Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Hourly Load”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Coordinated Ramping Product and Regulation Reserve Procurements in CAISO and MISO using Multi-Scale Probabilistic Solar Power Forecasts (Pro2R)

How can probabilistic solar forecasts lower costs and improve reliability for independent system operator (ISO) markets? We tackle this question in three steps. First, we enhance an existing solar forecasting system to provide well-calibrated hours-ahead probabilistic forecasts. We then relate the degree of uncertainty in those forecasts to error distributions for net load ramps for the California ISO (CAISO) using statistical and machine learning methods. Projected net load errors conditioned on solar uncertainty are translated into flexible ramp requirements that therefore reflect real-time meteorological and solar conditions, improving on typical ISO procedures. Finally, a multi-period look-ahead production cost model quantifies how conditional ramp requirements can a) decrease operating costs by lowering requirements compared to often conservative unconditional methods, and b) reduce generation scarcity events and consequently improve reliability by increasing flexibility requirements at times when unconditional forecast-based requirements understate actual ramp uncertainty. In addition to the products just described (quantification of solar uncertainty, its translation into requirements for ramp capability product, and quantification of the benefits of more accurate ramp requirements), this project also developed a visualization system that alerts system operators of ramp and uncertainty conditions within the network based on solar forecasts. The system is called Resource Forecast and Ramp Visualization for Situational Awareness (RaVIS). These four products represent significant advances in the state-of-the-art of probabilistic solar forecasting, development of weather-informed reserve requirements, production costing methods for estimating the benefits of more accurate reserve requirements, and visualization of system status, respectively. Yet the products are also practical and can be immediately implemented, potentially enabling system operators to save millions of dollars in ramp product procurement costs per year.

14 SOLAR ENERGY↗

Understanding the Charging Flexibility of Shared Automated Electric Vehicle Fleets

The combined anticipated trends of vehicle sharing (ride-hailing), automated control, and powertrain electrification are poised to disrupt the current paradigm of predominately owner-driven gasoline vehicles with low levels of utilization. Shared, automated, electric vehicle (SAEV) fleets offer the potential for lower cost and emissions and have garnered significant interest among the research community. While promising, unmanaged operation of these fleets may lead to unintended negative consequences. One potentially unintended consequence is a high quantity of SAEVs charging during peak demand hours on the electric grid, potentially increasing the required generation capacity. This research explores the flexibility associated with charging loads demanded by SAEV fleets in response to servicing personal mobility travel demands. Travel demand is synthesized in four major United States metropolitan areas: Detroit, MI; Austin, TX; Washington, DC; and Miami, FL. In each of these four cities, SAEV simulations are performed using local projected electricity prices from the Regional Energy Deployment System (ReEDS) for a handful of supply side scenarios. A coordinated charging model is introduced that seeks to reduce fleet charging costs in response to time-varying electricity prices and increasing shares of personal trip demand served (between 1% and 25% of all metro trips served by the SAEV fleet). Simulation results are presented across various scenarios assuming fleetwide coordination to minimize charging energy costs while constrained by offering adequate mobility service to fleet customers. The results indicate that the SAEV charging load is highly flexible; energy costs were shown to reduce between 13% and 46% across a wide range of simulated scenarios. In addition, these savings were realized without detrimentally impacting the fleet’s ability to service trips.

autonomous vehicle↗

Subhourly Clipping Correction Model Comparison

This work will compare the Allen method and Walker method of accounting for subhourly inverter clipping power losses in hourly PV performance models. The Allen method uses a matrix lookup based on DNI clearness and clipping potential to assign a clipping correction loss at each simulation timestep. The Walker method models the PV DC power input to the inverter as a distribution over the hourly timestep and uses integration over the timestep to determine the amount of clipping that occurs within the timestep. Both these models have been recently implemented in the System Advisor Model's (SAM) open-source code, and will be applied to hourly SURFRAD datasets to analyze the subhourly clipping loss predicted by each model for different system designs and inverter loading conditions. Both models will be compared to "true" 1-minute SURFRAD data simulations to see their accuracy against more accurate 1-minute clipping correction loss predictions. This model comparisons will be investigated in more detail at the PVSC conference in Seattle, Washington June 2024.

