orbit, the high altitude mapping orbit (HAMO), and the low altitude mapping orbit (LAMO) with arrival to LAMO on December 13, 2015, almost eight years after the start of deterministic thrusting to Vesta. The LAMO orbit, at a mean altitude above Ceres of approximately 385 km, is the spacecraft’s final destination and there are no plans to move the spacecraft from LAMO once science operations there are completed. Since arrival at LAMO Dawn’s IPS has been used for occasional orbit maintenance maneuvers while the spacecraft performs scientific investigations. Dawn has successfully completed its science goals and Dawn’s primary mission is scheduled to end June 30, 2016. To date the IPS has been operated for approximately 48,458 hours, consumed approximately 401 kg of xenon, and provided a delta-V of over 11.0 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2016. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations from Survey orbit through the completion of Dawn’s primary mission.

Garner, Charles E.↗

In-flight Operation of the Dawn Ion Propulsion System Through the Low Altitude Mapping Orbit at Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ΔV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to the Approach phase, survey orbit, the high altitude mapping orbit (HAMO), and the low altitude mapping orbit )LAMO) with arrival to LAMO on December 13, 2015, almost eight years after the start of deterministic thrusting to Vesta. The LAMO orbit, at a mean altitude above Ceres of approximately 385 km, is the spacecraft’s final destination and there are no plans to move the spacecraft from LAMO once science operations there are completed. Since arrival at LAMO Dawn’s IPS has been used for occasional orbit maintenance maneuvers while the spacecraft performs scientific investigations. Dawn has successfully completed its science goals and Dawn’s primary mission is scheduled to end in the summer of 2016. To date the IPS has been operated for over 48,454 hours, consumed approximately 401 kg of xenon, and provided a delta-V of over 11.0 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2016. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations from Survey orbit through June 2016.

Garner, Charles E.↗

NASA's Space Launch System: Unprecedented Payload Capabilities

As NASA turns 60 and plans to transition the International Space Station (ISS) and other low-Earth orbit (LEO) activities to commercial enterprises, the Agency's human exploration program turns its focus to deep space. With missions planned to send astronauts back to the Moon and to construct a lunar orbiting Gateway for surface access as well as science experiments and technology demonstrations, NASA requires a vehicle with capabilities for launching more mass and volume than is currently commercially available. To that end, NASA and its private sector partners are building the Space Launch System (SLS) super heavy-lift launch vehicle, which will send the new Orion crew capsule, eventually with a complement of four astronauts, to cislunar space for the first time since the Apollo Program in the 1960s and 1970s. NASA Kennedy Space Center's (KSC's) Exploration Ground Systems (EGS) Program has upgraded and refurbished ground and launch facilities to process, assemble and launch NASA's new deep space exploration system, which is managed by the Exploration Systems Development (ESD) organization in the Human Exploration and Operations Mission Directorate (HEOMD). Offering an unmatched combination of power, payload capacity and departure energy, the evolvable SLS features the world's most proven propulsion system: solid rocket boosters and RS-25 main engines with a modified Delta Cryogenic Second Stage (DCSS) cryogenic upper stage. The initial SLS configuration, Block 1, will deliver at least 26 metric tons (t) to trans-lunar injection (TLI). The second variant, Block 1B, will deliver at least 34 t to TLI in its crew configuration and at least 40 t to TLI in its cargo configuration. The Block 1 cargo vehicle will fly with an industry-standard 5 m fairing while the Block 1B cargo configuration will accommodate 8 m-diameter fairings in varying lengths. The Block 2 vehicle will incorporate upgraded boosters and possibly larger fairings for launching Mars-class payloads to deep space. Although designed to enable human exploration of deep space, the vehicle also provides game-changing benefits for large science payloads and even harnesses excess capacity to provide small satellites with access to deep space. Three flights of the Block 1 vehicle are now planned; the first vehicle, being built for a test flight known as Exploration Mission-1 (EM-1), is nearing completion at NASA and contractor sites across the United States. In fact, hardware for the second mission has also been built. This paper will provide an overview of the SLS vehicle, with a focus on its payload accommodations and the missions enabled by the unprecedented payload volume and departure energy of SLS. This paper also describes the status of the manufacturing and integration for first flight and beyond.

