Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Reproduction of the Yucca Mountain Project TSPA-LA Uncertainty and Sensitivity Analyses and Preliminary Upgrade of Models

Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014) and Hadgu et al. (2015). The TSPA computing hardware (CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of GoldSim with Versions 9.60.300, 10.5 and 11.1.6 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA-type analysis on the server cluster. The current tasks included verification of the TSPA-LA uncertainty and sensitivity analyses, and preliminary upgrade of the TSPA-LA from Version 9.60.300 to the latest version 11.1. All the TSPA-LA uncertainty and sensitivity analyses modeling cases were successfully tested and verified for the model reproducibility on the upgraded 2014 server cluster (CL2014). The uncertainty and sensitivity analyses used TSPA-LA modeling cases output generated in FY15 based on GoldSim Version 9.60.300 documented in Hadgu et al. (2015). The model upgrade task successfully converted the Nominal Modeling case to GoldSim Version 11.1. Upgrade of the remaining of the modeling cases and distributed processing tasks will continue. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reproduction of the Yucca Mountain Project TSPA-LA Model Runs using TSPA Computing Systems

Sandia National Laboratories (SNL) conducted an evaluation of total system performance assessment (TSPA) related computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014). The current work examined main components of the computing system identified in the previous work (Lee and Hadgu, 2014) to ensure the operational readiness of the TSPA-LA model capability on the server cluster. The TSPA computing hardware and storage system were replaced in late 2014 to maintain core capability and improve computation efficiency. One floating license of GoldSim Version 9.60.300 was installed on the upgraded cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software was tested and installed to support the TSPA-type analysis on the server cluster. All the TSPA-LA modeling cases were tested and verified for the model reproducibility on the upgraded 2014 server cluster (CL2014). All test runs were executed on multiple processors on the server cluster utilizing the GoldSim distributed processing capability, and all runs completed successfully. The model reproducibility verification was evaluated by two approaches: numerical value comparison and graphical comparison. The analysis demonstrated an excellent reproducibility of the TSPA-LA model runs on the upgraded server cluster. The 2014 server cluster and supporting software systems are fully operational to support TSPA- LA type analysis.

97 MATHEMATICS AND COMPUTING↗

Reproduction of the Yucca Mountain Project TSPA-LA Model Runs using TSPA Computing Systems

Sandia National Laboratories (SNL) conducted an evaluation of total system performance assessment (TSPA) related computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014). The current work examined main components of the computing system identified in the previous work (Lee and Hadgu, 2014) to ensure the operational readiness of the TSPA-LA model capability on the server cluster. The TSPA computing hardware and storage system were replaced in late 2014 to maintain core capability and improve computation efficiency. One floating license of GoldSim Version 9.60.300 was installed on the upgraded cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software was tested and installed to support the TSPA-type analysis on the server cluster. All the TSPA-LA modeling cases were tested and verified for the model reproducibility on the upgraded 2014 server cluster (CL2014). All test runs were executed on multiple processors on the server cluster utilizing the GoldSim distributed processing capability, and all runs completed successfully. The model reproducibility verification was evaluated by two approaches: numerical value comparison and graphical comparison. The analysis demonstrated an excellent reproducibility of the TSPA-LA model runs on the upgraded server cluster. The 2014 server cluster and supporting software systems are fully operational to support TSPA- LA type analysis.

97 MATHEMATICS AND COMPUTING↗

FY2021 Status Report on the Computing Systems for the Yucca Mountain Project TSPA-LA Models and Testing of Selected Process Models

Sandia National Laboratories continued evaluation of the total system performance assessment (TSPA) for License Application (LA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. The FY21 task included continued operation of the cluster; maintenance of the TSPA-LA models (with GoldSim 9.60.300); continued assessment of the status of the Infiltration Model; (a process model that feeds the TSP -LA) and preliminary assessments of the Unsaturated Zone Flow Model and the Saturated Zone Flow and Transport Model Abstraction (process models that feed the TSPA-LA). The 2014 cluster and supporting software systems are currently fully operational to support TSPA-LA type analyses.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstration of low-density, high-performance operation of sustained spheromaks and favorable scalability toward compact, low-cost fusion power plants (Final Scientific/Technical Report)