ENERGY PLANNING, POLICY, AND ECONOMY,MATHEMATICS A↗

ResStock: Annual Baseline Results with Component Loads

The ResStock Analysis Tool was developed by NREL with support from the U.S. Department of Energy to provide a new approach to large-scale residential analysis by combining large public and private data sources, statistical sampling, detailed sub hourly building simulations, and high-performance computing. This combination achieves unprecedented granularity and accuracy in modeling the diversity of the housing stock and the distributional impacts of building technologies in different communities. The annual baseline energy results from a national-scale ResStock run use typical meteorological year 3 (TMY3) files for energy simulations. Results include heating and cooling loads for individual components of each building. Component loads describe the heating/cooling load that can be attributed to specific elements of a home, such as heat transfer through walls or internal gains. Additionally, these results include the standard ResStock outputs for housing characteristics and numerous energy outputs by end-use and fuel. A snapshot of the ResStock version used to produce this data, including a configuration file for the run can be found using the Source Code resource link.

Array↗

Status and Trends in the U.S. Voluntary Green Power Market: 2022 Data

Voluntary green power, for the purposes of this report, refers to renewable energy procurement by retail electricity customers above what is otherwise provided by load-serving entities. This report is part of an annual series of reports synthesizing trends in the United States voluntary green power market. In 2022, about 9.6 million retail electricity customers procured about 272 million megawatt-hours (MWh) of voluntary green power, representing about 38% of non-hydro renewable energy sales and about 6% of all U.S. retail electricity sales. Most of the remainder of U.S. renewable energy sales reflects renewable energy procured by load-serving entities to comply with state renewable energy mandates, also known as compliance-based procurement.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis – Simulated Wind

The U.S. Department of Energy and the National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis, hydrogen compression and storage, and variable hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) initiative. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence (AI) data centers and other variable loads. This dataset entry describes hydrogen production using a single, simulated wind turbine. The electrolyzer is a 1.25-MW proton exchange membrane type MC250 system manufactured by Nel Hydrogen . While the unit supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack. For the simulated wind energy profiles, NLR used OpenFAST to simulate a 3.4-MW International Energy Agency (IEA) reference wind turbine. The hour-long wind energy profiles varied over wind turbulence intensity (Class A or Class C) and average wind speed (5, 7, or 9 m/s). To match the power limits of the 1.25-MW electrolyzer and 3.4-MW IEA wind turbine most effectively and to maximize the efficiency of hydrogen production at a given average wind speed, the profiles were sometimes scaled by two times. This means that, in some cases, the experimental setup assumed two 1.25-MW electrolyzers were coupled with the wind turbine, representing a total maximum electrolysis load of 2.5 MW. Finally, NLR experimented with two settings for the electrolyzer power supply minimum and maximum current ramp rates (gain and slew): 200 and 400 amperes per second. The simulated profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1-Hz frequency. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single wind turbine electrolysis experiment and is formatted as follows: {technology}-{average wind speed}-{turbulence class}_{number of 1.25 MW electrolyzers connected}-{electrolyzer ramp rate in amperes/second} For instance, “windIEA3.4-5ms-C_2-400.zip” represents the hour-long experiment using the IEA 3.4-MW turbine, subjected to an average wind speed of 5 m/s and Class C wind turbulence, and connected to two 1.25-MW electrolyzers with the power supply set to a maximum current ramp rate (gain and slew) of 400 A/s. Each .zip folder contains the following files: A .csv file containing raw data. An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production in kilograms per hour, electrolysis power consumption, and input wind turbine power. An experiment labeled “characterization_200.zip” demonstrates the MC250 electrolyzer steady-state response with 30 minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all simulated wind experiments combined into one dataset labeled "combined_wind_experiments.csv". NLR also built an AI/machine-learning predictive model based on these datasets. The model ingests the electrolyzer current command in amperes, as well as various pressures and temperatures across the system, and predicts hydrogen output in kilograms per hour. The complete model can be found at https://huggingface.co/NatLabRockies/ptmelt-hydrogen-electrolysis .

