Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integrated Operations for Nuclear”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Scaling for Nuclear Reactor System: Overview

A scaling analysis is essential for predicting the behavior of a reactor system under various operating conditions, as well as for ensuring safe and reliable experimentation and adequate dataset generation for supporting the system code model development and assessment in accordance with USNRC guidelines 1.203. Testing and modeling can be carried out at various scales, from small test units to full-scale reactors, to validate the predictions produced by the analysis. However, due to the cost and challenges associated with full-scale testing, the nuclear industry uses scaled test facilities—integral effect test (IET) and separate effect test (SET)—to identify potential design issues and optimize the design to ensure regulatory compliance for safer operation and anticipated accident management. In general, IET facilities are non-nuclear thermal hydraulics test facilities. In contrast, SET facilities can be non-nuclear testing (e.g., steam generator, containment, pump system SETs) and nuclear testing (mostly fuel-material irradiation testing). IETs are used to study the system-level thermal-hydraulic behavior of the reactor coolant system (RCS) under different anticipated operational occurrences (AOOs) and design basis accidents (DBAs) such as loss-of-coolant-accident (LOCA) and loss-of-power (i.e., station blackout) and loss-of-flow (i.e., failure of RCS pump). Several LOCA scenarios could happen in reactor DBAs, such as main steam line break (MSLB), SG tube rapture (SGTR), break in direct vessel injection (DVI), and other small breaks LOCA. Scaling analysis determines the appropriate size and operating conditions for the test facility. This involves analyzing the system's thermal-hydraulic behavior at different scales and identifying the key parameters that affect the thermal-hydraulic behavior of the reactor. These key parameters can be identified so that the scaled facility can replicate the expected conditions in a prototypical setting. The scaled facility can simulate the same flow rates, pressure gradients, heat transfer coefficients, and fluid properties as the prototype. Scaling analysis is used to ensure that the results from these tests can be scaled up to predict the behavior of a full-scale prototype with an acceptable range of scaling distortions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Innovative Hot Lab Concept for Advanced D and D Application - 19175

Hot Labs are used in the nuclear industry for various purposes: maintenance of nuclear reactor, sampling and testing of fuel, inspection activities and decommissioning. Despite their vast use, their current designs and operations do not meet entirely today's needs and requirements of the operations nor tomorrow's. This paper will give an overview of the research and investigations performed around Hot Cells design and concept in order to integrate new operability modes and functions. The overall idea is to bring modularity, flexibility and adaptability to the Hot Lab nuclear industry. Taking the key principles of Model Based System Engineering, an interoperable data model, the most advanced digital technologies (Building Information Modelling - BIM, Virtual Reality / Augmented Reality, Artificial Intelligence), and looking at all the life-cycle of such a facility, a concept design of a new type of Hot Lab has been developed. Four mains aspects are implemented during this study: Implement the principles of the Industry 4.0; use modular and flexible solutions; explore the concept of in service maintenance and predictive maintenance; optimise the decommissioning and dismantling process by taking into account the entire life-cycle of the facility. The design was developed as a case study taking several assumptions to adapt to any project. The design developed demonstrates that modularity and flexibility can be brought in without compromising the core safety functions of such a facility. This Hot Lab concept brings the current Hot Lab to the next level as the design has been adapted to meet the current operational needs, implement novel ideas and consider its entire life-cycle. This paper will demonstrate how decommissioning and dismantling operations can become more efficient and safer with such a concept. In addition, the Model Based System Engineering approach used from the beginning of the design phase allows to have an optimum architecture during its entire lifetime. It also allowed to flag new topics to be further developed for the benefit of the nuclear industry as a whole. A first example would be the development of the Control System using digital tools and artificial intelligence to run remotely controlled equipment inside the Hot Lab. Assystem is an international engineering group. As a key participant in the nuclear industry for over 50 years, the Group supports its clients in managing their capital expenditure throughout their asset life-cycles. Assystem can offer support in project management, design, digital engineering, industrial control systems, security and safety and industrial digitalisation. Assystem's Imagine program is an internal program intending to serve as an incubator for the development of innovations. The Innovative Hot Lab project integrates one of the four innovation projects Assystem choose to develop and invest in. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulation of 15% and 50% Thermal Power Dispatch to an Industrial Facility Using a Flexible Generic Full-Scope Pressurized Water Reactor Plant Simulator

