Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “November 2011”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Causes of the 2011-14 California Drought

The causes of the California drought during November-April winters of 2011/12-2013/14 are analyzed using observations and ensemble simulations with seven atmosphere models forced by observed SSTs. Historically, dry California winters are most commonly associated with a ridge off the west coast but no obvious SST forcing. Wet winters are most commonly associated with a trough off the west coast and an El Nino event. These attributes of dry and wet winters are captured by many of the seven models. According to the models, SST forcing can explain up to a third of California winter precipitation variance. SST forcing was key to sustaining a high pressure ridge over the west coast and suppressing precipitation during the three winters. In 2011/12 this was a response to a La Nina event, whereas in 2012/13 and 2013/14 it appears related to a warm west-cool east tropical Pacific SST pattern. All models contain a mode of variability linking such tropical Pacific SST anomalies to a wave train with a ridge off the North American west coast. This mode explains less variance than ENSO and Pacific decadal variability, and its importance in 2012/13 and 2013/14 was unusual. The models from phase 5 of CMIP (CMIP5) project rising greenhouse gases to cause changes in California all-winter precipitation that are very small compared to recent drought anomalies. However, a long-term warming trend likely contributed to surface moisture deficits during the drought. As such, the precipitation deficit during the drought was dominated by natural variability, a conclusion framed by discussion of differences between observed and modeled tropical SST trends.

California Drought↗

Acoustic Imaging Evaluation of Juvenile Salmonid Behavior in the Immediate Forebay of the Water Temperature Control Tower at Cougar Dam, 2010

This report presents the results of an evaluation of juvenile Chinook salmon (Oncorhynchus tshawytscha) behavior at Cougar Dam on the south fork of the McKenzie River in Oregon in 2010. The study was conducted by the Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers (USACE). The overall goal of the study was to characterize juvenile salmonid behavior and movement patterns in the immediate forebay of the Water Temperature Control (WTC) tower of the dam for USACE and fisheries resource managers use in making decisions about bioengineering designs for long-term structures and/or operations to facilitate safe downstream passage for juvenile salmonids. We collected acoustic imaging (Dual-Frequency Identification Sonar; DIDSON) data from March 1, 2010, through January 31, 2011. Juvenile salmonids (hereafter, called 'fish') were present in the immediate forebay of the WTC tower throughout the study. Fish abundance index was low in early spring (<200 fish per sample-day), increased in late April, and peaked on May 19 (6,039 fish). A second peak was observed on June 6 (2904 fish). Fish abundance index decreased in early June and remained low in the summer months (<100 fish per sample-day). During the fall and winter, fish numbers varied with a peak on November 10 (1881 fish) and a minimum on December 7 (12 fish). A second, smaller, peak occurred on December 22 (607 fish). A univariate statistical analysis indicated fish abundance index (log10-transformed) was significantly (P<0.05) positively correlated with forebay elevation, velocity over the WTC tower intake gate weirs, and river flows into the reservoir. A subsequent multiple regression analysis resulted in a model (R2=0.70) predicting fish abundance (log-transformed index values) using two independent variables of mean forebay elevation and the log10 of the forebay elevation range. From the approximate fish length measurements made using the DIDSON imaging software, the average fish length during early spring 2010 was 214 ± 86 mm (standard deviation). From May through early November, the average fish length remained relatively consistent (132 ± 54 mm), after which average lengths increased to 295 ± 148 mm for mid-November though early December. From mid-December through January the average fish length decreased to 151 76 mm. Milling in front of the WTC tower was the most common fish behavior observed throughout the study period. Traversing along the front of the tower, east-to-west and west-to-east, was the next common behavior. The percentage of fish events showing movement from the forebay to the tower or from the tower to the forebay was generally low throughout the spring, summer, and early fall (0 to 30% for both directions combined, March through early November). From mid-November 2010 through the end of the study (January 31, 2011), the combined percentages of fish moving into and out of the tower were higher (25 to 70%) than during previous months of the study. Schooling behavior was most distinct in the spring. Schooling events were present in 30 to 96% of the fish events during that period, with a peak on May 19. Schooling events were also present in the summer, but at lower numbers. With the exception of some schooling in mid-December, few to no schooling events were observed in the fall and winter months. Diel distributions for schooling fish during spring and fall months indicate schooling was concentrated during daylight hours and no schooling was observed at night. However, in December, schooling occurred at night, after midnight, and during daylight hours. Predator activity, most likely bull trout or rainbow trout according to a USACE biologist, was observed during late spring, when fish abundance index and schooling were highest for the year, and again in the fall months when fish events increased from a summer low. No predator activity was observed in the summer, and little activity occurred during the winter months.