08 HYDROGEN↗

Probabilistic Resilience of DER Systems - A Simulation Assisted Optimization Approach

Energy systems resilience is becoming increasingly important as the frequency of major grid outages increases. In this work, we present a methodology to optimize a behind-tlie-meter distributed energy resource system to sustain a site's critical loads during a pre-defined outage period. With the fixed system design, we then propose an outage simulation approach to estimate the resilience potential of the DER system to sustain loads beyond the fixed outage period - a yearlong resilience performance analysis. We apply statistical analysis to assess the system's resilience performance over a broader parametric problem space on an hourly, monthly, and yearly basis. We demonstrate the impact of the pre-defined outage period on the resilience performance through a case study. Results show that the probability of surviving a random outage of a given duration changes from 20% to 95% when the outage is modeled for a weekday instead of a weekend for the given load-profile.

28 EE - Advanced Manufacturing Office (EE-5A)↗

Probabilistic Resilience of DER Systems - A Simulation Assisted Optimization Approach

Energy systems resilience is becoming increasingly important as the frequency of major grid outages increases. In this work, we present a methodology to optimize a behind-the-meter distributed energy resource system to sustain a site's critical loads during a pre-defined outage period. With the fixed system design, we then propose an outage simulation approach to estimate the resilience potential of the DER system to sustain loads beyond the fixed outage period - a yearlong resilience performance analysis. We apply statistical analysis to assess the system's resilience performance over a broader parametric problem space on an hourly, monthly, and yearly basis. We demonstrate the impact of the pre-defined outage period on the resilience performance through a case study. Results show that the probability of surviving a random outage of a given duration changes from 20% to 95% when the outage is modeled for a weekday instead of a weekend for the given load-profile.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

AST Development in M2FCT (ASTWG and iDWG) Update to 21CTP [Slides]

Accelerated Stress Tests (ASTs) are required to evaluate fuel cell component durability in a reasonable time. Current DOE and FCTT ASTs are light duty focused with 5000 – 8000 hour durability requirements. Heavy duty ASTs need to reflect the 25000+ hour durability requirement. Interim solution is to extend the duration of the current light duty ASTs: Catalyst AST has been extended from 30,000 cycles to 90,000 cycles (From 50 hours to 150 hours). We need to understand Heavy duty stressors and tailor ASTs for heavy duty applications: Longer lifetimes; Higher efficiencies – Higher loadings - Potentially higher operating temperatures and voltages; Heat rejection during low speed hill climbs – Higher operating temperature; Longer Idling times – Higher operating voltages and drier operation; Take into account different hybridization strategies (Vary size of battery).

30 DIRECT ENERGY CONVERSION↗

Hydronic Shell: An Affordable Solution for Multifamily Deep Energy Retrofit

Approximately 42% of multi-family buildings in the United States have do not have insulation as required by the building codes. Envelope retrofits of these buildings are needed to improve their thermal performance, provide thermal resilience, and enable a pathway to electrification of space heating systems. Hydronic shell (HS) is a retrofit technique where a stud wall layer is added to a masonry wall along with a convective coil and a fan coil unit fitted in the façade cavity which can provide both heating and cooling to the space. The HS system serves a dual purpose of 1) retrofitting the building envelope and 2) retrofitting the HVAC system and enabling electrification of space heating. The electrification of space heating is possible from the installation of a combination of hydronic system/fan coil unit system which uses a central heat pump as a source of heating water in the cavity between the existing wall and retrofit insulation layer. This study evaluates the performance of the HS system at varying outdoor conditions mimicked by a climate chamber and hot water supply temperature from a water bath. During the ramp-up period, the indoor chamber temperature could be increased from 66 ºF to 69.5 ºF within an hour using heating water at 120 ºF when the outdoor chamber temperature was at 0 ºF. When the indoor chamber temperature was maintained within a deadband, variation in cavity air temperature was mostly influenced by the duration when water was flowing through the cavity convector. It was seen from the testing that the hydronic system alone without use of fan in the system is able to maintain the space temperature at coldest outdoor condition used in the experiment (0 ºF) even at lowest hot water supply temperature chosen (90 ºF). During the ramp-down period, the fastest decline in temperature took 6.4 hours from temperature to drop from 69.6 ºF to 66 ºF which shows tremendous potential of thermal resilience and peak load shifting.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Startup Physics Testing of Advanced Reactors

