Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Leak Test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Extensive Aging and Evaluation of Nonmetallic Components in the Waste Transfer System at Hanford - 18371

Nonmetallic materials are used in the United States Department of Energy's Hanford Site Tank Farm waste transfer system. These materials include the inner primary hoses in the hose-in-hose transfer lines (HIHTLs), Garlock{sup R} gaskets, ethylene propylene diene monomer (EPDM) O-rings, and other nonmetallic materials. These nonmetallic materials are exposed to β and γ radiation, caustic solutions as well as high temperature and pressure stressors. How the nonmetallic components react to each of these stressors individually has been well established. However, simultaneous exposure of these stressors has not been evaluated and is of great concern to Hanford Site engineers. FIU-ARC engineers worked closely with key Hanford HLW personnel to develop an experimental test plan that determines how these nonmetallic components react to various simultaneous stressor exposures. In this paper, data obtained from experimental testing of the hose-in-hose transfer lines, Garlock{sup R} gaskets and EPDM O-rings used in the Hanford tank farm waste transfer system under simultaneous stressor exposures is presented. The stressor exposure experiments consisted of combinations of simultaneous stressor exposure of caustic solution and elevated temperature stressors. Evaluation of materials that have been conditioned with the various stressors for duration of 6-months was conducted and compared with baseline unexposed materials. Evaluations included burst pressure tests of the EPDM hose-in-hose transfer lines, leak pressure tests of the EPDM O-rings and Garlock{sup R} gaskets, material tensile strength test of EPDM and Garlock{sup R} coupons. Scanning electron microscopy with energy dispersive X-ray spectroscopy (SEM-EDX) was conducted on aged and un-aged baseline coupons to determine if there was any change in the surface microstructure and to see how far the NaOH penetrated analysis is continuing. Conclusions from the 6-month testing indicates that the specimens did not see a significant in the pressure tests, but the material properties of both the EPDM and Garlock{sup R} coupons did see changes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Leak detector-measurer

Detector locates leaks from inside pressurized cabins. Head is placed flush against area being tested. Should leak be present, most air inside detector housing will escape. Diaphragm will then flex into chamber and push electrical contact together, closing circuit and turning on warning light.

Sawyer, J. T.↗

Examination of T-111 clad uranium nitride fuel pins irradiated up to 13,000 hours at a clad temperature of 990 C

The examination of 27 fuel pins irradiated for up to 13,000 hours at 990 C is described. The fuel pin clad was a tantalum alloy with uranium nitride as the nuclear fuel. Two nominal fuel pin diameters were tested with a maximum burnup of 2.34 atom percent. Twenty-two fuel pins were tested for fission gas leaks; thirteen pins leaked. Clad ductility tests indicated clad embrittlement. The embrittlement is attributed to hydrogen from an n,p reaction in the fuel. Fuel swelling was burnup dependent, and the amount of fission gas release was low, generally less than 0.5 percent. No incompatibilities between fuel, liner, and clad were in evidence.

Slaby, J. G.↗

Evaluation of Series T22 Wet Tantalum Capacitors

Several types of advanced wet tantalum capacitors, and series T22 in particular, are designed without internal Teflon sealing that is used for military grade, CLR style capacitors. This raises concerns regarding hermeticity of the single seal parts and their capability to withstand high internal gas pressures that might develop during operation in space. To address these issues, T22 series capacitors rated to 50 V and 125 V were subjected to highly accelerated life testing (HALT) at 125 C and rated voltage and step stress random vibration testing (RVT). To simulate conditions of storage or operation under increased internal gas pressure, the parts were stored at temperature of 150 C for 2500 hr (HTS150). Electrical characteristics of the parts were measured through the storage testing and the hermeticity leak rate was tested before and after HTS150. To assess thermo-mechanical robustness of the part, capacitors were manually soldered onto printed wired boards (PWB) and stressed by 1000 temperature cycles between -55 C and +125 C. The effect of temperature cycling was assessed by additional HALT at different temperatures. Results show that T22 series capacitors have robust design and can satisfy requirements for space applications.

Wet tantalum capacitors↗

Orifice gross leak tester Patent

Test chambers with orifice and helium mass spectrometer for detecting leak rate of encapsulated semiconductor devices

Altshuler, T. L.↗

Detecting Leaks With An Infrared Camera

Proposed test reveals small leak in gas pipe - for example, leak through fatigue crack induced by vibration - even though insulation covers pipe. Infrared-sensitive video camera aimed at part(s) containing suspected leak(s). Insulated pipe pressurized with gas that absorbs infrared light. If crack were present, escaping gas travels along outside of pipe until it reached edge of insulation. Gas emerging from edge of insulation appears as dark cloud in video image.

