Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RADIOACTIVE WASTE STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Implementation of the Brazilian National Repository - RBMN Project - 13008

Ionizing radiation in Brazil is used in electricity generation, medicine, industry, agriculture and for research and development purposes. All these activities can generate radioactive waste. At this point, in Brazil, the use of nuclear energy and radioisotopes justifies the construction of a national repository for radioactive wastes of low and intermediate-level. According to Federal Law No. 10308, Brazilian National Commission for Nuclear Energy (CNEN) is responsible for designing and constructing the intermediate and final storages for radioactive wastes. Additionally, a restriction on the construction of Angra 3 is that the repository is under construction until its operation start, attaining some requirements of the Brazilian Environmental Regulator (IBAMA). Besides this NPP, in the National Energy Program is previewed the installation of four more plants, by 2030. In November 2008, CNEN launched the Project RBMN (Repository for Low and Intermediate-Level Radioactive Wastes), which aims at the implantation of a National Repository for disposal of low and intermediate-level of radiation wastes. This Project has some aspects that are unique in the Brazilian context, especially referring to the time between its construction and the end of its institutional period. This time is about 360 years, when the area will be released for unrestricted uses. It means that the Repository must be safe and secure for more than three hundred years, which is longer than half of the whole of Brazilian history. This aspect is very new for the Brazilian people, bringing a new dimension to public acceptance. Another point is this will be the first repository in South America, bringing a real challenge for the continent. The current status of the Project is summarized. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site: Proposed Mixed Waste Disposal Unit (MWSU)

The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When the proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. Senate Bill S.854-IS - A Maladjusted Politicized Maze for Consent-Based Siting of New HLW-Repositories - 16019

At the end of 2015, the USA's HLW-disposal program had been on hold since 2010 pending the enactment of enabling legislation for one or both of: 1) The Yucca Mountain HLW repository; and/or 2) The law proposed in Senate Bill S.854-IS 'to establish a new organization to manage nuclear waste, provide a consensual process for siting nuclear waste facilities, ensure adequate funding for managing nuclear waste, and for other purposes'. But, S.854-IS does not acknowledge the existence of the Yucca Mountain HLW repository, which, if re-enabled, would affect both when another HLW repository would be needed and its disposal capacity. Furthermore, it neither timely nor meaningfully integrates waste generators, facility-host(s) and other directly affected parties with the new 'implementing' organizations deemed to be more susceptible to political influence and interferences than those plaguing the Yucca Mountain HLW repository program since 1987 that resulted in a multitude of contentions, lawsuits, delays, and increased costs. For these and other reasons very compelling and conclusive to the author, the legal status of the YM HLW repository should be 'definitive' before a law based upon S.854-IS is enacted. Instead, the near-term focus should be on: 1. Defining 'consent-based' quantitatively. 2. Promptly siting and opening at least one large, expandable, 'consolidated' HLW-storage facility allowing the government to begin taking title to commercially-generated HLW; most-expeditiously accomplished by amending existing legislation. 3. Updating S.854-IS based on lessons learned about siting, developing, and licensing nuclear-waste-storage and -disposal facilities in the USA and abroad the past 30+ years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cadarache LOR (liquides organiques radioactifs) treatment by a solidification process using NOCHAR polymers

