Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PV battery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Planning for the storm: Considering renewable energy for critical infrastructure resilience

This study uses the renewable energy optimization model to assess three critical facilities in North Carolina. Techno-economic results were then compared to analyses completed for critical facilities in California and New York to assess energy system cost effectiveness. Though solar photovoltaic (PV) arrays are cost-effective across each of the three North Carolina facilities, adopting battery storage to enable PV to operate with existing diesel generators in a hybrid energy system reduces the economic value of the system. This is in contrast to more economically viable systems in California and New York. All of these systems also offer unquantified resilience benefits by extending operation from hours to weeks across the facilities. If decision makers were able to value the resilience benefits offered by each system or utility rate structures were changed to incentivize battery storage during normal operations, it would impact these assessments. Even so, this analysis provides decision makers a key set of cost benchmarks when considering how they might improve resilience at their critical operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Q1-2024 Solar Cost Benchmarks

Each year, the U.S. Department of Energy’s (DOE) Solar Energy Technologies Office (SETO) and its national laboratory partners develop cost benchmarks for U.S. solar photovoltaic (PV) systems. These benchmarks track progress toward reducing solar costs and guide R&D priorities. Unlike typical studies that report only $/W, SETO uses intrinsic units (e.g., $/m² for mounting structures) to better capture how technology improvements such as module efficiency would impact system costs. This allows flexible modeling where inputs can vary significantly to assess cost sensitivity. Costs are reported in two ways: Minimum Sustainable Price (MSP): Long term, financially viable price under stable market conditions. Modeled Market Price (MMP): Actual market price, influenced by short term distortions such as tariffs or subsidies. Three national labs collect cost data from industry stakeholders, ensuring no duplication in outreach to stakeholders. Data reflects real transactions (primarily from Q1) and is weighted based on the number of sources per cost element. The PV System Cost Model (PVSCM) divides total installed system cost into eight categories: 1. Module (PV) 2. Inverter 3. Energy Storage System (ESS) 4. Structural BOS (SBOS) 5. Electrical BOS (EBOS) 6. Fieldwork 7. Office work 8. Other (developer/EPC costs) The first five are hardware costs, while the last three are soft costs. Each category includes fixed and variable cost components, where “size” depends on context (e.g., manufacturing capacity for modules vs. system capacity for installation costs). Variable costs are expressed using appropriate intrinsic units. The model reflects the owner’s upfront overnight capital cost, excluding tax credits. Tariffs and subsidies are treated as temporary market distortions affecting MMP but not MSP. PVSCM is implemented in Excel, where cost elements are aggregated into total system cost. Additional sheets handle unit conversions and operation & maintenance (O&M), with O&M costs levelized over the system’s lifetime.

14 SOLAR ENERGY↗

Utility-Scale Solar, 2021 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2021 Edition” provides an overview of key trends in the U.S. market, with a focus on 2020. Highlights of this year’s update include: A record of nearly 9.6 GWAC of new utility-scale PV capacity came online in 2020, bringing cumulative installed capacity to more than 38.7 GWAC across 43 states. 89% of all new utility-scale PV capacity added in 2020 uses single-axis tracking. Median installed project costs declined to $\$$1.4/WAC (or $\$$1.1/WDC) in 2020. Project-level capacity factors vary widely, from 9% to 36% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. Utility-scale PV’s LCOE fell to $\$$34/MWh in 2020 ($\$$28/MWh if factoring in the federal investment tax credit, or ITC). PPA prices have largely followed the decline in solar’s LCOE over time, but have stagnated more recently. Prices from a sample of recent contracts average just above $\$$20/MWh (levelized). In 2020, solar’s average market value (defined in the report to include only energy and capacity value) exceeded average wholesale prices in 12 of the 17 balancing authorities analyzed (including 4 of the 7 independent system operators across the United States). Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata for more than 150 PV+battery hybrid projects that are already online or that have secured offtake arrangements. At the end of 2020, there were at least 460 GW of utility-scale solar power capacity within the interconnection queues across the nation, 160 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY↗

