At least 253 records · Page 14

Application for Permit to Operate a Class II Solid Waste Disposal Site at the Nevada Test Site - U10c Disposal Site

The Nevada Test Site (NTS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NTS and National Security Technologies LLC (NSTec) is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The site will be used for the disposal of refuse, rubbish, garbage, sewage sludge, pathological waste, Asbestos-Containing Material (ACM), industrial solid waste, hydrocarbon-burdened soil, hydrocarbon-burdened demolition and construction waste, and other inert waste (hereafter called permissible waste). Waste containing free liquids or regulated under Subtitle C of the Resource Conservation and Recovery Act (RCRA) will not be accepted for disposal at the site. Waste regulated under the Toxic Substance Control Act (TSCA), excluding Polychlorinated Biphenyl [PCB], Bulk Product Waste (see Section 6.2.5) and ACM (see Section 6.2.2.2) will not be accepted for disposal at the site. The disposal site will be used as the sole depository of permissible waste which is: (1) Generated by entities covered under the U.S. Environmental Protection Agency (EPA) Hazardous Waste Generator Identification Number for the NTS; (2) Generated at sites identified in the Federal Facilities Agreement and Consent Order (FFACO); (3) Sensitive records and media, including documents, vugraphs, computer disks, typewriter ribbons, magnetic tapes, etc., generated by NNSA/NSO or its contractors; (4) ACM generated by NNSA/NSO or its contractors according to Section 6.2.2.2, as necessary; (5) Hydrocarbon-burdened soil and solid waste from areas covered under the EPA Hazardous Waste Generator Identification Number for the NTS; (6) Other waste on a case-by-case concurrence by NDEP/BFF. The generator of permissible waste is responsible for preparing documentation related to waste acceptance criteria, waste characterization, and load verification. Waste and Water (WW) personnel are responsible for operating the disposal site and reviewing documentation to determine if the waste is acceptable.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Evaluation for the Installation of Treatment Capability for Mixed Low Level Waste at the Nevada National Security Site

National Security Technologies, LLC, initiated an evaluation of treatment technologies that they would manage and operate as part of the mixed low-level waste (MLLW) disposal facilities at the Nevada National Security Site (NNSS). The NNSS Disposal Facility has been receiving radioactive waste from the U.S. Department of Energy (DOE) complex since the 1960s, and since 2005 the NNSS Disposal Facility has been receiving radioactive and MLLW for disposal only. In accordance with the Resource Conservation and Recovery Act (RCRA), all mixed waste must meet land disposal restrictions (LDRs) prior to disposal. Compliance with LDRs is attained through treatment of the waste to mitigate the characteristics of the listed waste hazard. Presently, most generators utilize commercial capacity for waste treatment prior to shipment to the NNSS Disposal Facility. The objectives of this evaluation are to provide a conceptual study of waste treatment needs (i.e., demand), identify potential waste treatment technologies to meet demand, and analyze implementation considerations for initiating MLLW treatment capacity at the NNSS Disposal Facility. A review of DOE complex waste generation forecast data indicates that current and future Departmental demand for mixed waste treatment capacity will remain steady and strong. Analysis and screening of over 30 treatment technologies narrowed the field of treatment technologies to four: • Macroencapsulation • Stabilization/microencapsulation • Sort and segregation • Bench-scale mercury amalgamation The analysis of treatment technologies also considered existing permits, current the NNSS Disposal Facility infrastructure such as utilities and procedures, and past experiences such as green-light and red-light lessons learned. A schedule duration estimate has been developed for permitting, design, and construction of onsite treatment capability at the NNSS Disposal Facility. Treatment capability can be ready in 20 months.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Use of Haz-Flote to Efficiently Remove Mercury from Contaminated Materials

There are thousands of known contaminated sites in the United Stated, including Superfund sites (1500 to 2100 sites), RCRA corrective action sites (1500 to 3500 sites), underground storage tanks (295,000 sites), U.S. Department of Defense sites (7300 sites), U.S. Department of Energy sites (4,000 sites), mining refuse piles, and numerous other hazardous metals and organic contamination sites. Only a small percentage of these sites has been cleaned up. The development of innovative technologies to handle the various clean-up problems on a national and international scale is commonplace. Many innovative technologies have been developed that can be used to effectively remediate contaminated materials. Unfortunately, many of these technologies are only effective for materials coarser than approximately 200 mesh. In addition, these technologies usually require considerable investment in equipment, and the clean-up costs of soil material are relatively high - in excess of $100 to $500 per yd{sup 3}. These costs result from the elaborate nature of the processes, the costs for power, and the chemical cost. The fine materials are disposed of or treated at considerable costs. As a result, the costs often associated with amelioration of contaminated sites are high. Western Research institute is in the process of developing an innovative soil washing technology that addresses the removal of contaminants from the fine size-fraction materials located at many of the contaminated sites. This technology has numerous advantages over the other ex-situ soil washing techniques. It requires a low capital investment, low operating costs and results in high levels of re-emplacement of the cleaned material on site. The process has the capability to clean the fine fraction (<200 mesh) of the soil resulting in a replacement of 95+% of the material back on-side, reducing the costs of disposal. The Haz-Flote{trademark} technology would expand the application of soil washing technology to heavy soils (clay-type should) to which current soil washing practices are not applied. WRI is not aware of any other soil washing technologies that demonstrate this ability at the expected cost on a per ton basis. The market for this technology is considered excellent for Superfund and other inorganic contaminated sites.

