Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operational Resilience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Addressing Consequence within Operational Risk: An Approach for Understanding an Organization’s Unique Infrastructure Environment

The endeavor of tackling operational risk focused on consequences is challenging even for the most resourced entity but can be advanced though a simplified approach: identifying, binning, and prioritizing the infrastructure environment. While no two entities within a single element of the 16 critical infrastructure sectors are exactly alike when it comes to risk, there is a basic process to move toward a greater understanding of operational risk through becoming more informed about the infrastructure landscape in which the entity exists. The process starts with bringing internal and external stakeholders and subject matter experts together to analyze key areas such as Information Technology (IT) and Operational Technology (OT) components and points of convergence, analyzing internal and external cyber and physical dependencies, accounting for explosive growth in devices and wireless technology, and leveraging the contributions of people inside and outside the operational environment. Attaining a common understanding of the infrastructure landscape as part of addressing consequences within operational risk is not easy to do or resource light, but the process outlined provides the framework to further any entity’s efforts in this space.

99 GENERAL AND MISCELLANEOUS↗

Addressing Consequence within Operational Risk (O.T. Gagnon III) 9-18-2024

Addressing Consequence within Operational Risk: Why threats and security are just not that important! When dealing with cyber or physical risk within any critical infrastructure (CI) environment, don’t concern yourself with vulnerabilities and threats, at least not at first! Also, don’t be overly fixated on “securing the systems” within the organization. The endeavor of tackling operational risk focused on consequences in any critical infrastructure environment to include the complex Aviation ecosystem is challenging even for the most resourced entity but can be advanced though a simplified approach: identifying, binning, and prioritizing the infrastructure environment. While no two entities within a single element of the 16 critical infrastructure sectors are exactly alike when it comes to risk, there is a basic process to move toward a greater understanding of operational risk through becoming more informed about the infrastructure environment in which the entity exists. The process starts with bringing internal and external stakeholders and subject matter experts together to analyze key areas such as Information Technology (IT) and Operational Technology (OT) components and points of convergence, analyzing internal and external cyber and physical dependencies, accounting for explosive growth in devices and wireless technology, and leveraging the contributions of people inside and outside the operational environment. Attaining a common understanding of the infrastructure environment as part of addressing consequences within operational risk is not easy to do or resource light, but the process outlined provides the framework to further any entity’s efforts in this space. When it comes to cyber risks, before an organization can consider vulnerabilities within and threats to its operations, it must first have a solid understanding of the consequences existing inside its infrastructure environment. Idaho National Lab’s Consequence-Driven, Cyber-Informed Engineering is offered as an example of this approach to effective and efficient cyber risk mitigation.

99 GENERAL AND MISCELLANEOUS↗

Lessons Learned for Responsible Use of Cloud in the Cirrus Project, Following the CrowdStrike Outage Event

A disruption in CrowdStrike’s Falcon cybersecurity platform on July 19th, 2024, caused worldwide chaos. This event highlights the imperative need for cloud security measures for networks that are critically reliant on cloud technology. This incident negatively impacted air travel, government networks, and critical infrastructure sectors such as hospitals and financial institutions. While no electric utilities had a physical impact, and few had an IT impact, there were issues created by loss of cloud services, and other interrelated industries. For utilities and energy distribution organizations, understanding and mitigating these risks is essential. The Cirrus tool offers a strategic solution engineered to weave cloud integration seamlessly into the fabric of operational management, thereby enhancing resilience and streamlining efficiency in the face of digital challenges.

25 ENERGY STORAGE↗

Robotics for Energy Infrastructure Construction on Earth and Beyond: Pilot Study Exploring Level 3-4 Semi-Autonomous Installation of a Reduced-Scale Photovoltaic Power Plant Prototype: Preprint

There is a growing need to build energy infrastructure at massive scale on both Earth and in space. On Earth, increasing electricity demand from applications such as AI data centers is driving rapid expansion of power systems, while in space, long-duration missions such as lunar operations require reliable and resilient energy infrastructure that can be deployed quickly. These needs outpace the capabilities of conventional construction methods. Robotic construction offers a path to faster, lower-cost, and more consistent deployment, yet most existing approaches focus on automating individual tasks rather than end-to-end assembly. The Industrialized Construction Innovation (ICI) team at the National Laboratory of the Rockies (NLR), in collaboration with the Colorado School of Mines, has been investigating robotics and automation strategies for rapid end-to-end energy infrastructure construction. This paper presents a pilot study demonstrating level 3-4 semi-autonomous, end-to-end robotic assembly of a reduced-scale photovoltaic power plant prototype under terrestrial conditions. The approach combines hardware redesign of photovoltaic components for robotic compatibility, discrete-event and physics-based robotic simulations in synthetic environments, and sim-to-real deployment to execute end-to-end robotic assembly of[NM1.1][NM1.2] tracking components, structural members, photovoltaic modules, and embedded electrical connections. The pilot identifies key limitations like tolerance management, perception and localization, end effector capability, fastening methods, and multi-physics simulation fidelity, that must be addressed to enable end-to-end robotic assembly of full-scale energy infrastructure. The study highlights how these insights inform scaling strategies for terrestrial energy infrastructure and adaptation to unstructured and extreme environments, including off-world scenarios such as robotic assembly of vertical tall lunar towers.

