Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Scientific use of Space Station Freedom

The overall strategic science planning of the Office of Space Science and Applications (OSSA) is presented. The science opportunities inherent to the restructured Space Station are discussed and a synopsis of the OSSA implementation plan for Space Station Freedom utilization is offered. Attention is given to the microgravity science and applications facilities, the advanced protein crystal growth facility, the biotechnology facility, the modular combustion facility, and the life sciences facility.

Rhome, Robert C.↗

New Millennium EO3

The New Millennium Program (NMP) is a NASA technology program that focuses on the validation of advanced spacecraft and instrumentation technologies in space. This program specifically seeks technologies that could significantly benefit future space and Earth science missions by enabling new science capabilities and reducing life cycle costs. These technologies must also require a validation in space to mitigate risks to the first science users, and provide cross-cutting benefits to both NASA's Earth and Space Science enterprises. The NASA Office of Earth Science (OES) directed the NMP to focus the third Earth Observing mission, E03, on innovative measurement concepts that would facilitate remote sensing observations from orbits beyond conventional low-Earth orbit (LEO). These orbits include geosynchronous orbits, highly elliptical orbits, mid-Earth and high-Earth orbits, and other unique vantage points such as L1 and L2. To maximize the input from the Earth science community, a NASA Research Announcement (NRA) was released to solicit innovative measurement concepts for this NMP flight. Because the NMP is a technology validation program, rather than a conventional science program, the NRA required that these measurement concepts employ revolutionary technologies and/or measurement strategies that will enable future science missions from orbits beyond LEO. Another requirement was that a validation in space was needed to reduce real or perceived risks of this concept to future science users. The proposals submitted in response to this NRA were peer reviewed by the NASA OES. The measurement concepts selected through this process will be summarized in this presentation. The E03 measurement concept NRA did not solicit complete mission concepts or flight hardware. Instead, the selected investigators will join integrated project formulation teams to define the mission for the demonstration of the measurement technique and participate in mission design trades and implementation planning. The teams will define and document the measurement approach, the required technologies, the validation plan, the scalability of the design to future science missions, and the infusion path for the completely validated instrument. During this project formulation phase, the specific technologies required to implement each measurement concept will be solicited through an open technology solicitation, and the technology providers will be added to the integrated teams. Once a complete candidate mission concept has been formulated for each measurement concept, these concepts will be subjected to a comprehensive review. The Associate Administrator of the OES will use the results of this review to select a single concept for the E03 flight opportunity. That mission concept will enter its implementation phase, which is expected to last for less than 36 months before launch. During this phase, and after launch, the implementation team will work with the NMP to document and disseminate the information gathered during the flight qualification testing and operations of the measurement concept and its component technologies. This information will be archived and published, where appropriate, to encourage the rapid infusion of these validated technologies into future space and Earth science missions. I

Li, Fuk K.↗

Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

Measures↗

Development Plan for the Fuel Cycle Simulator

The Fuel Cycle Simulator (FCS) project was initiated late in FY-10 as the activity to develop a next generation fuel cycle dynamic analysis tool for achieving the Systems Analysis Campaign 'Grand Challenge.' This challenge, as documented in the Campaign Implementation Plan, is to: 'Develop a fuel cycle simulator as part of a suite of tools to support decision-making, communication, and education, that synthesizes and visually explains the multiple attributes of potential fuel cycles.'

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nevada National Security Site Radiological Control Manual

This manual contains the radiological control requirements to be used for all radiological activities conducted by programs under the purview of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO). (Activities conducted under the purview of the U.S. Department of Energy, Office of Environmental Management Nevada[(EM Nevada] may require additional approval authorities as described in the EM Nevada Prime Contractor’s implementation plan.) Compliance with these requirements will ensure compliance with Title 10 Code of Federal Regulations (CFR) Part 835, “Occupational Radiation Protection.” This manual represents policies, guidelines, and best practices for implementing the DOE/NV/03624--0082, “Nevada National Security Site Radiation Protection Program,” (NNSS RPP) according to the requirements of 10 CFR 835.

61 RADIATION PROTECTION AND DOSIMETRY↗

Nevada National Security Site Radiological Control Manual

Please have this STIP assigned, documented, and recorded in OSTI as Report Number DOE/NV/03624--0257 Revision 1 and Author as Radiological Control Managers' Council. This manual contains the radiological control requirements to be used for all radiological activities conducted by programs under the purview of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO). (Activities conducted under the purview of the U.S. Department of Energy, Office of Environmental Management Nevada[(EM Nevada] may require additional approval authorities as described in the EM Nevada Prime Contractor’s implementation plan.) Compliance with these requirements will ensure compliance with Title 10 Code of Federal Regulations (CFR) Part 835, “Occupational Radiation Protection.” This manual represents policies, guidelines, and best practices for implementing the DOE/NV/03624--0082, “Nevada National Security Site Radiation Protection Program,” (NNSS RPP) according to the requirements of 10 CFR 835.