Nuclear power plants in the United States are increasingly challenged to compete in wholesale electricity markets due to the low electricity costs and increasingly dynamic grid conditions from competing generation sources. An alternative market for nuclear power is industrial facilities that can use the thermal and/or electrical power generated by a nuclear power plant to offset the economic losses incurred by electricity market challenges. A generic pressurized water reactor (PWR) simulator was used to show the results of a basic design for a generic thermal power extraction system and tests were run using a set of procedures to show what happens when a nuclear power plant transitions from full electrical power dispatch to 15% and 50% thermal power dispatch. This type of operation leads to losses in turbine performance efficiency due to the deviation from the design operating point, but because the thermal power is also used by the industry load without conversion losses, the combined thermal efficiency of the PWR increases. For the 15% case, the thermal efficiency increased from 32% to 41.9%, while for the 50% case, the efficiency increased up to 60.1%. In addition, for 50% thermal power dispatch, the power dissipated by the condenser decreased from approximately 2000 to approximately 1300 MW (thermal), indicating a substantially diminished impact on the environment in terms of releasing heat into the cooling water reservoir.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A feasibility assessment of nuclear reactor power system concepts for the NASA Growth Space Station

A preliminary feasibility assessment of the integration of reactor power system concepts with a projected growth Space Station architecture was conducted to address a variety of installation, operational, disposition and safety issues. A previous NASA sponsored study, which showed the advantages of Space Station - attached concepts, served as the basis for this study. A study methodology was defined and implemented to assess compatible combinations of reactor power installation concepts, disposal destinations, and propulsion methods. Three installation concepts that met a set of integration criteria were characterized from a configuration and operational viewpoint, with end-of-life disposal mass identified. Disposal destinations that met current aerospace nuclear safety criteria were identified and characterized from an operational and energy requirements viewpoint, with delta-V energy requirement as a key parameter. Chemical propulsion methods that met current and near-term application criteria were identified and payload mass and delta-V capabilities were characterized. These capabilities were matched against concept disposal mass and destination delta-V requirements to provide a feasibility of each combination.

Bloomfield, H. S.↗

Review of the National Ignition Campaign 2009-2012

The National Ignition Campaign (NIC) was a multi-institution effort established under the National Nuclear Security Administration of DOE in 2005, prior to the completion of the National Ignition Facility (NIF) in 2009. The scope of the NIC was the planning and preparation for and the execution of the first 3 yr of ignition experiments (through the end of September 2012) as well as the development, fielding, qualification, and integration of the wide range of capabilities required for ignition. Besides the operation and optimization of the use of NIF, these capabilities included over 50 optical, x-ray, and nuclear diagnostic systems, target fabrication facilities, experimental platforms, and a wide range of NIF facility infrastructure. The goal of ignition experiments on the NIF is to achieve, for the first time, ignition and thermonuclear burn in the laboratory via inertial confinement fusion and to develop a platform for ignition and high energy density applications on the NIF. The goal of the NIC was to develop and integrate all of the capabilities required for a precision ignition campaign and, if possible, to demonstrate ignition and gain by the end of FY12. The goal of achieving ignition can be divided into three main challenges. The first challenge is defining specifications for the target, laser, and diagnostics with the understanding that not all ignition physics is fully understood and not all material properties are known. The second challenge is designing experiments to systematically remove these uncertainties. The third challenge is translating these experimental results into metrics designed to determine how well the experimental implosions have performed relative to expectations and requirements and to advance those metrics toward the conditions required for ignition. This paper summarizes the approach taken to address these challenges, along with the progress achieved to date and the challenges that remain. At project completion in 2009, NIF lacked almost all the diagnostics and infrastructure required for ignition experiments. About half of the 3 yr period covered in this review was taken up by the effort required to install and performance qualify the equipment and experimental platforms needed for ignition experiments. Ignition on the NIF is a grand challenge undertaking and the results presented here represent a snapshot in time on the path toward that goal. The path forward presented at the end of this review summarizes plans for the Ignition Campaign on the NIF, which were adopted at the end of 2012, as well as some of the key results obtained since the end of the NIC.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Irradiation Assessment of a Lightweight Industrial Robot - Towards Faster, Safer and Sooner Waste Decommissioning - 20317