This report documents the startup physics testing from initial fuel loading through ascension to full power for past advanced reactor startup physics testing programs. The review includes an assessment of what nuclear physics data was measured, why this data was measured, how was the measurement made, and the agreement with predictive reactor performance calculations of that time. The purpose of this review is to establish historical precedence for test inclusion for future advanced reactors planned for demonstration at the National Reactor Innovation Center (NRIC). The historical review includes reactor designs considered to be significantly different from current light-water reactor designs, or use simplified, inherent, passive, or other innovative means to accomplish their safety functions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Community-scale interaction of energy efficiency and demand flexibility in residential buildings

Demand-side management (DSM) strategies, including energy efficiency (EE) and demand flexibility (DF), contribute to cost-effective operation of the electricity grid. From a system-level perspective, such programs reduce costs, enhance reliability, and reduce network issues. Similarly, DSM programs help participating customers reduce utility bills while maintaining occupant comfort. Understanding the relationship between EE and DF is key to realizing the full potential of DSM programs. In this study, we modeled an all-electric residential community based on a 498-home community that is planned for construction in Fort Collins, Colorado in the United States. We used this community model to study the relationship between different EE measures, including building envelope upgrades and smart appliances, and DF enabled by a home energy management system (HEMS) responding to a time-varying tariff. Various EE levels in the homes – code-minimum, zero energy ready, and even higher levels of envelope efficiency – were simulated. DF is enabled by the HEMS, which coordinates behind-the-meter resources, including flexible building loads, PV, and home battery systems, to minimize utility bills while maintaining occupant comfort. When comparing to the code-minimum homes, EE upgrades alone reduce HVAC energy use during peak hours by up to 50% and the HVAC utility bill by up to $312/year. With the addition of HEMS, the average daily peak demand can be reduced by up to 0.58 MW or 1.2 kW/home in the higher envelope efficiency homes. The combination of EE upgrades, HEMS, and home battery systems is expected to save homeowners up to $590/year while increasing community load flexibility. However, HEMS and home battery systems are less effective in increasing the DF in the more efficient homes due to the lower load.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Probabilistic Modeling of Climate Change Impacts on Renewable Energy and Storage Requirements for NM's Energy Transition Act (SAND Report)

This report provides a study of the potential impacts of climate change on intermittent renewable energy resources, battery storage, and resource adequacy in Public Service Company of New Mexico’s Integrated Resource Plan for 2020 – 2040. Climate change models and available data were first evaluated to determine uncertainty and potential changes in solar irradiance, temperature, and wind speed in NM in the coming decades. These changes were then implemented in solar and wind energy models to determine impacts on renewable energy resources in NM. Results for the extreme climate-change scenario show that the projected wind power may decrease by ~13% due to projected decreases in wind speed. Projected solar power may decrease by ~4% due to decreases in irradiance and increases in temperature in NM. Uncertainty in these climate-induced changes in wind and solar resources was accommodated in probabilistic models assuming uniform distributions in the annual reductions in solar and wind resources. Uncertainty in battery storage performance was also evaluated based on increased temperature, capacity fade, and degradation in round-trip efficiency. The hourly energy balance was determined throughout the year given uncertainties in the renewable energy resources and energy storage. The loss of load expectation (LOLE) was evaluated for the 2040 No New Combustion portfolio and found to increase from 0 days/year to a median value of ~2 days/year due to potential reductions in renewable energy resources and battery storage performance and capacity. A rank-regression analyses revealed that battery round-trip efficiency was the most significant parameter that impacted LOLE, followed by solar resource, wind resource, and battery fade. An increase in battery storage capacity to ~25,000 – 30,000 MWh from a baseline value of ~14,000 MWh was required to reduce the median value of LOLE to ~0.2 days/year with consideration of potential climate impacts and battery degradation.

