Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Lockwood”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

The Road from the NASA Access-to-Space Study to a Reusable Launch Vehicle

NASA has established a goal of providing low-cost reliable access to space. While this goal has been around for many years, it received a major impetus when the U.S Congress mandated the Access-to-Space study in 1993. This study concluded that a rocket powered single-stage-to-orbit vehicle offered the best opportunity for low-cost reliable space transportation by the first decade of the new millennium. This required a focused technology development program before such a vehicle could be built. NASA recognized that no commercial entity would commit to the development of a single-stage-to-orbit vehicle without the U.S. Government's participation. To this end, NASA entered into a cooperative agreement with industry to mature the required technologies. This effort includes the development of an experimental subscale-vehicle known as the X-33, an extensive ground-based program to provide the required additional technology development, and conceptual through preliminary design of an operational reusable launch vehicle. Following this effort, a decision will be made whether or not to proceed with the detailed design and fabrication of an operational vehicle.

Powell, Richard W.↗

The Road from the NASA Access-to-Space Study to a Reusable Launch Vehicle

NASA has established a goal of providing low-cost reliable access to space. While this goal has been around for many years, it received a major impetus when the U.S. Congress mandated the Access-to-Space study in 1993. This study concluded that a rocket powered single-state-to-orbit vehicle offered the best opportunity for low-cost reliable space transportation by the first decade of the new millennium. This required a focused technology development program before such a vehicle could be built. NASA recognized that no commercial entity would commit to the development of a single-stage-to-orbit vehicle without the U.S. Government's participation. To this end, NASA entered into a cooperative agreement with industry to mature the required technologies. This effort includes the development of an experimental subscale-vehicle known as the X-33, an extensive ground-based program to provide the required additional technology development, and conceptual through preliminary design of an operational reusable launch vehicle. Following this effort, a decision will be made whether or not to proceed with the detailed design and fabrication of an operational vehicle.

Powell, Richard W.↗

Observations of Ion Signatures of Magnetic Reconnection for Northward IMF

Magnetic merging at Earth's magnetopause produces distinct mixtures of ions and electrons as well as signatures in their distribution functions. High resolution measurements allow for the separation of the different distributions and quantification of their characteristics. This provides details on the temporal and spatial nature of the merging site and the resulting history of the merged fields. The event of May 29, 1996 resulted in remote observations of the effects of reconnection on both magnetosheath and magnetosphere populations for a period of approximately three hours. Three-dimensional ion distributions obtained by the Thermal Ion Dynamics Experiment on the Polar spacecraft show that field lines threading the spacecraft's location in the northern cusp region contained a mix of D-shaped ions from the magnetosheath and accelerated magnetospheric ions both moving parallel to the local magnetic field. This mix of ions resulted from transmission of magnetosheath ions across the magnetopause at speeds greater than the de-Hoffman-Teller speed and the reflection of cold, slow-moving plasmasphere-like ions at the magnetopause. These observations are used to conclude that these field lines were connected to the ionosphere in the northern hemisphere and, southward of the spacecraft, the interplanetary magnetic field and crossed the magnetopause in the equatorial region southward of the spacecraft.

Chandler, Michael O.↗

Evidence of Component Merging Equatorward of the Cusp

The Polar spacecraft passed through a region near the dayside magnetopause on May 29, 1996, at a geocentric distance of approx. 8 R (sub E) and high, northern magnetic latitudes. The interplanetary magnetic field (IMF) was northward during the pass. Data from the Thermal Ion Dynamics Experiment revealed the existence of low-speed (approx. 50 km s (exp-1)) ion D-shaped distributions mixed with cold ions (approx. 2 eV) over a period of 2.5 hours. These ions were traveling parallel to the magnetic field toward the Northern Hemisphere ionosphere and were convecting primarily eastward. The D-shaped distributions are distinct from a convecting Maxwellian and, along with the magnetic field direction, are taken as evidence that the spacecraft was inside the magnetosphere and not in the magnetosheath. Furthermore, the absence of ions in the antiparallel direction is taken as evidence that low-shear merging was occurring at a location southward of the spacecraft and equatorward of the Southern Hemisphere cusp. The cold ions were of ionospheric origin, with initially slow field-aligned speeds, which were accelerated upon reflection from the magnetopause. These observations provide significant new evidence consistent with component magnetic merging sites equatorward of the cusp for northward IMF.