Utility-Scale Solar, 2022 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2022 Edition” provides an overview of key trends in the U.S. market, with a focus on 2021. Highlights of this year’s update include: -A record of nearly 12.5 GWAC of new utility-scale PV capacity came online in 2021, bringing cumulative installed capacity to more than 51.3 GWAC across 44 states. -90% of all new utility-scale PV capacity added in 2021 uses single-axis tracking. -Median installed project costs declined to $\$1.35$/WAC (or $\$1.02$/WDC) in 2021. -Project-level capacity factors vary widely, from 9% to 35% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. -Utility-scale PV’s LCOE fell to $\$33$/MWh in 2021 ($\$27$/MWh if factoring in the federal investment tax credit, or ITC). -PPA prices have largely followed the decline in solar’s LCOE over time, but have recently stagnated and even moved slightly higher. Prices from a sample of recent contracts average around $\$20$/MWh (levelized) in the West and $\$30-40$/MWh elsewhere in the continental US. In 2021, solar’s average market value (defined in the report to include only energy and capacity value) rose by 55% to $\$47$/MWh and exceeded average wholesale prices in 13 of the 17 balancing authorities analyzed. -Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata and PPA prices from 67 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -At the end of 2021, there were at least 674 GW of utility-scale solar power capacity within the interconnection queues across the nation, 284 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Bidding Curve Design for Hybrid Power Plants with Uncertain Solar Forecast

This paper presents a novel bidding curve design algorithm tailored for hybrid power plants (HPPs) to participate in the wholesale electricity market. Utilizing forecasts for photovoltaic (PV) generation and available battery power, our algorithm strategically computes the bidding curve to maximize HPP profit while adeptly managing the inherent uncertainty associated with PV power generation. In addition, the introduction of the penalty cost in HPP bidding curves provides the system operator a tool to effectively manage the system-level uncertainty that caused by HPPs. Numerical analysis through Monte Carlo simulations confirms that our bidding curve methodology outperforms the benchmark across various scenarios.

bidding curve↗

Bidding Curve Design for Hybrid Power Plants with Uncertain Solar Forecast: Preprint

This paper presents a novel bidding curve design algorithm tailored for hybrid power plants (HPPs) to participate in the wholesale electricity market. Utilizing forecasts for photovoltaic (PV) generation and available battery power, our algorithm strategically computes the bidding curve to maximize HPP profit while adeptly managing the inherent uncertainty associated with PV power generation. In addition, the introduction of the penalty cost in HPP bidding curves provides the system operator a tool to effectively manage the system-level uncertainty that caused by HPPs. Numerical analysis through Monte Carlo simulations confirms that our bidding curve methodology outperforms the benchmark across various scenarios.

bidding curve↗

Day-Ahead Bidding and Scheduling Method of a PV + Storage Plant

A Hybrid PV plant refers to the paradigm combining a PV farm with a battery energy storage system (BESS). Our study aims to answer the following questions. a) when the renewable penetration reaches 70%, a hybrid PV plant should bid as a thermal plant in the future electricity market. How should a hybrid PV plant bid in this market? b) the BESS can be used for arbitrage and/or capacity firming. How to schedule the BESS's operation in coordination with the bid decision?

Huang, Xiaoge↗

Segmented Energy Routing for a Modular AC/DC Hybrid System

This article presents a modular ac/dc system with both distributed and centralized power ports for energy router (ER) applications. In each module of the described system, photovoltaic (PV) power generation units, battery-type energy storage (ES) units, and critical loads are connected to the cascaded H-bridge (CHB)-organized medium-voltage (MV) dc links, with fully distributed low-voltage (LV) dc power ports. Copies of modules share the centralized load bus and interact with an MV ac grid in parallel. Hybrid power port (HPO) assigns flexibility to the system but makes energy routings a necessity for stable operation. In this article, a segmented energy management strategy for the HPO-ER is proposed. In terms of the grid-side power transferring, the system ratings are intentionally designed to match significant power imbalance. Focally, a segmented energy management strategy is proposed to realize fully autonomous energy routing involving MV ac grid, distributed PV generations, distributed battery storages, and LV load. The system is proven to be stable using the derived impedance-based model considering the interaction between power blocks. The feasibility of the topology and control strategy is also verified through software simulation, laboratorial hardware prototype experiment, and hardware-in-the-loop (HIL) emulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Estimating the impact of tariff-driven behind-the-meter storage operation on distribution grid investments