54 ENVIRONMENTAL SCIENCES↗

Canister Centerline Cooling Experiments for DPF5-336 Reference Material Made with ERV3b Salt Simulant

This report provides experimental details and results on the elemental distributions (compositions), crystalline/amorphous phase distribution, and microstructures for DPF5-336 reference materials made with ERV3b salt that were subjected to the canister centerline cooling (CCC) heat treatment process. To fabricate these materials, ammonium dihydrogen phosphate was mixed with ERV3b salt simulant and a dechlorination procedure was run in the generation-2 dechlorinator at the Pacific Northwest National Laboratory up to 600°C in an alumina crucible. After the dechlorination process, the product was removed from the crucible, lightly crushed, loaded into a new alumina crucible, Fe 2 O 3 was added, and this was vitrified at 1100°C for 1 hour and quenched. The quenched material was mostly amorphous but showed some small diffraction peaks attributed to Li 3 Fe 2 (PO 4 ) 3 . This quenched material was ground to a fine particle size in a milling chamber, and this was subjected to the CCC cooling profile in duplicate within alumina and fused quartz crucibles. The CCC experiment is designed to simulate the slowest cooling profile (the vertical centerline) of a 0.61-m diameter canister where the slower cooling profile often results in the production of a variety of different crystalline phases upon formation of which result in a residual glass of unknown composition and properties. The information gleaned from these types of experiments will lead to improved composition-property predictions for materials with similar compositions. The results of the alumina and fused quartz experiments show different microstructures but similar diffraction patterns providing evidence of similar crystalline phases being present in each sample. Both samples had monazite [i.e., (Ce,Nd)PO 4 ] and mixtures of phases containing P, Fe, and alkali metal elements. This report completes the milestone M4FT-23PN030104042 with details provided in Appendix B.

36 MATERIALS SCIENCE↗

Status and Trends in the U.S. Voluntary Power Market: 2024 Data

Voluntary renewable power, for this report, refers to renewable energy procurement by retail electricity customers above what is otherwise provided by load-serving entities. This report is part of an annual series of reports synthesizing trends in the U.S. voluntary renewable power market. In 2024, about 9.2 million retail electricity customers procured about 315 million megawatt-hours (MWh) of voluntary renewable power (Figure ES-1). Estimated voluntary renewable power market sales represented about 45% of renewable energy sales excluding large hydropower and about 8% of all U.S. retail electricity sales in 2024. Most of the remainder of U.S. renewable energy sales reflects renewable energy procured by load-serving entities to comply with state renewable energy mandates.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis - NLR Historical Wind

