Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Industrial application experiment series

Two procurements within the Industrial Application Experiment Series of the Thermal Power Systems Project are discussed. The first procurement, initiated in April 1980, resulted in an award to the Applied Concepts Corporation for the Capital Concrete Experiment: two Fresnel concentrating collectors will be evaluated in single-unit installations at the Jet Propulsion Laboratory Parabolic Dish Test Site and at Capitol Concrete Products, Topeka, Kansas. The second procurement, initiated in March 1981, is titled, "Thermal System Engineering Experiment B." The objective of the procurement is the rapid deployment of developed parabolic dish collectors.

Bluhm, S. A.↗

Quality assurance and risk management: Perspectives on Human Factors Certification of Advanced Aviation Systems

This paper is based on the experience of engineering psychologists advising the U.K. Ministry of Defense (MoD) on the procurement of advanced aviation systems that conform to good human engineering (HE) practice. Traditional approaches to HE in systems procurement focus on the physical nature of the human-machine interface. Advanced aviation systems present increasingly complex design requirements for human functional integration, information processing, and cognitive task performance effectiveness. These developing requirements present new challenges for HE quality assurance (QA) and risk management, requiring focus on design processes as well as on design content or product. A new approach to the application of HE, recently adopted by NATO, provides more systematic ordering and control of HE processes and activities to meet the challenges of advanced aircrew systems design. This systematic approach to HE has been applied by MoD to the procurement of mission systems for the Royal Navy Merlin helicopter. In MoD procurement, certification is a judicial function, essentially independent of the service customer and industry contractor. Certification decisions are based on advice from MoD's appointed Acceptance Agency. Test and evaluation (T&E) conducted by the contractor and by the Acceptance Agency provide evidence for certification. Certification identifies limitations of systems upon release to the service. Evidence of compliance with HE standards traditionally forms the main basis of HE certification and significant non-compliance could restrict release. The systems HE approach shows concern for the quality of processes as well as for the content of the product. Human factors certification should be concerned with the quality of HE processes as well as products. Certification should require proof of process as well as proof of content and performance. QA criteria such as completeness, consistency, timeliness, and compatibility provide generic guidelines for progressive acceptance and certification of HE processes. Threats to the validity of certification arise from problems and assumptions in T&E methods. T&E should seek to reduce the risk of specification non-compliance and certification failure.

Taylor, Robert M.↗

Recommendations on the Use of Commercial-Off-The-Shelf (COTS) Electrical, Electronic, and Electromechanical (EEE) Parts for NASA Missions - Phase II

