At least 253 records · Page 14

Region-Based Stability Analysis of Resilient Distribution Systems with Hybrid Grid-Forming and Grid-Following Inverters

In this paper, distribution system stability considering mixed grid-forming (GFM) and grid-following (GFL) inverters is discussed. A holistic small-signal model of the distribution feeder accommodating both GFM and GFL inverters is derived. In contrast to conventional point-by-point stability analysis, a region-based stability assessment approach is proposed and implemented to evaluate small-signal system stability with both GFM and GFL controls. Furthermore, to enhance the computational efficiency, an Artificial Intelligence (AI) assisted Kernel Ridge Regression (KRR) approach is developed to obtain the stability region boundary. Therefore, with the derived stability region, the impact of critical parameters on system stability is intuitively shown, and more importantly, the relationship between the maximum penetration level and the corresponding feasible range of the selected control parameters can be quantified. The proposed approach has been validated using MATLAB/Simulink.

grid-following↗

Control of Grid-Connected Multiport MV Power Electronics Energy Hub: Preprint

In this paper a new concept of multiport modular medium-voltage power electronics hub (M3PE-HUB) is introduced for future power grid. The goal for this project is to design, develop, and demonstrate foundational technologies and capabilities for multiport power electronics energy hubs that can serve as intelligent devices to coordinate and control several different sources and loads. In this paper, the architecture of the controller, the central controls, and its verification is presented.

controls↗

Development of Application Function Blocks for Power-Hardware-in-the-Loop Testing of Grid-Connected Inverters: Preprint

Stability and accuracy of the PHIL platform has been a common problem and challenging issue for a long time, thus continuous efforts and research have been devoted to developing interface algorithms to improve upon this. Some of existing works exhibit promising solutions to compensate the errors in the PHIL platform. However, there is a need to harmonize various solutions into a standard framework that provides a general solution for various PHIL test beds and that can be reused with minimum modifications to avoid extra effort. A good way to do this is by using application function blocks (AFBs), which are model-based and can be developed as a standard library component, thus achieving satisfactory reusability and reconfigurability for various platforms. Since PHIL simulation has the flexibility of the software simulation, proper functions can be easily implemented in the digital real-time simulator (DRTS) to preprocess the reference signal before sending it to the power amplifier. Therefore, this paper aims to develop standard AFBs in DRTS for the PHIL interface to test grid-connected inverters. The PHIL interface algorithm is separated into five AFBs that will be presented in detail in this paper.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Autonomous Microgrid Restoration Using Grid-Forming Inverters and Smart Circuit Breakers

The proliferation of distributed inverter-based resources (IBRs) raises the questions if these IBRs can be used to blackstart microgrids and distribution feeders after major outages. In this paper, we propose and evaluate an autonomous microgrid restoration concept using grid-forming (GFM) IBRs and smart circuit creakers (SCBs). The concept is first explored in simulation platform and then a hardware testbed containing actual GFM inverters is developed to demonstrate these functionalities. A combination of dispatchable virtual oscillator control (dVOC) and droop-based control schemes have been designed for GFM inverter controls in the software simulations and hardware testbed. Subsequently, operation of SCBs using two distinct principles have been demonstrated that can restore or connect portions of the network.

black start↗

Clean Grid Vision: A U.S. Perspective - Chapter 1. Clean Grid Scenarios

Chapter 1: Clean Grid Scenarios serves as a broad introduction to the type of future power systems envisioned in the Clean Grid Vision: one with high penetrations of variable renewable energy generation (for example, more than 53% nationally and up to 73% in the Eastern Interconnection) and significant share of natural gas. Our study shows that the conterminous United States has adequate resources to support such systems with current technologies, and these systems can be operated cost-effectively to meet all sub-hourly demand and reserve requirements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Opportunities for Grid Modernization Collaboration: U.K.-U.S. Grid Modernization Workshop Report, February 28 - March 2, 2017

This report captures the discussions and takeaways from the U.K.-U.S. Grid Modernization Workshop on February 28-March 2, 2017 at the National Renewable Energy Laboratory. Speakers from across the United States and Europe convened to discuss the challenges associated with grid modernization for the 21st century, while identifying transatlantic solutions and opportunities for collaboration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Experimental Investigation of Bearing Slip in a Wind Turbine Gearbox During a Transient Grid Loss Event