In France, two options can be considered to handle the Very Low Level Waste (VLLW) and the Low Level Waste (LLW). The first one is the incineration at CENTRACO facility and the second one is the disposal at ANDRA sites. The waste acceptance in these two channels is dependent upon the adequacy between the waste characteristics (physical chemistry and radiological) and the channel specifications. If the waste characteristics and the channel specifications (presence of significant quantities of halogens, complexing agents, organic components... or/and high activity limits) are incompatible, an alternative solution have to be identify. It consists of a waste pre-treatment process. For Cadarache LOR (Liquides Organiques Radioactifs) waste streams, two radioactive scintillation cocktails have to be treated. They are composed of a mix of organic liquids and water: for the first one, 19 % of organic compounds (xylene, mesitylene, diphenyloxazole, TBP...) and 86.9 % of water, and for the second one, 23 % of organic compounds (TBP...) and 77 % of water. They contain halogens (chlorine and fluorine), complexants agents (nitrate, sulphate, oxalate and formate) and have got αβγ spectra with mass activities equal to some 100 Bq/g. Therefore, tritium is also present. As a consequence, in order for storage acceptance at the ANDRA site, it is necessary to pre-treat the waste. An adequate solution seems to be a solidification process using NOCHAR polymers. Indeed, NOCHAR polymers correspond to an important variety of products applied to the treatment of radioactive aqueous and organic liquids (solvent, oil, solvent/oil mixing ...) and sludge through a mechanical and chemical solidification process. For Cadarache LOR, N910 and N960 respectively dedicated to the organic and aqueous liquids solidification are considered. With the N910, the organic waste solidification occurs in two steps. As the organic liquid travels moves through the polymer strands, the strands swell and immobilize the liquid. Then as the polymer-organic cure, over time, the polymer continues to collapse on the organic to create a permanent chemical bond. The N960 has the ability to absorb aqueous waste up to 100 times its own weight. It creates a strong mechanical bond which permanently traps the contamination imbedded in the aqueous liquids. Therefore, these two NOCHAR polymers seem to be able to constitute a suitable solidification matrix for a final acceptance in storage on ANDRA sites. In order to validate the solidification process using NOCHAR polymers as an acceptable solution for Cadarache LOR treatment, some solidification tests realised with N910 and N960, have been carried out for different Waste/Polymer ratios. To determine the best Waste/Polymer ratio and the optimal experimental parameters, exudation tests have been made. Indeed, the process prevents leaching and it results in the absence residual free organic or aqueous liquid which is forbidden in storage by ANDRA specifications. With these results, the obtained scientific data constitute a fundamental basis of an ANDRA agreement. As a conclusion, the aim of this study is to demonstrate that the pre-treatment by solidification using NOCHAR polymers can constitute a solution for Cadarache LOR handling and more generally, for various organic and mixed organic/aqueous waste which can not be directly acceptable at CENTRACO facility or at ANDRA storage sites. So then, this study is a solid background to demonstrate the feasibility of the waste pre-treatment by solidification with NOCHAR polymer and to encourage this process development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

License Amendment Request for Storing Exelon Sister Nuclear Stations Class B/C LLRW in the LaSalle Station Interim Radwaste Storage Facility - 13620

Exelon Nuclear (Exelon) designed and constructed an Interim Radwaste Storage Facility (IRSF) in the mid-1980's at LaSalle County Nuclear Station (LaSalle). The facility was designed to store low-level radioactive waste (LLRW) on an interim basis, i.e., up to five years. The primary reason for the IRSF was to offset lack of disposal in case existing disposal facilities, such as the Southeast Compact's Barnwell Disposal Facility in Barnwell, South Carolina, ceased accepting radioactive waste from utilities not in the Southeast Compact. Approximately ninety percent of the Radwaste projected to be stored in the LaSalle IRSF in that period of time was Class A, with the balance being Class B/C waste. On July 1, 2008 the Barnwell Disposal Facility in the Southeast Compact closed its doors to out of- compact Radwaste, which precluded LaSalle from shipping Class B/C Radwaste to an outside disposal facility. Class A waste generated by LaSalle is still able to be disposed at the 'Envirocare of Utah LLRW Disposal Complex' in Clive, Utah. Thus the need for utilizing the LaSalle IRSF for storing Class B/C Radwaste for an extended period, perhaps life-of-plant or more became apparent. Additionally, other Exelon Midwest nuclear stations located in Illinois that did not build an IRSF heretofore also needed extended Radwaste storage. In early 2009, Exelon made a decision to forward Radwaste from the Byron Nuclear Station (Byron), Braidwood Nuclear Station (Braidwood), and Clinton Nuclear Station (Clinton) to LaSalle's IRSF. As only Class B/C Radwaste would need to be forwarded to LaSalle, the original volumetric capacity of the LaSalle IRSF was capable of handling the small number of additional expected shipments annually from the Exelon sister nuclear stations in Illinois. Forwarding Class B/C Radwaste from the Exelon sister nuclear stations in Illinois to LaSalle would require an amendment to the LaSalle Station operating license. Exelon submitted the License Amendment Request (LAR) to NRC on January 6, 2010; NRC approved the LAR on July 21, 2011. A similar decision was made by Exelon in early 2009 to forward Radwaste from Limerick Nuclear Station to its sister station, the Peach Bottom Atomic Power Station; both in Pennsylvania. A LAR submittal to the NRC was also provided and NRC approval was received in 2011. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of Ir-192 Disused Sealed Sources with Long-Lived Radioactive Contaminants