61 RADIATION PROTECTION AND DOSIMETRY↗

The Evolution of Planetary Protection Implementation on Mars Landed Missions

NASA has developed requirements dedicated to the prevention of forward and backward contamination during space exploration. Historically, international agreements provided guidelines to prevent contamination of the Moon and other celestial bodies, as well as the Earth (e.g., sample return missions). The UN Outer Space Treaty was established in 1967 and the Committee on Space Research (COSPAR) maintains a planetary protection policy complying with Article IX of this treaty. By avoiding forward contamination, the integrity of scientific exploration is preserved. Planetary Protection mission requirements are levied on missions to control contamination. These requirements are dependent on the science of the mission and on the celestial bodies encountered or targeted along the way. Consequently, categories are assigned to missions, and specific implementation plans are developed to meet the planetary protection requirements. NASA missions have evolved over time with increasingly more demanding scientific objectives and more complex flight systems to achieve those objectives and, thus, planetary protection methods and processes used for implementation have become much more intricate, complicated, and challenging. Here, we will portray the evolution of planetary protection implementation at JPL in several important areas throughout the course of NASA sponsored robotic Mars lander or rover missions, starting from Mars Pathfinder through the beginning of Mars 2020. Highlighted in the discussion will be process changes in planetary protection requirements development and flow down. Development and implementation of new and improved methods used in the reduction of spacecraft bioburden will be discussed as well as approaches and challenges that come along with setting up remote laboratories to perform bioassays. The consequences and forward planning of delays on missions will be highlighted as well as lessons learned on the impact of communication and training in achieving planetary protection requirements. The evolution of methods used for the detection of microbial bioburden on spacecraft hardware will be considered. These methods use standard microbiology as well as the adaptation of advances in biotechnology, molecular biology, and bioinformatics. Technical approaches developed for the prevention of contamination and recontamination of hardware during Assembly, Test, and Launch Operations will be discussed.

Kazarians, Gayane A.↗

SU-F-T-43: Prediction of Dose Increments by Brain Metastases Resection Cavity Shrinkage Model with I-125 and Cs-131 LDR Seed Implantations

Purpose: This work aims to determine dose variability via a brain metastases resection cavity shrinkage model (RC-SM) with I-125 or Cs-131 LDR seed implantations. Methods: The RC-SM was developed to represent sequential volume changes of 95 consecutive brain metastases patients. All patients underwent serial surveillance MR and change in cavity volume was recorded for each patient. For the initial resection cavity, a prolate-ellipsoid cavity model was suggested and applied volume shrinkage rates to correspond to 1.7, 3.6, 5.9, 11.7, and 20.5 months after craniotomy. Extra-ring structure (6mm) was added on a surface of the resection volume and the same shrinkage rates were applied. Total 31 LDR seeds were evenly distributed on the surface of the resection cavity. The Amersham 6711 I-125 seed model (Oncura, Arlington Heights, IL) and the Model Cs-1 Rev2 Cs-131 seed model (IsoRay, Richland, WA) were used for TG-43U1 dose calculation and in-house-programed 3D-volumetric dose calculation system was used for resection cavity rigid model (RC-RM) and the RC-SM dose calculation. Results: The initial resection cavity volume shrunk to 25±6%, 35±6.8%, 42±7.7%, 47±9.5%, and 60±11.6%, with respect to sequential MR images post craniotomy, and the shrinkage rate (SR) was calculated as SR=56.41Xexp(−0.2024Xt)+33.99 and R-square value was 0.98. The normal brain dose as assessed via the dose to the ring structure with the RC-SM showed 29.34% and 27.95% higher than the RC-RM, I-125 and Cs-131, respectively. The dose differences between I-125 and Cs-131 seeds within the same models, I-125 cases were 9.17% and 10.35% higher than Cs-131 cases, the RC-RM and the RC-SM, respectively. Conclusion: A realistic RC-SM should be considered during LDR brain seed implementation and post-implement planning to prevent potential overdose. The RC-SM calculation shows that Cs-131 is more advantageous in sparing normal brain as the resection cavity volume changes with the LDR seeds implementation.

