Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Flight Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

In-flight Geometric Calibration Plan

This MISR in-flight Geometric Calibration (IGC) Plan describes the concept, development strategy and operational design to be used for geometric calibration of the instrument and for producing the Geometric Calibration Dataset (GCD) which is required as an input to the L1B2 standard processing.

geometric in-flight calibration plan↗

STS payloads mission control study continuation phase A-1. Volume 2-C, task 3: Identification of joint activities and estimation of resources in preparation for joint flight operations

Payload mission control concepts are developed for real time flight operations of STS. Flight planning, training, simulations, and other flight preparations are included. Payload activities for the preflight phase, activity sequences and organizational allocations, and traffic and experience factors to establish composite man-loading for joint STS payload activities are identified for flight operations from 1980 to 1985.

Source record↗

Aviation meteorology: Today and the future

A representative of the Air Weather Service, USAF addressed the workshop and gave an assessment of the present state of aviation meteorology and a prognosis of the future. Three categories of meteorological support to aviation systems are considered and discussed; (1) terminal weather; (2) the winds for flight planning; and (3) en route flight hazards.

Rowe, B. W.↗

Aeroheating Analysis for the Mars Reconnaissance Orbiter with Comparison to Flight Data

The aeroheating environment of the Mars Reconnaissance Orbiter (MRO) has been analyzed using the Direct Simulation Monte Carlo and free-molecular techniques. The results of these analyses were used to develop an aeroheating database to be used for the pre-flight planning and the in-flight operations support for the aerobraking phase of the MRO mission. The aeroheating predictions calculated for the MRO include the heat transfer coefficient (C(H)) over a range of angles-of-attack, side-slip angles, and number densities. The effects of flow chemistry were also investigated. Flight heat flux data deduced from surface temperature sensors have been compared to pre-flight predictions and agree favorably.

Liechty, Derek S.↗

Software for Engineering Simulations of a Spacecraft

Spacecraft Engineering Simulation II (SES II) is a C-language computer program for simulating diverse aspects of operation of a spacecraft characterized by either three or six degrees of freedom. A functional model in SES can include a trajectory flight plan; a submodel of a flight computer running navigational and flight-control software; and submodels of the environment, the dynamics of the spacecraft, and sensor inputs and outputs. SES II features a modular, object-oriented programming style. SES II supports event-based simulations, which, in turn, create an easily adaptable simulation environment in which many different types of trajectories can be simulated by use of the same software. The simulation output consists largely of flight data. SES II can be used to perform optimization and Monte Carlo dispersion simulations. It can also be used to perform simulations for multiple spacecraft. In addition to its generic simulation capabilities, SES offers special capabilities for space-shuttle simulations: for this purpose, it incorporates submodels of the space-shuttle dynamics and a C-language version of the guidance, navigation, and control components of the space-shuttle flight software.

Shireman, Kirk↗

Flight Performance Maneuver Planning for NASA’s X-57 “Maxwell” Flight Demonstrator – Part 1: Power-Off Glides

Distributed Electric Propulsion technology is expected to yield up to a fivefold increase in high-speed cruise efficiency for NASA’s X-57 “Maxwell” flight demonstrator when compared to a combustion-powered general aviation baseline. A portion of this increased efficiency is due to beneficial aero-propulsive interaction inherent to the distributed propulsion architecture. The measure of the relative increase in efficiency between a conventional and distributed propulsion wing will be extracted from comparisons between flight test data from the electrically powered X-57 Mod II configuration with a conventional wing, and from the electrically powered X-57 Mod III/IV configuration with a distributed propulsion wing. Flight test maneuvers that accommodate errors in instrumentation and the flight test environment are developed to establish the power-off drag characteristics for all X-57 configurations. Analysis of these maneuvers with typical errors, including pilot-in-the-loop simulation data that incorporates simulated atmospheric turbulence effects, shows that the proposed power-off flight maneuvers can generate accurate power-off drag predictions for the X-57. These predictions show that the power-off differences in aerodynamic performance between the conventional and distributed propulsion configurations can be accurately measured from flight test data in the presence of typical data error sources.