14 SOLAR ENERGY↗

MCOR User Guide

User guide for the MCOR software package which is currently publicly hosted on Github (https://github.com/pnnl/MCOR). The Microgrid Component Optimization for Resilience (MCOR) tool simulates the operation of a renewable energy, battery, and back-up generator microgrid under a large range of outage conditions to understand how a potential system can meet the resilience goals of a particular site. It is an open-source, command line, Python-based tool that produces an output Excel spreadsheet as well as several types of plots to enable a user to compare different microgrid system sizes and costs. It is intended for high-level system planning and opportunity identification, and not for detailed electric system modeling and design. The tool includes a range of input parameters that can be adjusted or tuned to provide a more custom analysis as needed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High Value Opportunities to Advance Automation in Electric Grid Control Rooms

Grid operators and electric utilities are increasingly driven to develop automated processes and introduce decision support tools to reduce cognitive demand on System Operations staff and aid in the operational decision-making process. However, System Operation staff are traditionally hesitant to implement and accept new solutions, automation processes, and tools within the control room. This paper explores high-value opportunities to advance automation in electric grid control rooms for the purpose of improving grid safety, reliability, and resiliency during normal and emergency operating conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient Inverter-Driven Black Start with Collective Parallel Grid-Forming Operation

As modern power systems are experiencing exceptional changes with increasing penetrations of inverter-based resources (IBRs), system restoration using IBRs has received attention. Using local grid-forming (GFM) assets near consumers, engineered to establish grid voltages in the absence of a stiff grid, i.e., bottom-up restoration, a distribution system could obtain high system resilience by not relying on the bulk power system restoration, which requires significant human intervention and procedure. This paper studies the technical feasibility of the novel approach with detailed electromagnetic transient (EMT) simulations. To thoroughly evaluate the potential of GFM inverters and the technical challenges in IBR-driven black start, a detailed three-phase inverter model is developed, including negative-sequence control for voltage balance and a phase-by- phase current limiter to sustain momentary overloading during the black start. To examine dynamic aspects of the black-start process, the EMT simulation also models transformer and motor dynamics to emulate their inrush and startup behaviors as well as network dynamics. In addition, active involvement of grid- following distributed energy resources is also studied to facilitate the black-start process. By allowing multiple GFM inverters to collectively black start without leader-follower coordination, we demonstrate that a system can achieve high resilience even with a fraction of assets lost. Two test cases of inverter-driven black start, using two and one GFM inverters, respectively, for a heavily unbalanced 2-MVA distribution feeder are demonstrated. Takeaways for further study and field deployment are provided.

grid-forming inverter↗

Oxidation Resistance in 1200°C Steam of a FeCrAl Alloy Fabricated by Three Metallurgical Processes

Abstract FeCrAl alloys are a leading candidate material for accident tolerant fuel cladding due to their good performance in both normal light-water reactor operating conditions as well as their resilience to high-temperature accident scenarios. For commercial-scale production, new fabrication techniques need to be investigated. In this study, the effects of fabrication methods on the high-temperature steam oxidation performance of C26M (Fe12Cr6Al2Mo in wt.%) were investigated. Three variants of C26M were manufactured: wrought (cast and forged) (WC26M), powder metallurgy hot isostatic pressing (PMC26M), and laser powder bed fusion additive manufacturing (AMC26M). All three variants were exposed to steam at 1200°C for 2 h. Results showed no significant variation in mass change between the variants after steam exposure. All three variants effectively formed stable protective alumina films with ~0.6–1.3 µ m thickness. This study suggests FeCrAl alloys have excellent resilience to high-temperature steam in nuclear reactor accident scenarios regardless of the fabrication method.