60 APPLIED LIFE SCIENCES↗

Oak Ridge National Laboratory 2025 Site Sustainability Plan With FY 2024 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Office (SPO) issues instruction documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPO is part of the DOE Office of Asset Management. As required by DOE Order 436.1A, Departmental Sustainability, each site develops and commits to an annual site sustainability plan (SSP) that identifies its respective contribution toward meeting DOE’s sustainability goals. SPO collects and compiles information reported by each site to develop an agency-wide sustainability report and implementation plan, which are used to report DOE sustainability progress to the federal government as required by all major federal agencies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Feasibility of using the Massively Parallel Processor for large eddy simulations and other Computational Fluid Dynamics applications

The results of an investigation into the feasibility of using the MPP for direct and large eddy simulations of the Navier-Stokes equations is presented. A major part of this study was devoted to the implementation of two of the standard numerical algorithms for CFD. These implementations were not run on the Massively Parallel Processor (MPP) since the machine delivered to NASA Goddard does not have sufficient capacity. Instead, a detailed implementation plan was designed and from these were derived estimates of the time and space requirements of the algorithms on a suitably configured MPP. In addition, other issues related to the practical implementation of these algorithms on an MPP-like architecture were considered; namely, adaptive grid generation, zonal boundary conditions, the table lookup problem, and the software interface. Performance estimates show that the architectural components of the MPP, the Staging Memory and the Array Unit, appear to be well suited to the numerical algorithms of CFD. This combined with the prospect of building a faster and larger MMP-like machine holds the promise of achieving sustained gigaflop rates that are required for the numerical simulations in CFD.

Bruno, John↗

Modular space station phase B extension program master plan

The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

Munsey, E. H.↗

Department of Energy – Office of Science: Pacific Northwest Site Office Environmental Monitoring Plan for the DOE-SC PNNL Site

The Pacific Northwest Site Office (PNSO) manages the contract for operations at the U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site in Richland, Washington. Radiological operations at the DOE-SC PNNL Site expanded in 2010 with the completion of facilities at the Physical Sciences Facility. As a result of the expanded radiological work at the site, the Washington State Department of Health (WDOH) has required that offsite environmental surveillance be conducted as part of the PNNL Site Radioactive Air Emissions License. The environmental monitoring and surveillance requirements of various orders, regulations, and guidance documents consider emission levels and subsequent risk of negative human and environmental impacts. This Environmental Monitoring Plan (EMP) describes air surveillance activities at the DOE-SC PNNL Site. The determination of offsite environmental surveillance needs evolved out of a Data Quality Objectives process (Barnett et al. 2010) and Implementation Plan (Snyder et al. 2010). The entire EMP is a compilation of several documents, which include: - the Main Document, this text, (PNNL-20919), - Attachment 1, Sampling and Analysis Plan (SAP) (PNNL-20919-1), - Attachment 2, Data Management Plan (DMP) (PNNL-20919-2), and - Attachment 3, Dose Assessment Guidance (DAG) (PNNL-20919-3). Although the EMP is considered the compilation of these documents, each covers topics that can be updated independently. As a result, each may have different publication dates. Current version dates can be verified with Effluent Management staff. The procedures, forms, and data management activities described herein may change with radiological research projects at the DOE-SC PNNL Site. The scope of this EMP will evolve as needed, during routine reviews or in response to changes in facility operations. This document provides the SAP, DMP, and DAG effective at the time of publication. Updates to this document will be published at the discretion of the Effluent Management group of PNNL.

54 ENVIRONMENTAL SCIENCES↗

Oak Ridge National Laboratory FY 2023 Site Sustainability Plan With FY 2022 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Division (SPD) issues guidance documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPD is part of the DOE Office of Asset Management. As required by DOE Order 436.1, Departmental Sustainability, “each site will develop and commit to an annual Site Sustainability Plan (SSP) that identifies its respective contribution toward meeting the DOE’s sustainability goals.” SPD collects and compiles information reported by each site to develop an agency-wide Sustainability Report and Implementation Plan, which is used to report DOE sustainability progress to the federal government as required by all major federal agencies. DOE launched a formal Sustainability Office and annual SSP process in 2011. Each year, Oak Ridge National Laboratory (ORNL), in concert with the Office of Science (SC), provides the resources essential to fulfill its commitment to deliver a complete and accurate SSP report and quality performance data for entry into the DOE Sustainability Dashboard as managed by SPD. The performance data entered by each DOE site are then combined to disclose the progress of each DOE Program Office and are further combined to show comprehensive progress for the agency. The Office of Asset Management provides assistance to program offices in sustaining their missions, freeing up resources by reducing waste, avoiding excess expenditure on utilities, maximizing productivity, and improving the efficiency of facilities and processes. By focusing on mission needs, programs and associated DOE sites can help the agency meet its sustainability goals, as outlined in federal statutory and regulatory requirements. In FY 2022, the SSP guidance was updated to capture requirements from Executive Order (EO) 14008, Tackling the Climate Crisis at Home and Abroad, the Energy Act of 2020 (EAct 20), actions outlined in DOE’s Climate Adaptation & Resilience Plan and Sustainability Plan, and EO 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability. Updates in SSP guidance help to minimize and streamline reporting while simultaneously addressing updated federal requirements. Per DOE, each SSP report should provide an overview of the site’s planned actions, as well as an overview of efforts and accomplishments during the reporting period. SPD collects and compiles information reported by each site to develop DOE’s Annual Sustainability Report, Climate Adaptation & Resilience Plan, and Annual Energy Management Report to Congress. The agency goal has been to lower the reporting burden for sites and increase and improve the consistency of information available to decision makers, allowing them to better identify projects and potential for increased efficiency, as well as to reduce waste, lower emissions, and enhance operational resilience. Sites may elect to produce a more polished publication for their leadership and stakeholders, but this step is no longer required. The ORNL SSP narrative report (this document) and the reporting of DOE SPD Sustainability Dashboard performance data is a collaborative effort of approximately 30 subject matter experts (SMEs) from ORNL facility management and research divisions. Annually, these associates come together to provide a report that can be used by DOE to demonstrate continued agency progress in energy efficiency and sustainable federal operations.