54 ENVIRONMENTAL SCIENCES↗

Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee

The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010, and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.

54 ENVIRONMENTAL SCIENCES↗

An Overall Assessment of JPSS-2 VIIRS Radiometric Performance Based on Pre-Launch Testing

The Visible Infrared Imaging Radiometer Suite (VIIRS) on-board the second Joint Polar Satellite System (JPSS) completed its sensor level testing in February 2018. The JPSS-2 (J2) mission is scheduled to launch in 2022 and will be very similar to its two predecessor missions, the Suomi National Polar-orbiting Partnership (SNPP) mission, launched on 28 October 2011 and JPSS-1 (renamed NOAA-20) launched on 18 November 2017. VIIRS instrument has 22 spectral bands covering the spectrum between 0.4 and 12.6 μm: 14 reflective solar bands (RSB), 7 thermal emissive bands (TEB) and one day-night band (DNB). It is a cross-track scanning radiometer capable of providing global measurements through observations at two spatial resolutions, 375 m and 750 m at nadir for the imaging bands and moderate bands, respectively. This paper will provide an overview of J2 VIIRS characterization methodologies and calibration performance during the pre-launch testing phases performed by the National Aeronautics and Space Administration (NASA) VIIRS Characterization Support Team (VCST) to evaluate the at-launch baseline radiometric performance and generate the parameters needed to populate the sensor data record (SDR) Look-Up-Tables (LUTs). Our analysis results confirmed the good performance of J2 VIIRS, in general as good as previous VIIRS instruments and all non-compliances are expected to have low impact on data quality. Key sensor performance metrics include the signal to noise ratio (SNR), radiance dynamic range, reflective and emissive bands calibration performance, polarization sensitivity, spectral performance, response versus scan-angle (RVS) and scattered light response. A set of performance metrics generated during the pre-launch testing program will be compared to both the SNPP and JPSS-1 VIIRS sensors.

Oudrari, Hassan↗

Comparison of the MODIS and VIIRS On-Board SD and SDSM Performance

The MODIS reflective solar bands (RSB) are calibrated on-orbit using a solar diffuser (SD) with its on-orbit degradation, or change in the bi-directional reflectance factor (BRF) monitored using a solar diffuser stability monitor (SDSM). By performing alternate observations of direct sunlight via an attenuation screen and of sunlight reflected diffusely off the SD, the SDSM monitors the on-orbit degradation of the SD. The MODIS SDSM has 9 detectors, covering wavelengths from 0.41 to 0.94 microns. Both Terra and Aqua MODIS instruments have successfully operated for more than 16 years on-orbit, with the SD experiencing significant degradation at the shortest wavelength (about 50 percent for Terra MODIS and about 20 percent for Aqua MODIS at 0.41 microns). The first VIIRS instrument on the Suomi NPP spacecraft was launched in October 2011 and the follow-on instrument was launched in November 2017 on the JPSS-1 spacecraft (now NOAA-20). Both the VIIRS instruments carry a MODIS-like SD and SDSM system with an improved design based on the lessons learned from MODIS. Unlike MODIS, the VIIRS SDSM collects data using 8 detectors covering a similar wavelength range as MODIS. A similar wavelength dependent SD degradation pattern is also observed in both VIIRS instruments. This paper provides a comparison of the on-orbit performance of the four instruments in terms of the on-orbit changes in the SDSM detector responses and on-orbit degradations of their SDs. The NOAA-20 VIIRS instrument is still in its first year of operation and hence the early performance of the Terra and Aqua MODIS and SNPP VIIRS is discussed to provide a perspective comparison.