This project worked to advance the technical viability of a novel method for efficiently sustaining stable, high-performance spheromak plasma configurations to serve as the basis of compact, low-cost fusion power plants. In particular, our group worked to improve the method of Steady Inductive Helicity Injection (SIHI) with Imposed-Dynamo Current Drive (IDCD) for spheromak plasma sustainment. Prior to this project demonstrations of this plasma sustainment technology have achieved plasma performance consistent with entry milestone 3 of the BETHE FOA. Research and development (R&D) activities for this project were focused on increasing plasma performance toward a level consistent with exit milestone 4. To do this the PI and his group worked to increase the performance of sustained spheromaks produced in an existing experimental prototype (HIT-SIU) while improving confidence in projections to and design of future, higher performance devices through three primary R&D activities: 1) Improved control over the density of plasma in the device throughout a discharge to provide a pathway for demonstration of spheromaks Ohmically heating to the Mercier beta limit via: a. Fueling the device directly with plasma through the installation of pre-ionized source on the injectors b. Optimization of electrical current waveforms in the driver circuits to enable low-density plasma formation with a lower fueling rate 2) Computational demonstration of a validated, realistic injector circuit coupled to a dynamic plasma model capable of use as a design tool for SIHI drivers and associated circuits for new experimental design points on the pathway to commercial reactors. The improvements in plasma performance achieved during research activity 1), and the computational projections performed in research activity 2) increased the technological readiness level (TRL) of this fusion energy concept toward a level sufficient to attract early-stage private investment and/or other forms of follow-on investment to pursue required R&D activities required for the eventual fusion power plants based on this novel technical approach.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

NIF Enhanced Yield Capability Conceptual Design Review Report

The purpose of the NIF Enhanced Yield Capability (EYC) Conceptual Design Review was to evaluate key aspects of the design and assess readiness to move to the next phase of the project. The NNSA accepted the NIF Integrated Product Review Board (IPRB) process as an appropriate means of conducting the review. The review committee finds that the NIF EYC Design Team has successfully addressed the review scope objectives. No Type 1 action items or liens were identified during the technical review. Some recommendations and observations are recorded below to assist the team.

42 ENGINEERING↗

Mercury-metadata data management system

Mercury is a federated metadata harvesting, search and retrieval tool based on both open source software and software developed at Oak Ridge National Laboratory. It was originally developed for NASA, USGS, and DOE. A major new version of Mercury (version 3.0) was developed during 2007 and released in early 2008. This Mercury 3.0 version provides orders of magnitude improvements in search speed, support for additional metadata formats, integration with Google Maps for spatial queries, facetted type search, support for RSS delivery of search results, and ready customization to meet the needs of the multiple projects which use Mercury. For the end users, Mercury provides a single portal to very quickly search for data and information contained in disparate data management systems. It collects metadata and key data from contributing project servers distributed around the world and builds a centralized index. The Mercury search interfaces then allow the users to perform simple, fielded, spatial, and temporal searches across these metadata sources. This centralized repository of metadata with distributed data sources provides extremely fast search results to the user, while allowing data providers to advertise the availability of their data and maintain complete control and ownership of that data.

Source record↗

BETO 2021 Peer Review - FCIC Task 5 - Preprocessing

In the study of feedstock variability, this presentation specifically looks at preprocessing processes that will created well-defined and homogenous feedstock from variable biomass resources, in the quest to produce homogeneous intermediates that will be converted into market-ready products. The objective of this stage of the project is to develop science-based design and operation principles informed by TEA/LCA that result in predictable, reliable, and scalable performance of preprocessing unit operations (comminution, fractionation, deconstruction, and real-time imaging).