Increasing growth of distributed solar photovoltaics (PV) and electric vehicles (EV) can strain local distribution networks and require costly upgrades. Distributed battery storage, often deployed alongside PV, can be used to mitigate those costs, depending on how batteries are operated. This study evaluates the potential deferral value of distributed battery storage across a range of tariff structures, focusing on the rate structures most commonly available to residential customers today and related variants. Deferrals are evaluated with a least-cost distribution grid expansion optimization model to identify requirements on line reconductoring, transformer upgrades, and voltage regulator installations under each tariff. Results show that TOU rates and net billing tariffs can yield meaningful deferral value, depending on specific tariff structure features. Under the best performing tariff structure tested, storage produced a median annualized deferral value of $7.18 per kW of storage capacity ( kW S ) across all feeders in the sample, though deferral values were considerably larger for feeders with peak loads that coincide with utility system peak, i.e., timing of TOU peak period. In contrast, under an unrestricted TOU design with no restrictions on grid charging or discharging, the median deferral value was $0/ kW S illustrating the critical importance of tariff structure details.

Rodriguez-Garcia, Luis↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis

This report presents an analytical methodology to identify alternative options to manage interconnection costs and streamline interconnection timelines for distribution system-connected photovoltaic (PV) systems not co-located with load. Specifically, the report details the methodology and results of an analysis that: 1. Identifies potential grid violations that would be induced by a PV system requesting interconnection to a distribution circuit; 2. Identifies multiple technically viable options for mitigating the potential violations, including infrastructure upgrades, downsizing the PV system size, curtailment of PV, and addition of battery energy storage; 3. Defines the required technical operating parameters of the system in order to mitigate all potential violations (the "Operating Envelope"); 4. Compares the economics of each option, from the PV developer's perspective. The analysis supports the ongoing evolution of interconnection standards for combined PV and energy storage systems by providing a methodology to define allowable maximum export limits during each hour. The methodology presented could be used by utilities as part of the interconnection study process, to inform negotiations with DER developers and the drafting of mutually acceptable interconnection agreements. The resulting technical operating parameters could be included as part of the interconnection service agreement (ISA) between the system owner and the utility company. The companion report to this analysis, Gill et al. (2022), details the envisioned framework for the implementation of the technical operating parameters.

14 SOLAR ENERGY↗

Solar PV Curtailment in Changing Grid and Technological Contexts: Preprint

Solar photovoltaic (PV) systems generate electricity with no marginal costs or emissions. As a result, PV output is almost always prioritized over other fuel sources and delivered to the electric grid. At increasing levels of PV penetration situations arise where PV is curtailed, either because of local supply/demand imbalances or to maintain system flexibility. In 2018, we estimate that about 6.5 million MWh of PV output was curtailed in four key countries: Chile, China, Germany, and the United States. We find that PV curtailment peaks in the spring and fall, when PV output is relatively high but electricity demand is relatively low. Similar to the case of wind, some PV curtailment is attributable to limited transmission capacity connecting sparsely populated solar-heavy regions to load centers.Grid policies generally seek to minimize curtailment because it is viewed as an economic and environmental loss. However, we argue that changing grid and technological contexts warrant new thinking on PV curtailment. In the grid context, as grids integrate more PV and other renewable energy generation, seeking an optimal level of accepted curtailment becomes more efficient than preventing it. In the technological context, emerging technologies such as advanced inverters and low-cost battery storage are making PV systems more flexible. With flexible PV, grid operators can use withheld PV output to provide various non-generation grid services. This withheld PV output is a form of curtailment under prevailing definitions of the term. Hence, policies that aim to minimize curtailment may undercut the ability of grid operators to fully use the emerging capabilities of flexible PV systems. We argue that the changing grid and technological contexts require a re-examination of the curtailment paradigm. We argue that PV output that is withheld to provide grid services is fundamentally different from output that goes unused in response to system constraints. As a result, we propose a more exclusive definition of curtailment as unused PV output rather than the more expansive conventional definition as any reduction in system output from its technical potential. The terminological distinction is more than a question of semantics. Facilitating grid services by withholding PV output may increase the potential value of flexible PV systems to the grid. This shift in thinking may allow grid operators and policymakers to think in terms of PV curtailment management rather than minimization. Effective curtailment management may include policies that increase PV system dispatchability, alternative PV compensation schemes that decouple generator revenue from system output, and policies to increase grid flexibility.

