Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NNSS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Hydrologic Impacts of a Strike-Slip Fault Zone: Insights from Joint 3D Body-Wave Tomography of Rock Valley

The Rock Valley fault zone (RVFZ), an intraplate strike-slip fault zone in the southern Nevada National Security Site (NNSS), hosted a series of very shallow (<3 km) earthquakes in 1993. The RVFZ may also have hydrological significance within the NNSS, potentially playing a role in regional groundwater flow, but there is a lack of local hydrological data. In the Spring of 2021, we collected active-source accelerated weight drop seismic data over part of the RVFZ to better characterize the shallow subsurface. Here, we manually picked ~17,000 P-wave travel times and over 14,000 S-wave travel times, which were inverted for P-wave velocity (V P ), S-wave velocity (V S ), and V P /V S ratio in a 3D joint tomographic inversion scheme. Seismic velocities are imaged as deep as ~700 m in areas and generally align with geologic and structural expectations. V P and V S are relatively reduced near mapped and inferred faults, with the most prominent lower V P and V S zone around the densest collection of faults. We image V P /V S ratios ranging from ~1.5 to ~2.4, the extremes of which occur at a depth of ~100 m and are juxtaposed across a fault. One possible interpretation of the imaged seismic velocities is enhanced fault damage near the densest collection of faults with relatively higher porosity and/or crack density at ~100 m depth, with patches of semiperched groundwater present in the sedimentary rock in higher V P /V S areas and drier rock in lower V P /V S areas. A relatively higher V P /V S area beneath the densest faults persists at depth, which suggests percolation of groundwater via the fault damage zone to the regionally connected lower carbonate aquifer. Potentially, the presence and movement of groundwater may have played a role in the 1993 earthquake aftershocks.

58 GEOSCIENCES↗

Recovery and Calibration of Legacy Underground Nuclear Test Seismic Data from the Leo Brady Seismic Network

The Leo Brady Seismic Network (LBSN, originally the Sandia Seismic Network) was established in 1960 by Sandia National Laboratories to monitor underground nuclear tests (UGTs) at the Nevada National Security Site (NNSS, formerly named the Nevada Test Site). The LBSN has been in various configurations throughout its existence, but it has generally been comprised of four to six stations at regional distances (~150–400 km) from the NNSS with approximately evenly spaced azimuthal coverage. Between 1962 and the end of nuclear testing in 1992, the LBSN—and a sister network operated by Lawrence Livermore National Laboratories—was the most comprehensive United States source of regional seismic data of UGTs. Approximately 75% of all UGTs performed by the United States occurred in the predigital era. At that time, LBSN data were transmitted as frequency-modulated (FM) audio over telephone lines to a central location and recorded as analog waveforms on high-fidelity magnetic audio tapes. These tapes have been in dry temperature-stable storage for decades and contain the sole record of this irreplaceable data; full waveforms of LBSN-recorded UGTs from this era were not routinely digitized or otherwise published. We have developed a process to recover and calibrate data from these tapes. First, we play back and digitize the tapes as audio. Next, we demodulate the FM “audio” into individual waveforms. We then estimate the various instrument constants through careful measurement of “weight-lift” tests performed prior to each UGT on each instrument. Finally, these coefficients allow us to scale and shape the derived instrument response of the seismographs and compute poles and zeros. Finally, the result of this process is a digital record of the recorded seismic ground motion in a modern data format, stored in a searchable database. To date, we have digitized tapes from 592 UGTs.