VIIRS↗

Understanding Workforce Agility at NASA Kennedy Space Center

NASA leads the world in space research and provides other government agencies, educational institutions, and companies opportunities to explore, launch, and conduct research in and around space. NASA has 11 formal locations based around the United States, and each has different goals and objectives to help NASA meet its overall mission. 2004, President George Bush announced a new vision for the Space Exploration program. During his grand announcement, he discussed that the Space Shuttles would retire due to the 2003 Space Shuttle Columbia accident, where the crew and the space vehicle were lost. The Kennedy Space Center (KSC) would no longer manage the day-to-day operations of maintaining the US Space Shuttle fleet. Our NASA teams would continue working to finish the Space Shuttle program's mission to build the International Space Station. Afterward, NASA would transition to develop and test a new spacecraft, the Crew Exploration Vehicle. The third goal was to return to the moon by 2020 as the launching point for missions beyond, to get humans from lower Earth orbit to the moon and Mars. (Secretary, 2004) The KSC engineering workforce had to prepare to transition from Operational support of the Space Shuttle program to the design and development of over 50 subsystems for the future SLS and Orion Launch Systems at the Kennedy Space Center. These subsystems developed at the Kennedy Space Center Engineering Directorate followed a comprehensive design process that required several different product deliverables during various phases for each subsystem. (Schafer et al., 2013) What allowed these systems to be successful? What enabled NASA KSC to complete over 130 Artemis 1 Design Certification and System Acceptance Reviews, closing over 21,656 Requirements to deem the Artemis 1 rocket ready for launch? Little is known about the NASA engineering workforce agility characteristics that enabled the organization to transition from the Space Shuttle program that ended in 2011 and launch the Artemis Program's SLS rocket on November 16, 2022.

Workforce Agility↗

Juniper Pollen Hotspots in the Southwest

Rationale: Juniperus pollen is a major allergen in Texas, Oklahoma, and New Mexico. While the bulk of pollen may be released in rural areas, large amounts of pollen can be transported to urban areas. Major juniper species in the region include: Juniperus ashei, J. virginiana, J. pinchotii, and J. monosperma. Pollen release is virtually continuous beginning in late September with J. pinchotii and ending in May with J. monosperma. Urban areas in the region were evaluated for the potential of overlapping seasons in order to inform sensitive individuals. Methods: Burkard volumetric pollen traps were established for two consecutive spring seasons at 6 sites in northern New Mexico and 6 sites for two consecutive winter and fall seasons in Texas and Oklahoma Standard methods were used in the preparation and analysis of slides. Results: The Dallas-Fort Worth Metroplex is home to over 6 million people. It is adjacent to populations of J. pinchotii, J. virginiana, and J. ashei. Peak concentration near Dallas for J. ashei in 2011 was 5891 pollen grains/m3 in January 7th. The peak date for J. pinchotii at an upwind sampling location in San Marcos, TX was November 1, 2010 and peak for J. virginiana at a nearby station in Tulsa, OK was November 1, 2010 and peak for J. virginiana at a nearby station in Tulsa, OK was February 20, 2011. Amarillo, TX is adjacent to J. pinchotii, J. ashei, and J. monosperma populations and may be subject to juniper pollen from September through May. Conclusions: Considering the overlapping distributions of juniper trees and the overlapping temporal release of pollen, sensitive patients may benefit from avoiding hotspots.

Bunderson, L. D.↗

Radio and γ-ray follow-up of the exceptionally high-activity state of PKS 1510-089 in 2011

In this paper, we investigate the radio and γ-ray variability of the flat spectrum radio quasar PKS 1510-089 in the time range between 2010 November and 2012 January. In this period the source showed an intense activity, with two major γ-ray flares detected in 2011 July and October. During the latter episode both the γ-ray and the radio flux density reached their historical peak. Multiwavelength analysis shows a rotation of about 380° of the optical polarization angle close in time with the rapid and strong γ-ray flare in 2011 July. An enhancement of the optical emission and an increase of the fractional polarization both in the optical and in radio bands are observed about three weeks later, close in time with another γ-ray outburst. On the other hand, after 2011 September a huge radio outburst has been detected, first in the millimetre regime followed with some time delay at centimetre down to decimetre wavelengths. This radio flare is characterized by a rising and a decaying stage, in agreement with the formation of a shock and its evolution, as a consequence of expansion and radiative cooling. Lastly, if the γ-ray flare observed in 2011 October is related to this radio outburst, then this strongly indicates that the region responsible for the γ-ray variability is not within the broad line, but a few parsecs downstream along the jet.