Chile↗

Arbitrage and Capacity Firming in Coordination with Day-Ahead Bidding of a Hybrid PV Plant: Preprint

A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.

BESS scheduling↗

Techno-economic and environmental assessment of solar-based electrical vehicles charging stations integrated with hydrogen production

With the growing interest in adopting both commercial and residential electric vehicles (EVs) utilizing green renewable energy, the techno-economic assessment of EV charging stations with solar energy is a critical aspect of the transition to sustainable transportation. However, battery storage capacity for variable solar energy production is becoming increasingly less cost-effective due to the higher Lithium price. Complementing solar energy production and battery storage, the potential of combining green hydrogen fuel energy integration with solar energy for EV charging stations can provide a sustainable alternative to reach carbon-free transportation. This research aims to assess the technical and economic viability of grid-connected Photovoltaic (PV)-based EV charging stations across Kentucky based on existing EV load profiles. The study considers different PV system sizes, locations, orientations, and the impact of net metering policies and electricity tariffs on the profitability of the PV systems. Further, using excess PV energy, Lithium-Ion batteries will be charged, which will be assessed considering the techno-economic and environmental impacts of green EV charging stations. To further enhance green renewable energy production, we also investigated the feasibility of on-grid PV-based EV charging stations with Lithium-Ion batteries charged during low tariff periods. In comparison with these scenarios, we studied the potential benefits of integrating green hydrogen energy production using excess solar energy with and without governmental incentives. Furthermore, we assess the environmental impact of these green EV charging stations across Kentucky. Our study indicates that EV stations across Kentucky have similar techno-economic feasibility with insignificant deviation in the levelized cost of electricity, payback period, and PV energy fraction with/without Li-Ion batteries. However, with green hydrogen production, the marginal H 2 production cost indicates the first scenario (on-grid PV energy charging) is the most significant, roughly 10 USD/Kg, which is similar to 1.5 times higher than the second (charging during low-tariff periods) and the third scenarios (power grid to satisfy the demand deficit - approximately 6.5 USD/Kg). From the environmental perspective, the second scenario would be a good option for either hybrid EV/H 2 or EV charging stations in Kentucky, factoring in the hydrogen production cost and the carbon footprint.

08 HYDROGEN↗

U.S. Solar Photovoltaic System and Energy Storage Cost Benchmarks, With Minimum Sustainable Price Analysis: Q1 2023

The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office (SETO) aims to accelerate the advancement and deployment of solar technology in support of an equitable transition to a decarbonized economy no later than 2050, starting with a decarbonized power sector by 2035. Its approach to achieving this goal includes driving innovations in technology, hardware, and soft cost reductions to make solar affordable and accessible for all. As part of this effort, SETO must track solar cost trends so it can focus its research and development (R&D) on the highest-impact activities. The benchmarks in this report are bottom-up cost estimates of all major inputs to PV and energy storage system installations. Bottom-up costs are based on national averages and do not necessarily represent typical costs in all local markets. Like last year's report, this year's report includes two distinct sets of benchmarks: minimum sustainable price (MSP) benchmarks and modeled market price (MMP) benchmarks. MSP benchmarks can be interpreted as the minimum price a company needs to charge to remain financially solvent in the long term based on the minimum sustainable prices of all inputs including minimum sustainable profit margins. MMP benchmarks can be interpreted as the actual cash sales price a company charges in the given benchmark period. These simplified estimates are useful for tracking technological progress, but they do not reflect all experiences. In fact, no individual estimate under any approach can reflect the diversity of the PV and storage manufacturing and installation industries. Our residential MMP benchmark ($2.90 per watt direct current [Wdc]) is 24% higher than the MSP benchmark ($2.34/Wdc) and 9% lower than our MMP benchmark ($3.18/Wdc) from Q1 2022 in 2022 U.S. dollars (USD). For community solar, our MMP benchmark ($1.75/Wdc) is 18% higher than our MSP benchmark ($1.49/Wdc). Our Q1 2022 benchmark report has no community solar system for comparison. For utility-scale systems with one-axis tracking, our MMP benchmark ($1.17/Wdc) is 22% higher than our MSP benchmark ($0.96/Wdc) and 10% higher than its counterpart ($1.07/Wdc) in Q1 2022 in 2022 USD.