Chandler, M. O.↗

Overview of Conceptual Design of Early VentureStar(TM) Configurations

One of NASA's goals is to enable commercial access to space at a cost of $1000/lb (an order of magnitude less than today's cost) by approximately 2010. Based on results from the 1994 Congressionally mandated, NASA led, Access-to-Space Study, an all rocket-powered single-stage-to-orbit reusable launch vehicle was, selected as the best option for meeting the goal. To address the technology development issues and the follow-on development of an operational vehicle, NASA initiated the X-33 program. The focus of this paper is on the contributions made by the NASA Langley Research Center (LaRC), from 1997-1998, to the conceptual design of the Lockheed Martin Skunk Work's (LMSW) operational reusable single-stage-to-orbit VentureStar(sup TM) vehicle. The LaRC effort has been in direct support of LMSW and NASA Marshall Space Flight Center (MSFC). The primary objectives have been to reduce vehicle dry weight and improve flyability of the VentureStar(sup TM) concepts. This paper will briefly describe the analysis methods used and will present several of the concepts analyzed and design trades completed.

Lockwood, M. K.↗

TOPEX Radar Altimeter Engineering Assessment Report. Update: Launch to January 1, 1997

The initial TOPEX Mission Radar Altimeter Engineering Assessment Report, in February 1994, presented performance results for the NASA Radar Altimeter on the TOPEX/POSEIDON spacecraft, from its launch in August 1992 to February 1994. There have been supplemental Engineering Assessment Reports, issued in March 1995 and again in May 1996, which updated the performance results through the end of calendar years 1994 and 1995, respectively. This supplement updates the altimeter performance to the end of calendar year 1996, and describes significant events that occurred during 1996. As the performance data base has expanded, and as analysis tools and techniques continue to evolve, the longer-term trends of the altimeter data have become more apparent. The updated findings are presented here.

Hancock, D. W., III↗

Entry System Design Considerations for Mars Landers

The objective for the next generation or Mars landers is to enable a safe landing at specific locations of scientific interest. The 1st generation entry, descent and landing systems, ex. Viking and Pathfinder, provided successful landing on Mars but by design were limited to large scale, 100s of km, landing sites with minimal local hazards. The 2 nd generation landers, or smart landers, will provide scientists with access to previously unachievable landing sites by providing precision landing to less than 10 km of a target landing site, with the ability to perform local hazard avoidance, and provide hazard tolerance. This 2nd generation EDL system can be utilized for a range of robotic missions with vehicles sized for science payloads from the small 25-70 kg, Viking, Pathfinder, Mars Polar Lander and Mars Exploration Rover-class, to the large robotic Mars Sample Return, 300 kg plus, science payloads. The 2nd generation system can also be extended to a 3nd generation EDL system with pinpoint landing, 10's of meters of landing accuracy, for more capable robotic or human missions. This paper will describe the design considerations for 2nd generation landers. These landers are currently being developed by a consortium of NASA centers, government agencies, industry and academic institutions. The extension of this system and additional considerations required for a 3nd generation human mission to Mars will be described.

Lockwood, Mary Kae↗

GEOSAT Follow-on (GFO) Altimeter Document Series: GFO Altimeter Engineering Assessment Report: From Launch to Acceptance, 10 February 1998 to 29 November 2000 - Volume 1

The US Navy's Geosat Follow-On (GFO) Mission, launched on February 10, 1998, is the latest in a series of altimetric satellites which include Seasat, Geosat, ERS-1, and TOPEX/POSEIDON (T/P). The purpose of this report is to document the GFO altimeter performance determined from the analyses and results performed by the NASA/GSFC/Wallops altimeter calibration team. It is the first of an anticipated series of NASA/GSFC/Wallops' GFO performance documents, each of which will update assessment results. This report covers the performance from launch to instrument acceptance by the Navy on November 29, 2000. Data derived from GFO will lead to improvements in the knowledge of ocean circulation, ice sheet topography, and climate change. In order to capture the maximum amount of information from the GFO data, accurate altimeter calibrations are required for the civilian data set which NOAA will produce. Wallops Flight Facility has provided similar products for the Geosat and T/P missions and is doing the same for GFO.

