Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Expectation Maximization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Modeling Diurnal and Annual Ethylene Generation from Solar-Driven Electrochemical CO 2 Reduction Devices

Integrated solar fuels devices for CO 2 reduction (CO 2 R) are a promising technology class towards achieving net-negative carbon emissions. Designing integrated CO 2 R solar fuels devices requires careful co-design of electrochemical and photovoltaic components as well as consideration of the diurnal and seasonal effects of solar irradiance, temperature, and other meteorological factors expected for ‘on-sun’ deployment. Here, using a photovoltaic-electrochemical (PV-EC) platform, we developed a temperature and potential-dependent diurnal and annual model using experimental CO 2 R performance of Cu-based electrocatalysts, local meteorological data from the National Solar Radiation Database (NSRD), and modeled performance of commercial c-Si PVs. We simulated diurnal product outputs with and without the effects of ambient temperature to determine gaseous product temperature sensitivity. From these outputs, we observed seasonal variation in gaseous product generation, with up to two-fold increases in ethylene productivity between the Winter and Summer, analyzed the consequences of dynamic cloud coverage, and identified periods where device cooling/heating mechanisms could be implemented to maximize ethylene generation. Finally, we modeled the annual ethylene generation for a scaled 1 MW solar farm at three different locations (Beijing, CN; Sydney, AUS; Barstow, CA) to determine the consequences of local meteorological climates on PV-EC CO 2 R product output, recording a maximum ethylene output of 18.5 tonne/yr at Barstow. Overall, this model presents a critical tool for streamlining the translation of experimental solar-driven electrochemical research to real-world implementation.

Yap, Kyra M. K.↗

Quantifying limits on CP violating phases from EDMs in supersymmetry

We revisit the calculation of the electron, neutron, and proton electric dipole moments (EDMs) in the constrained minimal supersymmetric standard model (CMSSM). The relatively large mass of the Higgs boson, m H ≃ 125 GeV coupled with the (as yet) lack of discovery of any supersymmetric particle at the LHC, has pushed the supersymmetry breaking scale to several TeV or higher. Though one might expect this decoupling to have relaxed completely any bounds on the two CP violating phases in the CMSSM (θ μ and θ A ), the impressive experimental improvements in the limits on the EDMs (particularly the electron EDM) still allow us to set constraints of order (0.01–0.1)π on θ A and (0.001–0.1)π on θ μ . We also discuss the impact of future improvements in the experimental limits on supersymmetric models.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Finding middle ground: Flow regimes designed for salmon and energy value

In regulated rivers, shaping seasonal flows to recover species at risk depends on understanding when to expect conflicts with competing water users and when their interests are aligned. Multi-objective optimization can be used to reveal such conflicts and commonalities. When species are involved, multi-objective optimization is challenged by the need to simulate complex species responses to flow regimes. Previously, we addressed that challenge by developing a simplified salmon model (Quantus) that defines cohorts of salmon by the river section and time in which they were spawned. Salmon in these space-time cohorts are tracked from the time redds (nests) are constructed until the cohort exits the tributary en route to the ocean. In this study, we modeled seasonal patterns in energy value and developed a Pareto-optimal frontier of seasonal flow patterns to maximize in-river salmon survival and hydropower value. Candidate flow regimes were characterized by two pulse flows varying in magnitude, timing, and duration and constrained by a total annual flow near the historical median. Our analysis revealed times when economic and salmon objectives were aligned and times when they differed. Pulse flows that favored higher energy value were timed to meet demand during extreme temperatures. Both salmon and hydropower objectives produced optimal flow regimes with pulse flows in early summer, but only solutions favoring hydropower value included high flows in mid-winter. Solutions favoring higher age-0 salmon survival provided an extended pulse flow in late winter/early spring, which suggests that access to productive floodplain habitat allowed faster growth and earlier out-migration and reduced the need for higher temperature-moderating flows later in spring. Minimum flows were also higher among solutions favoring salmon over energy. The tools used to produce these results can help to design simplified seasonal flow regimes by revealing compromise solutions that satisfy both fish and energy producers and highlighting when potential conflicts are likely.