Easter, Barry P.↗

SIXTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

A series of experiments to monitor the aging performance of Viton{reg_sign} GLT O-rings used in the Model 9975 package has been ongoing for seven years at the Savannah River National Laboratory. Seventy tests using mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested periodically to determine if they meet the criterion of leak-tightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 33 GLT O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350 F and higher temperatures, and in 7 fixtures aging at 300 F. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 41-60 months, which is still bounding to O-ring temperatures during storage in K-Area Complex (KAC). Based on expectations that the fixtures aging at 200 F will remain leak-tight for a significant period yet to come, 2 additional fixtures began aging within the past year at an intermediate temperature of 270 F, with hopes that they may leak before the 200 F fixtures. High temperature aging continues for 6 GLT-S O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200-300 F for up to 26 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the Orings displayed a compression set ranging from 51-96%. This is greater than seen to date for packages inspected during KAC field surveillance (24% average). For GLT O-rings, separate service life estimates have been made based on the O-ring fixture leak test data and based on compression stress relaxation (CSR) data. These two predictive models show reasonable agreement at higher temperatures (350-400 F). However, at 300 F, the room temperature leak test failures to date experienced longer aging times than predicted by the CSR-based model. This suggests that extrapolations of the CSR model predictions to temperatures below 300 F will provide a conservative prediction of service life relative to the leak rate criterion. Leak test failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Model 9975 PCV O-Ring Fixture Long-Term Leak Performance (Seventh Interim Status Report)

A series of experiments to monitor the aging performance of Viton® GLT O-rings used in the Model 9975 package has been ongoing since 2004 at the Savannah River National Laboratory. Seventy tests using mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450ºF. They were leak-tested initially and have been tested periodically to determine if they meet the criterion of leak-tightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400ºF. High temperature aging continues for 23 GLT O-ring fixtures at 200–270ºF. Room temperature leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350ºF and higher temperatures, and in 8 fixtures aging at 300ºF. The remaining GLT O-ring fixtures aging at 300ºF have been retired from testing following more than 5 years at temperature without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200ºF for 54-72 months, which is still bounding to O-ring temperatures during storage in K-Area Complex (KAC). Based on expectations that the fixtures aging at 200ºF will remain leak-tight for a significant period yet to come, 2 additional fixtures began aging in 2011 at an intermediate temperature of 270ºF, with hopes that they may reach a failure condition before the 200ºF fixtures. High temperature aging continues for 6 GLT-S O-ring fixtures at 200–300ºF. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400ºF. No failures have yet been observed in GLT-S O-ring fixtures aging at 200-300ºF for 30-36 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the O-rings displayed a compression set ranging from 51–96%. This is greater than seen to date for any packages inspected during KAC field surveillance (24% average). For GLT O-rings, separate service life estimates have been made based on the O-ring fixture leak test data and based on compression stress relaxation (CSR) data. These two predictive models show reasonable agreement at higher temperatures (350–400ºF). However, at 300ºF, the room temperature leak test failures to date experienced longer aging times than predicted by the CSR-based model. This suggests that extrapolations of the CSR model predictions to temperatures below 300ºF will provide a conservative prediction of service life relative to the leak rate criterion. Leak test failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining PCV O-ring fixtures.

36 MATERIALS SCIENCE↗

Bipropellant shut-off valve

An advanced design of an all metal, fast response, bipropellant, shut-off valve for use on long duration space missions is reported. The valve provides the flow control capability for a 1,000 lb thrust, bipropellant engine using oxygen difluoride and diborane as propellants. The shutoff seal selection is a soft-on-hard metal concept. The soft seal is a spherical shell that seats against a hard conical seat. Beryllium copper and beryllium nickel seals were selected to seal against an electrolyzed Inconel 718 seat. Poppet shaft sealing is achieved by use of hydroformed, Inconel 718 bellows. Two valve assemblies were fabricated and subjected to a series of tests including leak, response time, flow capacity, dry cycles, water cycles, liquid nitrogen cycles, liquid fluorine cycles, and lead-lag operation cycles. These tests demonstrated the ability of the valve to meet design goals.