14 SOLAR ENERGY↗

Frequency Analysis of Solar PV Power to Enable Optimal Building Load Control

In this paper, we present a flexibility estimation mechanism for buildings’ thermostatically controlled loads (TCLs) to enable the distribution level consumption of the majority of solar photovoltaic (PV) generation by local building TCLs. The local consumption of PV generation provides several advantages to the grid operation as well as the consumers, such as reducing the stress on the distribution network, minimizing voltage fluctuations and two-way power flows in the distribution network, and reducing the required battery storage capacity for PV integration. This would result in increasing the solar PV generation penetration levels. The aims of this study are twofold. First, spectral (frequency) analyses of solar PV power generation together with the power consumption of multiple building TCLs (such as heating, ventilation, and air conditioning (HVAC) systems, water heaters, and refrigerators) are performed. These analyses define the bandwidth over which these TCLs can operate and also describe the PV generation frequency bandwidth. Such spectral analyses, in frequency domain, can help identify the flexible components of PV generation that can be consumed by the various TCLs through optimal building load utilization. Second, a quadratic optimization problem based on model predictive control is formulated to allow consuming most of the low and medium frequency content of the PV power locally by building TCLs, while maintaining occupants’ comfort and TCLs’ physical constraints. The solution to the proposed optimization problem is achieved using optimal control strategies. Numerical results show that most of the low and medium frequency content of the PV generation can be consumed locally by building TCLs. The remaining high-frequency content of the PV generation can then be stored/offset using energy storage systems.

14 SOLAR ENERGY↗

Investigating capacity credit sensitivity to reliability metrics and computational methodologies

Assigning capacity value to renewable energy sources (RES) is a challenge faced in planning their integration with the grid. The difficulties stem from the natural characteristics of variability and intermittency of wind and solar sources. The capacity credit (CC) analysis evaluates the system’s actual power output compared with a constant capacity generator, i.e., conventional generator and determines an effective capacity to use for planning and operation. Herein this paper presents different factors that could affect the CC of a system. Two methods are proposed to determine the CC, namely equivalent firm capacity (EFC) and effective load carrying capability (ELCC). Since these methods are based on satisfying reliability criteria, daily loss of load expectation (LOLE), hourly loss of load (LOLH), and expected energy not served (EENS) have been employed as indices. To obtain the CC value, both methods apply two techniques: traditional and optimization. Genetic algorithm (GA) is the optimization approach used in this paper. Then, this work compares the two techniques and shows the superior performance of the optimization approach. Two hybrid systems, stand-alone (SA) and grid-connected (GC) modes, are proposed and used as case studies. The hybrid systems consist of photovoltaic (PV), wind turbine (WT), and battery energy storage system (BESS). In this work, three different scenarios are used to compare capacity credit: system as a whole, only wind, and no batteries. Finally, sensitivity analysis is carried out to examine the impact of varying the wind speed, solar irradiation, and load. It is demonstrated that the choice of reliability index plays an important role in determining the capacity credit and it is shown that EENS is a more comprehensive and consistent index of reliability.

24 POWER TRANSMISSION AND DISTRIBUTION↗