This work investigates the behaviour of the high speed stage of a wind turbine gearbox during a transient grid loss event. Dynamometer testing on a full scale wind turbine nacelle is used. A combination of external and internal gearbox measurements is analysed. Particular focus is on the characterization of the high speed shaft tapered roller bearing slip behaviour. This slipping behaviour is linked to dynamic events by many researchers and described as potential bearing failure initiator. However only limited full scale dynamic testing is documented. Strain gauge bridges in grooves along the circumference of the outer ring are used to characterize the bearing behaviour in detail. It is shown that during the transient event the high speed shaft experiences a combined torsional and bending deformation. These unfavourable loading conditions induce roller slip in the bearings during the torque reversals indicating the potential of the applied load case to go beyond the preload of the tapered roller bearing.

17 WIND ENERGY↗

Electrified autonomous freight benefit analysis on fleet, infrastructure and grid leveraging Grid-Electrified Mobility (GEM) model

Fast-growing freight activities over the decades have become one of the major contributors to air pollution, leading to many efforts in freight decarbonization and electrification. However, the development of freight electrification is slow due to technological uncertainty, slow charging, high capital cost, etc. This paper analyzes the potential impact and benefit of heavy-duty vehicle (HDV) electrification and automation on fleet cost, infrastructure cost, the electricity grid, and environmental outcomes. In this work, we extended the vehicle electrification benefit analysis tool: Grid-Electrified Mobility (GEM) model, which had primarily been used to study light-duty passenger vehicles (LDVs), to analyze heavy-duty vehicle electrification. The extended model is derived for freight transportation electrification, and different freight electrification and automation adoption scenarios were analyzed. We find that the increased penetration of automated electric freight fleets within other types of electrified freight fleets from 1% to 99% will result in an overall cost reduction of 18.2%, fleet size reduction of 20.4%, and lower peak load reduction of 14.3%.

33 ADVANCED PROPULSION SYSTEMS↗

A Reversed Impedance-Based Stability Criterion for IBR Grids

The existing impedance-based stability criterion is effective for analyzing local control interactions; however, it is difficult to scale the existing criterion to analyze wide-area control interactions among numerous IBRs through a complex power system network. The scaled version of the existing criterion requires the impedance response of each IBR in the system as well as of the network looking from all the IBRs. It is quite challenging to obtain all these impedance responses because of the computational effort and the requirement of separately scanning the impedance of the network and the IBRs. We propose a reversed criterion for the impedance-based stability analysis to address these problems. In contrast to the existing criterion, the reversed criterion analyzes the stability of a power system when an IBR is disconnected from the system. The reversed criterion estimates the impact of an IBR on the frequency and damping of power system oscillation modes using the impedance scans of only the IBR and the grid at its terminal. It can be sequentially applied at different IBRs to evaluate their impact on the power system stability. In addition to scalability, the reversed criterion gives flexibility to focus only on a few selected IBRs, depending on their rating, the magnitude of oscillations observed at their terminals, and the vendor support available for implementing stabilizing control system updates. The reversed criterion is demonstrated on a 14-bus power system with 100% IBRs.

control interactions↗

Hydropower Potential at Non-Powered Dams: A Multi-Criteria Decision Analysis Tool based on Grid, Community, Industry, and Environmental Impacts

Non-powered dams (NPDs) are dams that do not include hydraulic turbine (hydropower) equipment. Currently, there are more than 80,000 such dams in the United States, which provide a variety of non-energy benefits, including flood control, water supply, navigation, and recreation. Approximately 500 of these NPDs are identified as having the potential to add hydropower generation (totaling up to a capacity of more than 8200 MW). A large share of investment costs and environmental impacts of dam construction have already been incurred at these NPDs. Hence, adding power to the existing dam structure is hypothesized to be achieved at a lower cost, with less risk, and a shorter timeframe than the development required for new dam construction. The abundance of NPDs, the associated environmental favorability, and cost advantages, combined with the reliability, predictability, and dispatchability of hydropower, make NPDs a strong candidate in the nation’s renewable energy portfolio. To assess the NPD to hydropower conversion potential, in this study, we developed a GIS-based multi-criterial decision analysis tool, which allows users to rank these NPDs based on the grid, community, industry, and environmental impacts (i.e., GCIE impacts). This web-based interactive tool (developed using open-source Python and JavaScript) lets the user choose from a wide range of features to define each of the GCIE impact scores through a user-friendly graphical user interface. These features are related to dam operation, hydropower generation opportunity, power market economy, social vulnerability and risk, proximity to critical infrastructure and energy generating facilities, environmental concerns (air, water, and critical habitat), and exposure to natural hazards. The overall priority score of NPDs is calculated based on user-defined weights for each of the GCIE impact scores. Besides ranking NPDs, the tool can also be used to estimate the energy-storage feasibility (battery, hydrogen, and pump-storage hydropower) at each of the potential sites.