Smith, J. V.↗

Helium Mass Spectrometer Leak Detection: A Method to Quantify Total Measurement Uncertainty

In applications where leak rates of components or systems are evaluated against a leak rate requirement, the uncertainty of the measured leak rate must be included in the reported result. However, in the helium mass spectrometer leak detection method, the sensitivity, or resolution, of the instrument is often the only component of the total measurement uncertainty noted when reporting results. To address this shortfall, a measurement uncertainty analysis method was developed that includes the leak detector unit's resolution, repeatability, hysteresis, and drift, along with the uncertainty associated with the calibration standard. In a step-wise process, the method identifies the bias and precision components of the calibration standard, the measurement correction factor (K-factor), and the leak detector unit. Together these individual contributions to error are combined and the total measurement uncertainty is determined using the root-sum-square method. It was found that the precision component contributes more to the total uncertainty than the bias component, but the bias component is not insignificant. For helium mass spectrometer leak rate tests where unit sensitivity alone is not enough, a thorough evaluation of the measurement uncertainty such as the one presented herein should be performed and reported along with the leak rate value.

error analysis↗

A Battery Certification Testbed for Small Satellite Missions

A battery pack consisting of standard cylindrical 18650 lithium-ion cells has been chosen for small satellite missions based on previous flight heritage and compliance with NASA battery safety requirements. However, for batteries that transit through the International Space Station (ISS), additional certification tests are required for individual cells as well as the battery packs. In this manuscript, we discuss the development of generalized testbeds for testing and certifying different types of batteries critical to small satellite missions. Test procedures developed and executed for this certification effort include: a detailed physical inspection before and after experiments; electrical cycling characterization at the cell and pack levels; battery-pack overcharge, over-discharge, external short testing; battery-pack vacuum leak and vibration testing. The overall goals of these certification procedures are to conform to requirements set forth by the agency and identify unique safety hazards. The testbeds, procedures, and experimental results are discussed for batteries chosen for small satellite missions to be launched from the ISS.

Certification↗

HIGH-DENSITY, BIO-COMPATIBLE, AND HERMETIC ELECTRICAL FEEDTHROUGHS USING EXTRUDED METAL VIAS

Implanted medical devices such as pacemakers and neural prosthetics require that the electronic components that power these devices are protected from the harsh chemical and biological environment of the body. Typically, the electronics are hermetically sealed inside a bio-compatible package containing feedthroughs that transmit electrical signals, while being impermeable to particles or moisture. We present a novel approach for fabricating one of the highest densities of biocompatible hermetic feedthroughs in alumina (Al{sub 2}O{sub 3}). Alumina substrates with laser machined vias of 200 {mu}m pitch were conformally metallized and lithographically patterned. Hermetic electrical feedthroughs were formed by extruding metal studbumps partially through the vias. Hermeticity testing showed leak rates better than 9x10{sup -10} torr-l/s. Based on our preliminary results and process optimization, this extruded metal via approach is a high-density, low temperature, cost-effective, and robust method of miniaturizing electrical feedthroughs for a wide range of implantable bio-medical device applications.

42 ENGINEERING↗

Hanford double-shell tank AY-102 radioactive waste leak investigation update - 15302

Tank AY-102 was the first of 28 double-shell radioactive waste storage tanks constructed at the U.S. Department of Energy's Hanford Site, near Richland, WA. The tank was completed in 1970, and entered service in 1971. In August, 2012, an accumulation of material was discovered at two sites on the floor of the annulus that separates the primary tank from the secondary liner. The material was sampled and determined to originate from the primary tank. This paper summarizes the changes in leak behavior that have occurred during the past two years, inspections to determine the capability of the secondary liner to continue safely containing the leakage, and the initial results of testing to determine the leak mechanism. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Surplus Plutonium Disposition Sphincter Seal Development & Testing

The Surplus Plutonium Disposition Project (SPD, Project Y744) requested the Savannah River National Laboratory (SRNL) to perform a series of leak and durability tests on sphincter seals that were designed to process blend cans and shield cans into an SPD glovebox. Each sphincter seal assembly consisted of a stainless-steel outer sleeve weldment that was bolted onto the test enclosure and an aluminum inner sleeve that housed seven to nine Neoprene seals. All tests were executed to determine long term effects from processing approximately a year’s worth of blend and shield cans through the sphincter seals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

JC-13 Fluorocarbon Tech Discussion

The end goal of this presentation is to make aware JEDEC members of needed modifications /updates in standards that use fluorocarbon electrical fluids to address test sensitivity (discuss potential root cause of False/Passes) and change of content in standards when mentioning trademark names of electrical fluids to be phase out by 3M due to PFAs content.