biomass↗

Low Temperature Aluminum Dissolution Of Sludge Waste

High Level Waste (HLW) at the Savannah River Site (SRS) is currently stored in aging underground storage tanks. This waste is a complex mixture of insoluble solids, referred to as sludge, and soluble salts. Continued long-term storage of these radioactive wastes poses an environmental risk. The sludge is currently being stabilized in the Defense Waste Processing Facility (DWPF) through a vitrification process immobilizing the waste in a borosilicate glass matrix for long-term storage in a federal repository. Without additional treatment, the existing volume of sludge would produce nearly 8000 canisters of vitrified waste. Aluminum compounds, along with other non-radioactive components, represent a significant portion of the sludge mass currently planned for vitrification processing in DWPF. Removing the aluminum from the waste stream reduces the volume of sludge requiring vitrification and improves production rates. Treating the sludge with a concentrated sodium hydroxide (caustic) solution at elevated temperatures (>90 deg. C) to remove aluminum is part of an overall sludge mass reduction effort to reduce the number of vitrified canisters, shorten the life cycle for the HLW system, and reduce the risk associated with the long term storage of radioactive wastes at SRS. A projected reduction of nearly 900 canisters will be achieved by performing aluminum dissolution on six targeted sludge batches; however, a project to develop and install equipment will not be ready for operation until 2013. The associated upgrades necessary to implement a high temperature process in existing facilities are costly and present many technical challenges. Efforts to better understand the characteristics of the sludge mass and dissolution kinetics are warranted to overcome these challenges. Opportunities to further reduce the amount of vitrified waste and increase production rates should also be pursued. Sludge staged in Tank 51 as the next sludge batch for feed to DWPF consisted primarily of radioactive wastes containing a very high aluminum concentration. Based on initial laboratory testing and previous sludge characterization, aluminum in this sludge could be dissolved at low temperature (no more than 65 deg. C) in a concentrated caustic solution. The amount of aluminum predicted to dissolve under these conditions ranged from 25% to 80%. An opportunity existed to remove a significant amount of aluminum prior to vitrification in DWPF and increase the level of understanding of the effects of caustic dissolution of aluminum at lower temperatures. This paper presents the results of a real waste laboratory demonstration and full-scale implementation of a low temperature aluminum dissolution process which should be considered as a viable means to reduce radioactive sludge mass and reduce the amount of waste to be vitrified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Technical, Economic, Risk, and Adoption Assessment for Evaluating Work Reduction Opportunities in the Nuclear Industry

Automation and cost-saving initiatives, such as process automation with advances in artificial intelligence, are gaining traction in modernization efforts across the nuclear industry. As these innovations are increasingly adopted, it becomes crucial to evaluate their impacts comprehensively. Various technical and economic attributes, along with risk and human readiness factors, must be achieved to ensure that innovative projects enabling automation and modernization are successful. However, no systematic or integrated framework exists that allows plants to evaluate these innovative projects. To address this gap, the Technical, Economic, Risk, and Adoption (TERA) assessment offers a structured method to evaluate innovative technologies, ensuring solutions meet both operational and safety standards. The TERA framework integrates the disparate perspectives to assess modernization opportunities in nuclear operations. It combines qualitative and quantitative models to evaluate the relationship between performance and business impacts, while also enabling continuous re-evaluation during project development. This approach helps plant owners identify high-priority opportunities, optimize cost savings, and minimize risks, ensuring projects remain on track to achieve desired returns. By providing a comprehensive, systematic methodology, TERA enables informed, data-driven decisions that support successful modernization efforts, enhancing efficiency, safety, and cost savings across nuclear operations. This paper explains the TERA framework and its benefits for the nuclear industry.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Essence2.0 Development and Deployment (Final Report)

The objective of the project was to take two core technologies that have been developed under the Recipient’s solid laboratory products and integrate them into a single CyberPhysical awareness platform and complete development on current field-tested prototypes that will extend the integrated capability of the platform. During the final development phase, the Recipient development team and its selected industry partners tested and hardened the platform to ensure resilient and secure operation of the integrated platform. The team also executed substantial field testing and established the framework for defining the organization and/or commercial infrastructure needed to sustain operations and provide readiness for a national scale deployment. The focus of the project was (1) the improvement, refinement, and deployment of technology for the detection of cyber-attacks on utility operational technology (OT) and information technology (IT) networks and assets, including Supervisory Control and Data Acquisition Systems (SCADA) systems; and (2) support for containment and remediation of adversarial threats and actions against those systems and environments.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Next Generation Nuclear Plant Project Technology Development Roadmaps: The Technical Path Forward for 750–800°C Reactor Outlet Temperature