79 ASTRONOMY AND ASTROPHYSICS↗

Monitoring VIIRS Thermal Emissive Bands Long-Term Performance Using Lunar Observations

Two Visible Infrared Imaging Radiometer Suite (VIIRS) instruments are currently operating in space, one onboard the Suomi National Polar-orbiting Partnership (S-NPP) satellite launched on October 28, 2011 and the other onboard the NOAA-20 satellite launched on November 18, 2017. The performance of the seven VIIRS thermal emissive bands (TEBs) is monitored via on-orbit calibration data, the analysis of Earth view observations, as well as inter-comparisons with other sensors. The Moon has been used as a unique invariant target for on-orbit sensor calibration because its surface property is considered extremely stable over time in spectra, radiometry, and geometry with a repeatable lunar phase. This paper presents the assessments of the S-NPP and NOAA-20 VIIRS TEB on-orbit calibration stability using near-monthly scheduled lunar observations over their respective missions. The methodology previously developed for MODIS is now applied to VIIRS to monitor the TEB long-term stability by extracting and trending the lunar brightness temperatures from selected unsaturated pixels. It includes a correction applied to reduce any impact from the Sun–Moon geometry (e.g. Sun-Moon distance variation). The results show that the mission-long brightness temperature trends from the lunar surface are stable for all VIIRS TEBs, despite noticeable seasonal variations in the lunar thermal emissive radiance.

VIIRS↗

Clearance Analysis of Node 3 Aft CBM to the Stowed FGB Solar Array

In early 2011, the ISS Vehicle Configuration Office began considering the relocation of the Permanent Multipurpose Module (PMM) to the aft facing Common Berthing Mechanism (CBM) on Node 3 to open a berthing location for visiting vehicles on the Node 1 nadir CBM. In this position, computer-aided design (CAD) models indicated that the aft end of the PMM would be only a few inches from the stowed Functional Cargo Block (FGB) port solar array. To validate the CAD model clearance analysis, in the late summer of 2011 the Image Science and Analysis Group (ISAG) was asked to determine the true geometric relationship between the on-orbit aft facing Node 3 CBM and the FGB port solar array. The desired measurements could be computed easily by photogrammetric analysis if current imagery of the ISS hardware were obtained. Beginning in the fall of 2011, ISAG used the Dynamic Onboard Ubiquitous Graphics (DOUG) program to design a way to acquire imagery of the aft face of Node 3, the aft end-cone of Node 1, the port side of pressurized mating adapter 1 (PMA1), and the port side of the FGB out to the tip of the port solar array using cameras on the Space Station Remote Manipulator System (SSRMS). This was complicated by the need to thread the SSRMS under the truss, past Node 3 and the Cupola, and into the space between the aft side of Node 3 and the FGB solar array to acquire more than 100 images from multiple positions. To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which the cameras are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which all of the needed imagery could be acquired. Based on a photogrammetric simulation, it was estimated that the location of the FGB solar array could be measured within an accuracy of about 1 in. in each axis relative to the ISS Analysis Coordinate System (ISSACS). In October 2011, a proposed image-acquisition plan was drafted by ISAG and released for review. The ISS Robotics flight control team (ROBO) proposed minor changes to SPDM positions 1 and 4 to meet ISS proximity requirements. The updated image acquisition plan and draft chit were presented to and approved by the Systems Working Group (SWG) November 18 and were sent to the Vehicle Configuration Board (VCB) in early December 2011. Working with ROBO on 3 successive days (February 21, 22, and 23), ISAG collected 161 images of the ISS. Approximately 40 images were collected from each of the four different SSRMS/SPDM positions, with each set mapping the region from the Node 3 end cone, across Node 1, along the forward port side portion of the FGB, and out the port side FGB solar arrays. From this imagery, the best 80 images were selected for use in the analysis. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for 54 handrail attachment bolts on the aft face of Node 3, in the ISSACS coordinate system. The results of this analysis produced the measured coordinates of 116 points distributed across the face of the FGB solar array panels (see figure 3) along with propagated uncertainty estimates in each coordinate axis. These results were sent to the ISS Vehicle Configuration Office, which sent them to the Configuration Analysis Modeling and Mass Properties (CAMMP) team for comparison with the Russian-provided CAD model for the retracted FGB solar arrays. The CAMMP analysis unexpectedly showed that the measured location of the port FGB solar array was up to 41-in. further outboard than the design and was slightly twisted about its rotational axis. The unexpected comparison results produced some initial concern regarding the accuracy of the photogrammetric measurements. To verify the measured results, ISAG personnel conducted a second analysis using just the imagery of the solar arrays in an arbitrary coordinate system defined by the three corner points of the inboard-most panel, with the design distance between points A1 and A10 as the only scale. The new measurements agreed with the original results to within less than 1 in. RMS in each axis, confirming the original solar array measurements. ISAG produced a final report for the ISS Vehicle Configuration Office documenting an apparent anomaly in the retracted configuration of the port FGB solar arrays. A copy of the measurement report was translated and sent to the Russian Space Agency. During a Vehicle Integrated Performance and Resources (VIPeR) teleconference September 24, 2012, the Russians acknowledged receipt of a translated copy of the ISAG report. The Russian representative stated that the head of the solar array design team claimed that the measured configuration was impossible unless the structure was physically broken. The Russians acknowledged that they had no expertise in photogrammetry, so the analysis technique employed was a "black box" to them, and they did not know how to use the ISAG results. They asked for a single image in which the overextension of the port solar array could be obviously seen. On November 10, 2012, during a face-to-face meeting with their Russian counterparts at JSC, ISAG presented nadir-view imagery of the FGB acquired during Space Shuttle rendezvous. Using the known width of the pressurized portion of the FGB as a scale, this analysis clearly showed that the port FGB solar array was extended outboard further than the Russian design for the retracted solar array.