Robotic systems have been successfully applied in the nuclear industry for several decades as a safe approach to minimize the exposure dose of human operators. As nuclear waste management and decommissioning gathers pace, there is an emerging interest integrating modern off-the-shelf industrial robots in nuclear robotic systems which make use of complex electronics and software to improve functionality over traditional machines. The use of the industrial robots will significantly increase the pace of development of automated waste management systems at a reduced cost, and although these off-the-shelf robots are proven robust in typical industrial environments, performance in radioactive environments is less clear. This paper investigates the performance degradation of a lightweight industrial robot (KUKA iiwa 7 LBR 800) in a controlled radiation field, aiming to simulate conditions in highly radioactive nuclear waste handling facilities. The degradation of the industrial robot's performance is identified while measuring the air kerma dose-tolerance of sensitive components, via a systematic experimental methodology. The experience from this experiment has demonstrated the significant capabilities of industrial robots, which tolerated a large gamma dose of 164 Gy before a system failure. Future tests are planned, aiming to enable faster, safer and sooner waste management and decommissioning using complex robotic systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Primary System Test Facility Review

Idaho National Laboratory (INL) is designing a Dynamic Energy Transport and Integration Laboratory (DETAIL) to demonstrate the operation of an integrated energy system as part of supporting research and development needs for the DOE Office of Nuclear Energy Integrated Energy Systems (IES) Program. DETAIL will demonstrate real-time integration with the electrical grid, renewable energy inputs, thermal and electrical energy storage, and energy delivery to an end user. A Thermal Energy Distribution System (TEDS) is being constructed within the DETAIL facility to demonstrate the operation of integrated energy system heat transfer components, thermal energy storage, distribution systems, and instrumentation and control (I&C), which will allow the facility to emulate the distribution of thermal energy to the generation of electrical power, and/or producing non-electrical commodities (e.g., hydrogen). As is the case for other subsystems within DETAIL, TEDS is designed to operate either independently or as a part of an integrated system to demonstrate the operation of integrated components, develop and validate thermal energy transport models and control systems, and study thermal energy inertia and energy storage. In an effort to completely understand how TEDS will integrate with operational plants, data from tests previously run at existing integral system test facilities (IST) will be used to drive the TEDS heater. Alternatively, a real-time data connection would allow steam conditions at the IST to drive the TEDS heater at the same time as having TEDS conditions provide feedback to the IST in terms of steam demand and/or pressure. This integrated testing approach will assess the ability of TEDS to operate during all plant conditions. Three existing integral system test facilities have been reviewed to determine their suitability for demonstrating TEDS capabilities when integrated within the DETAIL. This report summarizes the capabilities of each IST facility and any challenges that must be overcome to meet the operational needs of TEDS and DETAIL.

25 ENERGY STORAGE↗

INTEGRATION OF FLEX EQUIPMENT AND OPERATOR ACTIONS IN PLANT FORCE-ON-FORCE MODELS WITH DYNAMIC RISK ASSESSMENT

The overall operation and maintenance cost to protect nuclear power plants accounts for approximately 7% of the total cost of power generation, with labor accounting for half of this cost. In the current research, from interaction with utilities and other stakeholders, it was determined that physical security forces account for nearly 20% of the entire workforce at several nuclear power plants. Labor costs continue to rise in the U.S., so any measures to reduce the cost of operating a nuclear power plant will need to include a reduction in labor. The physical security pathway within the DOE’s Light Water Reactor Sustainability program aims to lower the cost of physical security through directed research into modeling and simulation, application of advanced sensors or deployment of advanced weapons. This report presents a modeling and simulation framework for integrating Diverse and Flexible Mitigation Capability (FLEX) portable equipment performance with Force on Force models of a plant’s physical security posture. The generic framework is described in detail, followed by a case study of modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical nuclear power plant. Two different FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial Force on Force tool are integrated with the FLEX deployment model in INL’s dynamic modeling tool EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework integrating FLEX equipment with Force on Force models enables the nuclear power plants to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security.