54 ENVIRONMENTAL SCIENCES↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimal Power Sharing Speed Compensation in On-road Wireless EV Charging Systems

Dynamic wireless charging of electric vehicles (EV) is an emerging technology with the potential to address range anxiety and reduce the size of batteries or provide charge-sustaining operation. Charging demand for dynamic wireless charging systems (DWCS) varies greatly in response to location-specific traffic behaviors including the number and speed of vehicles. This paper highlights the potential reduction of load variation with speed compensation and simulates opportunities to maximize the number of cars charged concurrently through “power sharing” or altering power output to slower cars while maintaining a maximum delivered energy. An improved sub-minute model for synthetic traffic is proposed to effectively model DWCS load on high speed roadways and a power electronics model is created based on an existing prototype developed by ORNL to investigate the potential for power sharing. Reductions in the average speed of traffic can greatly increase instantaneous DWCS load by as much as 26%, complicating capacity sizing. Parametric studies with a LCC-S power electronics model shows feasible power reduction of more than 20%, while maintaining a maximum achievable efficiency greater than 90%. Speed compensation on a roadway with large speed variation can reduce average power expected by 21% and increase the maximum number of cars charged simultaneously by 30%. The application of power sharing may significantly reduce load variability due to speed, allow for increased car hosting capability, and guarantee a maximum energy delivered.

Lewis, Donovin D.↗

Biased degenerate ground-state sampling of small Ising models with converged quantum approximate optimization algorithm

The quantum alternating operator ansatz, a generalization of the quantum approximate optimization algorithm (QAOA), is a quantum algorithm used for approximately solving combinatorial optimization problems. QAOA typically uses the transverse field mixer as the driving Hamiltonian. One of the interesting properties of the transverse field driving Hamiltonian is that it results in nonuniform sampling of degenerate ground states of optimization problems. In this study, we numerically examine the fair sampling properties of the transverse field mixer QAOA, and Grover mixer QAOA (GM-QAOA), which provides theoretical guarantees of fair sampling of degenerate optimal solutions, up to a large enough p such that the mean expectation value converges to an optimal approximation ratio of 1. This comparison is performed with high-quality heuristically computed, but not necessarily optimal, QAOA angles, which give strictly monotonically improving solution quality as p increases. These angles are computed using the Julia based numerical simulation software JuliQAOA. Fair sampling of degenerate ground states is quantified using the Shannon entropy of the ground-state amplitudes distribution. The fair sampling properties are reported on several quantum signature Hamiltonians from previous quantum annealing fair sampling studies. Small random fully connected spin glasses are shown, which exhibit exponential suppression of some degenerate ground states with transverse field mixer QAOA. The transverse field mixer QAOA simulations show that some problem instances clearly saturate the Shannon entropy of 0 with a maximally biased distribution that occurs when the learning converges to an approximation ratio of 1 while other problem instances never deviate from a maximum Shannon entropy (uniform distribution) at any p step. Published by the American Physical Society 2025

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Measurement of the inclusive and differential Higgs boson production cross sections in the leptonic WW decay mode at $\sqrt{s} =$ 13 TeV

Measurements of the fiducial inclusive and differential production cross sections of the Higgs boson in proton-proton collisions at $ \sqrt{s} $ = 13 TeV are performed using events where the Higgs boson decays into a pair of W bosons that subsequently decay into a final state with an electron, a muon, and a pair of neutrinos. The analysis is based on data collected with the CMS detector at the LHC during 2016–2018, corresponding to an integrated luminosity of 137 fb$^{−1}$. Production cross sections are measured as a function of the transverse momentum of the Higgs boson and the associated jet multiplicity. The Higgs boson signal is extracted and simultaneously unfolded to correct for selection efficiency and resolution effects using maximum-likelihood fits to the observed distributions in data. The integrated fiducial cross section is measured to be 86.5 ± 9.5 fb, consistent with the Standard Model expectation of 82.5 ± 4.2 fb. No significant deviation from the Standard Model expectations is observed in the differential measurements.[graphic not available: see fulltext]

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Inclusive search for highly boosted Higgs bosons decaying to bottom quark-antiquark pairs in proton-proton collisions at $\sqrt{s} =$ 13 TeV