Borer, Nicholas K.↗

Flight Performance Maneuver Planning for NASA’s X-57 “Maxwell” Flight Demonstrator – Part 2: Power-On Effects

Distributed Electric Propulsion technology as envisioned for NASA’s X-57 “Maxwell” flight demonstrator concept was designed to increase high-speed cruise efficiency compared to a combustion-powered general aviation baseline. A portion of this increased efficiency was due to beneficial aero-propulsive interaction inherent to the distributed propulsion architecture. The measure of the increase in efficiency between a conventional and distributed propulsion wing was to be determined by comparing flight test data from the electrically powered, conventional wing X-57 Mod II configuration to data obtained from the electrically powered, distributed propulsion wing X-57 Mod III/IV configuration. Flight test maneuvers that accommodate errors in instrumentation and the flight test environment were previously developed to establish the power-off drag characteristics for all X-57 configurations. In this paper, test points and maneuvers are evaluated to establish the installed and gross thrust that build upon the power-off drag estimates. Analysis of the proposed power-on maneuvers shows that the selected test points and measurement techniques could generate installed thrust estimates within 3-7% (at the 50% confidence level) of the actual values if each maneuver is conducted over a time period of 40 seconds.

Nicholas K Borer↗

Development Overview of the Revised NASA Ultra Long Duration Balloon

The development of the National Aeronautics and Space Administration s (NASA) Ultra Long Duration Balloon (ULDB) has made significant strides in addressing the deployment issues experienced in the scaling up of the balloon structure. This paper concentrates on the super-pressure balloon developments that have been, and are currently being planned by the NASA Balloon Program Office at Goddard Space Flight Center s Wallops Flight Facility. The goal of the NASA ULDB development project is to attempt to extend the potential flight durations for large scientific balloon payloads. A summary of the February 2005 test flight from Ft. Sumner, New Mexico will be presented. This test flight spurred a number of investigations and advancements for this project. The development path has pursued some new approaches in the design, analysis, and testing of the balloons. New issues have been ideEti6ed throu& both analysis md testing. These have been addressed in the design stage before the next balloon construction was begun. This paper will give an overview of the recent history for this effort and the development approach pursued for ULDB. A description of the balloon design, including the modifications made as a result of the lessons learned, will be presented. Areas to be presented include the design approach, deployment issues that have been encountered and the proposed solutions, ground testing, photogrammetry, and an analysis overview. Test flight planning and considerations will be presented including test flight safety. An extended duration test flight of the National Aeronautics and Space Administration s Ultra Long Duration Balloon is planned for the May/June 2006 time frame. This flight is expected to fly from Sweden to either Canada or Alaska. Preliminary results of this flight will be presented as available. Future plans for both ground testing and additional test flights will also be presented. Goals of the future test flights, which are staged in increments of increasing suspended load and altitude, will be presented. This will include the projected balloon volumes, payload capabilities, test flight locations, and proposed flight schedule.

Cathey, H. M.↗

Analysis of Factors for Incorporating User Preferences in Air Traffic Management: A system Perspective

This paper presents an analysis of factors that impact user flight schedules during air traffic congestion. In pre-departure flight planning, users file one route per flight, which often leads to increased delays, inefficient airspace utilization, and exclusion of user flight preferences. In this paper, first the idea of filing alternate routes and providing priorities on each of those routes is introduced. Then, the impact of varying planning interval and system imposed departure delay increment is discussed. The metrics of total delay and equity are used for analyzing the impact of these factors on increased traffic and on different users. The results are shown for four cases, with and without the optional routes and priority assignments. Results demonstrate that adding priorities to optional routes further improves system performance compared to filing one route per flight and using first-come first-served scheme. It was also observed that a two-hour planning interval with a five-minute system imposed departure delay increment results in highest delay reduction. The trend holds for a scenario with increased traffic.

