Project 57 Air Monitoring Report: January 1 through September 30, 2020, with a Review of the Period of Record Radionuclide Analyses
The DOE Environmental Management Nevada Program (EM NV) identified the Project 57 contaminated area as Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion Site, which consisted of one Corrective Action Site (CAS): NAFR-23- 02, Pu Contaminated Soil (U.S. DOE, 2014). The CAS included several Project 57 operational facilities in addition to the plutonium-contaminated soil. With approval of the State of Nevada Division of Environmental Protection, the DOE closed the Project 57 surface soil contamination site in October 2020. Closure was accomplished by installing a clean soil cap constructed over ground zero and the surrounding areas of the CA that may be entrained with wind-transported soil particles. After completion of the ground zero cap in October 2020, DRI discontinued monitoring of meteorological and associated environmental conditions at the Project 57 site as directed by DOE EM NV. Navarro dismantled air monitoring stations P57-3 and P57-4 and removed the equipment on October 20, 2020. This report presents the meteorological and dust observations and radiological analyses accomplished during the approximately 10 months when the air monitoring data collection equipment was operational during CY2020.