This assessment had two Phases. Phase I captured NASA Centers’ current practices for commercial-off-the-shelf (COTS) Electrical, Electronic, and Electromechanical (EEE) parts 1 used in spaceflight systems and ground support equipment (available at https://ntrs.nasa.gov/citations/20205011579) [ref. 1]. The Phase II report provides guidance for selecting and using COTS parts in NASA missions. The approaches proposed in this report differ from current agency practices. This top-level executive summary touches on these new approaches for using COTS parts but does not provide the detailed information that is critical in understanding the rationale behind these new approaches. Readers will need to read the entire report to gain full understanding and effectively use the recommendations herein. NASA’s historical approach to selecting and applying parts has been to define certain parts, primarily specific classes of military specification (MIL-SPEC) parts, as “standard”, leaving all others, including COTS parts, as nonstandard. Standard parts typically are used without further testing (“use-as-is”). Nonstandard parts are subjected to initial screening and subsequent lot acceptance testing of representative samples from each procured lot per MIL-SPEC or similar requirements. Decades later, top-tier commercial part manufacturers have evolved significant manufacturing, statistical control, and technological improvements that can now provide parts as reliable or more reliable than MIL-SPEC parts, when used within their datasheet limits. Concurrently, the space science and exploration community’s needs demand technological advances unavailable with MIL-SPEC parts. This ongoing change necessitates using COTS parts for space missions. Properly selected COTS parts in appropriate applications can offer performance and supply availability advantages compared to MIL-SPEC parts. Their utility and demonstrated reliability result from large volumes and automated production and testing processes. However, careful review and a thorough understanding of their specifications (i.e., datasheet limitations) is needed, and verifying that manufacturer specifications and reliability meet space hardware application needs are necessary. This report recommends MIL-SPEC screening and non-radiation-related lot acceptance testing be reduced or eliminated in cases where evidence of sufficient quality and reliability exists for COTS parts. The extent of NASA's insight into COTS manufacturers and the amount and nature of the needed evidence will differ by mission and will likely be driven by a mission's resources and associated risk posture. To facilitate this goal, two new terminologies have been defined and described: “Industry Leading Parts Manufacturer (ILPM)” and “Established COTS parts.” An ILPM is a COTS manufacturer that produces high quality and reliable parts. Some parts produced by ILPMs, defined as Established COTS parts, do not need any additional MIL-SPEC or NASA screening and lot acceptance testing to be used in space applications. This report provides guidance for selecting, procuring, and applying COTS parts and for performing part-, board-, and system-level COTS parts verification. The recommendation to select Established COTS parts from ILPMs will assure those COTS parts will have comparable quality to corresponding MIL-SPEC parts. Selecting, applying, and verifying Established COTS parts from ILPMs requires a holistic team approach, engaging parts engineers, circuit designers, quality, reliability, and systems engineers, procurement specialists, radiation specialists, avionics leads, and program/project managers. A mission-specific approach tailored to a project’s Mission, Environment, Applications and Lifetime (MEAL) [ref. 2] requirements should be developed and approved by program/project managers. Any associated risks should be clearly identified, quantified, mitigated, and/or accepted. Different approaches are recommended according to program/project Risk Classes A, B, C, and D [ref. 3] and human-rated missions [ref. 4]: 1. Recommend Classes A and B and human-rated missions consider a “MIL-SPEC parts- based design” approach. ”MIL-SPEC parts-based design” approach is one in which most parts are MIL-SPEC parts and Established COTS parts from ILPMs are used only when an equivalent MIL-SPEC part does not meet functional or size, weight, and power (SWaP) or performance requirements, or is not available. 2. Recommend Classes D and Sub-D missions consider a “System of COTS” approach. “System of COTS” approach is one which most parts are Established COTS parts from ILPMs. 3. Recommend Class C missions determine which approach is the best for their projects; that is, use either a “MIL-SPEC parts-based design” approach, “System of COTS” approach, or a combined approach utilizing elements of both. This report intends to provide guidance in using COTS parts for NASA missions with risk classifications of A through D and human-rated missions; but it does not address the costs of using COTS parts. Costs of using COTS parts in different NASA mission classes can vary significantly even if the same parts are used in different risk postures, due to differing verification levels needed. The guidance does not distinguish between critical or non-critical systems, and a given project will need to apply the appropriate guidance based on their risk posture. The intended audience of this report are NASA personnel and commercial practitioners who support NASA’s spaceflight missions, including spaceflight program or project managers, parts engineers, parts manufacturers, radiation engineers, avionics engineers, system engineers, circuit design engineers, reliability engineers, safety and mission assurance (SMA) personnel, and parts procurement specialists. The NEPP Program will perform a pathfinder study to explore implementing the guidance in this NESC report. An ILPM verification process is not the same as conventional vendor qualification processes performed according to military standards and specifications. This NESC report intends to provide guidance in utilizing available parts data from ILPM manufacturers for parts assurance assessments needed for NASA missions. The report also captured the current practices from DoD and Federal Aviation Administration (FAA) in Section 10. Note each DoD and FAA report was provided by the corresponding agencies regarding their practices, which are independent from the NESC recommendations in the report.

Commercial-Off-The-Shelf↗

Assessing Commercialization Strategies for Evolving Network Demand (ASCEND) in the NASA Space Communications and Navigation (SCaN) Program

What will NASA’s future communications demand and expenditure look like, in a paradigm where space policy encourages maximum private sector involvement? In this paper we consider this question, as NASA moves towards commercial procurement for Direct-To-Earth and Space Relay communication services. We develop a new quantitative Techno-Economic Assessment (TEA) model capable of evaluating the incremental cost over time to NASA of utilizing commercial communication services, for different mission and market scenarios. We find that current and future NASA demand could be viably procured from commercial services, with the potential to reduce cost using non-exclusive networks and the sharing of fixed costs. However, there is a key trade-off identified between maximizing economies of scale benefits and ensuring sufficient competition between communication providers to avoid collusion and excessive pricing. For example, procuring from 1-2 providers would maximize scale economies, whereas procuring from 5-6 providers would maximize competition. Given this context, it would be prudent to seek to award service contracts for 3-4 providers to optimize economies of scale benefits, while mitigating possible market collusion. These recommendations enable NASA to successfully achieve its scientific mission over the next decade, while managing limited financial and networking resources.