Gross leak test↗

Development of a high power electron beam welding gun with replaceable high voltage feed-through insulators

Ceramic to metal sealed feed-through insulators are commonly used in electron beam welding gun. The above feed-through insulators are susceptible to failure, as the brazing joints in them are not always very strong. Failure in one of these feed-through could render the complete gun unusable. This problem has already been faced in BARC, which led to the development of the electron gun with replaceable feed through insulators. A 24 kW Electron Beam Welding (EBW) gun with indigenous designed replaceable insulators is fabricated in BARC. Emphasis during the design of the gun had been to reduce the use of imported components to zero. This paper describes the design and fabrication of this gun and reports various simulations and tests performed. Beam trajectory of the gun is numerically computed and presented. Weld passes were carried out on stainless steel plates show satisfactory penetrations. (author)

43 PARTICLE ACCELERATORS↗

SU-C-213-07: Fabrication and Testing of a 3D-Printed Small Animal Rectal Cooling Device to Evaluate Local Hypothermia as a Radioprotector During Prostate SBRT

Purpose: The protective effects of induced or even accidental hypothermia on the human body are widespread with several medical uses currently under active research. In vitro experiments using human cell lines have shown hypothermia provides a radioprotective effect that becomes more pronounced at large, single-fraction doses common to SBRT treatments. Relevant to prostate SBRT, this work details the fabrication and testing of a 3D-printed cooling device to facilitate the investigation of the radioprotective effect of local hypothermia on the rat rectum. Methods: A 3cm long, two-channel rectal cooling device was designed in SOLIDWORKS CAD for 3D printing. The water intake nozzle is connected to a 1mm diameter brass pipe from which water flows and circulates back around to the exit nozzle. Both nozzles are connected by plastic tubing to a water chiller pump. Following leak-proof testing, fiber optic temperature probes were used to evaluate the temperature over time when placed adjacent to the cooling device within a rat rectum. MRI thermometry characterized the relative temperature distribution in concentric ROIs surrounding the probe. CBCT images from a small-animal irradiator were evaluated for imaging artifacts which could affect Monte Carlo dose calculations during treatment planning. Results: The rectal temperature adjacent to the cooling device decreased from body temperature (37°C) to 15°C in 10–20 minutes from device insertion. Rectal temperature was maintained at 15±3°C during active cooling. MRI thermometry tests revealed a steep temperature gradient with increasing distance from the cooling device, with the desired temperature range maintained within the surrounding few millimeters. Conclusion: A 3D printed rectal cooling device was fabricated for the purpose of inducing local hypothermia in rat rectums. Rectal cooling capabilities were characterized in-vivo to facilitate an investigation of the radioprotective effect of hypothermia for late rectal toxicity following a single large dose of radiation. Funding support provided by RSNA research seed grant.

60 APPLIED LIFE SCIENCES↗

FY2017 status report: Model 9975 O-ring fixture long-term leak performance

A series of experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the Model 9975 shipping package has been ongoing since 2004 at the Savannah River National Laboratory. One approach has been to periodically evaluate the leak performance of O-rings being aged in mock-up 9975 Primary Containment Vessels (PCVs) at elevated temperature. Other methods such as compression-stress relaxation (CSR) tests and field surveillance are also on-going to evaluate O-ring behavior. Seventy tests using PCV mock-ups with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 ºF. They were leak-tested initially and have been tested periodically to determine if they continue to meet the leak-tightness criterion defined in ANSI standard N14.5-97. Due to material substitution, a smaller test matrix with fourteen additional tests was initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 ºF. Leak test failures have been experienced in all of the GLT O-ring fixtures aging at 350 ºF and higher temperatures, and in 8 fixtures aging at 300 ºF. The 300 °F GLT O-ring fixtures failed after 2.8 to 5.7 years at temperature. The remaining GLT O-ring fixtures aging at 300 ºF were retired from testing following more than 5 years at temperature without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200 ºF for 9 to 10.5 years, or in GLT O-ring fixtures aging at 270 ºF for 5.7 years. These aging temperatures bound O-ring temperatures anticipated during normal storage in K-Area Complex (KAC). Leak test failures have been experienced in all of the GLT-S O-ring fixtures aging at 300 ºF and above. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 and 250 ºF for 6.9 to 7.5 years. Data from the O-ring fixtures are generally consistent with results from compression stress relaxation testing, and provide confidence in the predictive models based on those results. However, uncertainty still exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in KAC. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicates margin remains for O-rings still in service. Aging and periodic leak testing will continue for the remaining PCV fixtures.

42 ENGINEERING↗