Iridium-192 sealed sources are the most widely used sealed source in industrial applications in Brazil. They are not recyclable and in the end of the useful life, they are discarded as radioactive waste. The recommended management strategy of this waste is decay in storage and disposal as exempt waste because the half-life is only 73.8 days. Presently, thousands of Ir- 192 sources are under storage waiting release. Surprisingly, sources that were under storage for more than ten years and for which no measurable contact dose rate was expected still present significant remaining radioactivity. The examination of the gamma spectra of these sources showed the presence of Co-60 and the gamma emission lines from the Ir-192m2 isomer, the metastable isotope with half-life of 241 years, which is also formed by the irradiation of natural iridium. The aim of the study reported in this paper is to characterize the Ir-192 disused sources under interim storage at the Radioactive Waste Management Department, considering the presence of minor contaminants in the irradiated iridium and the fraction of the total initial activity of the sources that is attributable to that metastable isotope. The radioactive inventories at the end of the irradiation and after the decay period were predicted using the Scale 6.0 code and the results were compared with activity measurements of the disused sources by gamma spectrometry. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Development of a Universal Canister for Disposal of High-Level Waste in Deep Boreholes.

The mission of the United States Department of Energy’s Office of Environmental Management is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. Some of the wastes that must be managed have been identified as good candidates for disposal in a deep borehole in crystalline rock. In particular, wastes that can be disposed of in a small package are good candidates for this disposal concept. A canister-based system that can be used for handling these wastes during the disposition process (i.e., storage, transfer, transportation, and disposal) could facilitate the eventual disposal of these wastes. Development of specifications for the universal canister system will consider the regulatory requirements that apply to storage, transportation, and disposal of the capsules, as well as operational requirements and limits that could affect the design of the canister (e.g., deep borehole diameter). In addition, there are risks and technical challenges that need to be recognized and addressed as Universal Canister system specifications are developed. This paper provides an approach to developing specifications for such a canister system that is integrated with the overall efforts of the DOE’s Used Fuel Disposition Campaign's Deep Borehole Field Test and compatible with planned storage of potential borehole-candidate wastes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Birds of a Feather - Developments towards shared, regional geological disposal in the EU?

Geological disposal is an essential component of the long-term management of spent fuel, high level and other long-lived radioactive waste. In the EU, all 25 member states generate radioactive waste. Of course, there are large differences in type and quantity between the member states, but all of them need a long-term solution. Even a country with only lightning rods with radium will need a long-term solution for the disposal. The 1600 year half-life of radium does not fit in a solution with a span of control of just a few hundred years. Implementation of a suitable deep repository may, however, be difficult or impossible for countries with small volumes of waste, because of the high costs involved. Will economy of scale force these birds of a feather to wait to flock together and share a repository? Implementing a small repository and operating it for very long times is very costly. There are past and current examples of countries being prepared to accept radioactive waste from others if a better environmental solution is thus achieved and if the arrangements are fair for all parties involved. The need for supranational surveillance also points to shared solutions. Although the European Parliament and the Commission have both supported the concept of shared regional repositories in Europe, (national) political and societal constraints have hampered the realization of such facilities up to now. The first step in this staged process was the EC funded project, SAPIERR I. The project (2003 to 2005) studied the feasibility of shared regional storage facilities and geological repositories, for use by European countries. It showed that, if shared regional repositories are to be implemented even some decades ahead, efforts must already be increased now. The next step in the process is to develop a practical implementation strategy and organizational structures to work on shared EU radioactive waste storage and disposal activities. This is addressed in the EC funded project SAPIERR II (2006-2008). The paper gives an update of the SAPIERR II project and describes the progress achieved. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Full-Scale Retrieval and Transfer System Testing for Pneumatic Conveyance of High-Level Calcine Waste - 20241