NSN↗

SPC-70692 Rev 0 MARVEL B4C Powder Specification

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for procurement of the B4C Powder. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-71123 Rev 1 MARVEL Control Drum Actuator Torsional Spring

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This specification defines the requirements for the procurement and factory acceptance testing of the MARVEL control drum actuator torsional spring. The purpose of this specification is to define the requirements to procure the MARVEL control drum actuator torsional spring component and witness a torsional spring rate Factory Acceptance Test (FAT) at the subcontractor’s facility with the contractor present. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Identifying institutional barriers and policy implications for sustainable energy technology adoption among large organizations in California

Large organizations wield considerable market power, their procurement activities can be leveraged to achieve social, economic and environmental goals by ‘pulling’ more desirable products into the market. However, while there is substantial research in individual consumer buying behavior and market barriers to sustainable technology adoption, less is known about large organizational buying behavior and the impact of institutional barriers in this area. To address these research gaps, in this work we conducted an exploratory study aimed at better understanding the process through which large organizations purchase sustainable energy technologies and what internal barriers they experience during that process. Additionally, we surveyed and interviewed 120 individuals involved in procurement from Californian organizations representing both public and private sectors. Survey results indicate the need to resolve the conflict between prioritizing lowest first cost and lowest life cycle cost, better engage multiple stakeholders involved in internal decision-making around purchasing, and improve existing procurement tools or offer new ones. We provide recommendations for how policymakers can apply our findings to increase the adoption of sustainable energy technologies in their own organizations and communities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Status and Trends in the U.S. Voluntary Green Power Market (2015 Data)

The voluntary green power market refers to the sale and procurement of renewable energy for voluntary purposes by residential and commercial customers. This report reviews seven green power procurement mechanisms: utility green pricing programs, utility green tariffs, voluntary unbundled renewable energy certificates, competitive supplier green power, community choice aggregations, voluntary power purchase agreements (PPAs), and community solar. This report details the status of trends of those seven green power procurement mechanisms in 2015. Three trends -- significant growth of the voluntary PPA project pipeline, innovative green power mechanisms developed by utilities, and geographic expansion of green power mechanisms -- suggest that the green power market is likely to continue to grow in coming years.

2015↗

Authorization to proceed with production engineering for the waste treatment and immobilization plant's high-level waste facility - 15595

The U.S. Department of Energy restricted certain engineering, procurement, and construction work on the Waste Treatment and Immobilization Plant's (WTP) Pretreatment Facility, and to a lesser degree the High-Level Waste (HLW) Facility in 2012 and early 2013 because of the impact of unresolved technical issues on the facility design, and a misalignment between the facility design and nuclear safety basis. The U.S. Department of Energy, Office of River Protection (ORP) needed a way to minimize project management risk, while continuing limited critical path construction work for the HLW Facility and resolving the technical and safety basis issues. ORP developed a process to systematically address and resolve the technical, management, and quality issues that led DOE to restrict HLW Facility production activities in 2012 and 2013. This process provided for a phased resumption of HLW engineering, procurement, and construction activities on an incremental basis and a final decision for release to full production. In August 2014, ORP provided authorization for the WTP contractor to resume all engineering work necessary to finalize the HLW Facility design. The decision to proceed with production engineering in the HLW Facility, representing the first of two decision points, was based on significant progress in resolving HLW technical issues and improving work processes to align the HLW design and safety basis. Full release for HLW equipment procurements and construction is forthcoming based on conditions that must be fully satisfied and demonstrated during a transition period expected to continue for the next few years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optics Supply Planning System

The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system at a level of detail that can be used for construction and deployment. Test and quality assurance plans are also included to insure that the system delivers all requirements when it is built. The design is for an automated forecasting prototype that allocates inventory and processing resources in response to potentially daily changes in the forecasted optics exchanges required to operate NIF. It will automatically calculate future inventory levels and processing rates based on current inventory and projected exchanges, procurements, and capacities. It will include screens that allow users to readily assess the feasibility of the forecast, identify failures to meet the demand, revise input data, and re-run the automated forecast calculation. In addition, the system will automatically retrieve the current exchange demand from an external database. Approved forecasts from the system will automatically update work order plans and procurement plans in the existing inventory and production control database. The timing of optics exchanges affects the forecast of damage and future exchanges, so an approved exchange plan will be fed back to the demand database and be used to calculate the next demand projection. The system will read the demand data and update the forecast and output files daily. This specification has been divided into two parts. This document, Part 1 lays out the major design decisions and specifies the architectural, component, and data structure designs. Part 2 will add interface designs, quality assurance and testing plans, and deployment details.