Hancock, David W., III↗

Brazil Fire Characterization and Burn Area Estimation Using the Airborne Infrared Disaster Assessment (AIRDAS) System

Remotely sensed estimations of regional and global emissions from biomass combustion have been used to characterize fire behavior, determine fire intensity, and estimate burn area. Highly temporal, low resolution satellite data have been used to calculate estimates of fire numbers and area burned. These estimates of fire activity and burned area have differed dramatically, resulting in a wide range of predictions on the ecological and environmental impacts of fires. As part of the Brazil/United States Fire Initiative, an aircraft campaign was initiated in 1992 and continued in 1994. This multi-aircraft campaign was designed to assist in the characterization of fire activity, document fire intensity and determine area burned over prescribed, agricultural and wildland fires in the savanna and forests of central Brazil. Using a unique, multispectral scanner (AIRDAS), designed specifically for fire characterization, a variety of fires and burned areas were flown with a high spatial and high thermal resolution scanner. The system was used to measure flame front size, rate of spread, ratio of smoldering to flaming fronts and fire intensity. In addition, long transects were flown to determine the size of burned areas within the cerrado and transitional ecosystems. The authors anticipate that the fire activity and burned area estimates reported here will lead to enhanced information for precise regional trace gas prediction.

Brass, J. A.↗

GFO Altimeter Engineering Assessment Report

The U.S. Navy's Geosat Follow-On (GFO) Mission, launched on February 20, 1998, is one of a series of altimetric satellites which include Seasat, Geosat, ERS-1, and TOPEX/POSEIDON (T/P). The purpose of this report is to document the GFO altimeter performance determined from the analyses and results performed by NASA's GSFC and Wallops altimeter, calibration team. It is the second of an anticipated series of NASA's GSFC and Wallops GFO performance documents, each of which will update assessment results. This report covers the performance from instrument acceptance by the Navy on November 29, 2000, to the end of Cycle 20 on November 21, 2001. Data derived from GFO will lead to improvements in the knowledge of ocean circulation, ice sheet topography, and climate change. In order to capture the maximum amount of information from the GFO data, accurate altimeter calibrations are required for the civilian data set which NOAA will produce. Wallops Flight Facility has provided similar products for the Geosat and T/P missions and is doing the same for GFO.

Lockwood, Dennis W.↗

GEOSAT Follow-on (GFO) Altimeter Document Series: GFO Altimeter Engineering Assessment Report, Version 1 - Volume 3

The U.S. Navy's Geosat Follow-On (GFO) Mission, launched on February 20, 1998, is one of a series of altimetric satellites which include Seasat, Geosat, ERS-1, and TOPEX/POSEIDON (T/P). The purpose of this report is to document the GFO altimeter performance determined from the analyses and results performed by NASA's GSFC and Wallops altimeter, calibration team. It is the second of an anticipated series of NASA's GSFC and Wallops GFO performance documents, each of which will update assessment results. This report covers the performance from instrument acceptance by the Navy on November 29, 2000, to the end of Cycle 20 on November 21, 2001. Data derived from GFO will lead to improvements in the knowledge of ocean circulation, ice sheet topography, and climate change. In order to capture the maximum amount of information from the GFO data, accurate altimeter calibrations are required for the civilian data set which NOAA will produce. Wallops Flight Facility has provided similar products for the Geosat and T/P missions and is doing the same for GFO.

Hancock, David W., III↗

GFO Altimeter Engineering Assessment Report. Update: The First 43 Cycles Since Acceptance, November 29, 2000 to November 30, 2002, Version 1

The U.S. Navy's Geosat Follow-On (GFO) Mission, launched on February 20, 1998, is one of a series of altimetric satellites which include Seasat, Geosat, ERS-1, and TOPEX/POSEIDON (T/P). The purpose of this report is to document the GFO altimeter performance determined from the analyses and results performed by NASA's GSFC and Wallops altimeter, calibration team. It is the third of an anticipated series of NASA's GSFC and Wallops GFO performance documents, each of which will update assessment results. This report covers the performance from instrument acceptance by the Navy on November 29, 2000, to the end of Cycle 42 on November 30, 2002. Data derived from GFO will lead to improvements in the knowledge of ocean circulation, ice sheet topography, and climate change. In order to capture the maximum amount of information from the GFO data, accurate altimeter calibrations are required for the civilian data set which NOAA will produce. Wallops Flight Facility has provided similar products for the Geosat and T/P missions and is doing the same for GFO.