58 GEOSCIENCES↗

Imaging the Shallow Structure of the Yucca Flat at the Source Physics Experiment Phase II Site with Horizontal-to-Vertical Spectral Ratio Inversion and a Large- N Seismic Array

The Source Physics Experiment (SPE) is a series of chemical explosions at the Nevada National Security Site (NNSS) with the goal of understanding seismic-wave generation and propagation of underground explosions. To understand explosion source physics, accurate geophysical models of the SPE site are needed. Here, we utilize a large-N seismic array deployed at the SPE phase II site to generate a shallow subsurface model of shear-wave velocity. The deployment consists of 500 geophones and covers an area of, approximately, 2.5 × 2 km. The array is located in the Yucca Flat in the northeast corner of the NNSS, Nye County, Nevada. Using ambient-noise recordings throughout the large-N seismic array, we calculate horizontal-to-vertical spectral ratios (HVSRs) across the array. We obtain 2D seismic images of shear-wave velocities across the SPE phase II site for the shallow structure of the basin. In this work the results clearly image two significant seismic impedance interfaces at ~150–500 and ~350–600 m depth. The shallower interface relates to the contrast between Quaternary alluvium and Tertiary volcanic rocks. The deeper interface relates to the contrast between Tertiary volcanic rocks and the Paleozoic bedrock. The 2D subsurface models support and extend previous understanding of the structure of the SPE phase II site. This study shows that the HVSR method in conjunction with a large-N seismic array is a quick and effective method for investigating shallow structures.

58 GEOSCIENCES↗

Site-Directed Research and Development Fiscal Year 2013 Annual Report

A hallmark of high-performance research and development is sustained achievement that endures. R&D organizations and laboratories have changed the course of technology and the world, and their innovations impact us for generations. At the center of the Nevada National Security Site’s (NNSS) science, technology, and engineering (ST&E) mission is the Site-Directed Research and Development Program (SDRD), which, through sustained achievement, has had an indelible impact on our mission and altered some of our most important work for the foreseeable future. The innovations created in the SDRD program have a remarkably high return on investment, and the SDRD program has helped raise the overall emphasis on the ST&E mission. In recent years the technology mission and its importance to the long-term vitality of the NNSS has been a prominent focus of National Security Technologies, LLC (NSTec). For example, NSTec created the Chief Technology Officer (CTO) position and filled it in August 2013 (see Foreword). SDRD was functionally realigned to report to the CTO concurrent with this change in leadership structure. A new corporate systems–based approach to strategic applied science and technology is starting to materialize, and expectations are that this shift of attention to technology innovation will bring about powerful outcomes for our mission and customers.

information sciences↗

Ecological Monitoring and Compliance Program 2013 Report

The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2013. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2013, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

54 ENVIRONMENTAL SCIENCES↗

Background Information for the Nevada National Security Site Integrated Sampling Plan, Revision 0

This document describes the process followed to develop the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan). It provides the Plan’s purpose and objectives, and briefly describes the Underground Test Area (UGTA) Activity, including the conceptual model and regulatory requirements as they pertain to groundwater sampling. Background information on other NNSS groundwater monitoring programs—the Routine Radiological Environmental Monitoring Plan (RREMP) and Community Environmental Monitoring Program (CEMP)—and their integration with the Plan are presented. Descriptions of the evaluations, comments, and responses of two Sampling Plan topical committees are also included.

54 ENVIRONMENTAL SCIENCES↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

Velocimetry Overview for visitors from the DOD

We are in the midst of a transformative period in which technological advances are making fundamental changes in the measurement techniques that form the backbone of nuclear weapon certification. Optical velocimetry has replaced electrical shorting pins in “Hydrotests,” which measure the dynamic implosion process. This advance has revolutionized nuclear weapons certification during the last 5 years. We can now measure the implosion process that drives a nuclear detonation with many orders of magnitude more resolution in both space and time than was possible just 10 years ago. It has been compared to going from Morse Code to HDTV, resulting in a dozen or more improvements in models of these weapons. These Hydrotests are carried out at LANL, LLNL and the NNSS, with the later holding the important role of allowing us to test with nuclear materials, in sub-critical configurations (i.e., no yield.) Each of these institutions has largely replaced pins with hundreds of channels of optical velocimetry. Velocimetry is non-contact and is used simultaneously with the X-ray capability of these facilities. The U1-a facility at NNSS pioneered this approach in the Gemini series in 2012, and continues to lead, both in channel count and technological advances. Close cooperation among LANL, LLNL and NSTec in these advances serves the complex by leveraging capabilities across sites and accelerating the pace of technical improvements.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Ecological Monitoring and Compliance Program 2015 Report

The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2015. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2015, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.

