Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Launch operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Results of an Advanced Fan Stage Operating Over a Wide Range of Speed and Bypass Ratio: Fan Stage Design and Experimental Results - Part 1

NASA s Fundamental Aeronautics Program is investigating turbine-based combined cycle (TBCC) propulsion systems for access to space because it provides the potential for aircraft-like, space-launch operations that may significantly reduce launch costs and improve safety. To this end, National Aeronautics and Space Administration (NASA) and General Electric (GE) teamed to design a Mach 4 variable cycle turbofan/ramjet engine for access to space. To enable the wide operating range of a Mach 4+ variable cycle turbofan ramjet required the development of a unique fan stage design capable of multi-point operation to accommodate variations in bypass ratio (10 ), fan speed (7 ), inlet mass flow (3.5 ), inlet pressure (8 ), and inlet temperature (3 ). In this paper, NASA has set out to characterize a TBCC engine fan stage aerodynamic performance and stability limits over a wide operating range including power-on and hypersonic-unique "windmill" operation. Herein, we will present the fan stage design, and the experimental test results of the fan stage operating from 15 to 100 percent corrected design speed. Whereas, in the companion paper, we will provide an assessment of NASA s APNASA code s ability to predict the fan stage performance and operability over a wide range of speed and bypass ratio.

Suder, Kenneth L.↗

Update of KSC activities for the space transportation system

The paper is a status report on the facilities and planned operations at the Kennedy Space Center (KSC) that will support Space Shuttle launches. The conversion of KSC facilities to support efficient and economical checkout and launch operations in the era of the Space Shuttle is nearing completion. The driving force behind the KSC effort has been the necessity of providing adequate and indispensable facilities and support systems at minimum cost. This required the optimum utilization of existing buildings, equipment and systems, both at KSC and at Air Force property on Cape Canaveral, as well as the construction of two major new facilities and several minor ones. The entirely new structures discussed are the Shuttle Landing Facility and Orbiter Processing Facility. KSC stands ready to provide the rapid reliable economical landing-to-launch processing needed to ensure the success of this new space transportation system.

Gray, R. H.↗

Launch vehicle test and checkout plan. - Volume 2: Saturn 1B launch vehicle Skylab R (rescue) and AS-208 flow plan and listings

The launch operations test and checkout plan is a planning document that establishes all launch site checkout activity, including the individual tests and sequence of testing required to fulfill the development center and KSC test and checkout requirements. This volume contains the launch vehicle test and checkout plan encompassing S-1B, S-4B, IU stage, and ground support equipment tests. The plan is based upon AS-208 flow utilizing a manned spacecraft, LUT 1, and launch pad 39B facilities.

Source record↗

Delta-85 Orbiting Solar Observatory-H (OSO-H) Operations summary

The objectives of the Orbiting Solar Observatory (OSO-H) are discussed. Subjects considered are the: (1) mission objectives, (2) mission plan, (3) post launch operations, (4) communications, and (5) test operations. Illustrations of the satellite configuration and the Delta 85 launch vehicle are included.

Source record↗

Launch Pad Closeout Operations for the Mars Science Laboratory's Heat Rejection System

The Mars Science Laboratory (MSL) rover was launched on an Atlas V on November 26, 2011. Preparations were carried out prior to launch in order to closeout the spacecraft's complex heat rejection system (HRS), which consists of two mechanically pumped CFC-11 fluid loops. The first HRS loop, onboard the Curiosity rover, was fully integrated, filled with CFC-11, and successfully operated prior to launch pad operations; however, the second thermal loop, called the cruise HRS loop, required final mechanical and thermal integration activities to occur while on the launch pad in order to accommodate the last minute installation of the rover's Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) power source. In order to prevent overheating of propellant tanks and critical avionics equipment buried deep within the spacecraft's aeroshell, the MMRTG needed to be pre-cooled using a separate non-flight mechanically pumped fluid loop prior to and during the final closeout and subsequent startup of the flight loop. This paper outlines the various steps that took place to safely install the MMRTG while carefully transitioning from the pre-cooling operation to the final startup and operation of the flight cruise HRS loop. Temperature data of the launch pad thermal transition from the ground support loop activity to the final flight loop operation is presented. Some background development of the ground support loop and lessons learned are also discussed. This successful launch pad integration activity required a close-knit coordination between NASA KSC, JPL, the Department of Energy, Idaho National Labs, Pratt and Whitney Rocketdyne Inc., Teledyne Technologies Inc., ULA, and Advanced Thermal Sciences Corp.

thermal↗

Launch vehicle system requirements and restraints for the ERTS-A spacecraft

The technical requirements and restraints imposed by the ERTS spacecraft upon the Delta launch vehicle, shroud system, associated launch complex, and range are presented for technical coordination among various agencies involved in the launch vehicle and launch operations. The payload and spacecraft systems are described, and the mission, design, test, and launch base data are outlined.