54 ENVIRONMENTAL SCIENCES↗

Ecological Impacts of the Space Shuttle Program at John F. Kennedy Space Center, Florida

The Space Shuttle Program was one of NASAs first major undertakings to fall under the environmental impact analysis and documentation requirements of the National Environmental Policy Act of 1969 (NEPA). Space Shuttle Program activities at John F. Kennedy Space Center (KSC) and the associated Merritt Island National Wildlife Refuge (MINWR) contributed directly and indirectly to both negative and positive ecological trends in the region through the long-term, stable expenditure of resources over the 40 year program life cycle. These expenditures provided support to regional growth and development in conjunction with other sources that altered land use patterns, eliminated and modified habitats, and contributed to cultural eutrophication of the Indian River Lagoon. At KSC, most Space Shuttle Program related actions were conducted in previously developed facilities and industrial areas with the exception of the construction of the shuttle landing facility (SLF) and the space station processing facility (SSPF). Launch and operations impacts were minimal as a result of the low annual launch rate. The majority of concerns identified during the NEPA process such as potential weather modification, acid rain off site, and local climate change did not occur. Launch impacts from deposition of HCl and particulates were assimilated as a result of the high buffering capacity of the system and low launch and loading rates. Metals deposition from exhaust deposition did not display acute impacts. Sub-lethal effects are being investigated as part of the Resource Conservation and Recovery Act (RCRA) regulatory process. Major positive Space Shuttle Program effects were derived from the adequate resources available at the Center to implement the numerous environmental laws and regulations designed to enhance the quality of the environment and minimize impacts from human activities. This included reduced discharges of domestic and industrial wastewater, creation of stormwater management systems, remediation of past contamination sites, implementation of hazardous waste management systems, and creation of a culture of sustainability. Working with partners such as the USFWS and the St Johns River Water Management District (SJRWMD), wetlands and scrub restoration and management initiatives were implemented to enhance fish and wildlife populations at the Center. KSC remains the single largest preserve on the east coast of Florida in part due to NASAs commitment to stewardship. Ongoing Ecological Program projects are directed at development of information and knowledge to address future KSC management questions including the transition to a joint government and commercial launch facility, enhanced habitat management requirements for wetlands and scrub, potential impacts of emerging contaminants, and adaptation to climate change including projected sea level rise over the next 50-75 years.

Space Shuttle Program↗

Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

IMWP↗

Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples will be collected at locations SW0001, SW0002, and SW0003 during both the March and September 2017 events. Team consensus was also reached at the October 2017 KSCRT meeting to continue with operation and maintenance (O&M) of the AS system at SW3.

REPORT↗

C-5 Electrical Substation (SWMU 066) Performance Monitoring Report

The C-5 Electrical Substation (C5ES) is a National Aeronautics and Space Administration (NASA) operated electrical power substation located at the John F. Kennedy Space Center (KSC), Florida. This facility has been designated Solid Waste Management Unit (SWMU) 066 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. This Performance Monitoring Report (PMR) presents the Interim Measure (IM) activities, including baseline sampling, air sparge system construction and operation, and performance monitoring, that were completed to remediate chlorinated volatile organic compounds (CVOC) in groundwater exceeding the Florida Department of Environmental Protection (FDEP) natural attenuation default concentrations (NADC).

Andrew Scott Starr↗

Hydrocarbon Burn Facility, SWMU 007 PER- and Polyfluoroalkyl Substances (PFAS) Assessment report Addendum Kennedy Space Center, Florida

This document discusses the Per-and Polyfluoroalkyl Substances (PFAS) assessment activities performed from December 2020 through November 2021 at the Hydrocarbon Burn Facility (HBF) located at Kennedy Space Center (KSC), Florida. The HBF site has been designated Solid Waste Management Unit (SWMU) 007 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This PFAS Assessment Report Addendum (ARA) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) Contract 80KSC019D0011-80KSC019F0077.