54 ENVIRONMENTAL SCIENCES↗

Investigating the Influence of Regional Stress on Fault and Fracture Permeability at Pahute Mesa, Nevada National Security Site

Regional stress may exert considerable control on the permeability and hydraulic function (i.e., barrier to and/or conduit for fluid flow) of faults and fractures at Pahute Mesa, Nevada National Security Site (NNSS). In-situ measurements of the stress field are sparse in this area, and short period earthquake focal mechanisms are used to delineate principal horizontal stress orientations. Stress field inversion solutions to earthquake focal mechanisms indicate that Pahute Mesa is located within a transtensional faulting regime, represented by oblique slip on steeply dipping normal fault structures, with maximum horizontal stress ranging from N29°E to N63°E and average of N42°E. Average horizontal stress directions are in general agreement with large diameter borehole breakouts from Pahute Mesa analyzed in this study and with stress measurements from other locations on the NNSS.

54 ENVIRONMENTAL SCIENCES↗

Hydrophysical Evaluation of Wells TW-B, TW-7, UE-6d, U-2gg PSE 3A, U-10L 1, and UE-6e in Yucca Flat

This study evaluated six wells in Yucca Flat in support of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) at the Nevada National Security Site (NNSS). Accessibility and groundwater sampling conditions were assessed and if conditions permitted, samples were collected for tritium analysis. Four of the wells, TW-B, UE-6d, UE-6e, and TW-7 were sampled in support of UGTA responses to recommendations made by the Yucca Flat/Climax Mine External Peer Review Committee (Navarro, 2016). In addition to its role in support of these responses, TW-7 was included because it is listed in the NNSS Integrated Groundwater Sampling Plan (DOE, 2014) as a required sampling location, although it had not been sampled since 1994. U-2gg PSE 3A and U-10L 1 were evaluated to determine whether deteriorating well conditions can be addressed so that these wells can be used as additional sampling points in Yucca Flat.

54 ENVIRONMENTAL SCIENCES↗

PNNL Measurement Results for the 2016 Criticality Accident Dosimetry Exercise at the Nevada National Security Stite (IER-148)

The Pacific Northwest National Laboratory (PNNL) participated in a criticality accident dosimetry intercomparison exercise held at the Nevada National Security Site (NNSS) May 24-27, 2016. The exercise was administered by Lawrence Livermore National Laboratory (LLNL) and consisted of three exposures performed using the Godiva-IV critical assembly housed in the Device Assembly Facility (DAF) located on the NNSS site. The exercise allowed participants to test the ability of their nuclear accident dosimeters to meet the performance criteria in ANSI/HPS N13.3-2013, Dosimetry for Criticality Accidents and to obtain new measurement data for use in revising dose calculation methods and quick sort screening methods where appropriate. PNNL participated with new prototype Personal Nuclear Accident Dosimeter (PNAD) and Fixed Nuclear Accident Dosimeter (FNAD) designs as well as the existing historical PNAD design. The new prototype designs incorporate optically stimulated luminescence (OSL) dosimeters in place of thermoluminescence dosimeters (TLDs), among other design changes, while retaining the same set of activation foils historically used. The default dose calculation methodology established decades ago for use with activation foils in PNNL PNADs and FNADs was used to calculate neutron dose results for both the existing and prototype dosimeters tested in the exercise. The results indicate that the effective cross sections and/or dose conversion factors used historically need to be updated to accurately measure the operational quantities recommended for nuclear accident dosimetry in ANSI/HPS N13.3-2013 and to ensure PNAD and FNAD performance meets the ANSI/HPS N13.3-2013 performance criteria. The operational quantities recommended for nuclear accident dosimetry are personal absorbed dose, Dp(10), and ambient absorbed dose, D*(10).