Corrigan, J. F.↗

A continuation of base-line studies for environmentally monitoring Space Transportation Systems (STS) at John F. Kennedy Space Center. Volume 4: Threatened and endangered species of the Kennedy Space Center. Part 1: Marine turtle studies

The status of marine turtle populations in the KSC area was studied using data from previous results from ground and aerial surveillance conducted from 1976 to April 1979. During ground surveillance, various data were recorded on emergent turtles such as: species, weight, tag number (if previously tagged), time discovered, activity at discovery and the location of discovery. Observations were also made on nesting and reproductive characteristics, population estimates, immigration and emigration and growth rate of the turtles. Mortality studies were additionally made and autopsies performed on dead turtles found in the area. It is concluded that further mortality documentation should be done just prior to and just after a future space launch operation in order to accurately assess the cause and effect relationship of such a launch on the turtle population.

Ehrhart, L. M.↗

Launch vehicle technology

Launch vehicle technology summary - structure, guidance, engines, propellants, testing, checkout, and launch operations

SPACECRAFT STRUCTURE↗

Delta-95, RAE-B operations summary

A systems analysis of the Radio Astronomy Explorer - B satellite is presented. The subjects discussed are: (1) mission objective, (2) launch vehicle and spacecraft configurations, (3) launch operations plan, (4) communications, and (5) test operations.

Source record↗

Fluid system design for a superfluid helium space tanker

The design of a superfluid helium space tanker is described, which has the characteristics of minimum boil-off, low-g venting and maintenance of the superfluid state, transfer operations that include a pumping method, the additional fluid conditioning required during transfer, and a liquid acquisition system for transfer in a weightless environment. A concept for loading and ground conditioning of He, that simplifies launch operations and maximizes the quantity available at launch is presented. Configuration diagrams are included.

Gille, John P.↗

Lunar Orbiter 3 - Photographic Mission Summary

Systems performance, lunar photography, and launch operations of Lunar Orbiter 3 photographic mission. The third of five Lunar Orbiter spacecraft was successfully launched from Launch Complex 13 at the Air Force Eastern Test Range by an Atlas-Agena launch vehicle at 01:17 GMT on February 5,1967. Tracking data from the Cape Kennedy and Grand Bahama tracking stations were used to control and guide the launch vehicle during Atlas powered flight. The Agena-spacecraft combination was boosted to the proper coast ellipse by the Atlas booster prior to separation. Final 1 maneuvering and acceleration to the velocity required to maintain the 100-nautical-milealtitude Earth orbit was controlled by the preset on-board Agena computer. In addition, the Agena computer determined the maneuver and engine-burn period required to inject the spacecraft on the cislunar trajectory 20 minutes after launch. Tracking data from the downrange stations and the Johannesburg, South Africa station were used to monitor the entire boost trajectory.

Source record↗

IMP I, H, and J

The schedule for the IMP project for the eighth, ninth, and tenth satellites of the series is presented. A description of the spacecraft and the weekly summaries of the operations performed on the spacecraft are provided. The project planning, project problems, recommendations, and reports of launch operations are described. Drawings of the satellite structures are included.

Source record↗

Microwave Power Beaming Infrastructure for Manned Lightcraft Operations: Part 2

In the past {approx}7 years, microwave gyrotron technology has rapidly evolved to a critical threshold wherein ultra-energetic space launch missions based on beamed energy propulsion (BEP) now appear eminently feasible. Over the next 20 years, hundred megawatt-class microwave power-beaming stations could be prototyped on high deserts and 3- to 4 km mountain peaks before migrating into low Earth orbit, along with their passive microwave relay satellites. Described herein is a 20 GW rechargeable nuclear power satellite and microwave power-beaming infrastructure designed for manned space launch operations in the year 2025. The technological readiness of 2500 GJ superconducting magnetic energy storage 'batteries', 433-m ultralight space structures, 100 MW liquid droplet radiators, 1-6+ MW gyrotron sources, and mega-scale arrays (e.g., 3000 phase-locked units) is addressed. Microwave BEP is 'breakthrough' technology with the very real potential to radically reduce space access costs by factors of 100 to 1000 in the forseeable future.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Requirement for a standard language for test and ground operations