Liddle, Donn↗

Thermal Structure of Supra-Arcade Plasma in Two Solar Flares

In this work, we use Hinode/XRT and SDO/AIA data to determine the thermal structure of supra-arcade plasma in two solar flares. The first flare is a Ml.2 flare that occurred on November 5, 2010 on the east limb. This flare was one of a series of flares from AR 11121, published in Reeves & Golub (2011). The second flare is an XI.7 flare that occurred on January 27, 2012 on the west limb. This flare exhibits visible supra-arcade downflows (SADs), where the November 2010 flare does not. For these two flares we combine XRT and AlA data to calculate DEMs of each pixel in the supra-arcade plasma, giving insight into the temperature and density structures in the fan of plasma above the post-flare arcade. We find in each case that the supra-arcade plasma is around 10 MK, and there is a marked decrease in the emission measure in the SADs. We also compare the DEMs calculated with the combined AIA/XRT dataset to those calculated using AIA alone.

Reeves, Katharine K.↗

Plant Decontamination as a Precondition of the Remote Dismantling Concept of the Karlsruhe Vitrification Plant VEK - 12206

Vitrification of the high-active liquid waste concentrates (HAWC) was a major milestone in the WAK decommissioning project (StiWAK). From September 2009 to June 2010, about 56 m{sup 3} of HAWC were vitrified at the Karlsruhe vitrification facility (VEK) and filled into 123 canisters. HAWC vitrification was followed by an extensive rinsing and shutdown program, in the course of which both the VEK process installations and the facilities for the storage and evaporation of high-active fission product solutions (LAVA) are prepared specifically for dismantling. Finally the rinsing programme leads to an overall reduction of the remaining contamination in the installations by a factor of approx. 5 - 10. The amount of liquids arisen from this program has been vitrified and another 17 canisters have been filled. In total, 140 canisters were packed into 5 CASTOR casks that were already transported to the Zwischenlager Nord (interim store North) of EWN GmbH (ZLN) in the mid of February 2011. The melter of the VEK was already shut down in the late November 2010. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Komplast Experiment: Space Environmental Effects after 12 Years in LEO (and Counting)