The Idaho National Laboratory processed spent nuclear fuel from 1953 to 1994. The process used solvent extraction to separate uranium, resulting in a liquid waste. A calcination process was used to convert the liquid waste to a high-level radioactive solid powder, referred to as calcine. The calcine is stored in stainless steel bins contained within concrete vaults called the Calcined Solids Storage Facilities. There are a total of seven CSSFs. The Calcine Retrieval Project is tasked with retrieving the calcine from the bins of CSSF 1 and pneumatically transferring it to the bins of CSSF 6. CSSF 1 was constructed to be a final calcine repository with no forethought of retrieval. It represents the greatest technical hurdle to calcine extraction of all the CSSFs. The challenges inherent with accessing the calcine, safely extracting it, and securely transporting it are copious and complex. Once the calcine is removed from CSSF1, that facility may be closed, reducing the footprint of waste storage at the INL. The same process for removing Calcine from CSSF1 may then be utilized to remove the calcine from the remaining CSSFs for final treatment and transport to a long-term storage facility. To overcome these inherent challenges with accessing CSSF 1 and extracting the calcine in a timely manner, a full-scale integrated mockup has been constructed. The mockup includes a full-size model of a concentric group of bins from CSSF 1 and a storage vessel representing CSSF 6. All essential elements of the transport design are represented in the Mockup, including motive and makeup air supply (air compressor), a replica of the CSSF6 cyclone, pre-filter, HEPA filter, vacuum pump, and retrieval control devices. Construction on the Mockup was completed in 2018 and testing began in February 2019. It has already proven very beneficial to the CRP. Experience in running the Mockup have aided in the development of retrieval and transport methodologies and the selection of process parameter values. It has also uncovered some unforeseen technological challenges and will continue to be valuable to the testing team as these hurdles are overcome and the process is proven effective. Operations personnel have also benefitted from its use as a training tool and will continue to use the Mockup as a simulator to reproduce problems encountered during extraction and transfer of Calcine from CSSF 1. The knowledge gained during this process will also be of continued benefit as future work is done to remove various types of calcine from the remaining CSSFs. The methodology of safe and secure transfer of radioactive material may be of benefit to others throughout the U.S. Department of Energy complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Phenix Decommissioning Project - Overview

The first heading of your manuscript must be 'Introduction'. Phenix is the only remaining French fast breeder reactor after the shutdown of Superphenix (1999) and Rapsodie (1983). Phenix is located inside the Marcoule nuclear site along the Rhone river near Bagnols-sur-Ceze in southeastern France. Phenix is one of the facilities belonging the French Atomic Energy Commission (CEA) on the Marcoule site. It is a fast breeder reactor (FBR) developed at the end of the 1960's. that has been in operation since 1973 and was connected to the power grid in 1974. It is a second generation prototype developed while the first generation FBR, Rapsodie, was still in operation. Phenix is a 250 electrical MW power plant. During the first 20 years of operation, its main aim was to demonstrate the viability of sodium-cooled FBRs. Since the 1991 radioactive waste management act, Phenix has become an irradiation tool for the actinide transmutation program. To extend its operating life for 6 additional cycles, it was necessary to refurbish the plant; this involved major work performed from 1999 to 2003 at a total cost of about 250 M??. Today, with a realistic expectation, the final shutdown is planned for the beginning of 2009. The main objective of the Phenix dismantling project is to eliminate all the process equipment and clean all the building to remove all the radioactive zones. To reach this objective, three main hazards must be eliminated: Fuel (criticality hazard), Sodium, Radioactive equipment. The complexity of decommissioning a facility such as Phenix is increased by: - the lack of storage facility for high radioactive material, - the decision to treat all the radioactive sodium and sodium waste inside the plant, - the very high irradiation of the core structures due to the presence of cobalt alloys. On the other hand, Phenix plant is still under operating with a qualified staff and the radioactivity coming from structural activation is well known. After the final shutdown, the first operations will be conducted by the same staff under the same safety report. Another interesting fact is that the decommissioning funds project exist and are available. The CEA decided to begin the dismantling phase without waiting because after a period of decay it is not really cheaper or easier to work. This approach needs interim storage facilities not long after the final shutdown. For the low- and intermediate-level radioactive waste there are national storage centers but for the high-level wastes, each operator must manage its waste until a suitable disposal site is available. At Marcoule a new storage facility is now being designed and scheduled to begin operating after 2013-2014. After removal of the fuel and core elements, the primary sodium will be drained and eliminated by a carbonation process. To ensure biological shielding, the reference scenario calls for filling the primary vessel with water. The most radioactive structures (dia-grid and core support) will be cut up with remote tools, after which the rest of the structure will be cut up manually. Phenix contains about 1450 metric tons of sodium. The CEA initially planned to build ATENA, a new facility for all radioactive sodium waste from R and D and FBR facilities. For various reasons, but mainly to save money, the CEA decided to treat all radioactive sodium and sodium waste in the framework of the Phenix dismantling project. There are no real difficulties in the dismantling schedule because of the advanced state of development of the processes selected for the ATENA project. Because of the knowledge already obtained, the issues concern project management, waste management and human resources reduction more than technical 0014challe.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Multi-Attribute Utility Analyses to Assess Transportation Routes from ISFSIs - 20535