13 HYDRO ENERGY↗

Decentralized Control of Cascaded H-Bridge Inverters for Medium-Voltage Grid Integration: Preprint

This paper introduces a fully decentralized control strategy that allows for individualized active and reactive power control of H-bridge inverters connected in series. After formulating a model of the system power flows, we outline a communications-free approach where each inverter can act on independent commands. Inverter-level feedback is accomplished locally via a measurement of current flowing through the stack. A key feature is the lack of any centralized control routines or phase-locked loop. In this framework, the reactive power control loops achieve voltage synchronization among the converters and the grid, and the active power control loops modulate the terminal voltage amplitudes that influence power delivery. Furthermore, pole placement via state feedback is used to ensure stability of voltage synchronization while also enabling tracking of bidirectional power commands. Simulations are presented to validate the proposed approach.

communication-free modular converter control↗

Adaptive Transmission Planning: Implementing a New Paradigm for Managing Economic Risks in Grid Expansion

The problem of whether, where, when, and what type of transmission facilities to build in terms of minimizing costs and maximizing net economic benefits has been a challenge for the power industry from the beginning-ever since Thomas Edison debated whether to create longer dc distribution lines (with their high losses) or build new power stations in expanding his urban markets. Today's planning decisions are far more complex, as grids cover the continent and new transmission, generation, and demand-side technologies are emerging.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Blockchain Delay on Grid-Tied Solar Inverter Performance

This paper investigates the impact of the delay resulting from a blockchain, a promising security measure, for a hierarchical control system of inverters connected to the grid. The blockchain communication network is designed at the secondary control layer for resilience against cyberattacks. To represent the latency in the communication channel, a model is developed based on the complexity of the blockchain framework. Taking this model into account, this work evaluates the plant’s performance subject to communication delays, introduced by the blockchain, among the hierarchical control agents. In addition, this article considers an optimal model-based control strategy that performs the system’s internal control loop. The work shows that the blockchain’s delay size influences the convergence of the power supplied by the inverter to the reference at the point of common coupling. In the results section, real-time simulations on OPAL-RT are performed to test the resilience of two parallel inverters with increasing blockchain complexity.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Impacts of Voltage-Based Grid Support Functions on Energy Production of PV Customers

This paper presents the impact of inverter grid- support functions (GSFs) on photovoltaic (PV) customer energy production on a real distribution feeder in Oahu, HI. These autonomous GSFs based on local voltage measurements are good alternatives to increase PV hosting capacity. However, these functions can result in PV energy curtailment to the customer, and this study addresses the concerns about the impact of inverter GSFs through detailed quasi-static time series (QSTS) simulations. It proposes four metrics: maximum and average GSF curtailment, average increased generation and average net generation change, to assess the impact of a given control on PV systems located on customer sites. It was found that curtailment of PV production is negligible for customers where peak voltage is within ANSI C84.1 range. A reliable relationship between curtailment and peak customer voltage is demonstrated, suggesting that peak voltage could be used as an indicator of customer curtailment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Blackstart of Power Grids with Inverter-Based Resources

This paper presents the findings of our investigation into inverter-based resource-(IBR-) driven blackstart of electric grids. Four potential black-start configurations with different setups are presented. To evaluate the technical feasibility of IBR-driven black start in the four configurations, a behavioral model of inverters that mimics current-limited inverter operation is developed using variable resistors in the MATLAB Simulink/Simscape environment. The inverter model is connected to an induction motor through transformers and a transmission line to simulate its startup. Simulation results show that even with the limited current supply capability of inverters because of their physical constraints, IBRs can black-start a motor under certain conditions. Results also show that by using soft-start techniques, such as ramped supply voltage, inrush currents can be reduced, thereby expanding the conditions under which IBRs can provide black-start support. Simulation results with different scenarios lead to discussions and key takeaways that could be valuable for further IBR-driven black-start research.

41 EE - Solar Energy Technologies Office (EE-4S)↗