The basic requirements for a standard test and checkout language applicable to all phases of the space shuttle test and ground operations are determined. The general characteristics outlined here represent the integration of selected ideas and concepts from operational elements within Kennedy Space Center (KSC) that represent diverse disciplines associated with space vehicle testing and launching operations. Special reference is made to two studies conducted in this area for KSC as authorized by the Advanced Development Element of the Office of Manned Space Flight (MSF). Information contained in reports from these studies have contributed significantly to the final selection of language features depicted in this technical report.

Medlock, J. R.↗

A scientific operations plan for the large space telescope

The paper describes an LST ground system which is compatible with the operational requirements of the LST. The goal of the approach is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of LST science. Attention is given to cost constraints and guidelines, the telemetry operations processing systems (TELOPS), the image processing facility, ground system planning and data flow, and scientific interfaces.

West, D. K.↗

Launch Characteristics of the X-15 Research Airplane as Determined in Flight

The first 16 air launches of the X-15 airplane demonstrated the feasibility of air launch from an asymmetric position under the wing of the B-52 carrier airplane. With all dampers operating, launch transients were minimized and no stability problems were encountered. But, when the roll damper failed to function, the X-15 experienced relatively large roll rates in the presence of the carrier airplane, creating the possibility of the X-15 upper vertical tail hitting the cutout in the B-52 wing. Specific flight data demonstrated that left-aileron settings of from 6 deg to 8 deg at launch minimized the right-roll transient. The altitude loss of 3,000 to 9,000 feet before climbout could be effected was a function of launch altitude and recovery angle of attack. The average time for the X-15 to separate 10 feet from the B-52 carrier airplane was about 0.8 second. Flight-measured separation rates and launch transients agree well with predicted values where the initial conditions and control motions are similar.

Matranga, Gene J.↗

Analysis of Proposed 2007-2008 Revisions to the Lightning Launch Commit Criteria for United States Space Launches

Ascending space vehicles are vulnerable to both natural and triggered lightning. Launches under the jurisdiction of the United States are generally subject to a set of rules called the Lightning Launch Commit Criteria (LLCC) (Krider etal., 1999; Krider etal., 2006). The LLCC protect both the vehicle and the public by assuring that the launch does not take place in conditions posing a significant risk of a lightning strike to the ascending vehicle. Such a strike could destroy the vehicle and its payload, thus causing failure of the mission while releasing both toxic materials and debris. To assure safety, the LLCC are conservative and sometimes they may seriously limit the ability of the launch operator to fly as scheduled even when conditions are benign. In order to safely reduce the number of launch scrubs and delays attributable to the LLCC, the Airborne Field Mill (ABFM II) program was undertaken in 2000 - 2001. The effort was directed to collecting detailed high-quality data on the electrical, microphysical, radar and meteorological properties of thunderstorm-associated clouds. Details may be found in Dye et al., 2007. The expectation was that this additional knowledge would provide a better physical basis for the LLCC and allow them to be revised to be less restrictive while remaining at least as safe. That expectation was fulfilled, leading to significant revisions to the LLCC in 2003 and 2005. The 2005 revisions included the application of a new radar-derived quantity called the Volume Averaged Height Integrated Radar Reflectivity (VAHIRR) in the rules governing flight through anvil clouds. VAHIRR is the product of the volume averaged radar reflectivity times the radardetermined cloud thickness. The reflectivity average extends horizontally 5 km west, east, south and north of a point along the flight track and vertically from the 0 C isotherm to the top of the radar cloud. This region is defined as the "Specified Volume". See Dye et al., 2006 and Merceret et al., 2006 for a more thorough description of VAHIRR. The units are dBZ km (not dBZ per kilometer) and the threshold is 10 dBZ km. It is safe to fly through an anvil cloud for which VAHIRR is below this threshold everywhere along the flight track as long as (1) the entire cloud within 5 nmi. (9.26 km) of the flight track is colder than 0 C, (2) the points at which VAHIRR must be evaluated are at least 20 km from any active convective cores and recent lightning, and (3) the radar return is not being attenuated within the Specified Volume around those points.

Dye, James E.↗