99 GENERAL AND MISCELLANEOUS↗

Project Basis for Automation of a Quality Assurance System in Radioactive Waste Management - 17317

A low- and intermediate-level radioactive waste management facility is required to comply with Regulation 1.16 of the Brazilian National Nuclear Energy Commission 'Quality Assurance for the Safety of Nuclear Power Plants and Other Facilities'. However, the text of this regulation is very generic and does not address the more specific controls necessary for the management of quality. Therefore, the objective of this paper is to identify such detailed controls in all applicable activities of the facility and to provide an implementation plan in the form of flowcharts, for further development of an automated system. This work takes as a basis the recommendations of the International Atomic Energy Agency and the rules and procedures implemented by the U.S. Department of Energy's Office of Civilian Waste Management related to Quality Assurance. In such way, we intend to provide a more reliable implementation system of quality assurance for the management of radioactive waste in Brazil. Keywords: radioactive waste; quality assurance; automated system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SUMC reconfigurable micro-assembler

The development of a reconfigurable micro-assembler to provide the micro-programmer the capability to specify micro-instructions in concise, meaningful terms is discussed. The implementation plan for the development of the micro-assembler was predicted on the existing capabilities of the SUMC Reconfigurable Assembler. Utilizing the reconfigurable assembler as a base, new directives and existing directive modifications were implemented to provide the micro-assembly as a new capability of the reconfigurable assembler. The micro-assembler language allows the specification of all micro-instruction control field settings in one concise assembler source statement. The language appears very similar to a conventional machine instruction assembler language. The machine instruction assembler language has the characteristic of one operation specification per statement whereas, the micro-instruction assembler language allows multiple operations to be designated per statement.

Edwards, A. J.↗

2023 Land Use Control Inspections Report

2023 Land Use Control (LUC) Inspections Report for John F. Kennedy Space Center (KSC), Florida. This letter report documents the quarterly LUC inspections the KSC Remediation Group conducts at Remediation Sites. No LUC findings occurred in 2023. A Corrective Action to address arsenic-impacted soil at the KSC Child Development Center was performed in July 2023. This letter report provides a summary and documents the field activities for that Corrective Action. Copies of the formal LUC Implementation Plans (LUCIPs) for 71 Remediation Sites at KSC are presented in this letter report. For the Remediation Sites that do not have formal LUCIPs, the report documents that informal LUCs that the Remediation Group has implemented at these sites.

Christopher Adkison↗

The Civil Aviation Sector in Lebanon: Institutional Reforms - Part 1

Civil aviation is one of the key contributors to a successful economic system. This has been recognized within Lebanon, which is undertaking developing a new civil aviation strategy encompassing a program of organizational reform, coordinated internationally, to meet the challenges of the new century. Such strategy is vital, as it will provide a coherent vision for the sector, compliment the extensive investments deployed by Lebanon in its aviation infrastructure, and guide future planning and investments. The proposed Civil Aviation Strategy for Lebanon has two major components: (1) institutional reform aiming at creating effective overall legal and regulatory frameworks in-line with current international best practice; and (2) implementation of liberalization measures and open skies policy. This paper aims to: (1) present Lebanon's current institutional arrangements; (2) review the institutional arrangements in key select countries (in order to define current trends in best institutional practice); (3) discuss the proposed institutional reform (which are at the basis of Lebanon's Draft Civil Aviation Reform Law) while showing that they conform with the identified best institutional trends; and (4) outline an implementation plan. The Draft Law has been approved by the Council of Ministers and now awaits Parliamentary endorsement.

Baaj, M. Hadi↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine Nevada National Security Site, Nevada, Revision 1

This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigation (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.

54 ENVIRONMENTAL SCIENCES↗