Jennifer M. Buel↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

Fire Station #3 Area, Solid Waste Management Unit (SWMU) 106 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report Kennedy Space Center, Florida

This Per-and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) presents the activities and results associated with PFAS investigation in the Fire Station #3 (FS3) Area located at Kennedy Space Center (KSC), Florida. FS3 (formerly known as Fire Station #6) was previously designated as Solid Waste Management Unit (SWMU) 106 for legacy contaminants that were investigated and still being managed under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This PFAS SA is being managed under SWMU 106 as the fire station was also identified as the potential source of PFAS to the environment in this area.

Sarah Damphouse↗

Fire Station #1 Area, SWMU 116 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report Kennedy Space Center, Florida

This Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) discusses the investigation activities and findings for the Fire Station #1 (FS1) Area (formerly known as Fire Station #4) located at Kennedy Space Center (KSC), Florida (Figure 1-1). This site has been designated Solid Waste Management Unit (SWMU) 116 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This PFAS SA is being managed under SWMU 116 as the fire station was identified as a potential source of PFAS to the environment. This PFAS SAPR was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0070. This is the first progress report to document on-going SA activities; supplemental progress reports will be provided as additional data is collected. During the SA, a total of six soil, 48 groundwater direct push technology (DPT), eight groundwater monitoring well, and one surface water sample were collected between October 2021 and March 2022. The samples were analyzed for 28 PFAS compounds using the Department of Defense Quality Systems Manual-compliant Method. SA sample results were used along with historical results to evaluate the extent of PFAS impacts to the environment in the FS1 Area. Data generated to date and prior results were screened against the United States Environmental Protection Agency (USEPA) May 2022 Tap Water Regional Screening Levels (RSLs) for groundwater and residential RSLs for soil (hazard quotient of 0.1). Surface water results were screened against the State of Florida Human Health Surface Water Screening Levels (SWSLs). Overall, results from the SA showed exceedances of the applicable screening criteria for soil, groundwater and surface water. Considering the current and historical dataset, perfluorooctanesulfonic acid (PFOS) is the prevalent PFAS compound, which is indicative of AFFF releases. Based on results of the SA, additional groundwater DPT and surface water sampling should be considered, focused on evaluating surface water bodies in the southeast portion of the Industrial Area, which discharge into the Banana River. Additionally, installation of monitoring wells should be considered to evaluate the interaction between groundwater and surface water in the FS1 Area.

PFAS↗

Sewage Treatment Plant #1 Area, SWMU 117 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report

This Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) discusses the investigation activities and findings for the Sewage Treatment Plant #1 (STP1) Area located at Kennedy Space Center (KSC), Florida (Figure 1-1). This site has been designated Solid Waste Management Unit (SWMU) 117 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program, as the sewage treatment plant and associated areas were identified as a potential source of PFAS to the environment. This PFAS SAPR was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0070. This is the first progress report to document on-going SA activities; supplemental progress reports will be provided as additional data is collected. PFAS SA activities were conducted between April 2020 and March 2022 to collect additional data to supplement the existing datasets to better understand the extent of PFAS impacts to the environment in the STP1 Area. The SA for the STP1 Area covers an approximately 130-acre investigation area with multiple structures and buildings. The focus of the SA is the STP1 Complex and associated structures, including the former Polishing Pond, former Sludge Disposal8 Area, and former Spray Field. The STP1 Complex is located in the KSC Industrial Area, at the southwest corner of 4th Street SE and C Avenue SE. The STP1 Complex is located approximately ¼-mile south and downgradient of the Fire Station #1 site (SWMU 116), which is also currently undergoing a PFAS SA because of potential releases of PFAS-containing aqueous film-forming foam (AFFF). During the SA, a total of seven soil, 131 groundwater direct push technology (DPT), 24 groundwater monitoring well, and 11 surface water samples were collected between April 2020 and March 2022. Monitoring well samples were analyzed for 18 PFAS compounds, with all other samples analyzed for 28 PFAS compounds. The SA sample results were used along with historical results to evaluate the extent of PFAS impacts to the environment in the STP1 Area. Data generated to date and prior results were screened against the United States Environmental Protection Agency (USEPA) May 2022 Tap Water Regional Screening Levels (RSL) for groundwater and residential RSLs for soil (hazard quotient of 0.1). Surface water results were screened against the State of Florida Human Health Surface Water Screening Levels (SWSLs). Results from the SA showed exceedances of the applicable screening criteria for groundwater and surface water. Considering the current and historical dataset, PFOS is the prevalent PFAS compound. Based on these results, additional groundwater DPT and surface water sampling should be considered for PFAS analysis, focused on evaluating surface water bodies in the southeast portion of the Industrial Area, which discharge into the Banana River. Additionally, installation of monitoring wells should be considered to evaluate the interaction between the groundwater and surface water at the site. Collection of additional samples for TOC analysis should also be considered from representative groundwater (saturated soils) and surface water locations to further evaluate potential correlations between PFAS and TOC to provide a more comprehensive dataset to assist in fate and transport analyses.