A search for standard model Higgs bosons (H) produced with transverse momentum (p$_{T}$) greater than 450 GeV and decaying to bottom quark-antiquark pairs ($ \mathrm{b}\overline{\mathrm{b}} $) is performed using proton-proton collision data collected by the CMS experiment at the LHC at $ \sqrt{s} $ = 13 TeV. The data sample corresponds to an integrated luminosity of 137 fb$^{−1}$. The search is inclusive in the Higgs boson production mode. Highly Lorentz-boosted Higgs bosons decaying to $ \mathrm{b}\overline{\mathrm{b}} $ are reconstructed as single large-radius jets, and are identified using jet substructure and a dedicated b tagging technique based on a deep neural network. The method is validated with Z →$ \mathrm{b}\overline{\mathrm{b}} $ decays. For a Higgs boson mass of 125 GeV, an excess of events above the background assuming no Higgs boson production is observed with a local significance of 2.5 standard deviations (σ), while the expectation is 0.7. The corresponding signal strength and local significance with respect to the standard model expectation are μ$_{H}$ = 3.7 ± 1.2(stat)$ {}_{-0.7}^{+0.8} $(syst)$ {}_{-0.5}^{+0.8} $(theo) and 1.9 σ. Additionally, an unfolded differential cross section as a function of Higgs boson p$_{T}$ for the gluon fusion production mode is presented, assuming the other production modes occur at the expected rates.[graphic not available: see fulltext]

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Future Trends in Nuclear Physics Computing

In nuclear physics (NP) today the study of quarks, gluons and their strong interactions extends across a broad research program at a varied range of collaborative scales, from a few collaborators up to large experiments at scales comparable to those typical of high energy physics (HEP). Overall, the software and computing efforts vary accordingly, from pragmatic do-it-yourself approaches among a few, to substantial organized software and computing activities within large experiments. With new experiments starting up and on the horizon [1], and rapidly increasing data volumes [2, 3] and processing demands even at small experiments, the NP community has in recent years been thinking about the next generation of data processing and analysis workflows that will maximize the science output. One context for this discussion has been a series of workshops, “Future Trends in Nuclear Physics Computing” [4]. The most recent in this series took place in Fall 2020, organized by the authors together with colleagues. The workshop focused on identifying the unique aspects of software and computing in NP, and discussing how the NP community could strengthen common efforts and chart a path forward for the next decade, sure to be an exciting one with rich ongoing scientific programs at Brookhaven National Laboratory (BNL), Jefferson Lab (JLab), and other NP facilities, and culminating in datataking at the Electron-Ion Collider (EIC) [5,6,7] in the early 2030s. Without claiming to present a collective view from the workshop and discussions since—fortunately this is not expected of us in this opinion editorial—we offer here our reflections on the topic, informed by the workshop and the summary we authored with our colleagues [8], as well as discussions and developments in the eventful time since.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Direct Evidence of Charge Transfer upon Anion Intercalation in Graphite Cathodes through New Electronic States: An Experimental and Theoretical Study of Hexafluorophosphate

Graphite intercalation compounds continue to be central to technologies for electrochemical energy storage from anodes in established Li-ion batteries to cathodes in beyond Li-ion concepts paired with multivalent anodes. When used as a cathode, graphite intercalates a variety of anions with PF 6 - being among the most common. Paired with Li intercalation at the anode, the corresponding dual carbon battery yields high energy and power densities. Given the available choice of anions as intercalants, it is important to elucidate how the graphite structure accommodates them in order to tailor the molecular species to maximize charge and reversibility. However, the changes in electronic structure of the host graphite lattice upon anion intercalation are poorly understood compared to cations, which represent a fundamentally different reaction. Herein, PF 6 -intercalated graphite has been studied using techniques sensitive to electronic structure, namely, X-ray Raman spectroscopy (XRS), X-ray absorption near-edge spectroscopy (XANES), and X-ray emission spectroscopy (XES). Complementary full-potential, all-electron density functional theory calculations yielded excellent agreement with the spectra, thus providing insight into charge compensation in the graphite lattice. In particular, a pre-$π^*$ feature emerged in XRS/XANES, which is direct evidence of the removal of charge from the host lattice to compensate the intercalated anions, leading to an overall lowering of the Fermi energy level. This is expected to be characteristic of many intercalants in anion-intercalated graphite. The unambiguous identification of the origin of the pre-$π^*$ spectral feature, which is frequently seen in graphitic systems, is of broad interest to the spectroscopy of graphitic systems beyond the practical implications of anion-induced changes in the electronic properties for real devices.

36 MATERIALS SCIENCE↗

“Max-tech FHR”: What is the maximum technically achievable water delivery capacity from a single 120 V plug?