The Komplast materials experiment was designed by the Khrunichev State Research and Production Space Center, together with other Russian scientific institutes, and has been carried out by Mission Control Moscow since 18. Komplast panels fitted with material samples and sensors were located on the International Space Station (ISS) Functional Cargo Block (FGB) module exterior surface. Within the framework of this experiment, the purpose was to study the effect of the low earth orbit (LEO) environment on exposed samples of various materials. The panels were sent into orbit with the FGB when it launched on November 20, 1998. Panels #2 and #10 were retrieved during Russian extravehicular activity in February 2011 and sealed within cases to temporarily protect the samples from exposure to air until they could be studied on the ground. Panel #2 contained an experiment to detect micrometeoroid and orbital debris (MMOD) impacts, radiation and UV sensors, several pieces of electrical cable, and samples made from elastomeric and fluoroplastic materials. Panel #10 contained a temperature sensor, and both carbon composite and adhesive-bonded samples. A figure shows the location of panels #2 and #10 on the FGB module aft endcone. The panels were subsequently returned to Earth by Space Shuttle Discovery on the STS-133/ULF-5 mission after 12 years of LEO exposure and opened in an argon chamber at the Institute of Nuclear Physics at Moscow State University in July 2011. Based on the results of analyzing the readings from sensors located on Komplast panels and in studying material samples from the panels, the comprehensive effect of spaceflight factors on the FGB (at the locations of Panels #2 and #10) was evaluated. Total solar exposure was determined to be 960 +/- 200 kJ/square cm or 21,000 equivalent solar hours. Because of location of these two panels and the ISS flight attitude, atomic oxygen (AO) fluence was relatively low for such a long duration exposure, approximately 1.5x10 (exp 21) O atoms/sq. cm. Most of the AO fluence occurred during the early phase of ISS assembly. Temperatures ranged from a maximum of 107 C to a minimum of -80 C. The MMOD environment was determined, as is shown. Interestingly, the distribution of craters and low-velocity impact particles observed in the 5-50 micron size range was approx 2-3 orders of magnitude higher than that predicted by the ORDEM2000 model of natural and artificial origin microparticles in the ISS orbit. Contamination observations were also made, through the evaluation of optical properties on thermal control coatings and by the examination of visible deposits located near several samples on the panels, primarily from elastomeric samples. These elastomer samples were extensively investigated for their physical property changes and sealing capability. In addition, 16 samples of adhesive-bonded joints using three types of epoxy adhesive were evaluated studying fracture toughness, failure surface, and adhesive volume properties. Both rubber and adhesive-bonded specimens also underwent additional (post-flight) ground-based exposures to simulate a total 30 years in LEO prior to their evaluation. Overall, results indicate that space environmental effects will not adversely impact the service life of the FGB through 2028. Our investigation is complete and a summary of the results obtained from this uniquely long-duration exposure experiment will be presented.

Shaevich, S. K.↗

Preliminary results of AGC-4 irradiation in the advanced test reactor and design of AGC-5 - 18469

The U.S. Department of Energy Advanced Reactor Technologies Program will irradiate up to six nuclear graphite creep experiments in Idaho National Laboratory Advanced Test Reactor (ATR). The graphite experiments are being irradiated over an approximate 8-year period to support development of a graphite irradiation performance database on new nuclear grade graphites now available for use in high-temperature gas reactors. The goals of the irradiation experiments are to obtain irradiation performance data, including irradiation creep, at different temperatures and loading conditions to support design of the very high-temperature gas reactor and other future gas reactors. Each of the experiments consist of a single capsule that contains six stacks of graphite specimens, with half of the graphite specimens in each stack under a compressive load and the other half of specimens not subjected to a compressive load during irradiation. The six stacks have differing compressive loads applied to the top half of the diametrically opposite pairs of specimen stacks. A seventh specimen stack in the center of the capsule does not have a compressive load. The specimens are being irradiated in an inert sweep gas atmosphere with online temperature and compressive load monitoring and control. Also, samples are taken of sweep gas effluent to measure any oxidation or off-gassing that may occur during initial startup of the experiment. The first experiment Advanced Graphite Capsule (AGCJ-I started irradiation in September 2009 and completed in January 2011; the second experiment AGC-2 started irradiation in April 2011 and completed in May 2012; the third experiment AGC-3 started irradiation in late November 2012 and completed in April 2014; and AGC-4 is currently being irradiated in ATR. This paper will briefly discuss preliminary irradiation results from the AGC-4 experiment and design of AGC-3. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Acoustic Imaging Evaluation of Juvenile Salmonid Behavior in the Immediate Forebay of the Water Temperature Control Tower at Cougar Dam, 2010