The U.S. Department of Energy and the National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis from variable sources, hydrogen compression and storage, and hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) initiative. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence (AI) data centers and other variable loads. This dataset entry describes hydrogen production by conducting a statistical analysis of historical wind data over a five-year period (2020-2025) from a single 1.5MW turbine manufactured by General Electric (GE) located at NLR’s Flatirons Campus, to generate an experimental test profile that was deployed on a 1.25-MW proton exchange membrane type MC250 electrolyzer system manufactured by Nel Hydrogen . [1] While the electrolyzer balance-of-plant supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack. The historical wind data provided several metrics, however, the analysis particularly focused on the measured power output by the wind turbine. The power output time series of data for each day was categorized by total energy generation and standard deviation, and the day that represented the highest combination of these two metrics was chosen – December 25th, 2022. This process was then repeated for a moving four-hour window within this day to identify the most statistically variable period. Finally, this four-hour period was scaled by 65% to match the 1.25 MW electrolyzer. The electrolysis system controls hydrogen production by varying DC current applied to the stack, from a maximum of 3000 A to a minimum safe operation of 300 A, or 10%. Because the current – voltage characteristic changes as the stack ages and efficiency degrades, the actual minimum safe operating power changes over time. The historical wind profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1 Hz frequency. For more details on the statistical analysis process, see the presentation labeled “ Public Reference Data for Megawatt-Scale Hydrogen Electrolysis” provided with each data entry. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single wind turbine electrolysis experiment and is formatted as follows: {technology}_{scaling factor}-{electrolyzer ramp rate in amperes/second} For instance, “wind-GE1.5MW_0.65-400.zip” represents the hour-long experiment using historical data from the wind-GE1.5MW turbine, scaled to 65%, with the electrolyzer power supply set to a maximum ramp rate (gain and slew) of 400 A/s. Each .zip folder contains the following files: A .csv file containing raw data An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production, electrolysis power consumption, and wind power input. A PDF file detailing the historical wind data statistical analysis used to generate the wind profile. An experiment labeled “characterization_200.zip” demonstrates the MC250 electrolyzer steady-state response with 30-minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all simulated wind experiments combined into one dataset labeled "combined_historical_wind_experiments.csv". NLR also built an AI/machine-learning predictive model based on these datasets. The model ingests the electrolyzer current command in amperes, as well as various pressures and temperatures across the system, and predicts hydrogen output in kilograms per hour. The complete model can be found at https://huggingface.co/NatLabRockies/ptmelt-hydrogen-electrolysis [1] nelhydrogen.com/product/mc-series-electrolyser .

08 HYDROGEN↗

Comprehensive Physical Activity Assessment During U.S. Army Basic Combat Training

Abstract Alemany, JA, Pierce, JR, Bornstein, DB, Grier, TL, Jones, BH, and Glover, SH. Comprehensive physical activity assessment during U.S. Army Basic Combat Training. J Strength Cond Res 36(12): 3505–3512, 2022—Physical activity (PA) volume, intensity, and qualitative contextual information regarding activity type and loads carried are limited during U.S. Army Basic Combat Training (BCT). The purpose of this study was to characterize daily (05:00–20:00 hours) PA during BCT using a comprehensive approach. During 2 10-week BCT cycles ( n = 40 trainees per cycle), pedometers, accelerometers, and direct observation were used to estimate daily step count, PA volume, and intensity. Physical activity intensity was categorized by metabolic equivalents (METs) such as “sedentary” (1–2 METs), “light” (2–3 METs), “moderate” (3–6 METs), or “vigorous” (≥6 METs). Daily PA data were analyzed longitudinally using linear mixed models, with significance set at p ≤ 0.05. The mean daily step count was 13,459 ± 4,376 steps, and the mean daily accelerometer-assessed PA volume and intensity were as follows: sedentary: 505 ± 98 minutes, light: 190 ± 78 minutes, moderate: 168 ± 51 minutes, and vigorous: 14 ± 14 minutes, with no differences between cycles for all measures ( p > 0.50). Cumulative time on feet (∼50%) and sitting (20–25%) accounted for most daily activity types during both cycles. Trainees, on average, carried between 3 and 9 kg, and ≥9 kg, for 60% and 10% of the monitored day, respectively. Basic Combat Training's physical demands are high, where trainees achieved 1.7 to 2.7 times greater daily ambulation and 6 times the recommended weekly moderate-to-vigorous PA compared with civilian counterparts and performed weight-bearing load carriage for nearly half of the day. Basic Combat Training-associated PA may increase injury risk among trainees unaccustomed to arduous PA and exercise. Implementing national PA policies to improve physical fitness and facilitate acclimatization to BCT's high physical demands could reduce public health burdens and military nonreadiness.

Sport Sciences↗