With two consolidated interim storage facilities for used nuclear fuel (UNF) having applied for storage licenses, there is the potential need to transport UNF in the U.S. from shutdown reactor sites to complete the site cleanup and from operating reactor sites who may be running out of storage options (e.g., spent fuel pools are nearly full and dry storage facilities are reaching licensed capacity). At some of the shutdown reactor sites, only the independent spent fuel storage installation (ISFSI) exists and often there remains a degraded transportation infrastructure for performing shipments from these sites. At other sites (e.g., operating reactor plants), the existing transportation infrastructure on the site is unchanged and sufficient for moving UNF, but the environment around the route may have changed (e.g., what was once a rural setting has transformed into a more urban setting) and/or local stakeholders want their input taken into consideration in UNF transportation activities. So, although preliminary evaluations have been performed to identify viable modes of transport from these sites using rail, barge, and/or heavy haul truck, if multiple options exist for moving the UNF from the site (e.g., multiple truck routes or a truck and a barge route both exist) then an evaluation that takes input from multiple stakeholders should be considered to identified the preference (e.g., ranking) of routes from a site. Orano has supported the development of several studies examining the viable routes for removing UNF from some of these sites and has utilized a multi-attribute utility analysis (MUA) to establish a ranking of routes and associated modes to move the UNF from the ISFSIs to a Class I rail carrier. The ultimate result from the MUA is a list(s) of the most to the least favored/preferred routes from the site. This paper provides an overview of the MUA methodology and provides an example of its application to a site with a shutdown reactor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ADAPTING A CERTIFIED SHIPPING PACKAGE FOR STORAGE APPLICATIONS

For years shipping packages have been used to store radioactive materials at many DOE sites. Recently, the K-Area Material Storage facility at the Savannah River Site became interested in and approved the Model 9977 Shipping Package for use as a storage package. In order to allow the 9977 to be stored in the facility, there were a number of evaluations and modifications that were required. There were additional suggested modifications to improve the performance of the package as a storage container that were discussed but not incorporated in the design that is currently in use. This paper will discuss the design being utilized for shipping and storage, suggested modifications that have improved the storage configuration but were not used, as well as modifications that have merit for future adaptations for both the 9977 and for other shipping packages to be used as storage packages.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safely Managing CNL's Shutdown Prototype Power Reactors - 30 years of Experience - 19157

Canadian Nuclear Laboratories (CNL) has over 30 years of experience managing three prototype power reactors from shutdown through storage with surveillance and into preparation from final decommissioning. CNL is responsible for the safe storage with surveillance of three prototype power reactors; Nuclear Power Demonstration (NPD), Gentilly-1(G1) and Douglas Point (DP). Each of the Canadian prototype power reactor sites have been maintained using different post shutdown management strategies, which were based on the site location, configuration, and intended designation of the respective sites. This paper will discuss the post shutdown strategies employed at the three sites, including details of their shutdown strategy, current conditions, and experience gained from the period of storage with surveillance. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing a concept for a national used fuel interim storage facility in the United States

In the United States (U.S.) the nuclear waste issue has plagued the nuclear industry for decades. Originally, spent fuel was to be reprocessed but with the threat of nuclear proliferation, spent fuel reprocessing has been eliminated, at least for now. In 1983, the Nuclear Waste Policy Act of 1982 [1] was established, authorizing development of one or more spent fuel and high-level nuclear waste geological repositories and a consolidated national storage facility, called a 'Monitored Retrievable Storage' facility, that could store the spent nuclear fuel until it could be placed into the geological repository. Plans were under way to build a geological repository, Yucca Mountain, but with the decision by President Obama to terminate the development of Yucca Mountain, a consolidated national storage facility that can store spent fuel for an interim period until a new repository is established has become very important. Since reactor sites have not been able to wait for the government to come up with a storage or disposal location, spent fuel remains in wet or dry storage at each nuclear plant. The purpose of this paper is to present a concept developed to address the DOE's goals stated above. This concept was developed over the past few months by collaboration between the DOE and industry experts that have experience in designing spent nuclear fuel facilities. The paper examines the current spent fuel storage conditions at shutdown reactor sites, operating reactor sites, and the type of storage systems (transportable versus non-transportable, welded or bolted). The concept lays out the basis for a pilot storage facility to house spent fuel from shutdown reactor sites and then how the pilot facility can be enlarged to a larger full scale consolidated interim storage facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prospects and Challenges in the Management of Non-Retrievable Radioactive Waste in the Russian Federation - 17212