61 RADIATION PROTECTION AND DOSIMETRY↗

2016 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). These data include direct radiation exposure, as well as radiation from the air, groundwater, meteorology, and vadose zone. This report summarizes the 2016 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports, developed by National Security Technologies, LLC Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show that tritium concentrations in water vapor and americium and plutonium concentrations in air particles are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. During 2016, precipitation at the Area 3 RWMS was 8% below average, and precipitation at the Area 5 RWMS was 8% above average. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation as measured from the bare-soil weighing lysimeter. Vadose zone monitoring on Area 5 and Area 3 RWMS cell covers shows no evidence of precipitation percolating through the covers to the waste. Moisture from precipitation did not percolate below 150 centimeters (cm) (5 feet [ft]) in the vegetated final cover on the U-3ax/bl disposal unit at the Area 3 RWMS. During 2016, there was no drainage through 2.4 meters (8 ft) of soil as indicated from the Area 3 drainage lysimeters that received only natural precipitation. Forty-four percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter, which received 3 times the natural precipitation. All 2016 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facilities’ PAs

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site 2015 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). These data include direct radiation exposure, as well as radiation from the air, groundwater, meteorology, and vadose zone. This report summarizes the 2015 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports developed by National Security Technologies, LLC. Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show that tritium concentrations in water vapor and americium and plutonium concentrations in air particles are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. During 2015, precipitation at the Area 3 RWMS was 0.9% above average, and precipitation at the Area 5 RWMS was 25% above average. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation as measured from the bare-soil weighing lysimeter. The 1.8 inches of precipitation in September reached the lowest sensors at 180 cm on the Cell 5S and 5N covers, however the sensors on the floor do not indicate any signs of the precipitation percolating thru the waste to the floor. Moisture from precipitation did not percolate below 150 centimeters (cm) (5 feet [ft]) in the vegetated final cover on the U-3ax/bl disposal unit at the Area 3 RWMS. A second remedial revegetation trial was done on the southern portion of the North Cover. In March 2015 it was determined that germination occurred on both the mulched and non-mulched treatments that were irrigated, but that no germination occurred on the non-irrigated treatments. By June the seedlings observed in March were gone, possibly grazed by rabbits which were observed inside the rabbit-proof fence. In August the entire area was sprayed with the herbicide glyphosate in an attempt to minimize weed seed production. During 2015, there was no drainage through 2.4 meters (8 ft) of soil as indicated from the Area 3 drainage lysimeters that received only natural precipitation. Thirty-one percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter, which received 3 times the natural precipitation. All 2015 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facilities’ PAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of Experimental Methods for Estimating Matrix Diffusion Coefficients for Contaminant Transport Modeling

Diffusion cell and diffusion wafer experiments were conducted to compare methods for estimating matrix diffusion coefficients in rock core samples from Pahute Mesa at the Nevada Nuclear Security Site (NNSS). A diffusion wafer method, in which a solute diffuses out of a rock matrix that is pre-saturated with water containing the solute, is presented as a simpler alternative to the traditional through-diffusion (diffusion cell) method. Both methods yielded estimates of matrix diffusion coefficients that were within the range of values previously reported for NNSS volcanic rocks. The difference between the estimates of the two methods ranged from 14 to 30%, and there was no systematic high or low bias of one method relative to the other. From a transport modeling perspective, these differences are relatively minor when one considers that other variables (e.g., fracture apertures, fracture spacings) influence matrix diffusion to a greater degree and tend to have greater uncertainty than diffusion coefficients. For the same relative random errors in concentration measurements, the diffusion cell method yields diffusion coefficient estimates that have less uncertainty than the wafer method. However, the wafer method is easier and less costly to implement and yields estimates more quickly, thus allowing a greater number of samples to be analyzed for the same cost and time. Given the relatively good agreement between the methods, and the lack of any apparent bias between the methods, the diffusion wafer method appears to offer advantages over the diffusion cell method if better statistical representation of a given set of rock samples is desired.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