Sewage Treatment Plant↗

Request for Discontinuation of Long-Term Monitoring Orsino Storage Yard Solid Waste Management Unit 004 Kennedy Space Center, Florida

This report presents the site history, groundwater sampling results, and recommendations from the 2021 Industrial Area (IA) LTM activities at ORSY. ORSY has been used as a staging facility for electrical equipment since 1966 (EG&G 1991). Initial investigations conducted between 1986 and 1992 focused on polychlorinated biphenyls (PCBs) in soil. A series of soil excavation interim measures (IMs) were conducted to remove soils containing total PCB concentrations of greater than 25 milligrams per kilogram (mg/kg). A Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) was completed in several phases at ORSY from 1998 through 2005, with PCBs in soil and volatile organic compounds (VOCs) in groundwater identified as contaminants of concern.

Jennifer Lynn Joyal↗

Contractors Road Heavy Equipment Area (SWMU 055) 2022 Annual Groundwater Monitoring Report

This document presents a summary of activities completed at the Contractors Road Heavy Equipment (CRHE) Area, located at Kennedy Space Center (KSC), Florida, from June through December 2022. The activities conducted at the CRHE Area include: - Annual groundwater sampling activities associated with sitewide plume monitoring and Underground Injection Control (UIC) monitoring in the former bioremediation Interim Measures (IM) Hot Spot 1 (HS1) area; - Direct push technology (DPT) groundwater investigation; - Semiannual vapor intrusion (VI) evaluation activities. This facility is designated Solid Waste Management Unit (SWMU) Number 055 (SWMU 055) under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. HydroGeoLogic, Inc. (HGL) prepared this report for the National Aeronautics and Space NASA) under contract number 80KSC019F0096/80KSC019D0012, Technical Directive-03. An Advance Data Package (ADP) presentation of the elements of this report received Team (KSCRT) agreement at the April 5, 2023, KSCRT meeting. The chlorinated volatile organic compound plume appears to be stable vertically and horizontally. Additional DPT groundwater sampling will be completed to support a remedial alternatives evaluation for potential means to expedite groundwater cleanup. There are per- and polyfluorinated alkyl substances in site groundwater, and assessment is planned in the future. Sub-slab soil gas monitoring results do not indicate any concerns with indoor vapor intrusion. Based on the 2022 annual groundwater sampling results, it is recommended that annual sampling continue to alternate with the wet and dry season, with the next sampling event planned for December 2023.

groundwater↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Base Support Building Solid Waste Management Unit (SWMU) 014 PlumeStop Injection Pilot Study Work Plan

This document is a Pilot Study Work Plan (PSWP) for a PlumeStop® permeable reactive barrier (PRB) at the Base Support Building (BSB; the Site) located at the John F. Kennedy Space Center (KSC), Florida. The Site has been designated as Solid Waste Management Unit (SWMU) 014 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. This document was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0010, Task Order 80KSC021F0096. This PSWP details the permeable reactive barrier (PRB) being installed at the BSB to decrease concentrations of per- and polyfluoroalkyl substances (PFAS) in downgradient groundwater using PlumeStop®. PlumeStop® is a colloidal activated carbon that PFAS compounds readily adsorb to. This PSWP outlines the design criteria, injection plan, and performance monitoring schedule for the proposed PlumeStop® PRB study that will guide the possible selection for use and future design of future full-scale PlumeStop® PRBs at KSC.

PFAS↗

Launch Complex 34 SWMU CC054 Hot Spot Area 6 Expansion - Phase Three Implementation Work Plan

This Hot Spot (HS) Area 6 Air Sparge Expansion – Phase Three Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under the Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0067, for the implementation of an Air Sparging (AS) Interim Measure (IM) at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. LC34 has been designated as Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) operating permit. Expansion of the HS 6 IM will include installation of an additional 192 AS wells to depths of approximately 40 feet below land surface (bls) to remediate contaminated groundwater within two areas located west and northeast of the existing HS 6 AS treatment area. These areas were delineated via direct push technology investigations in September and October 2023. The expansion will target “hot spot” concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC), which are the contaminants of concern in these areas with concentrations greater than 10-times Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The highest cDCE and VC concentrations detected in the proposed phase three expansion area were 58,000 micrograms per liter (μg/L) (32 to 36 feet bls) and 12,000 μg/L (23 to 27 feet bls), respectively. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to support transition to long-term monitoring. This phase three expansion will add an additional 9.4 acres of treatment area to the HS 6 IM, which currently covers approximately 26.9 acres.

Launch Complex 34↗