In 2011, the Federal Law 'On the Management of Radioactive Waste' was enacted in the Russian Federation setting a framework for the Unified State System for Radioactive Waste Management and establishing a mandatory requirement for safe radioactive waste (RW) disposal. Particular category of 'non-retrievable RW' was defined given the amount of RW generated by that time, the issues associated with relevant sites, as well as the experience gained during the implementation of nuclear legacy programs. It was specified that in situ disposal is the preferred management option for this category of waste rather than RW retrieval and re-disposal due to relevant radiation and financial aspects. In 2011 - 2015, a set of high-priority tasks on taking the inventory of accumulated RW was accomplished. This work also provided for demonstrating the feasibility and making key decisions on the final stages on their lifecycle and relevant end-state strategies. Facilities holding non-retrievable RW were divided into two categories: - subject to transition into near-surface storage facilities by constructing additional safety barriers; - subject to controlled long-term storage followed by remediation. Efforts on a number of surface liquid RW storage water reservoirs falling under the first category launched back in the 20. century were completed. The new federal program provides for a set of follow-up efforts to be completed at 12 facilities. As it comes to the second category, the main task was to develop a set of safety management options, as well as some computational methods to demonstrate the feasibility of the selected end-state strategies. The most considerable efforts were made at the Techa Cascade of water reservoirs being the largest liquid radioactive waste (LRW) storage facility in the world that holds over 360 million m{sup 3} of waste with uncertain legal status, the lack of relevant computational models to predict its state. The paper summarizes the data on defining the end states of non-retrievable RW, completed and scheduled efforts on implementing relevant long-term safety strategies. The paper focuses on subsurface repositories and near-surface LRW storage reservoirs considered as common types of facilities holding non-retrievable RW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the B-25 Low Level Radioactive Waste Container in Taiwan - 1900x

Chinshan Nuclear Power Plant will be permanently stopped its operation in the middle of 2019 and will be the first nuclear power plant stepping into the decommissioning phase in Taiwan. According to Nuclear Reactor Facilities Regulation Act, a nuclear facility must be dismantled in 25 years after being permanently ceased operation. In its decommissioning plan, the B -25 low level radioactive waste container was one of the proposed containers used for this decommissioning task. However, the B-25 waste container was not used or developed in Taiwan before. To meet this need, Institute of Nuclear Energy Research developed a new type of B-25 waste container and will apply to the authority for its usage license. This article provided the information of the low level radioactive waste containers have been approved in Taiwan and described the design specifications of the developed B-25 waste container. Besides, the numerical evaluation and test results were also included in this article. Based on the evaluation and test results, the developed B-25 waste container satisfied the requirements of the storage container and industrial package type 2. It is believed that the usage license would be granted soon after applying it to the authority. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Understanding Radionuclide Interactions with Cementitious Materials for Radioactive Waste Management - 18298

In the UK, ILW is currently managed using cementitious encapsulation in Portland cement (PC)-based grouts. The long-term behaviour of radionuclides in ILW cementitious waste-forms under varying local conditions of extended interim storage and geological disposal is not well understood and the behaviour of cement minerals in the retention of various radionuclides is poorly constrained. This work focuses on the Ca-Si-[Al,Mg,S] mineral system and how this may evolve with the introduction of radionuclides into the system. Here, we discuss the experimental program aimed at underpinning the uptake and retention mechanisms of a range of key radionuclides (U, Tc, Ce/Pu), with selected cement phases: calcium-silicate-hydrate (C-S-H), hydrotalcite (Mg{sub 6}Al{sub 2}CO{sub 3}(OH)16.4H{sub 2}O) and ettringite (Ca{sub 6}(Al{sub 2}O{sub 6})(SO{sub 4}){sub 3}.32H{sub 2}O). Described here is the syntheses of C-S-H and radionuclide incorporation experiments performed on this phase. Further to this, thermodynamic geochemical modelling has been adopted to explore the Ca-Si-U mineral system, aimed at identifying the mineral phases likely to form on contact of C-S-H phases with aqueous uranium, as a function of pH. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