42 ENGINEERING↗

Price Projections of Feedstocks for Biofuels and Biopower in the U.S.

The economic availability of biomass resources is a critical component in evaluating the commercial viability of biofuels. To evaluate projected farmgate prices and grower payments needed to procure 295 million dry Mg (325 million dry tons) of biomass in the U.S. by 2022, this research employs POLYSYS, an economic model of the U.S. agriculture sector. A price-run simulation suggests that a farmgate price of $58.42 Mg{sup -1} ($53.00 dry ton{sup -1}) is needed to procure this supply, while a demand-run simulation suggests that prices of $34.56 and $71.61 Mg{sup -1} ($30.00 and $62.00 dry ton{sup -1}) in are needed in 2012 and 2022, respectively, to procure the same supply, under baseline yield assumptions. Grower payments are reported as farmgate price minus resource-specific harvest costs.

09 BIOMASS FUELS↗

A Privacy Preserving Model-Free Optimization and Control Framework for Demand Response from Residential Thermal Loads

We consider the problem of optimizing the cost of procuring electricity for a large collection of homes managed by a load serving entity, by pre-cooling or pre-heating the thermal inertial loads in the homes to avoid procuring power during periods of peak electricity pricing. We would like to accomplish this objective in a completely privacy-preserving and model-free manner, that is, without direct access to the state variables (temperatures or power consumption) or the dynamical models (thermal characteristics) of individual homes, while guaranteeing personal comfort constraints of the consumers. We propose a two-stage optimization and control framework to address this problem. In the first stage, we use a long short-term memory (LSTM) network to predict hourly electricity prices, based on historical pricing data and weather forecasts. Given the hourly price forecast and thermal models of the homes, the problem of designing an optimal power consumption trajectory that minimizes the total electricity procurement cost for the collection of thermal loads can be formulated as a large-scale integer program (with millions of variables) due to the on-off cyclical dynamics of such loads. We provide a simple heuristic relaxation to make this large-scale optimization problem model-free and computationally tractable. In the second stage, we translate the results of this optimization problem into distributed open-loop control laws that can be implemented at individual homes without measuring or estimating their state variables, while simultaneously ensuring consumer comfort constraints. We demonstrate the performance of this approach on a large-scale test case comprising of 500 homes in the Houston area and benchmark its performance against a direct model-based optimization and control solution.

Sivaranjani, S.↗

What Is the Value of Alternative Methods for Estimating Ramping Needs?

Power system operators procure and deploy flexibility reserves or ramping products to address balancing needs caused by uncertainty and variability of load and generation. Existing methods estimate ramping needs using calendar information and historical forecast errors. Novel methods investigate if real-time weather information could inform ramping and other balancing requirements. This paper compares estimation methods for ramping requirements in theory and practice. The theoretical framework indicates when an alternative method could yield improved economic or reliability performance than existing methods by requiring lower or higher levels of ramping products. Preliminary simulations on a 118-bus test system for 4 days in May 2019 illustrate how system performance improves or deteriorates when ramping requirements are weather-informed (alternative) instead of calendar-based (baseline). Preliminary results suggest high variability in change of performance and underline the impact of additional factors, such as system conditions, on the realized performance change.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Safety-Class Uninterruptable Power Supply General Contractor for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-002 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the procurement and construction of a Safety-Class Uninterruptable Power Supply (UPS) facility in accordance with ASME NQA-1 2008 and 2009 addenda. This scope includes Work required to construct a new UPS facility at Technical Area (TA)-55 including procurement, construction, installation, and post installation testing of all structures, systems, and equipment (e.g., foundations, concrete, structural steel, building components, HVAC, fire protection, site utilities) excluding the UPS system itself. Design of the facility and associated infrastructure are provided by LANL. Final design of the UPS system will be provided by the UPS Integrator under separate contract. Procurement of all safety-related components (specified by LANL) must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the Work as described herein.