Exploration Mission-1↗

In-Flight Operation of the Dawn Ion Propulsion System Through Start of the Vesta Cruise Phase

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. IPS will be operated for over two years at throttled power levels leading to arrival at Vesta in September of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of deterministic thrusting to Vesta.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System: Status at One Year from the Vesta Rendezvous

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The Dawn ion thruster [I thought we only called it a thruster. Both terms are used in the paper, but I think a replacement of every occurrence of "engine" with "thruster" would be clearer.] design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. Since resumption of cruise to Vesta IPS has been operated at throttled power levels, most of the time at full power, and with a duty cycle of approximately 93%, leading to an arrival at Vesta in July of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through one year from the spacecraft's rendezvous with Vesta.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Completion of the Final Orbit Around Dwarf Planet Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional DV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to all science orbits at Ceres including the final orbit for Dawn’s primary mission, called the low altitude mapping orbit (LAMO), a circular orbit at a mean altitude above Ceres of approximately 385 km. Dawn met or exceeded all pre-launch science requirements and Dawn's prime mission concluded on June 30, 2016. Dawn subsequently received NASA approval for two extended missions at Ceres, called XM1 and XM2. During XM1 IPS was used for orbit maintenance and to transit the spacecraft to several new, higher-altitude science orbits, ending in an elliptical orbit at a maximum altitude of approximately 38,000 km. In XM2, IPS operations included transiting the Dawn spacecraft to its final, highly elliptical orbit at Ceres ranging from 35 km perigee to 4,800 km apogee. Science data acquisition will continue in XM2 until the hydrazine is exhausted, which is expected to occur between August and October 2018. Dawn has successfully completed all science goals for both the primary and XM1 extended missions. To date the IPS has been operated for approximately 51,250 hours, consumed approximately 416 kg of xenon, and provided a delta-V of almost 11.5 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2018. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations for XM1, and XM2 through June 2018.

Rayman, Marc D.↗

Design Concepts for a Small Space-Based GEO Relay Satellite for Missions Between Low Earth and near Earth Orbits