97 MATHEMATICS AND COMPUTING↗

Power peaking with small modular reactors to support deep penetration of renewable energy sources - 192

As inherently intermittent sources of renewable energy more fully penetrate the US grid, peaking power is largely being supplied by carbon-emitting natural gas turbines. Significant greenhouse gas emissions can be avoided if these plants are replaced with carbon-neutral nuclear facilities to provide peaking power to complement renewable generation and meet overall power demand. There is a great deal of previous work regarding reactor power shaping with control rod movement for both currently operating nuclear power plants and proposed plants, but the literature on load-following to meet less predictable, more rapidly varying power demand is less comprehensive. We have chosen the Westinghouse IRIS integral PWR as our candidate for modeling, simulation, and control studies. A nodal model of the IRIS integral PWR, partially adapted from a MATLAB/Simulink model constructed by prior students at the University of Tennessee in Knoxville, has been constructed in Modelica. Currently the model includes the reactor vessel and steam generator system and simple assumptions for the balance of plant. The control scheme for the load-following operation of an IRIS integral PWR model would ultimately lead to the development of real operational mechanisms and principles in a grid with significant renewables capacity. In the future the model will be integrated with sophisticated grid and hybrid energy systems. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Technology Maturation of Hot Isostatic Pressing for Nuclear Waste Treatment - 20259

ANSTO is constructing a nuclear waste treatment facility for the immobilization of intermediate-level liquid waste (ILLW) from its nuclear medicine production [1]. This facility shall deploy ANSTO Synroc process technology that converts a liquid waste stream into a durable solid wasteform. Hot Isostatic pressing (HIP) shall be employed to consolidate the dry powdered waste effectively reducing the waste volume and immobilizing the waste components. This paper presents the technology maturation for HIP technology for utilisation in a nuclear waste treatment facility. The HIP has been designed to operate in a remote shielded enclosure, fully integrated with the front-end powder production. Attention has been given in the HIP system design to ensure that it can operate and be maintained to achieve the required production output of the facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Report Summarizing Boiling Transition (Dryout) Testing of FeCrAl Cladding

Nuclear fuel and cladding in a light water reactor must maintain integrity under all normal operational and anticipated operational occurrences. In a Boiling Water Reactor (BWR) some Anticipated Operational Occurrences (AOOs) and Anticipated Transients Without SCRAM (ATWS) events have been known to result in cladding damage due to dryout with conventional Zircaloy-2 claddings. This work presents an assessment of commercially-fabricated, accident tolerant iron-chromium-aluminum (FeCrAl) alloy C26M cladding in such events with regard to the ballooning failure mode for unirradiated cladding In the severe accident test station (SATS), an experiment has been developed to gauge accident tolerance of fuel cladding materials under simulated cyclic dryout conditions. Thermal cycling from 300°C to 650°C was implemented on C26M and Zircaloy-2 tubes. The C26M tube did not fail after 54 cycles. The Zircaloy- 2 tube run under the same parameters as the C26M tube failed during the fourth cycle, consistent with expectations from the literature. Due to thermal gradients present in the furnace, both tubes experienced a maximum temperature at ~780°C. Due to differences in tube geometry, the hoop stress of the C26M tube was significantly higher than that of the Zircaloy-2 tube, 76 MPa at the maximum peak temperature compared to 55 MPa at burst, respectively. The cyclic dryout experiments show an increased performance of C26M over Zircaloy-2 under simulated conditions, an indication of C26M possessing superior high temperature oxidation resistance, mechanical properties and potentially resistance to fatigue.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integrating Control Methods and Digital Twins for Advanced Nuclear Reactors

Advanced nuclear reactors offer new capabilities such as the ability to adapt to variable energy demand, operate autonomously with remote supervision, be deployable in rural locations, be compact in size, afford lower power ratings, and rely on novel techniques for increased operational safety. However, realizing these capabilities requires intelligent control systems that can track changing power demands and make autonomous decisions based on these demands. The unique aspects of advanced reactors (e.g., strict regulatory requirements, harsh operating environments, high consequences, highly coupled dynamics, evolving knowledge, and limited operating histories) directly impact the design and deployment of control systems for these reactors. The present work identifies and evaluates these aspects so as to develop a set of control system requirements to guide future research and development. To meet these requirements, a layered control system approach is proposed that integrates digital twins with different control paradigms. This work aims to demonstrate how different methods interface with enabling solutions, and to identify any gaps that need to be researched.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