Hancock, D. W., III↗

WFF TOPEX Software Documentation Altimeter Instrument File (AIF) Processing, October 1998

This document is a compendium of the WFF TOPEX Software Development Team's knowledge regarding Sensor Data Record (SDR) Processing. It includes many elements of a requirements document, a software specification document, a software design document, and a user's manual. In the more technical sections, this document assumes the reader is familiar with TOPEX and instrument files.

Lee, Jeffrey↗

GEOSAT Follow-On (GFO) Altimeter Document Series: Version 1 - Volume 5

This document is a compendium of the WFF GFO Software Development Team's knowledge regarding of GDO CAL/VAL Data. It includes many elements of a requirements document, a software specification document, a software design document, and a user's guide. In the more technical sections, this document assumes the reader is familiar with GFO and its CAL/VAL Data.

Lockwood, Dennis W.↗

TOPEX Software Document Series: Rev. 1 - Volume 5

This document is a compendium of the WFF TOPEX Software Development Team's knowledge regarding Geophysical Data Record (GDR) Processing. It includes many elements of a requirements document, a software specification document, a software design document, and a user's manual. In the more technical sections, this document assumes the reader is familiar with TOPEX and instrument files.

Lee, Jeffrey↗

TOPEX SDR Processing, October 1998

This document is a compendium of the WFF TOPEX Software Development Team's knowledge regarding Sensor Data Record (SDR) Processing. It includes many elements of a requirements document, a software specification document, a software design document, and a user's manual. In the more technical sections, this document assumes the reader is familiar with TOPEX and instrument files.

Lee, Jeffrey E.↗

TOPEX Radar Altimeter Engineering Assessment Report Update: Side B Turn-On to January 1, 2004

This is the eleventh in a series of TOPEX Radar Engineering Assessment Reports, The initial TOPEX Radar Altimeter Engineering Assessment Report, in February 1994, presented performance results for the NASA Radar Altimeter on the TOPEX/POSEIDON spacecraft, from the time of its launch in August 1992 to February 1994. Since the time of that initial report and prior to this report, there have been nine interim supplemental Engineering Assessment Reports, issued in March 1995, May 1996, March 1997, June 1998, August 1999, September 2000, June 2001, March 2002 and again in May 2003.The sixth supplement in September 2000 was the first assessment report that addressed Side B performance, and presented the altimeter performance from the turn-on of Side B until the end of calendar year 1999. This report extends the performance assessment of Side B to the end of calendar year 2003 and includes the performance assessment of Jason-1, the TOPEX follow-on mission, launched on December 7, 2001.

Hancock, David W., III↗

GFO Altimeter Engineering Assessment Report. Update: The First 65 Cycles Since Acceptance, November 29, 2000 to December 9, 2003, Version 1

The U.S. Navy's Geosat Follow-On (GFO) Mission, launched February 10, 1998, is one of a series of altimetric satellites which include Seasat, Geosat, ERS-1, and TOPEX/POSEIDON (T/P). The purpose of this report is to document the GFO altimeter performance determined from the analyses and results performed by NASA's GSFC and Wallops altimeter calibration team. It is the fourth of an anticipated series of NASA's GSFC and Wallops GFO performance documents, each of which will update assessment results. This report covers the performance from instrument acceptance by the Navy on November 29, 2000, to the end of Cycle 65 on December 9, 2003. Data derived from GFO will lead to improvements in the knowledge of ocean circulation, ice sheet topography, and climate change. In order to capture the maximum amount of information from the GFO data, accurate altimeter calibrations are required for the civilian data set which NOAA will produce. Wallops Flight Facility has provided similar products for the Geosat and T/P missions and is doing the same for GFO.

Hancock, D. W., III↗