Sheth, Kapil S.↗

Demand Capacity Balancing at Vertiports for Initial Strategic Conflict Management of Urban Air Mobility Operations

Urban Air Mobility (UAM) is a new transportation concept that enables highly automated, cooperative, passenger or cargo-carrying air transportation services in and around urban areas. To achieve the high level of operational density and complexity desired by the UAM community, an airspace system that allows UAM operators to readily access and operate safely and efficiently in the airspace is needed. This airspace system will require air traffic management designed to reduce the risk of conflicts and loss of separation between UAM flights. In general, strategic conflict management is considered as the first layer of conflict management for safe flight operations to condition the traffic to reduce the need for airborne separation provision, the second layer of conflict management. Demand Capacity Balancing (DCB) is one of the concept components to achieve strategic conflict management. DCB strategically evaluates traffic demand and resource capacities to allow UAM operators to determine when, where and how they operate, while mitigating conflicting needs for airspace and vertiport capacity. DCB can be applied whenever UAM demand exceeds the capacity in airspace or at vertiports. As the UAM ecosystem evolves with advanced technologies and matured operational procedures, more complicated conflict management will likely be needed. In the current UAM ‘Concept of Operation (ConOps) 1.0’ operational stage defined by FAA, however, it will be meaningful to explore the demand capacity balancing at vertiports only, as an initial strategic conflict management approach for UAM operations because vertiport capacity seems to be a bottleneck of UAM traffic. For this research, we developed a demand-capacity imbalance detection and resolution service for UAM. This DCB service identifies the demand from operators and compares the demand to a given capacity at the shared resources (i.e., vertiports) over the upcoming time horizon which is divided into time bins having a constant interval. When a new flight plan is submitted, the algorithm embedded in the DCB service checks the available time bins based on the desired departure time and estimated arrival time at origin and destination vertiports, respectively. If the time bins for the originally desired times are already occupied by other flights (i.e., demand is at or above capacity), the algorithm finds the next available time bins for takeoff and landing and shifts the conflicting departure time to the earliest time that satisfies the capacity constraints at both origin and destination vertiports. The details of the algorithm will be described in the final manuscript. Figure 1 shows that the proposed DCB algorithm works well for a sample traffic scenario. In this example, a total of 144 flights, split between two operators, are planned over 2 hours, traveling 10 routes between five vertiports. In the heatmaps, the horizontal axis shows 12 time bins where each bin represents a 12-minute interval, and the vertical axis shows five vertiports. The number in each cell shows the number of operations, counting both departures and arrivals, at a specific vertiport in each time bin. For the given capacity of 2 operations/vertiport/bin, Figure 1 shows that the original demand sometimes exceeds the capacity, but the modified demand is reduced to the given capacity after resolving demand-capacity imbalances. When UAM flights are operated, it is expected that many practical issues would arise in the federated system architecture with multiple operators. UAM operators may experience a time synchronization issue due to communication delay between operator and vehicle. UAM vehicles would fly at different flight speeds, depending on vehicle models. Actual departure and arrival times can have large variations, compared to the schedule. The lead time from flight plan submission to desired departure time can vary by service type (e.g., regular shuttle service vs. on-demand service). Using the proposed DCB algorithm, we also investigated how the actual flight schedule and DCB performance are affected by these uncertainties such as unsynchronized times between operators, flight speed differences, lead time differences, and departure time errors. The final manuscript will include the background of this research work, the description of the DCB algorithm and its use cases with traffic scenarios. It will also provide the analytical results about the impact of various uncertainties that can occur in actual UAM operations on the DCB at vertiports, in terms of demand distribution changes, number of simultaneous operations, and delay propagation.

Urban Air Mobility↗

Inflight crew activities.

In flight crew activities covering detailed flight plan, activities and procedures, checklists and summary

ASTRONAUT PERFORMANCE↗

An overview of aviation weather services

Safety of flight is the first concern of the aviation weather service, the economics of air transportation is a second major interest. Weather is a significant causal factor impacting on the efficiency of air transportation. A discussion is presented on the functions of various weather service agencies as they relate to one another in the dissemination of information to the pilot and to the air traffic controller. Improvements in the aviation weather service and weather knowledge are cited as future goals. The weather service at the present time is an efficient system but future aviation objectives dictate more improvements are needed (especially in automation technology) to enhance flight planning and for safe and efficient flight execution.

Connolly, J. W.↗