The main purpose of the Small Space-Based Geosynchronous Earth orbiting (GEO) satellite is to provide a space link to the user mission spacecraft for relaying data through ground networks to user Mission Control Centers. The Small Space Based Satellite (SSBS) will provide services comparable to those of a NASA Tracking Data Relay Satellite (TDRS) for the same type of links. The SSBS services will keep the user burden the same or lower than for TDRS and will support the same or higher data rates than those currently supported by TDRS. At present, TDRSS provides links and coverage below GEO; however, SSBS links and coverage capability to above GEO missions are being considered for the future, especially for Human Space Flight Missions (HSF). There is also a rising need for the capability to support high data rate links (exceeding 1 Gbps) for imaging applications. The communication payload on the SSBS will provide S/Ka-band single access links to the mission and a Ku-band link to the ground, with an optical communication payload as an option. To design the communication payload, various link budgets were analyzed and many possible operational scenarios examined. To reduce user burden, using a larger-sized antenna than is currently in use by TDRS was considered. Because of the SSBS design size, it was found that a SpaceX Falcon 9 rocket could deliver three SSBSs to GEO. This will greatly reduce the launch costs per satellite. Using electric propulsion was also evaluated versus using chemical propulsion; the power system size and time to orbit for various power systems were also considered. This paper will describe how the SSBS will meet future service requirements, concept of operations, and the design to meet NASA users' needs for below and above GEO missions. These users' needs not only address the observational mission requirements but also possible HSF missions to the year 2030. We will provide the trade-off analysis of the communication payload design in terms of the number of links looking above and below GEO; the detailed design of a GEO SSBS spacecraft bus and its accommodation of the communication payload, and a summary of the trade study that resulted in the selection of the Falcon 9 launch vehicle to deploy the SSBS and its impact on cost reductions per satellite. ======================================================================== Several initiatives have taken place within NASA1 and international space agencies2 to create a human exploration strategy for expanding human presence into the solar system; these initiatives have been driven by multiple factors to benefit Earth. Of the many elements in the strategy one stands out: to send robotic and human missions to destinations beyond Low Earth Orbit (LEO), including cis-lunar space, Near-Earth Asteroids (NEAs), the Moon, and Mars and its moons.3, 4 The time frame for human exploration to various destinations, based on the public information available,1,4 is shown in Figure 1. Advance planning is needed to define how future space communications services will be provided in the new budget environment to meet future space communications needs. The spacecraft for these missions can be dispersed anywhere from below LEO to beyond GEO, and to various destinations within the solar system. NASA's Space Communications and Navigation (SCaN) program office provides communication and tracking services to space missions during launch, in-orbit testing, and operation phases. Currently, SCaN's space networking relay satellites mainly provide services to users below GEO, at Near Earth Orbit (NEO), below LEO, and in deep space. The potential exists for using a space-based relay satellite, located in the vicinity of various solar system destinations, to provide communication space links to missions both below and above its orbit. Such relays can meet the needs of human exploration missions for maximum connectivity to Earth locations and for reduced latency. In the past, several studies assessed the ability of satellite-based relays working above GEO in conjunction with Earth ground stations. Many of these focused on the trade between space relay and direct-to-Earth station links5,6,7. Several others focused on top-level architecture based on relays at various destinations8,9,10,11,12. Much has changed in terms of microwave and optical technology since the publication of the referenced papers; Ka-band communication systems are being deployed, optical communication is being demonstrated, and spacecraft buses are becoming increasingly more functional and operational. A design concept study was undertaken to access the potential for deploying a Small Space-Based Satellite (SSBS) relay capable of serving missions between LEO and NEO. The needs of future human exploration missions were analyzed, and a notional relay-based architecture concept was generated as shown in Fig. 1. Relay satellites in Earth through cis-Lunar orbits are normally located in stable orbits requiring low fuel consumption. Relay satellites for Mars orbit are normally selected based on the mission requirement and projected fuel consumption. Relay satellites have extreme commonalities of functions between them, differing only in the redundancy and frequencies used; therefore, the relay satellite in GEO was selected for further analysis since it will be the first step in achieving a relay-based architecture for human exploration missions (see Fig.Figure 2). The mission design methodology developed by the Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team13 was used to produce the satellite relay design and to perform various design trades. At the start of the activity, the team was provided with the detailed concept of the notional architecture and the system and communication payload drivers.

Relay Satellites↗

NASA'S Space Launch System: Progress Toward the Proving Ground

With significant and substantial progress being accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight – using an upgraded version of the vehicle – and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and together with the Orion spacecraft will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 metric tons. For that flight, the new configuration introduces two major new elements to the vehicle – an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a “payload bay” for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Beyond the second flight, additional upgrades will be made to the vehicle. The Block 1B vehicle will also be able to launch 8.4-meter-diameter payload fairings, larger than any previously flown, and the Spacecraft Payload Integration and Evolution (SPIE) Element will oversee development and production of those fairings. Ultimately, SLS will be evolved to a Block 2 configuration, which will replace the solid rocket boosters on the Block 1 and 1B vehicles with more powerful boosters, and will be capable of delivering at least 130 metric tons to LEO. The Block 2 vehicle will be capable of launching even larger 10-meter diameter fairings, which will enable human mission of Mars. With these fairings, the Block 1B and 2 configurations of SLS will also be enabling for a wide variety of other payloads. For robotic science probes to the outer solar system, for example, SLS can cut transit times to less than half that of currently available vehicles, producing earlier data return, enhancing iterative exploration, and reducing mission cost and risk. In the field of astrophysics, SLS’ high payload volume, in the form of payload fairings with a diameter of up to 10 meters, creates the opportunity for launch of large-aperture telescopes providing an unprecedented look at our universe, and offers the ability to conduct crewed servicing missions to observatories stationed at locations beyond low Earth orbit. This paper will provide a description of the SLS vehicle, and an overview of the vehicle’s capabilities and utilization potential.

Jackman, Angie↗