This document presents the NGNP Critical PASSCs and defines their technical maturation path through Technology Development Roadmaps (TDRMs) and their associated Technology Readiness Levels (TRLs). As the critical PASSCs advance through increasing levels of technical maturity, project risk is reduced and the likelihood of within-budget and on-schedule completion is enhanced. The current supplier-generated TRLs and TDRMs for a 750–800°C reactor outlet temperature (ROT) specific to each supplier are collected in Appendix A.

42 ENGINEERING↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Evaluation of a Clock Multiplexing Circuit for the SSRL Booster Accelerator Timing System (Final Paper)

SPEAR3 is a 234 m circular storage ring at SLAC’s synchrotron radiation facility (SSRL) in which a 3 GeV electron beam is stored for user access. Typically the electron beam decays with a time constant of approximately 10hr due to electron lose. In order to replenish the lost electrons, a booster synchrotron is used to accelerate fresh electrons up to 3GeV for injection into SPEAR3. In order to maintain a constant electron beam current of 500mA, the injection process occurs at 5 minute intervals. At these times the booster synchrotron accelerates electrons for injection at a 10Hz rate. A 10Hz 'injection ready' clock pulse train is generated when the booster synchrotron is operating. Between injection intervals-where the booster is not running and hence the 10 Hz ‘injection ready’ signal is not present-a 10Hz clock is derived from the power line supplied by Pacific Gas and Electric (PG&E) to keep track of the injection timing. For this project I constructed a multiplexing circuit to 'switch' between the booster synchrotron 'injection ready' clock signal and PG&E based clock signal. The circuit uses digital IC components and is capable of making glitch-free transitions between the two clocks. This report details construction of a prototype multiplexing circuit including test results and suggests improvement opportunities for the final design.

43 PARTICLE ACCELERATORS↗

Design and Evaluation of a Clock Multiplexing Circuit for the SSRL Booster Accelerator Timing System - Oral Presentation [Slides]

SPEAR3 is a 234 m circular storage ring at SLAC’s synchrotron radiation facility (SSRL) in which a 3 GeV electron beam is stored for user access. Typically the electron beam decays with a time constant of approximately 10hr due to electron lose. In order to replenish the lost electrons, a booster synchrotron is used to accelerate fresh electrons up to 3GeV for injection into SPEAR3. In order to maintain a constant electron beam current of 500mA, the injection process occurs at 5 minute intervals. At these times the booster synchrotron accelerates electrons for injection at a 10Hz rate. A 10Hz 'injection ready' clock pulse train is generated when the booster synchrotron is operating. Between injection intervals-where the booster is not running and hence the 10 Hz ‘injection ready’ signal is not present-a 10Hz clock is derived from the power line supplied by Pacific Gas and Electric (PG&E) to keep track of the injection timing. For this project I constructed a multiplexing circuit to 'switch' between the booster synchrotron 'injection ready' clock signal and PG&E based clock signal. The circuit uses digital IC components and is capable of making glitch-free transitions between the two clocks. This report details construction of a prototype multiplexing circuit including test results and suggests improvement opportunities for the final design.

43 PARTICLE ACCELERATORS↗

Kilopower - Powering the Future of Space Exploration [Poster]

The Kilopower Project was initiated by NASA’s Space Technology Mission Directorate to demonstrate subsystem-level technology readiness of small space fission power in a relevant environment (TRL 5) for space science and human exploration power needs. The Kilopower Project centerpiece is the Kilowatt Reactor Using Stirling Technology (KRUSTY) test, which consists of the development and testing of a ground technology demonstrator of a 1 kWe class fission power system. The technologies to be developed and validated by KRUSTY are extensible to space fission power systems from 1 to 10 kWe, which can enable modular surface fission power systems for human exploration, as well as higher power future potential deep space science missions.