42 ENGINEERING↗

Safety-Class Uninterruptable Power Supply Integrator for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-001 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the detailed design and installation of a Safety-Class, Class 1E Uninterruptable Power Supply (UPS) system in accordance with ASME NQA-1 2008 and 2009 addenda and IEEE Std. 344, respectively. This scope includes all activities from detailed design of the UPS through procurement, installation, post installation testing, and dedication (as required) at Technical Area (TA)-55. Design, procurement, installation and testing of all safety-related components must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1 a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the UPS system as described herein. LANL intends to issue a separate RFP (excluding work specified herein) for work to be performed by a General Contractor supporting the UPS Project including procurement and installation of the new UPS building, pre-stressed concrete, structural steel, HVAC, fire protection, site utilities, and other ancillary equipment and components required for the facility.

42 ENGINEERING↗

Technical and Economic Aspects of Designing an Efficient Room Air-Conditioner Program in India

Several studies have projected a massive increase in the demand for air conditioners (ACs) over the next two decades in India. By 2030, room ACs could add 140 GW to the peak load, equivalent to over 30% of the total projected peak load. Therefore, there is significant interest among policymakers, regulators, and utilities in managing room AC demand by enhancing energy efficiency. Building on the historical success of the Indian Bureau of Energy Efficiency’s star-labeling program, Energy Efficiency Services Limited recently announced a program to accelerate the sale of efficient room ACs using bulk procurement, similar to their successful UJALA light-emitting diode (LED) bulk procurement program. This report discusses some of the key considerations in designing a bulk procurement or financial incentive program for enhancing room AC efficiency in India. We draw upon our previous research to demonstrate the overall technical potential and price impact of room AC efficiency improvement and its technical feasibility in India. We also discuss the importance of using low global warming potential (GWP) refrigerants and smart AC equipment that is demand response (DR) ready.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Community Choice Aggregation: Challenges, Opportunities, and Impacts on Renewable Energy Markets

Community choice aggregations (CCAs) are local governmental entities that procure electricity on behalf of retail electricity customers within some geographic area. CCAs are expanding in seven states that allow CCAs through enabling legislation. In 2017, we estimate that about 750 CCAs procured about 42 million MWh of electricity on behalf of about 5 million customers in 2017. In this report, we seek to summarize the current status of CCAs in the United States. We quantify CCA sales and customer bases in terms of both renewable and non-renewable energy. We summarize trends in CCA renewable energy power procurement. Based on 12 interviews with CCAs and other stakeholders, we identify key factors that could improve or reduce the potential of CCAs to support renewable energy markets. Last, we identify the challenges created and faced by the expansion of CCAs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Infrastructure Investments in LAMDA: SEM Mill and Vault (NSUF 2019 Milestone Report)

This document summarizes the procurement, installation, and commissioning of a scanning electron microscope (SEM) mill produced by Fischione Instruments and a lead-shielded vault for specimen storage in support of Nuclear Science User Facility (NSUF) awards for use in Oak Ridge National Laboratory’s (ORNL) Low Activation Materials Development and Analysis (LAMDA) laboratory. The Model 1061 SEM mill is a tabletop ion milling system for advanced sample preparation of high-quality SEM samples. This device was chosen for its broad range of ion energies allowing for both rapid milling and final polishing of the sample surface. The purchase order with Fischione Instruments was released and awarded by ORNL procurement on September 11, 2018. The instrument was shipped in December of 2018 and was installed in the LAMDA laboratory in March of 2019. During the commissioning of this equipment, electron backscatter diffraction (EBSD) was performed on specimens before and after milling to show the enhanced surface quality. With the purchase of a lead vault dedicated to NSUF library materials co-located in the LAMDA laboratory, the NSUF program will be able to maintain a significant sample library in LAMDA. These specimens will be easily accessible for rapid turnaround experiment (RTE) awards and will reduce the overall cost of year-over-year storage and shipments to and from ORNL hot cell facilities. The contract to fabricate a fourth lead vault dedicated to NSUF specimen storage was awarded by ORNL procurement on August 10, 2018. Installation of the new vault was completed in January of 2019.

47 OTHER INSTRUMENTATION↗