Materials Science↗

Resilient Inverter-Driven Black Start with Collective Parallel Grid-Forming Operation: Preprint

As the modern power systems are experiencing exceptional changes with increasing penetration of inverter-based resources (IBRs), system restoration using IBRs has received attention. Using local grid-forming (GFM) assets near consumers, engineered to establish grid voltages in the absence of a stiff grid, i.e., bottom-up restoration, a distribution system would obtain high system resilience, by not relying on the bulk power system restoration requiring significant human intervention and procedure to restore. This paper studies the technical feasibility of the novel approach with detailed electromagnetic transient (EMT) simulations. To thoroughly evaluate the potential of GFM inverters and technical challenges in IBR-driven black start, a detailed three-phase inverter model is developed, including negative-sequence control for voltage balance and a phase-by-phase current limiter to sustain momentary overloading during the black start. To examine dynamic aspects of the black start process, the EMT simulation also models transformer and motor dynamics to emulate their inrush and start-up behaviors as well as network dynamics. In addition, active involvement of grid-following distributed energy resources (DER) is also studied to facilitate the black start process. It is shown that, by allowing multiple GFM inverters to collectively black start without master-slave coordination, a system can achieve high resilience even with a fraction of assets lost. Two test cases of inverter-driven black start using two and one GFM inverters, respectively, for a heavily unbalanced 2-MVA distribution feeder are demonstrated. Takeaways for further study and field deployment are provided.

grid-forming inverter↗

Weather-Driven Resilience for Distribution Systems

With increasing billion dollar disasters due to weather events, it is of utmost priority for utility and grid operators to maintain and enhance the resilience of distribution grid. Traditionally, such analysis were conducted with reliability metrics alone. However, with increasing complexity of distribution grid and advancements in grid edge resources, evaluating grid resilience is challenging and involves multi-faceted analysis of the impact of weather events on the distribution grid. This presentation provides background, details, and future works in the field of weather-driven resilience for power distribution systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operational Evolution of FTS3: A DevOps Driven Approach to Elastic Operations

The File Transfer Service (FTS3) is a distributed data movement service developed at CERN and widely used to transfer data across the Worldwide LHC Computing Grid (WLCG). At Fermilab, FTS3 supports data transfers for multiple experiments, including Intensity Frontier experiments such as DUNE, enabling reliable data movement between WebDAV endpoints in Europe and the Americas.​ At CHEP 2021, we reported on the initial containerized deployment of FTS3 on OKD, the community Kubernetes distribution of Red Hat OpenShift. In this work, we present the subsequent evolution of this deployment, focusing on new operational capabilities introduced to improve scalability, robustness, and long-term maintainability.​ We describe the adoption of more secure and reproducible container build workflows, the integration of DevOps-driven operational practices, and enhancements in monitoring and automation. A key new result is the introduction of horizontal scaling and elastic resource management, allowing FTS3 components to dynamically adapt to workload variations while maintaining service reliability. We also discuss improvements in fault tolerance and operational procedures derived from production experience.​ Finally, we summarize lessons learned from operating FTS3 as a Kubernetes-native service and outline how these developments have improved the resilience and efficiency of data movement operations at Fermilab.

Munoz Flores, Victor Leopoldo [Fermilab]↗

Near-Term Reliability and Resilience (NTRR) (Final Report)

The Near-Term Reliability and Resiliency (NTRR) was awarded in December 2020 as an inter-lab project to examine the reliability and resilience of the electricity grid and natural gas transportation availability. The project builds on studies conducted by The North American Electric Reliability Corporation (NERC), the U.S. Department of Energy (DOE), and other non-governmental research and operational focused on reliability and resilience analyses challenges. The research was conceived to address near-term scenarios (within 10 years), when many local and regional policy transitions could begin to impact grid reliability, resilience, and supporting infrastructure availability. To integrate the natural gas interdependency, the team began with the generating capacity and demand projections from the 2020 NERC Long-Term Reliability Assessment and the Bulk Electric System (BES) transmission topologies defined in the Western Electricity Coordinating Council (WECC) Anchor Data Set, Eastern Interconnection Reliability Assessment Group Multi-Regional Modeling Working Group (ERAG/MMWG) Data Set, the team calculated baseline regional power sector gas demands from present electricity delivery year through the end of delivery year 2030/31 by applying security constrained economic dispatch. This demand was compiled along with demand projections for regional residential, commercial, and industrial natural gas demands from the most recent Energy Information Administration (EIA) Annual Energy Outlook Reference Case into Deloitte’s MarketBuilder® North American Gas Model. Through the application of these demands, MarketBuilder® was projected the topology of natural gas flows in the natural gas pipeline network across the interconnected North American system along with regional natural gas prices that may be seen by market participants in future years Additionally, contingencies and sensitivities focused on the built models of the Eastern Interconnection (EI) and Western Interconnection (WI). They address challenges from the following with the outcomes being an identification of performance under the extreme conditions and an identification of potential grid weaknesses that should be addressed to mitigate the reduced performance and improve the resilience and reliability of the specific regions as well as the National Grid: • Weather events including extreme heat, extreme cold, high wind, no wind, wind and solar forecasting errors, and wildfires. • Gas availability, factoring in supply disruption (contractual and physical), seasonal availability constraints, and infrastructure limitations; and • Transmission availability and congestion.