42 ENGINEERING↗

Reduction of CO 2 Emissions Through Lightweight Body Panels (Project Final Report)

Lightweight construction is an integral part of Volkswagen’s overall strategy of reducing CO 2 emissions. Due to its low cost, steel is the most commonly used material for automotive exterior body panels today. Unfortunately, steel has a high density, resulting in a relatively low specific strength. Glass fiber based sheet molding compounds (SMC) provide high properties in combination with lower density. The high specific strength of SMC offers an enormous lightweight potential. To unlock the full potential of SMC materials in combination with cutting edge manufacturing processes, Volkswagen Group of America worked together with IACMI (Institute for Advanced Composites Manufacturing Innovation) and the academic partners: University of Tennessee Knoxville, Purdue University and Michigan State University; as well as the industry partners: Ashland, IDI, Owens Corning and Continental Structural Plastics. Leveraging the expertise of all project partners, reaching over the entire supply chain the project demonstrated the potential of these materials. This report will highlight the major steps in the development process on the way to technology readiness for SMC using the example of the Volkswagen Atlas Liftgate. Over the 36-month period of the project, the work focused on three R&D areas: material development, design and simulation, and development of the manufacturing process. Material selection included alternative fibers and resin systems, and accounted for material availability, properties, and cost-efficiency. The work undertaken in the field of design and simulation has pushed the envelope of short fiber reinforced thermoset molding compound process simulation. Design iterations were virtually tested, while the final design was used to validate the simulation software against physical parts. Manufacturing development used cutting-edge technology, while experts along the supply chain were working together to ensure the best possible results. In the final stage of the project, liftgates were molded, trimmed, bonded, painted and assembled before exhaustive testing. The result is an e-coat (electrophoretic dip coating) capable Class-A SMC liftgate, which is ready for high-volume production, and can be used as a technology demonstrator. The prototypes manufactured in the scope of this work have exhibited a mass reduction for the Volkswagen Atlas liftgate of up to 35% compared to the series production steel version, without a degradation of the functionalities.

36 MATERIALS SCIENCE↗

Pre-Project Planning for a Flameless Pressurized Oxy-Combustion Pilot Plant (Final Technical Report)

The team of Southwest Research Institute® (SwRI®), ITEA, Electric Power Research Institute, Inc. (EPRI), GE Global Research (GE), Jacobs Engineering (Jacobs), and Peter Reineck Associates (PRA) are advancing Flameless Pressurized Oxy-Combustion (FPO), a novel coal technology. This effort seeks to complete the preliminary engineering and planning of a 50-MWth Pilot Plant that produces electricity and steam for district heating. The technology, pioneered by ITEA at the 5-MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this project was to bring all of the core cycle components to the same level of design maturity. Extensive cycle modeling and evaluation explored various configurations of the process. Different coals, operating conditions, and heat recovery devices were considered and modeled using Aspen Plus. The results of the cycle modeling informed the pilot plant configuration and the planned configuration at the commercial scale. The system pressurization is maintained in the flue gas clean-up and water removal. This allows for efficient and cost-effective carbon dioxide compression and sequestration package. Once the cycle was optimized, preliminary drawings, layouts, and plans defined the pilot facility. Process flow diagrams (PFD) were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. A detailed cost estimate for the planned configuration was completed with an Association for the Advancement of Cost Engineering (AACE) Class IV level of cost analysis. A site selection effort evaluated a variety of potential candidate sites. The selection effort focused on three sites for an in-depth evaluation of the merits and viability of hosting a pilot demonstration. The ability of the host site to support the project with cost sharing was also assessed. The selection process chose the University of Wyoming (UW) as the host site, and cost estimates for the pilot capital estimate were made using local data. A preliminary test plan and operation plan, which creates figures of merit, control, and instrumentation was produced. An effort that outlines methods of pilot cost reduction was completed near the end of the project. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

01 COAL, LIGNITE, AND PEAT↗