This report presents the results of an evaluation of juvenile Chinook salmonid (Oncorhynchus tshawytscha) behavior in the immediate forebay of the Water Temperature Control (WTC) tower at Cougar Dam in 2010. The study was conducted by the Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers. The overall goal of the study was to characterize juvenile salmonid behavior and movement patterns in the immediate forebay of the WTC tower for fisheries resource managers to use to make decisions on bioengineering designs for long-term structures and/or operations to facilitate safe downstream passage for juvenile salmonids. We collected acoustic imaging (Dual-Frequency Identification Sonar; DIDSON) data from February 1, 2010 through January 31, 2011 to evaluate juvenile salmonid behavior year-round in the immediate forebay surface layer of the WTC tower (within 20 m, depth 0-5 m). From October 28, 2010 through January 31, 2011 a BlueView acoustic camera was also deployed in an attempt to determine its usefulness for future studies as well as augment the DIDSON data. For the DIDSON data, we processed a total of 35 separate 24-h periods systematically covering every other week in the 12-month study. Two different 24-hour periods were processed for the BlueView data for the feasibility study. Juvenile salmonids were present in the immediate forebay of the WTC tower throughout 2010. The juvenile salmonid abundance index was low in the spring (<200 fish per sample-day), began increasing in late April and peaked in mid-May. Fish abundance index began decreasing in early June and remained low in the summer months. Fish abundance increased again in the fall, starting in October, and peaked on November 8-9. A second peak occurred on December 22. Afterwards, abundance was low for the rest of the study (through January 2011). Average fish length for juvenile salmonids during early spring 2010 was 214 {+-} 86 mm (standard deviation). From May through early November, average fish length remained relatively consistent (132 {+-} 39 mm), after which average lengths increased to 294 {+-} 145 mm for mid-November though early December. Fish behavior analysis indicates milling in front of the intake tower was the most common behavior observed throughout the study period (>50% of total fish events). The next most common movement patterns were fish traversing along the front of the tower, east-to-west and west-to-east. The proportion of fish events seen moving into (forebay to tower) or out of (tower to forebay) the tower was generally low throughout the spring, summer, and early fall for both directions combined. From mid-December 2010 through the end of the study, the combined proportions of fish moving into and out of the tower were higher than previous months of this study. Schooling behavior was most distinct in the spring from late April through mid-June. Schooling events were present in 30 - 96% of the fish events during that period, with a peak in mid-May. Schooling events were also present in the summer, but at lower numbers. Diel distributions for schooling fish during spring, fall, and winter months indicate schooling was concentrated during daylight hours. No schooling was observed at night. Predator activity was observed during late spring, when fish abundance and schooling were highest for the year, and again in the fall months when fish events increased from a summer low. No predator activity was observed in the summer, and little activity occurred during the winter months. For the two days of BlueView data analyzed for vertical distribution in the forebay, a majority of fish (>50%) were present in the middle of the water column (10 - 20 m deep). Between 20 and 41 % of total fish abundance were found in the bottom of the water column (20 - 30 m deep). Few fish were observed in the top 10 m of the water column.

54 ENVIRONMENTAL SCIENCES↗

Our History in the Stars

John C. Mather is senior project director of NASA's James Webb Space Telescope (JWST), successor to the Hubble Telescope. Nearly cancelled in summer 2011 during a flurry of federal budget cuts, the project was fully funded by Congress in November 201l. Fellowship spoke with Dr. Mather about his thoughts on the importance of funding space science and the JWST.

Mather, John C.↗

The Komplast Experiment: Space Environmental Effects after 12 Years in LEO (and Counting)

The Komplast materials experiment was designed by the Khrunichev Space Center, together with other Russian scientific institutes, and has been carried out by Mission Control Moscow since 1998. The purpose is to study the effect of the low earth orbit (LEO) environment on exposed samples of various spacecraft materials. The Komplast experiment began with the launch of the first International Space Station (ISS) module on November 20, 1998. Two of eight experiment panels were retrieved during Russian extravehicular activity in February 2011 after 12 years of LEO exposure, and were subsequently returned to Earth by Space Shuttle "Discovery" on the STS-133/ULF-5 mission. The retrieved panels contained an experiment to detect micrometeoroid and orbital debris (MMOD) impacts, radiation sensors, a temperature sensor, several pieces of electrical cable, both carbon composite and adhesive-bonded samples, and many samples made from elastomeric and fluoroplastic materials. Our investigation is complete and a summary of the results obtained from this uniquely long-duration exposure experiment will be presented.

Shaevich, S. K.↗