An overview of the IEEE human factors standard development activities - 2017 - 230

Since 1980 the Institute of Electrical and Electronics Engineers (IEEE) has supported development of human factors (HF) standards. Within IEEE, Subcommittee 5 (SC5) of the Nuclear Power Engineering Committee develops and maintains HF standards applicable to nuclear facilities. These standards are structured in a hierarchical fashion. The top-level standard defines the HF tasks required to support the integration of human performance into the design process. Five lower tier documents expand upon the upper tier standard. Presently, two new HF standards projects are underway; one to provide HF guidance for the validation of the system interface design and integrated systems operation and another for designing and developing computer-based displays for monitoring and control of nuclear facilities. In addition to producing and maintaining HF standards, SC5 is also involved in outreach activities, including sponsorship of a series of conferences on human factors and nuclear power plants. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Experimental and Computational Investigations of Plenum-to-Plenum Heat Transfer and Gas Dynamics under Natural Circulation in a Prismatic Very High Temperature Reactor

All the goals and the objectives set for the project were successfully executed and achieved and all the milestones have been successfully completed. The results that have been obtained for the first time advance the scientific and engineering knowledge and understanding of the plenum-to plenum natural convection of prismatic block nuclear reactors that is encountered during accident or abnormal operation. These have been accomplished by developing and implementing for the first time unique and flexible scaled-down separate and integrated effects experimental plenumto- plenum facility (P2PF) with dual channels at this time that has been equipped with sophisticated measurement techniques integrated in a novel way on the heated and cooled channels. The unique facility is an asset now that can be extended to research multiple channels and to study the effects of hot plumes in the plena for future projects if funding will be available. It can also be modified to research natural convection of pebble bed reactors. Hence, it complement the HTTF at Oregon State University. However, in this study, heat transfer coefficients from the inner wall surface to the flowing gas (both helium and air were used) and the radial temperature and gas velocity profiles have been measured and investigated along the height of the heated and cooled channels using in house developed wall flush mounted heat transfer probes, thermocouple with in house developed adjuster for radial movement with 1 mm increment inside the channel and hot wire anemometry with also in house developed adjuster for 1 mm radial movement inside the channel, respectively. Also advanced tracer technique has been developed to quantify also for the first time the dispersion of the gas dynamics of the hot and cold channels. The research has provided new knowledge and new benchmarking data that can be used to validate computational fluid dynamics (CFD) codes with conjugate heat transfer. The work and its results that have been performed within the budget have demonstrated their superior technical effectiveness and high economic feasibility to perform needed studies for safety analysis and assessment at least cost for these types of gas cooled very high temperature 4th generation nuclear reactors. Accordingly, the results obtained in this project and the unique facility and techniques that have been developed will benefit greatly the public by advancing the technology of the prismatic block nuclear reactors toward commercialization and to ensure they will be designed and operated safely by utilizing the obtained knowledge and having well validated CFD simulations integrated with heat transfer computations

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Consolidated Nuclear Security, LLC, Excess Facility Disposition Program - 17289

Consolidated Nuclear Security, LLC (CNS), the management and operating contractor for the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee, and the Pantex Plant (Pantex) in Amarillo, Texas, has developed an integrated strategy to address badly deteriorating excess facilities presenting risks to people, the environment, and the National Nuclear Security Administration (NNSA) mission. The comprehensive, integrated Excess Facilities Disposition Program (EFDP) incorporates NNSA scope for excess facility risk reduction, preparation of facilities to be transferred to the U.S. Department of Energy (DOE) Office of Environmental Management (EM) for demolition, and demolition of non-process contaminated facilities. The Program has been developed using the NNSA Office of Safety, Infrastructure, and Operations (NA-50) Program Management Plan as a guide. The Program has undertaken actions to address the most immediate risks associated with CNS excess facilities. At Y-12, new foam roofs have been installed on Buildings 9201-5 (Alpha 5), 9204-4 (Beta 4), and 9206 to minimize further facility degradation. Tanks and dikes outside of Alpha 5 and Beta 4 are also being disconnected, drained, and filled with concrete. In addition, Beta 4 will be getting a new electrical system as its Manhattan Project-era system will be replaced by a temporary 'construction power' setup that will provide as-needed electricity to the building that is safer, more reliable, and will ease demolition activities in the future. The EFDP is also focusing on the basement of Alpha 5 and is planning to remove the water from the aging facility's flooded basement, which in some areas contains up to 54 inches of water. The EFDP is also planning several efforts to remove excess materials from Alpha 5 and Beta 4, de-inventory the Alpha 5 Mercury House System and numerous transformers, and de-inventory Beta 4 hydraulic pumps and systems. Efforts are also underway to deactivate and decommission non-process-contaminated facilities at Y-12 and at Pantex. The EFDP has prioritized the performance of work to reduce risk while at the same time supporting the preparation of process-contaminated Y-12 facilities for transfer to EM. The Program aligns with the EM goal to have the NNSA scope completed in Alpha 5 and Beta 4 by the end of FY 2020, and Building 9206 completed by the end of FY 2024. These dates and project sequencing will support the Y-12-related DOE EM cleanup initiatives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development Strategy for Gas Turbines with Firebrick Resistance-Heated Energy Storage to Enable Nuclear-Renewable Grid Integration