Electrifying water heating will require affordable, direct drop-in replacements for existing gas water heaters that meet consumer expectations for hot water delivery. For many replacement scenarios, affordability requires a replacement option with like-for-like physical product dimensions, and existing consumer expectations presume a large delivery capacity from a small water heater. This work explores the technical potential for hot water delivery capacity for a heat pump water heater (HPWH) powered from a common 120 V plug. Delivery capability in this work is quantified by two metrics: the First Hour Rating (FHR) defined in the Code of Federal Regulations, and a real-world draw profile that resulted in hot water runout during field studies of 120 V HPWHs. The work focuses on the common “tall-and-slim” gas water heater product category, with external product dimensions of 20 inch diameter and 60 inch height. Using a simulation model in DOE/ORNL Heat Pump Design Model, validated by experimental baseline testing of a commercially available 120 V HPWH model, several measures were evaluated to maximize the delivery capacity of a 120 V HPWH. The 120 V HPWH was constrained by 1) external product dimensions of 20 in diameter and 60 inch height, 2) electrical power of 1.5 kW (85% of the available power from a dedicated 120 V, 15 A circuit), and 3) commercially-available components. The measures implemented included a large compressor, a pumped loop with plate heat exchanger to maximize tank stratification, enlarged heat exchangers, and relatively thin insulation to maximize the water storage volume.

Gluesenkamp, Kyle↗

Game-Theoretic Approach for Grace-Period Policy in Supercomputers

Job scheduling at supercomputing facilities is important for achieving high utilization of these valuable resources while ensuring effective execution of jobs submitted by users. The jobs are scheduled according to their specified resource demands such as expected job completion times, and the available resources based on allocations. Jobs that overrun their allocated times are terminated, for example, after a grace-period. It is non-trivial and often very complex for users to accurately estimate the completion times of their jobs, and consequently they face a dilemma: underestimate the job time to have a higher priority and risk job termination due to overrun, or overestimate it to ensure its completion and risk its delayed execution. In this paper, we investigate whether providing grace-period can benefit facility performance by developing a game- theoretic model between a facility provider and multiple users for a simplified scheduling scenario based on job execution times. We present closed-form expressions for the provider’s and user’s best-response strategies to maximize their respective utility functions. We describe conditions under which offering a grace-period is advantageous to both facility provider and users by deriving the Nash equilibrium of the game.

He, Fei↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Search for new physics in top quark production with additional leptons in proton-proton collisions at $\sqrt{s} = $ 13 TeV using effective field theory

Events containing one or more top quarks produced with additional prompt leptons are used to search for new physics within the framework of an effective field theory (EFT). The data correspond to an integrated luminosity of 41.5 fb$^{−1}$ of proton-proton collisions at a center-of-mass energy of 13 TeV at the LHC, collected by the CMS experiment in 2017. The selected events are required to have either two leptons with the same charge or more than two leptons; jets, including identified bottom quark jets, are also required, and the selected events are divided into categories based on the multiplicities of these objects. Sixteen dimension-six operators that can affect processes involving top quarks produced with additional charged leptons are considered in this analysis. Constructed to target EFT effects directly, the analysis applies a novel approach in which the observed yields are parameterized in terms of the Wilson coefficients (WCs) of the EFT operators. A simultaneous fit of the 16 WCs to the data is performed and two standard deviation confidence intervals for the WCs are extracted; the standard model expectations for the WC values are within these intervals for all of the WCs probed.[graphic not available: see fulltext]

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Search for the lepton flavor violating decay $\tau$ $\to$ 3$\mu$ in proton-proton collisions at $\sqrt{s} =$ 13 TeV

Results are reported from a search for the lepton flavor violating decay τ → 3μ in proton-proton collisions at $ \sqrt{\mathrm{s}} $ = 13 TeV. The data sample corresponds to an integrated luminosity of 33.2 fb$^{−1}$ recorded by the CMS experiment at the LHC in 2016. The search exploits τ leptons produced in both W boson and heavy-flavor hadron decays. No significant excess above the expected background is observed. An upper limit on the branching fraction ℬ(τ → 3μ) of 8.0 × 10$^{−8}$ at 90% confidence level is obtained, with an expected upper limit of 6.9 × 10$^{−8}$.[graphic not available: see fulltext]

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Experimental Validation and Continuous Testing of an On-Purpose High-Yield Pitch Synthesis Process for Producing Carbon Fiber from US Domestic Coal