03 NATURAL GAS↗

Robust Scheduling of Networked Microgrids for Economics and Resilience Improvement

The benefits of networked microgrids in terms of economics and resilience are investigated and validated in this work. Considering the stochastic unintentional islanding conditions and conventional forecast errors of both renewable generation and loads, a two-stage adaptive robust optimization is proposed to minimize the total operating cost of networked microgrids in the worst scenario of the modeled uncertainties. By coordinating the dispatch of distributed energy resources (DERs) and responsive demand among networked microgrids, the total operating cost is minimized, which includes the start-up and shut-down cost of distributed generators (DGs), the operation and maintenance (O&M) cost of DGs, the cost of buying/selling power from/to the utility grid, the degradation cost of energy storage systems (ESSs), and the cost associated with load shedding. The proposed optimization is solved with the column and constraint generation (C&CG) algorithm. The results of case studies demonstrate the advantages of networked microgrids over independent microgrids in terms of reducing total operating cost and improving the resilience of power supply.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Communication-Constrained Expansion Planning for Resilient Distribution Systems

Distributed generation and remotely controlled switches have emerged as important technologies to improve the resiliency of distribution grids against extreme weather-related disturbances. Therefore it becomes important to study how best to place them on the grid in order to meet a resiliency criteria, while minimizing costs and capturing their dependencies on the associated communication systems that sustain their distributed operations. This paper introduces the Optimal Resilient Design Problem for Distribution and Communication Systems (ORDPDC) to address this need. The ORDPDC is formulated as a two-stage stochastic mixed-integer program that captures the physical laws of distribution systems, the communication connectivity of the smart grid components, and a set of scenarios that specifies which components are affected by potential disasters. The paper proposes an exact branch-and-price algorithm for the ORDPDC that features a strong lower bound and a variety of acceleration schemes to address degeneracy. The ORDPDC model and branch-and-price algorithm were evaluated on a variety of test cases with varying disaster intensities and network topologies. The results demonstrate the significant impact of the network topologies on the expansion plans and costs, as well as the computational benefits of the proposed approach.

97 MATHEMATICS AND COMPUTING↗

Best Practices for Resilience in Smart Grid-Interactive Efficient Buildings

The Federal Energy Management Program (FEMP) supports federal agencies' energy decisions with information and guidance on design, funding, and operations to ensure federal buildings are efficient and resilient. The modernization of building infrastructure and the evolution of buildings to support decarbonization involves complex implementation of multiple components across several systems. This includes energy-efficient equipment, on-site energy generation and storage systems, and control systems. These systems have operational modes that can operate more efficiently if they are able to behave responsively to the conditions of the electrical grid. These grid-interactive efficient buildings (GEB) allow facilities to manage power demand according to operational constraints and market signals issued by grid operators. With proper design and planning, these same capabilities have the potential to enable building and facility resilience - coordinating with microgrids, maintaining power on critical circuits to sustain essential operations, and monitoring building health and safety status during an outage. By managing the load of buildings, GEBs can also reduce the cost of backup generation and make better use of renewable power sources on site. This document outlines some of the processes and considerations to guide the design and operation of GEBs in ways that promote facility resilience.

building decarbonization↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Building the Financial Business Case for Resilience

This fact sheet is designed to help owners, operators, occupants, and investors in commercial buildings and other sectors to understand and address emerging issues in resilience. It includes resources from DOE’s Better Buildings Financing and Resilience Roadmap to identify key issues in measuring, managing, and mitigating resilience risk.

Resilience, Resiliency, Commercial building, comme↗

Microgrid Controller Survey Report: 2024 Update

In the past decade, the number of microgrids deployed by electric utilities, end-use customers, and third parties has been increasing significantly both in the US and worldwide. The increase is driven by various reasons, such as carbon emission reduction, energy efficiency improvement, reliability and resilience enhancement, energy infrastructure modernization, and more. Microgrid controllers, as the most important components in these deployed microgrids, optimally coordinate the operation and control of the microgrid assets (e.g., distributed energy resources [DERs], energy storage systems, demand response, and even electric vehicles) and ensure that the microgrid is being operated in an efficient, clean, and resilient manner. To that end, the market for microgrid controllers has been growing rapidly in recent years. Various microgrid controllers have been released and continuously updated by vendors to satisfy the different needs of microgrid customers. However, the functionalities demonstrated by microgrid controllers released by different vendors show a huge difference because of a lack of widely known and accepted industrial standards, and various microgrid customers have specific requirements for different applications and scenarios. To obtain a clear view of the current state of the commercial microgrid controllers’ functionalities and identify potential research gaps, a survey of the functionalities of commercial microgrid controllers and the Advanced Distribution Management System (ADMS) developed by vendors and national laboratories was conducted in 2023. The results of the survey are presented in this report with the current status of commercial microgrid controllers analyzed, potential research gaps identified, and future research trends revealed.

24 POWER TRANSMISSION AND DISTRIBUTION↗