The world is transitioning to a low-carbon energy system. Variable electricity and industrial energy demands have been met with storable fossil fuels-systems with low-capital costs and high-operating costs. In contrast, the low-carbon energy sources (nuclear, wind and solar) are characterized by high-capital-costs and low-operating costs. High utilization is required to produce economic energy. The addition of large quantities of wind or solar changes the market. The Massachusetts Institute of Technology (MIT) Future of Solar Energy study examined the solar option and the challenge of moving from an electricity grid dominated by fossil fuel generation to a grid with significant solar capacity. As more solar plants are built, electricity prices at times of high solar output collapse; thus, solar revenue collapses as solar production increases. This limits unsubsidized solar capacity to a relatively small fraction of total electricity production even if there are large decreases in solar capital costs. The same occurs with the large-scale use of wind. This results in increasing number of hours of near-zero wholesale prices for electricity that has been seen in multiple electricity markets in Europe and the United States. This is bad economic news for nuclear, wind and solar for revenue collapse limits the use of low-carbon technologies. It favors lower-capital-cost higher-operating-cost natural gas plants with their capability to cycle up and down quickly. New technologies are required to store or use this electricity at times of low prices to produce electricity at times of high prices. The use of gas-turbines with Firebrick Resistance-Heated Energy Storage (FIRES) is proposed herein to address this challenge as part of a broader strategy to develop nuclear power systems with three goals: (1) compete with natural gas, (2) prosper with subsidized wind and solar and (3) enable a low-cost low-carbon nuclear-renewable energy system.

25 ENERGY STORAGE↗

Human factors and modeling methods in the development of control room modernization concepts - 315

Control room modernization is one of the most challenging and complex upgrade projects that a nuclear power plant can undertake. It can even have a bigger impact on operations than, for example, turbine replacement. The challenges of migrating an analog control system to a distributed control system are already well known and a number of nuclear utilities have embarked upon various levels of effort to upgrade some of the systems in the control room. When planning for control room upgrades, plants have to deal with a multitude of engineering and operational impacts. This will inevitably include several human factors considerations, including physical ergonomics of workstations, viewing angles, lighting, seating, new communication requirements, and new concepts of operation. In helping nuclear power utilities to deal with these challenges, the Idaho National Laboratory (INL) has developed human factors design and evaluation methods to be used in the development of an end-state control room concept and to manage the various phases of the upgrade life cycle. This included interactive sessions with operators in INL's Human System Simulation Laboratory, and three-dimensional modeling to visualize control board changes. To make the various upgrade phases as concrete and as visible as possible, the end-state concept includes a set of visual representations of the control room before and after various upgrade phases to provide the context and a framework within which to consider the various options in the upgrade. This includes the various control systems, human-system interfaces to be replaced, and possible changes to operator workstations. This paper describes how this framework helps to ensure an integrated and cohesive outcome that is consistent with human factors engineering principles and also provide substantial improvement in operator performance. The paper further describes the application of this integrated approach in the strategic modernization program at a nuclear power plant where legacy systems are upgraded to advanced digital technologies through a systematic process that links human factors principles to the systems engineering process. This approach results in an integrated control room architecture beyond what is possible for individual subsystem upgrades alone. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