This project aims to develop technology that converts domestic United States (US) raw coal to high quality, high value, and marketable carbon fiber. More specifically, the project aims to significantly improve the selectivity and yield of carbon fiber produced per ton of coal over conventional coal pitch-based production by using low-severity direct coal conversion technology to maximize the yield of pitch from coal, suitable for production of carbon fiber. To meet the stated objective of developing a technology platform, capable of producing high quality, high-value and marketable carbon fiber from domestic US coal, the proposed scope of work involves testing of a low-severity direct coal liquefaction (LS-DCL) process approach. The isotropic pitch produced from the LS-DCL process will be thermally treated using conventional processes to convert to a liquid crystal or “mesophase” pitch as a precursor for structural carbon fibers. This mesophase pitch will then be melt-spun into fiber, oxygen stabilized, and carbonized using conventional processes. The resulting carbon fiber will be evaluated for mechanical properties and suitability for structural applications such as automotive parts and spars for wind turbine blades. The overall process is expected to significantly lower the cost of fiber compared to state of the art fibers produced from polyacrylonitrile (PAN) precursors.

01 COAL, LIGNITE, AND PEAT↗

Projected network performance for next-generation xenon monitoring systems

Next-generation radioxenon monitoring systems are reaching maturity and are expected to improve certain aspects of performance in verifying the absence of nuclear tests. To predict the improvement in detecting and locating nuclear releases, thousands of releases all over the globe were simulated and the global detection probability was calculated. This was done for the International Monitoring System network of noble gas samplers as it currently exists (25 certified stations), and how it would be for potential future network sizes of 39 and 79 stations. The probability of detection was calculated for releases ranging from 10 10 Bq to 10 16 Bq of 133 Xe and presented as coverage maps and global integrals for both current and next-generation monitoring systems. Similarly, the number of detecting stations and the number of detecting samples were tabulated to elucidate the possibilities for enhanced location capability. Improvements in global detection coverage are maximized at different release sizes in a way that depends on the station density. For example, for releases of 3×10 14 Bq and 39 stations, the detection probability would rise from 60% to 70% with next-generation systems, while for releases of 10 13 Bq and 79 stations, it would rise from 37% to 52%. Achieving an average of two detecting stations requires a 1015 Bq release for a 39-station network and a 10 14 Bq release for a 79-station network. The largest impact of using next-generation systems may be the confidence, failure tolerance, and location capability that arise from obtaining multiple samples associated with a single release event.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Integral Experiment Final Design for Thermal/Epithermal eXperiments (TEX) Plutonium Additional Mixed Spectrum Configurations

This report presents the final design (CED-2) for three additional mixed-spectra configurations for plutonium Thermal/Epithermal eXperiments (TEX) to target the intermediate energy region (IER-553). The baseline cases of IER-184 (PU-MET-MIXED-002 [2]) spanned the entire fission energy spectrum. Case 3, which had a median fission energy (MFE) of approximately 6E-5 MeV and had a fission fraction of about 42% in the intermediate energy range, resulted in a $k_{eff}$ overestimation of 1.1%. Compared to 749 previous ICSBEP plutonium benchmarks, the baseline cases accurately predicted the experiments in the thermal and fast regions where the majority of benchmarks inhabit. The benchmarks in the intermediate energy region to date are sparse and overestimate $k_{eff}$ with an average C/E between 1.02 and 1.03. The additional proposed configurations span the whole of the intermediate energy region. The experimental design utilizes the plutonium/aluminum metal alloy Zero Power Physics Reactor (ZPPR) Plutonium-Aluminum No-Nickel (PANN) plates with varying polyethylene moderator thicknesses to span the intermediate fission energy region. Each of the cases have varying fractions of thermal, intermediate, and fast fissions. The designs were chosen to maximize the intermediate energy fraction. The experiment will take place on the universal critical assembly machine, Planet. The layers will be split as equally as possible between the lower platen and the upper stationary platform of Planet. The upper half of the experimental configuration will also have an upper reflector of polyethylene of specified thicknesses to achieve criticality when the lower platen is raised fully. The previous IER-184 configurations, specifically Case 3, were used to determine the configurations for the additional experiments and neutronics calculations were used to fine-tune the configurations to ensure criticality. The quadrature sum uncertainty in Δ$k_{eff}$ for Case 3 in PU-MET-MIXED-002 was found to be 0.00219. Section 3.8 gives a detailed description of the uncertainties calculated. The additional configurations, which are based directly on Case 3, are expected to have similar uncertainties. However, it is possible to reduce the overall uncertainty of Δ$k_{eff}$ for the additional configurations using the knowledge obtained from the calculations in the benchmark.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